Concrete top formwork corner connecting piece and concrete formwork assembly

By using stamped reinforcement ring and ribbed structure in the corner connector of concrete top formwork, combined with support plate and quick connection system, the construction efficiency problem caused by the large weight of the connector in the prior art is solved, and the structural strength and Improved efficiency.

CN222227943UActive Publication Date: 2024-12-24QINGDAO CONST FORGING INC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420633727.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-29
Publication Date
2024-12-24
Estimated Expiration
2034-03-29

AI Technical Summary

Technical Problem

Due to the large thickness of the corner connecting parts of the existing concrete roof formwork, the weight increases, causing problems of high labor intensity and low construction efficiency for construction workers.

Method used

A concrete top formwork corner connection is designed, and a stamped structure is arranged equidistantly with the first reinforcement ring and the second reinforcement ring. Combining the ribs and the support plate, reducing the thickness and increasing the structural strength, and passing through the first pin and the second The quick connection system of pins replaces bolt connections to simplify the assembly process.

Benefits of technology

The structural strength of the connector is improved, while reducing weight, reducing physical energy consumption of construction personnel, improving construction efficiency, and avoiding the problems of additional accessories and welding deformation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222227943U_ABST
    Figure CN222227943U_ABST
Patent Text Reader

Abstract

The utility model discloses a concrete top formwork corner connecting piece and a concrete formwork assembly, and relates to the technical field of concrete molds. The connecting piece is provided with a first carrying plate, a second carrying plate is arranged on one side of the first carrying plate, a first connecting plate is arranged on the other side of the first carrying plate, and a second connecting plate is arranged on the other side of the second carrying plate; a plurality of first reinforcing rings are arranged on the first connecting plate at equal intervals, first connecting holes are formed in the bottoms of the first reinforcing rings, and the first reinforcing rings and the first connecting holes are circular; a plurality of second reinforcing rings are arranged on the second connecting plate at equal intervals, second connecting holes are formed in the bottoms of the second reinforcing rings, and the second reinforcing rings and the second connecting holes are rectangular; at least one rib plate is welded and fixed among the first carrier plate, the second carrier plate, the first connecting plate and the second connecting plate on the connecting piece; according to the connecting piece, the problems that an original connecting piece is large in weight, labor intensity of constructors is large, operation is not convenient, and construction efficiency is low are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of concrete moulds, in particular to a concrete top mould corner connector and a concrete mould assembly. Background Art

[0002] When pouring concrete on the top slab of a building, you first need to build the top formwork. When building the top formwork, you need to use corner connectors to connect the top formwork and the side formwork as a whole. This is to utilize the side formwork and corner connectors to restrain the top formwork, preventing it from moving during pouring, and to provide stable support.

[0003] The corner connectors currently used are mostly angle steels, with connection holes opened on the two straight sides of the angle steels, and then connected by bolts. However, there is a problem with using angle steels: in order to ensure the structural strength between two adjacent frames and the strength of the connector itself, thicker angle steels are needed to compensate for the strength, but this increases the weight of the connector itself, which causes high labor intensity for construction workers and is very strenuous during operation, which further results in a decrease in construction efficiency.

[0004] Therefore, there is an urgent need for concrete top formwork corner connectors and concrete formwork components to solve the above-mentioned technical problems. Utility Model Content

[0005] In view of the above technical problems, the utility model provides a concrete top formwork corner connector and a concrete formwork assembly, which are used to solve the problem that the existing formwork corner connectors are heavy, cause high labor intensity for construction workers and affect construction efficiency.

[0006] The above technical objectives of the utility model are achieved through the following technical solutions:

[0007] A corner connector for a concrete top formwork, comprising a connector, characterized in that: the connector is provided with a first carrier plate, a second carrier plate is vertically provided on one side of the first carrier plate, a first connecting plate is vertically provided on the other side of the first carrier plate, and a second connecting plate is vertically provided on the other side of the second carrier plate;

[0008] The first connection plate is provided with a plurality of first reinforcement rings at equal intervals, the bottom of the first reinforcement ring is provided with a first connection hole, and both the first reinforcement ring and the first connection hole are circular;

[0009] The second connection plate is provided with a plurality of second reinforcement rings at equal intervals, the bottom of the second reinforcement ring is provided with a second connection hole, and the second reinforcement ring and the second connection hole are both rectangular;

[0010] The connecting member is located between the first carrier plate, the second carrier plate, the first connecting plate and the second connecting plate and is welded and fixed with at least one rib plate;

[0011] An operation port is provided between the first connecting plate and the second connecting plate.

[0012] Furthermore, a support plate is vertically provided on one side of the first connection plate close to the operation port.

[0013] Furthermore, the first reinforcement ring and the second reinforcement ring are at an equal distance from the end of the connecting piece, and the rib plate is located between the two first reinforcement rings.

[0014] Furthermore, the first reinforcement ring and the second reinforcement ring are an integrally stamped structure on the connecting piece.

[0015] Furthermore, one side of the first reinforcement ring is coplanar with the first connecting plate, and the other side protrudes toward the second carrier plate; one side of the second reinforcement ring is coplanar with the second connecting plate, and the other side protrudes toward the first carrier plate.

[0016] A concrete formwork assembly comprises a first formwork unit, a second formwork unit and the above-mentioned concrete top formwork corner connector, wherein the first formwork unit comprises a first frame and a first receiving plate connected to the first frame, the second formwork unit comprises a second frame and a second receiving plate connected to the second frame, the first frame comprises a first frame and a first reinforcement, and the second frame comprises a second frame and a second reinforcement, characterized in that: the first frame is matched with the first connecting plate, the second frame is matched with the second connecting plate, a third connecting hole of equal diameter is opened at a position corresponding to the first connecting hole of the first frame, a first pin is inserted between the first connecting hole and the third connecting hole, a fourth connecting hole of equal cross-section is opened at a position corresponding to the second connecting hole of the second frame, and a second pin is inserted between the second connecting hole and the fourth connecting hole.

[0017] Furthermore, a fourth connection hole is formed at a position of the first reinforcement member close to the third connection hole, and a fifth connection hole is formed at a position of the second reinforcement member close to the fourth connection hole.

[0018] Furthermore, the first pin includes a fixed end and a connecting rod, the connecting rod is provided with a first locking hole, and the second pin can be inserted into the first locking hole and the fifth connecting hole.

[0019] In summary, the beneficial technical effects of the utility model are:

[0020] (1) By setting a first reinforcement ring around the first connection hole and a second reinforcement ring around the second connection hole, the structure of the connector itself can be used to increase the structural strength of the entire connector while reducing the thickness of the connector, making it easier and faster for construction workers to operate. At the same time, the integrity of the connector is improved by adding ribs, further improving the structure.

[0021] (2) The support plate can play a supporting role when installing the first frame. The construction workers do not need to hold it up all the time, thereby reducing physical exertion. At the same time, the support plate can ensure that the end surface of the first frame is flush with the first carrier plate when it is installed to ensure the horizontality of the pouring.

[0022] (3) The first reinforcement ring and the second reinforcement ring formed by stamping the connector itself avoid the increase in weight caused by adding additional accessories, and also avoid the deformation caused by welding.

[0023] (4) By arranging the protrusions of the first reinforcement ring and the second reinforcement ring toward the inside of the connecting member, the fitting area between the first frame, the second frame and the connecting member is increased, making the assembled structure more stable.

[0024] (5) The first pin and the second pin are used to realize the quick connection between the connecting member and the first frame and the second frame, and also replace the bolt connection, thereby reducing the complexity of assembly.

[0025] (6) By using the first locking hole and the fifth connecting hole, after the first pin passes through the first connecting plate and the first frame, the second pin can be used to lock the first pin, thereby preventing the first pin from falling off. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram of the structure of the connector;

[0027] Figure 2 yes Figure 1 A schematic diagram of the structure from another angle;

[0028] Figure 3 is a schematic diagram of the structure of the first pin;

[0029] Figure 4 is a schematic diagram of the structure of the second pin;

[0030] Figure 5 It is the structure of the second frame;

[0031] Figure 6 It is a working schematic diagram of the utility model;

[0032] Figure 7 yes Figure 6 Schematic diagram from another angle;

[0033] Figure 8 yes Figure 6 Schematic diagram from the third angle.

[0034] Figure numerals: 1. connecting member; 2. first carrier plate; 3. second carrier plate; 4. first connecting plate; 5. second connecting plate; 6. first reinforcement ring; 7. second reinforcement ring; 8. first connecting hole; 9. second connecting hole; 10. support plate; 11. rib plate; 13. second frame; 15. second frame; 17. second reinforcement member; 18. first pin; 19. fixed end; 20. connecting rod; 21. second pin; 22. first locking hole; 23. second locking hole; 25. fourth connecting hole. DETAILED DESCRIPTION

[0035] The present invention will be described clearly and completely below in conjunction with the embodiments.

[0036] It should be noted that all directional indications (such as up, down, left, right, front, back...) in the embodiments of the present invention are only used to explain the relative position relationship, movement status, etc. between the various components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0037] In the description of the embodiments, unless otherwise clearly specified and limited, the terms "disposed", "connected" and the like should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, or an electrical connection; it can be a direct connection, or it can be connected through an intermediate medium, or it can be a communication between two components. For ordinary technicians in this field, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.

[0038] See attached Figure 1 , attached Figure 2 , shown is a corner connector for a concrete top formwork, including a connector 1, which is a carbon steel bent part, and is provided with a first carrier plate 2, and a second carrier plate 3 is vertically provided on one side of the first carrier plate 2 along the length direction, and the first carrier plate 2 and the second carrier plate 3 are of equal width, and are used to support the first receiving plate and the second receiving plate when in use, and a first connecting plate 4 is vertically provided on the other side of the first carrier plate 2, and a second connecting plate 5 is vertically provided on the other side of the second carrier plate 3, and the first connecting plate 4 and the second connecting plate 5 are of equal width;

[0039] The first connecting plate 4 is provided with first reinforcement rings 6 at equal intervals along the length direction, and a circular first connecting hole 8 is provided at the bottom of the first reinforcement ring 6. The second connecting plate 5 is provided with second reinforcement rings 7 at equal intervals along the length direction, and a rectangular second connecting hole 9 is provided at the bottom of the second reinforcement ring 7. The first reinforcement ring 6 and the second reinforcement ring 7 are both obtained by punching the connecting member 1. The first connecting hole 8 and the second connecting hole 9 are at equal distances from the end of the connecting member 1. At the same time, the connecting member 1 is provided with a rib plate 11 between the first carrier plate 2, the second carrier plate 3 and the first connecting plate 4 and the second connecting plate 5. It can be seen that the first reinforcement ring 6 and the second reinforcement ring 7 obtained by punching on the connecting member 1 can be combined with the rib plate 11 without adding additional materials to improve the overall structural strength of the connecting member 1. Compared with the original connection using angle steel, it not only reduces the labor intensity of the constructors, but also further improves the construction efficiency;

[0040] At the same time, a support plate 10 is vertically provided on the other side of the first connecting plate 4, which can provide support for the first frame to be assembled later, and also serves as a reference. When assembling, after the first frame is overlapped on the support plate 10, the other end surface of the first frame can be flush with the first carrier plate 2, so that the first receiving plate to be laid later can be kept horizontal, and the quality and accuracy of the subsequent pouring are guaranteed;

[0041] At the same time, the connector 1 is provided with an operation opening between the first connecting plate 4 and the second connecting plate 5, which facilitates the subsequent insertion of the first pin 18 and the second pin 21. In order to avoid interference with the rib plate 11 when the first pin 18 and the second pin 21 are inserted, the rib plate 11 is arranged between the two first connecting holes 8, thereby ensuring sufficient operation space.

[0042] See attached Figure 3-5 , shown is a concrete formwork assembly, including a first formwork unit, a second formwork unit and a concrete top formwork corner connector 1, the first formwork unit includes a first frame and a first receiving plate connected to the first frame, the second formwork unit includes a second frame 13 and a second receiving plate connected to the second frame 13, the first frame includes a first frame and a first reinforcement, the second frame 13 includes a second frame 15 and a second reinforcement 17, wherein a third connection hole of equal diameter is provided at a position of the first frame corresponding to the first connection hole 8, a first pin 18 is inserted into the first connection hole 8 and the third connection hole, and a first reinforcement is provided at a position of the first frame close to the third connection hole, and a fifth connection hole is provided on the first reinforcement;

[0043] A fourth connection hole 25 of equal cross-section is provided at a position of the second frame 15 corresponding to the second connection hole 9, and a second pin 21 is inserted into the second connection hole 9 and the fourth connection hole 25. At the same time, a second reinforcement member 17 is provided at a position of the second frame 15 close to the fourth connection hole 25, and a hole for inserting the second pin 21 is also opened and closed on the second reinforcement member 17;

[0044] See attached Figure 3 , Attachment Figure 4 As shown, the first pin 18 is provided with a fixed end 19, and a connecting rod 20 for insertion is provided on the fixed end 19. The connecting rod 20 is provided with a first locking hole 22, and the second pin 21 can be inserted into the first locking hole 22. Similarly, the second pin 21 is provided with a second locking hole 23 of its own width.

[0045] Please refer to the attached Figure 6-8 , as shown, first overlap the first frame on the support plate 10 of the first connecting plate 4, and make the first connecting hole 8 and the third connecting hole in a concentric position. At this time, the first frame and the first carrier plate 2 are in a flush state, and then the first pin 18 is passed from the operating port of the connector 1 through the first connecting hole 8 through the third connecting hole, and then the second pin 21 is passed through the first locking hole 22 to the fifth connecting hole and out, so that the braking and locking of the first pin 18 is achieved by the second pin 21 to prevent it from falling off, and then one side of the second frame 13 is attached to the second connecting plate 5, and the second connecting hole 9 is aligned with the fourth connecting hole 25, and then the second pin 21 is inserted into the second connecting hole 9 and the fourth connecting hole 25, and then another second pin 21 is passed through the second locking hole 23 of the previous second pin 21 to achieve the locking of the two, and finally the result is as shown in the figure. Figure 8 Status shown.

[0046] The above description is only a preferred specific implementation manner of the present utility model, and does not limit the protection scope of the present utility model. Therefore, any equivalent changes made based on the structure, shape, and principle of the present utility model should be included in the protection scope of the present utility model.

Claims

1. A concrete top formwork corner connector, comprising a connector (1), characterized in that: The connecting member (1) is provided with a first carrier plate (2), a second carrier plate (3) is vertically provided on one side of the first carrier plate (2), a first connecting plate (4) is vertically provided on the other side of the first carrier plate (2), and a second connecting plate (5) is vertically provided on the other side of the second carrier plate (3); A plurality of first reinforcement rings (6) are equidistantly arranged on the first connection plate (4); a first connection hole (8) is provided at the bottom of the first reinforcement ring (6); and both the first reinforcement ring (6) and the first connection hole (8) are circular; A plurality of second reinforcement rings (7) are equidistantly arranged on the second connection plate (5); a second connection hole (9) is provided at the bottom of the second reinforcement ring (7); and both the second reinforcement ring (7) and the second connection hole (9) are rectangular; The connecting member (1) is located between the first carrier plate (2), the second carrier plate (3), the first connecting plate (4) and the second connecting plate (5), and is welded and fixed with at least one rib plate (11); An operation opening is provided between the first connecting plate (4) and the second connecting plate (5).

2. The concrete top formwork corner connector according to claim 1, characterized in that: A support plate (10) is vertically provided on one side of the first connection plate (4) close to the operation port.

3. The concrete top formwork corner connector according to claim 1, characterized in that: The first reinforcement ring (6) and the second reinforcement ring (7) are at the same distance from the end of the connecting member (1), and the rib plate (11) is located between the two first reinforcement rings (6).

4. The concrete top formwork corner connector according to claim 1, characterized in that: The first reinforcement ring (6) and the second reinforcement ring (7) are an integrally stamped structure on the connecting piece (1).

5. The concrete top formwork corner connector according to claim 1, characterized in that: One side of the first reinforcement ring (6) is coplanar with the first connecting plate (4), and the other side protrudes toward the second carrier plate (3); one side of the second reinforcement ring (7) is coplanar with the second connecting plate (5), and the other side protrudes toward the first carrier plate (2).

6. A concrete formwork assembly, comprising a first formwork unit, a second formwork unit and a concrete top formwork corner connector according to any one of claims 1 to 5, wherein the first formwork unit comprises a first frame and a first receiving plate connected to the first frame, the second formwork unit comprises a second frame (13) and a second receiving plate connected to the second frame (13), the first frame comprises a first frame and a first reinforcement, the second frame (13) comprises a second frame (15) and a second reinforcement (17), characterized in that: The first connecting plate (4) is provided with a first frame, the second connecting plate (5) is provided with a second frame (13), a third connecting hole of equal diameter is provided at a position of the first frame corresponding to the first connecting hole (8), a first pin (18) is inserted between the first connecting hole (8) and the third connecting hole, a fourth connecting hole (25) of equal cross-section is provided at a position of the second frame (15) corresponding to the second connecting hole (9), and a second pin (21) is inserted between the second connecting hole (9) and the fourth connecting hole (25).

7. The concrete formwork assembly according to claim 6, characterized in that: A fourth connection hole (25) is formed on the first reinforcement member at a position close to the third connection hole, and a fifth connection hole is formed on the second reinforcement member (17) at a position close to the fourth connection hole (25).

8. The concrete formwork assembly according to claim 6, characterized in that: The first pin (18) comprises a fixed end (19) and a connecting rod (20), the connecting rod (20) is provided with a first locking hole (22), and the second pin (21) can be inserted into the first locking hole (22) and the fifth connecting hole.