Protective barrier fixing structure

The guardrail fixing structure with a pre-buried sleeve and sealing members enables quick and convenient installation and disassembly by eliminating the need for additional connecting members, addressing the inefficiencies of conventional expansion bolt methods.

CN222228060UActive Publication Date: 2024-12-24ZHEJIANG WUFENG CONSTRUCTION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421264692.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-04
Publication Date
2024-12-24
Estimated Expiration
2034-06-04

AI Technical Summary

Technical Problem

Conventional guardrail installations using expansion bolts are time-consuming and labor-intensive, with slow installation and disassembly processes.

Method used

A guardrail fixing structure utilizing a pre-buried sleeve with sealing members and positioning ribs, allowing for detachable connection of the guardrail body to the embedded sleeve, eliminating the need for additional connecting members during installation.

Benefits of technology

Facilitates faster and more efficient installation and disassembly of guardrails, reducing staff working time and improving installation efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222228060U_ABST
    Figure CN222228060U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of constructional engineering, in particular to a protective barrier fixing structure which comprises an embedded sleeve, a first sealing piece, a second sealing piece and a protective barrier body. The two ends of the pre-buried sleeve are of an opening structure, the first sealing piece and the second sealing piece are arranged at the two ends of the pre-buried sleeve respectively, and the guardrail body is detachably connected with the pre-buried sleeve. The pre-embedded sleeve is pre-embedded in the concrete, the guardrail body and the pre-embedded sleeve can be connected and installed after the second sealing piece is detached, other connecting pieces are not needed in the installation and connection process, and therefore the guardrail is more convenient to install and detach and high in installation efficiency, the working time of workers can be saved, and the working efficiency of the workers is improved. The device can be widely applied to edges of foundation pits, floors, water collecting wells, staircases, roofs and the like, and the application range is wide.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction engineering, in particular to a protective railing fixing structure. Background Art

[0002] In the fixed installation of conventional edge guardrails, the main uprights of the guardrails are usually fixed to the building structure through threaded connection with expansion bolts. The expansion bolts are installed and fixed to the main uprights through four points. The installation speed is slow. When dismantling, each expansion bolt needs to be cut off and then renovated. The installation and disassembly are time-consuming and labor-intensive, and the work efficiency is low. Utility Model Content

[0003] The utility model aims to solve at least one of the technical problems existing in the prior art or related technology.

[0004] In order to solve the above problems, the present application provides a guardrail fixing structure, including: a pre-buried sleeve, a first sealing member, a second sealing member and a guardrail body;

[0005] Both ends of the embedded sleeve are open structures, the first seal and the second seal are respectively arranged at both ends of the embedded sleeve, and the guardrail body is detachably connected to the embedded sleeve.

[0006] Optionally, positioning ribs are provided on both sides of the outer circumference of the embedded sleeve.

[0007] Optionally, the positioning ribs are arranged horizontally.

[0008] Optionally, the second sealing member includes a plug and a sealing plate, the bottom of the plug is threadably connected to the inner portion of the embedded sleeve, and the sealing plate is disposed on the top of the plug.

[0009] Optionally, the guardrail body includes a main vertical pole and a horizontal pole, the horizontal pole is horizontally arranged on the main vertical pole, and the main vertical pole is threadedly connected to the inside of the embedded sleeve.

[0010] Optionally, a steel pipe clip is provided between the horizontal rod and the main vertical rod.

[0011] Optionally, the first sealing member is a stop plate, and the diameter of the first sealing member is the same as the outer diameter of the embedded casing.

[0012] Optionally, the blocking plate is a stop plate, and the diameter of the blocking plate is not less than the outer diameter of the plug.

[0013] Optionally, the positioning rib is connected to the outer circumference of the embedded sleeve by welding.

[0014] Beneficial Effects

[0015] A guardrail fixing structure provided in the embodiment of the utility model embeds the embedded sleeve into the concrete, and the guardrail body can be connected and installed with the embedded sleeve after the second sealing member is removed. No other connecting members are required during the installation and connection process, which makes its installation and disassembly more convenient, has high installation efficiency, and can save the working time of the staff. The device can be widely used in foundation pits, floors, sump pits, stairwells, roofs and other edges, and has a wide range of applications. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is the main structural diagram of the utility model;

[0017] Figure 2 This is a structural diagram of the embedded sleeve, the first sealing member and the positioning rib of the utility model;

[0018] Figure 3 This is a cross-sectional structural diagram of the embedded sleeve, the first sealing member and the positioning rib of the utility model;

[0019] Figure 4 This is a top view of the structure of the embedded sleeve, the first sealing member and the positioning rib of the utility model;

[0020] Figure 5 This is a structural diagram of the embedded sleeve and the second sealing member of the utility model;

[0021] Figure 6 This is a structural diagram of the main upright pole of the present utility model.

[0022] [Description of Reference Numerals]

[0023] 1. Embedded casing; 2. First sealing member; 3. Second sealing member; 31. Plug; 32. Sealing plate; 4. Guardrail body; 41. Main vertical pole; 42. Horizontal pole; 5. Positioning rib. DETAILED DESCRIPTION

[0024] In order to better explain the present invention and facilitate understanding, the present invention is described in detail below through specific implementation modes in conjunction with the accompanying drawings.

[0025] See also Figures 1 to 6 As shown, according to an embodiment of the present application, a guardrail fixing structure is provided, comprising: an embedded sleeve 1, a first sealing member 2, a second sealing member 3 and a guardrail body 4;

[0026] Both ends of the embedded sleeve 1 are open structures, the first seal 2 and the second seal 3 are respectively arranged at both ends of the embedded sleeve 1, and the guardrail body 4 is detachably connected to the embedded sleeve 1.

[0027] Specifically, before pouring concrete, the first sealing member 2 is pasted to the bottom of the embedded sleeve 1 by means of structural adhesive, so that it seals the bottom of the embedded sleeve 1 to prevent cement slurry from entering the embedded sleeve 1 during pouring. A plurality of embedded sleeves 1 are respectively embedded at designated positions, and then the second sealing member 3 is installed on the top of the embedded sleeve 1 to seal the top of the embedded sleeve 1 to prevent concrete from entering the embedded sleeve 1 during pouring. After the concrete is poured and hardened, the second sealing member 3 is removed from the top of the embedded sleeve 1, and the guardrail body 4 is installed. It is installed on the embedded sleeve 1 to form an installation and fixation of the guardrail body 4. Compared with the prior art of installing the guardrail body 4 through expansion bolts, the present application removes the second sealing member 3 from the top of the embedded sleeve 1, and then the guardrail body 4 can be threadedly connected and installed with the embedded sleeve 1. No other connecting parts are required during the installation and connection process, which makes its installation and disassembly more convenient, with high installation efficiency, and can save staff working time. The device can be widely used in foundation pits, floors, sump pits, stairwells, roofs and other edges, and has a wide range of applications.

[0028] Positioning ribs 5 are arranged on both sides of the outer circumference of the embedded sleeve 1.

[0029] Specifically, the positioning ribs 5 are welded on both sides of the outer circumference of the embedded sleeve 1. When the embedded sleeve 1 is placed at the specified position before pouring concrete, the positioning ribs 5 are connected and fixed to the longitudinal force-bearing steel bars on the beam by tying wire, which can achieve a more stable fixation of the embedded sleeve 1, improve the stability of the fixation of the embedded sleeve 1 during concrete pouring, maintain its vertical placement, and facilitate subsequent connection and installation.

[0030] Among them, the positioning reinforcement 5 is a threaded steel bar, and its length is greater than the diameter of the embedded sleeve 1, which is more convenient to fix to the longitudinal force-bearing steel bars on the beam by tying wire.

[0031] The positioning ribs 5 are arranged horizontally.

[0032] Specifically, the positioning ribs 5 are horizontally welded on both sides of the outer circumference of the embedded sleeve 1. Through its horizontal setting, the positioning ribs 5 are parallel to the longitudinal stress-bearing steel bars on the beam, which facilitates the positioning ribs 5 to fit the longitudinal stress-bearing steel bars on the beam and connect and fix the two.

[0033] The second sealing member 3 includes a plug 31 and a sealing plate 32 . The bottom of the plug 31 is threadably connected to the inner portion of the embedded sleeve 1 , and the sealing plate 32 is disposed on the top of the plug 31 .

[0034] Specifically, the second sealing member 3 is installed on the embedded sleeve 1 and is used to seal the top of the embedded sleeve 1. It includes a plug 31 and a sealing plate 32. The plug 31 is a tubular structure with an external thread on the outer circumference of the bottom and an internal thread inside the embedded sleeve 1. The bottom of the plug 31 can be threadedly installed inside the embedded sleeve 1, and the sealing plate 32 is adhered to the top of the plug 31 by structural adhesive. During concrete pouring, the second sealing member 3 can seal the top of the embedded sleeve 1, and the top of the plug 31 is located above the poured concrete, which is convenient for disassembly of the plug 31. After disassembly of the plug 31, the interior of the embedded sleeve 1 can be exposed, which is convenient for connecting and installing the guardrail body 4 therewith.

[0035] The plug 31 is a steel pipe, and a thread is provided on the outer wall of the bottom thereof so as to enable it to be installed and removed from the interior of the embedded sleeve 1 .

[0036] The guardrail body 4 includes a main vertical pole 41 and a horizontal pole 42 . The horizontal pole 42 is horizontally arranged on the main vertical pole 41 . The main vertical pole 41 is threadedly connected to the inside of the embedded sleeve 1 .

[0037] Specifically, the guardrail body 4 includes several main vertical poles 41 connected to the embedded sleeve 1. After the plug 31 is removed from the embedded sleeve 1, the interior of the embedded sleeve 1 can be exposed, and the bottom of the main vertical pole 41 is connected to the interior of the embedded sleeve 1 in a spiral manner to achieve the installation of the main vertical pole 41. After several main vertical poles 41 are installed, the horizontal rod 42 is horizontally installed on the several main vertical poles 41 to achieve safer protection. The installation and disassembly of the guardrail body 4 is more convenient.

[0038] A steel pipe buckle is provided between the horizontal rod 42 and the main vertical rod 41 .

[0039] Specifically, the horizontal rod 42 is fixedly mounted on the main vertical rod 41 through a steel pipe buckle, and the steel pipe buckle can be a cross steel pipe buckle or a rotating fastener.

[0040] The first sealing member 2 is a stopper plate, and the diameter of the first sealing member 2 is the same as the outer diameter of the embedded sleeve 1 .

[0041] Specifically, the first sealing member 2 is a stop plate, which is made of a steel plate and has a circular structure. The diameter of the first sealing member 2 is the same as the outer diameter of the embedded sleeve 1. The first sealing member 2 is installed at the bottom of the embedded sleeve 1 by means of structural adhesive. After drying, the bottom of the embedded sleeve 1 can be sealed, and the slurry during concrete pouring can be prevented from entering from the bottom of the embedded sleeve 1.

[0042] The blocking plate 32 is a stop plate, and the diameter of the blocking plate 32 is not less than the outer diameter of the plug 31 .

[0043] Specifically, the blocking plate 32 is also a stop plate, and the diameter of the blocking plate 32 is not less than the outer diameter of the plug 31. The blocking plate 32 is also installed on the top of the plug 31 by structural adhesive to achieve sealing of the top of the plug 31, preventing concrete from entering the embedded sleeve 1 from the top during pouring, thereby facilitating the subsequent installation of the main pole 41.

[0044] The positioning rib 5 is connected to the outer circumference of the embedded sleeve 1 by welding.

[0045] In the description of the present utility model, it should be understood that the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the present utility model, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0046] In the present invention, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0047] In the present utility model, unless otherwise clearly specified and limited, when a first feature is “on” or “below” a second feature, it may be that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, when a first feature is “above”, “above” or “above” a second feature, it may be that the first feature is directly above or obliquely above the second feature, or it may simply mean that the first feature is higher in level than the second feature. When a first feature is “below”, “below” or “below” a second feature, it may be that the first feature is directly below or obliquely below the second feature, or it may simply mean that the first feature is lower in level than the second feature.

[0048] In the description of this specification, the description of the terms "one embodiment", "some embodiments", "embodiment", "example", "specific example" or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, unless they are contradictory.

[0049] Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are illustrative and cannot be understood as limitations of the present invention. Ordinary technicians in the field can change, modify, replace and modify the above embodiments within the scope of the present invention.

Claims

1. A guardrail fixing structure, characterized in that: include: Pre-buried sleeve (1), a first sealing member (2), a second sealing member (3) and a guardrail body (4); Both ends of the embedded sleeve (1) are open structures, the first sealing member (2) and the second sealing member (3) are respectively arranged at both ends of the embedded sleeve (1), and the guardrail body (4) is detachably connected to the embedded sleeve (1); Positioning ribs (5) are arranged on both sides of the outer circumference of the embedded sleeve (1).

2. The guardrail fixing structure according to claim 1, characterized in that: The positioning ribs (5) are arranged horizontally.

3. The guardrail fixing structure according to claim 2, characterized in that: The second sealing member (3) comprises a plug (31) and a sealing plate (32); the bottom of the plug (31) is connected to the inner thread of the embedded sleeve (1) by a thread, and the sealing plate (32) is arranged on the top of the plug (31).

4. The guardrail fixing structure according to claim 3, characterized in that: The guardrail body (4) comprises a main vertical pole (41) and a horizontal pole (42); the horizontal pole (42) is horizontally arranged on the main vertical pole (41); and the main vertical pole (41) is threadedly connected to the interior of the embedded sleeve (1).

5. The guardrail fixing structure according to claim 4, characterized in that: A steel pipe buckle is provided between the horizontal rod (42) and the main vertical rod (41).

6. The guardrail fixing structure according to claim 5, characterized in that: The first sealing member (2) is a stop plate, and the diameter of the first sealing member (2) is the same as the outer diameter of the embedded sleeve (1).

7. The guardrail fixing structure according to claim 6, characterized in that: The blocking plate (32) is a stop plate, and the diameter of the blocking plate (32) is not less than the outer diameter of the plug (31).

8. The guardrail fixing structure according to claim 7, characterized in that: The positioning rib (5) is connected to the outer circumference of the embedded sleeve (1) by welding.