Underground site construction stepping platform
By designing an adjustable underground construction stepping platform, the problem of walking difficulties for underground construction workers in coal mines is solved, and a safe and flexible walking solution is provided, which reduces construction risks and adapts to different underground environments.
Patent Information
- Application Number
- CN202421048663.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-14
- Publication Date
- 2024-12-24
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Underground construction personnel of coal mines have difficulty walking in areas such as laying pipelines, which poses great safety hazards. The underground environment is complex, and there are potential dangers such as gas explosion, roof slump and groundwater seepage.
Design a downhole on-site construction stepping platform, including two L-shaped support frames and a connecting plate. Through the design of movable insertion and fixtures, the platform can be adjusted according to the downhole space of different widths and lengths to provide a stable Walk on the platform to reduce safety risks.
By providing a solid platform, construction workers can walk safely, reducing the risk of walking on uneven or dangerous grounds, the platform's flexibility adapts to different conditions, improving construction safety and efficiency.
Smart Images

Figure CN222228556U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of coal mine construction, in particular to an underground on-site construction stepping platform. Background Art
[0002] As an important component of global energy, the safety and efficiency of coal mining has always been the focus of attention in the mining industry. The underground environment of coal mines is complex and there are many potential dangers, such as gas explosions, roof collapse and groundwater infiltration.
[0003] Some areas inside the coal mine may be laid with pipelines and other equipment, which makes it inconvenient for construction workers to walk, posing a major safety hazard. For this reason, this application document provides a step-through platform for underground on-site construction. Utility Model Content
[0004] The purpose of the utility model is to solve the problems raised in the above background technology, and the utility model provides a step-by-step platform for underground on-site construction.
[0005] In order to achieve the above-mentioned purpose, the utility model specifically adopts the following technical solutions:
[0006] A stepping platform for underground on-site construction comprises two L-shaped support frames and a connecting plate, wherein the two support frames are symmetrically arranged, the support frames comprise a horizontally arranged bearing plate and a support plate fixed at one end of the bearing plate, the bearing plate is provided with a slot at one end facing away from the support plate, the two opposite sides of the connecting plate are respectively movably inserted into the inside of the two slots, the bottom end of the support plate is provided with an extension slot, an extension plate is movably inserted into the inside of the extension slot, and the support plate is provided with a fixing piece for fixing the extension plate.
[0007] Preferably, one side of the extension plate is constructed with a plurality of fixing grooves distributed in an array along the length direction, and the fixing member includes a fixing nail threadedly inserted on the support plate, one end of the fixing nail is movably inserted into one of the fixing grooves, and a fixing knob is fixed to the other end of the fixing nail.
[0008] Preferably, a horizontally arranged pad is fixed to the bottom end of the extension plate.
[0009] Preferably, the bottom side of the connecting plate is constructed with a plurality of positioning grooves distributed in an array along the length direction, and a positioning pin is threadedly inserted into the bottom of the supporting plate, one end of the positioning pin is movably inserted into one of the positioning grooves, and a positioning knob is fixed to the other end of the positioning pin.
[0010] Preferably, a reinforcing rod is connected between the bearing plate and the connected supporting plate.
[0011] Preferably, the top side of the bearing plate is provided with anti-slip grooves.
[0012] Beneficial effects:
[0013] The utility model provides a stable platform and sets up the platform on the shaft, so that construction workers can walk safely above pipelines or other obstacles, reducing the risk of walking on uneven or dangerous ground. The flexibility of the platform design allows it to adapt to underground spaces of different widths and lengths, especially through the extension plate and the movably inserted connecting plate, so that the platform can be adjusted according to the site conditions. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0015] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;
[0016] Figure 2 For this utility model Figure 1 A three-dimensional cross-sectional view of
[0017] Figure 3 For this utility model Figure 1 A schematic diagram of the three-dimensional structure in another state;
[0018] Figure 4 For this utility model Figure 1 Schematic diagram of the three-dimensional structure of the middle part.
[0019] Figure 1-Figure 4 middle:
[0020] 1. Support frame; 11. Load-bearing plate; 111. Positioning pin; 112. Positioning knob; 12. Support plate; 13. Slot; 14. Extension slot; 15. Extension plate; 151. Fixing slot; 152. Pad; 16. Fixing piece; 161. Fixing pin; 162. Fixing knob; 17. Reinforcement rod; 2. Connecting plate; 21. Positioning slot. DETAILED DESCRIPTION
[0021] In order to make the purpose, technical solution and advantages of the embodiments of the present utility model clearer, the technical solution in the embodiments of the present utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the present utility model.
[0022] The present application provides a step-through platform for underground on-site construction, which is mainly used to solve the problem that some areas inside the coal mine may be laid with pipelines and other equipment, which makes it inconvenient for construction workers to walk and poses a great safety hazard, and provides the following technical solutions. Figure 1-Figure 4 Make a detailed description:
[0023] A step-through platform for underground on-site construction mainly comprises two L-shaped support frames 1 and a connecting plate 2. The two support frames 1 are symmetrically arranged. The support frame 1 comprises a horizontally arranged load-bearing plate 11 and a support plate 12 fixed at one end of the load-bearing plate 11. The load-bearing plate 11 is provided with a slot 13 at one end facing away from the support plate 12. The two opposite sides of the connecting plate 2 are respectively movably inserted in the two slots 13. The bottom end of the support plate 12 is provided with an extension slot 14. An extension plate 15 is movably inserted in the extension slot 14. The support plate 12 is provided with a fixing piece 16 for fixing the extension plate 15. When the device is installed and used, first, the connecting plate 11 is connected to the support plate 12. The two sides of the connecting plate 2 are inserted into the slots 13 on the two bearing plates 11, and the extension plate 15 is inserted into the extension slot 14. The distance between the two support frames 1 and the height of the support frames 1 are adjusted according to actual conditions. Then the two support frames 1 are symmetrically placed at predetermined positions in the underground construction area. Multiple such devices can form a platform to facilitate the movement of construction personnel and reduce safety hazards. In another modified plan, the connecting plate 2 is movably inserted in the slot 13, providing flexibility to adapt to underground spaces of different widths. The extension plate 15 can adjust its length according to actual needs, and with the use of fixings 16, the platform can adapt to different height requirements.
[0024] For details, please refer to Figure 2 , Figure 3 and Figure 4 A plurality of fixed grooves 151 distributed in an array are constructed on one side of the extension plate 15 along the length direction, providing a plurality of optional fixing positions for the fixing member 16. The fixing member 16 includes a fixing nail 161 threadedly inserted on the support plate 12, ensuring good stability and connection strength between the fixing nail 161 and the support plate 12. One end of the fixing nail 161 is movably inserted into the interior of one of the fixing grooves 151. According to actual needs, the extension plate 15 is placed in a suitable position, and then one end of the fixing nail 161 is movably inserted into a fixing groove 151 on the extension plate 15. A fixing knob 162 is fixed to the other end of the fixing nail 161. The fixing knob 162 is used to rotate the fixing nail 161, and the fixing knob 162 can be tightened to ensure the stable fixation of the extension plate 15 on the support plate 12. In this solution, the array distribution of the fixing grooves 151 provides multiple fixing points, so that the extension plate 15 can be fixed in multiple positions, which increases the adaptability and flexibility of the platform. The design of the fixing knob 162 makes the fixing and adjustment of the extension plate 15 simple and quick, and the operator can quickly adjust the position of the extension plate 15 to adapt to different construction requirements.
[0025] To ensure the stability of the device, refer to Figure 2 and Figure 4 A horizontally arranged pad 152 is fixed to the bottom end of the extension plate 15. The horizontal arrangement of the pad 152 provides a stable bottom surface for the extension plate 15, thereby increasing the stability of the entire structure. The pad 152 can disperse the load on the extension plate 15, reduce the pressure on the support plate 12, and improve the bearing capacity.
[0026] In this example, see Figure 2 and Figure 3 The bottom side of the connecting plate 2 is constructed with a plurality of positioning grooves 21 distributed in an array along the length direction. A positioning pin 111 is threadedly inserted into the bottom of the carrying plate 11. One end of the positioning pin 111 is movably inserted into one of the positioning grooves 21. A positioning knob 112 is fixed to the other end of the positioning pin 111. By rotating the positioning knob 112, the depth of the positioning pin 111 can be adjusted to ensure that the positioning pin 111 is stably inserted into the positioning groove 21. The design of the positioning knob 112 simplifies the fixing process of the positioning pin 111, so that non-professionals can also operate it conveniently. The array distribution of the positioning grooves 21 provides a plurality of optional positioning points, so that the carrying plate 11 can be adjusted according to different needs.
[0027] For further information, see Figure 2 , Figure 3 and Figure 4 A reinforcing rod 17 is connected between the load-bearing plate 11 and the connected support plate 12. The reinforcing rod 17 significantly improves the stability of the connection between the load-bearing plate 11 and the support plate 12, and reduces the deformation or bending of the structure under load. By using the reinforcing rod 17, the load-bearing capacity of the entire platform is improved, and more weight can be safely supported. The reinforcing rod 17 helps to more evenly distribute the load on the load-bearing plate 11 to the support plate 12, thereby improving the load distribution of the entire structure.
[0028] Furthermore, anti-slip grooves are provided on the top side of the load-bearing plate 11. The presence of the anti-slip grooves significantly reduces the risk of construction workers slipping on the load-bearing plate 11, especially in a humid or debris environment. By reducing the risk of slipping accidents, the anti-slip grooves help reduce work-related accidents and protect the health of construction workers.
[0029] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A step-through platform for underground on-site construction, characterized in that: The invention comprises two L-shaped support frames (1) and a connecting plate (2), wherein the two support frames (1) are symmetrically arranged, the support frames (1) comprising a horizontally arranged bearing plate (11) and a supporting plate (12) fixed to one end of the bearing plate (11), the end of the bearing plate (11) facing away from the supporting plate (12) being provided with a slot (13), the two opposite sides of the connecting plate (2) being movably inserted into the two slots (13), the bottom end of the supporting plate (12) being provided with an extension slot (14), the interior of the extension slot (14) being movably inserted with an extension plate (15), and the supporting plate (12) being provided with a fixing member (16) for fixing the extension plate (15).
2. The underground on-site construction stepping platform according to claim 1, characterized in that: One side of the extension plate (15) is provided with a plurality of fixing grooves (151) distributed in an array along the length direction; the fixing member (16) comprises a fixing nail (161) threadedly inserted on the support plate (12); one end of the fixing nail (161) is movably inserted into one of the fixing grooves (151); and a fixing knob (162) is fixed to the other end of the fixing nail (161).
3. The underground on-site construction stepping platform according to claim 2 is characterized in that: A horizontally arranged pad (152) is fixed to the bottom end of the extension plate (15).
4. The underground on-site construction stepping platform according to claim 1, characterized in that: The bottom side of the connecting plate (2) is provided with a plurality of positioning grooves (21) distributed in an array along the length direction; a positioning pin (111) is threadedly inserted into the bottom of the supporting plate (11); one end of the positioning pin (111) is movably inserted into one of the positioning grooves (21); and a positioning knob (112) is fixed to the other end of the positioning pin (111).
5. The underground on-site construction stepping platform according to claim 1, characterized in that: A reinforcing rod (17) is connected between the bearing plate (11) and the connected supporting plate (12).