Sewage treatment device for construction engineering

By using a round table filter plate and an automatic slide mechanism in the sewage treatment device, the problem of filter plate blockage is solved, the sewage treatment efficiency is improved and the difficulty of manual cleaning is reduced.

CN222239129UActive Publication Date: 2024-12-27GANZHOU QUANSHENG CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421475186.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-26
Publication Date
2024-12-27
Estimated Expiration
2034-06-26

AI Technical Summary

Technical Problem

The filter plates of existing sewage treatment devices are prone to affect the sewage treatment efficiency due to debris blockage, and require manual cleaning, which reduces the treatment effect.

Method used

A sewage treatment device including a circular table filter plate, sewage hole, return spring and a baffle that can slide up and down is designed. The oblique surface of the filter plate is used to prevent blockage, self-weight pressure and automatic sliding out mechanisms, and through Collect baskets to reduce the difficulty of cleaning.

Benefits of technology

Ensure that the filter plate is always unobstructed, prevents debris from being blocked, improves sewage treatment efficiency, and reduces the difficulty of manual cleaning by automated collection of debris.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222239129U_ABST
    Figure CN222239129U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of construction engineering, in particular to a sewage treatment device for construction engineering. The utility model provides a sewage treatment device for construction engineering, which comprises a tank body, a water inlet pipe, a water outlet pipe, supporting legs, a filter plate and a return spring, the water inlet pipe is fixedly mounted on the tank body and adaptively connected with a sewage transmission pipe, the water outlet pipe is fixedly connected to the lower part of the tank body, and the supporting legs are fixedly mounted on the lower part of the tank body. A sewage discharge hole is formed in the middle of the tank body, a filter plate capable of sliding up and down is arranged in the tank body, the filter plate is flush with the sewage discharge hole when moving downwards, and a return spring is arranged at the joint of the filter plate and the tank body. According to the utility model, the circular truncated cone-shaped filter plate is arranged in the tank body, so that impurities can be dispersed along the inclined surface of the circular truncated cone while the filter plate filters and screens sewage, and the middle part of the filter plate is always kept in a smooth state, thereby preventing the impurities from blocking the filter plate and influencing the sewage treatment efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of construction engineering, in particular to a sewage treatment device for construction engineering. Background Art

[0002] Construction projects refer to the general term for various types of buildings and engineering facilities that provide the material and technical basis for human life and production. Construction projects are organized, purposeful, large-scale economic activities of human beings. According to their natural attributes, construction projects can be divided into three categories: architectural engineering, civil engineering, and mechanical and electrical engineering. In the process of construction project production, a large amount of sewage will be generated and needs to be treated.

[0003] According to a Chinese patent disclosure document with patent publication number CN215712171U, a sewage treatment device is proposed, including a purification tank and a pre-treatment mechanism, the pre-treatment mechanism includes a sedimentation tank and a connecting pipe connected between the purification tank and the sedimentation tank, the connecting pipe is a U-shaped pipe, one end of the connecting pipe is fixed to the top of the sedimentation tank and communicated with the inner cavity of the sedimentation tank, and the other end of the connecting pipe is fixed to the purification tank and communicated with the inner cavity thereof.

[0004] Although the above patent can process sewage in construction projects, in actual use, when the filter plate of the patent filters debris, the debris is easy to clog the leakage of the filter plate. Therefore, it is necessary to manually clean the debris on the filter plate in time, otherwise it will directly affect the sewage treatment efficiency and reduce the sewage treatment effect. Utility Model Content

[0005] In order to overcome the shortcomings mentioned in the above background technology, the utility model provides a sewage treatment device for construction projects to solve the above problems.

[0006] The technical solution is: a sewage treatment device for construction projects, including a tank body, an inlet pipe, an outlet pipe and support legs. The tank body is fixedly equipped with an inlet pipe adapted to be connected to a sewage transmission pipe, the lower part of the tank body is fixedly connected to a water outlet pipe, the lower part of the tank body is fixedly equipped with a plurality of support legs, and also includes a filter plate and a rebound spring. A sewage discharge hole is opened in the middle of the tank body, and a filter plate which can slide up and down is provided in the tank body. When the filter plate moves downward, it will be flush with the sewage discharge hole, and a rebound spring is provided between the connection between the filter plate and the tank body.

[0007] More preferably, the filter plate is arranged in a truncated cone shape.

[0008] More preferably, it also includes a stepper motor, a threaded rod, a guide rod and a baffle, the stepper motor is fixedly installed in the middle of the tank body, the threaded rod fixedly connected to the output shaft of the stepper motor is rotatably installed on the left side of the middle of the tank body, the guide rod is fixedly installed on the right side of the middle of the tank body, and the threaded rod is threadedly connected to a baffle that can slide up and down along the guide rod.

[0009] More preferably, a collecting basket is further included, and the collecting basket is fixedly installed at the lower part of the tank body.

[0010] More preferably, a vibrator is further included, and the vibrator is fixedly mounted on the filter plate.

[0011] More preferably, an observation window is included, and a plurality of observation windows made of transparent material are fixedly mounted on the upper part of the tank body.

[0012] Compared with the prior art, the utility model has the following advantages: 1. The utility model arranges a truncated cone-shaped filter plate in the tank body so that the filter plate can filter and screen the sewage while the debris can be dispersed along the inclined surface of the cone, so that the middle part of the filter plate is always kept unobstructed, thereby preventing the debris from clogging the filter plate and affecting the sewage treatment efficiency.

[0013] 2. The utility model sets a drainage hole on the tank body, and uses the deadweight of the accumulated debris to press the filter plate to move to the drainage hole, so that the debris can slide out of the tank body along the drainage hole after losing the obstruction of the inner wall of the tank body, thereby preventing the filter plate from being blocked by excessive debris and ensuring the filtering effect of the filter plate on sewage.

[0014] 3. The utility model sets a baffle plate which can slide up and down at the drainage hole, and uses the baffle plate to block the drainage hole when the filter plate is filtering normally, so as to prevent sewage from overflowing, and collects the debris dropped from the drainage hole through the collection basket, so as to reduce the difficulty of manual cleaning in the later stage. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the overall structure of the utility model.

[0016] Figure 2 It is a partial structural schematic diagram of the utility model.

[0017] Figure 3 It is a schematic diagram of the cross-sectional structure of the tank body of the utility model.

[0018] Figure 4 It is a schematic diagram of the cross-sectional structure of the tank body of the utility model from the front perspective.

[0019] The markings of the components in the attached drawings are as follows: 1. tank body, 2. water inlet pipe, 3. water outlet pipe, 4. supporting leg, 5. drain hole, 6. filter plate, 7. return spring, 8. stepper motor, 9. threaded rod, 10. guide rod, 11. baffle, 12. collection basket, 13. vibrator, 14. observation window. DETAILED DESCRIPTION

[0020] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0021] Embodiment: A sewage treatment device for construction engineering, such as Figure 1-Figure 4 As shown, it includes a tank body 1, a water inlet pipe 2, a water outlet pipe 3 and a supporting leg 4. The water inlet pipe 2 adapted to be connected to the sewage transmission pipe is installed at the center of the top surface of the tank body 1 by bolts, and the water outlet pipe 3 is connected to the eccentric part of the lower part of the tank body 1 by bolts. Five supporting legs 4 are installed along the circumferential direction by bolts at the lower part of the tank body 1, and it also includes a filter plate 6 and a rebound spring 7. A sewage discharge hole 5 is opened in the middle part of the tank body 1 along the circumferential direction. A filter plate 6 that can slide up and down along its inner wall is provided in the tank body 1. The filter plate 6 is arranged in a truncated cone shape. When the filter plate 6 moves downward, it will be flush with the sewage discharge hole 5. A rebound spring 7 is provided between the connection between the filter plate 6 and the inner wall of the tank body 1.

[0022] like Figure 1 , Figure 3 and Figure 4 As shown, it also includes a stepper motor 8, a threaded rod 9, a guide rod 10 and a baffle 11. The stepper motor 8 is installed on the left side of the middle of the tank body 1 by bolts, and the threaded rod 9 connected to the output shaft of the stepper motor 8 through a coupling is rotatably installed on the left side of the middle of the tank body 1. The guide rod 10 is installed on the right side of the middle of the tank body 1 by bolts. The threaded rod 9 is threadedly connected with a baffle 11 that can slide up and down along the guide rod 10. When the baffle 11 moves, it will block the sewage hole 5, thereby preventing sewage from overflowing from the sewage hole 5.

[0023] like Figure 1 , Figure 3 and Figure 4 As shown, a collecting basket 12 is also included. The lower part of the outer wall of the tank body 1 is fixedly installed with the collecting basket 12 along the circumferential direction. The collecting basket 12 is located below the drain hole 5. The collecting basket 12 will receive the debris dropped from the drain hole 5.

[0024] like Figure 1 , Figure 3 and Figure 4 As shown, a vibrator 13 is also included. The vibrator 13 is installed at the center of the filter plate 6 through bolts. The vibrator 13 will cause the filter plate 6 to vibrate.

[0025] like Figure 1 , Figure 3 and Figure 4As shown, it also includes observation windows 14. Three observation windows 14 made of transparent material are installed on the upper part of the tank body 1 along the circumferential direction by bolts. The observation windows 14 will facilitate observation of the situation inside the tank body 1.

[0026] In the initial state, the baffle 11 is in a state of blocking the drainage hole 5. When it is necessary to process the sewage in the construction project, the sewage pipe is first connected to the water inlet pipe 2, and then the vibrator 13 is started. The vibrator 13 will vibrate the filter plate 6, and then the sewage in the construction project is injected into the tank body 1 from the water inlet pipe 2 through the sewage pipe. The filter plate 6 will filter and screen the debris in the sewage. The debris remaining on the filter plate 6 will be dispersed along the inclined surface of the truncated cone toward the inner wall of the tank body 1 as the filter plate 6 shakes, so that the middle part of the filter plate 6 is always kept in a smooth state, thereby preventing the debris from clogging the filter plate 6 and affecting the filtration efficiency of the sewage. At the same time, as the filter plate 6 The accumulation of debris will push the filter plate 6 to move downward along the inner wall of the tank body 1, and the return spring 7 will be compressed. When the filter plate 6 is observed to move to the drain hole 5 through the observation window 14, the stepper motor 8 is started, and the output shaft of the stepper motor 8 will drive the threaded rod 9 to rotate. The threaded rod 9 will drive the baffle 11 to move upward along the guide rod 10 through the thread, thereby opening the drain hole 5, so that the debris remaining on the filter plate 6 can slide out of the tank body 1 from the drain hole 5, and the collection basket 12 will receive and collect the debris dropped from the drain hole 5, thereby reducing the difficulty of manual cleaning in the later stage. When the sewage treatment is completed, the collection basket 12 can be cleaned.

[0027] The technical principles of the embodiments of the present utility model are described above in combination with specific embodiments. These descriptions are only for explaining the principles of the embodiments of the present utility model, and cannot be interpreted in any way as limiting the protection scope of the embodiments of the present utility model. Based on the explanations here, technicians in this field can think of other specific implementation methods of the embodiments of the present utility model without creative work, and these methods will fall within the protection scope of the embodiments of the present utility model.

Claims

1. A sewage treatment device for construction engineering, comprising a tank body (1), a water inlet pipe (2), a water outlet pipe (3) and support legs (4), wherein the tank body (1) is fixedly mounted with a water inlet pipe (2) adapted to be connected to a sewage transmission pipe, the lower part of the tank body (1) is fixedly connected with the water outlet pipe (3), and the lower part of the tank body (1) is fixedly mounted with a plurality of support legs (4), characterized in that: The tank body (1) further comprises a filter plate (6) and a return spring (7). A drainage hole (5) is provided in the middle of the tank body (1). A filter plate (6) which can slide up and down is provided in the tank body (1). When the filter plate (6) moves downward, it will be flush with the drainage hole (5). A return spring (7) is provided between the connection between the filter plate (6) and the tank body (1).

2. A construction engineering sewage treatment device as claimed in claim 1, characterized in that: The filter plate (6) is arranged in a truncated cone shape.

3. A construction engineering sewage treatment device as claimed in claim 2, characterized in that: The tank body (1) further comprises a stepper motor (8), a threaded rod (9), a guide rod (10) and a baffle (11). The stepper motor (8) is fixedly mounted in the middle of the tank body (1). The threaded rod (9) fixedly connected to the output shaft of the stepper motor (8) is rotatably mounted on the left side of the middle of the tank body (1). The guide rod (10) is fixedly mounted on the right side of the middle of the tank body (1). The threaded rod (9) is threadedly connected to a baffle (11) that can slide up and down along the guide rod (10).

4. A construction engineering sewage treatment device as claimed in claim 3, characterized in that: It also includes a collecting basket (12), and the collecting basket (12) is fixedly mounted on the lower part of the tank body (1).

5. A construction engineering sewage treatment device as claimed in claim 4, characterized in that: It also includes a vibrator (13), and the vibrator (13) is fixedly mounted on the filter plate (6).

6. A construction engineering sewage treatment device as claimed in claim 5, characterized in that: It also includes an observation window (14), and a plurality of observation windows (14) made of a transparent material are fixedly mounted on the upper part of the tank body (1).