Folding unit type aluminum plate suspended ceiling mounting device
By adopting a folding unit aluminum plate ceiling device in the metal plate ceiling installation, the combination of square pipe, angle steel and attachment system is used to solve the problems of cumbersome installation, inconvenient adjustment and high cost in the existing technology, and flexible adjustment and high efficiency are achieved Construction has improved construction safety and environmental protection.
Patent Information
- Application Number
- CN202420969535.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-07
- Publication Date
- 2024-12-27
- Estimated Expiration
- 2034-05-07
AI Technical Summary
During the installation and construction of existing metal plate ceilings, there are problems such as cumbersome installation procedures, inconvenient adjustment after welding, high cost, high labor intensity for workers and safety hazards, especially when dealing with the gaps and special-shaped folding surfaces of the ceiling panels.
The folding unit aluminum plate ceiling installation device is adopted, and the square tube is used as the main keel, combined with the angle steel boom and the attachment system, and the connecting and conversion device includes adjustment and conversion steel plate, thread adjustment rod and J-shaped reinforced edge rib to achieve flexibility of the ceiling panel. Variable and three-dimensional adjustment to adapt to different heights and special-shaped folding surface requirements.
The installation process is simplified, construction costs and labor intensity of workers are reduced, construction efficiency and safety are improved, environmental pollution during welding is avoided, and a green and environmentally friendly construction method is realized.
Smart Images

Figure CN222252715U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a folding unit type aluminum plate ceiling installation device. Background Art
[0002] Nowadays, with the increasing improvement of people's material life, the high-quality requirements for decorative effects are also increasing. Most metal plate ceilings will use double keels when there is a large gap between the ceiling panels during the installation process. The joints of the entire panel are uniform and the shape is relatively simple. Not only is the installation process cumbersome, adjustment after welding is inconvenient, and the cost is high, but the labor intensity of workers is high and on-site welding is required, which poses a safety hazard and increases the risks encountered by workers during the construction process.
[0003] At present, metal plate ceilings at home and abroad are installed and constructed with double keels. This method has complicated installation procedures, inconvenient adjustment after welding, high cost, and high labor intensity for workers. Due to the complicated fixing method, it not only delays the construction period, but also increases the risks encountered by workers during the construction process. Utility Model Content
[0004] In view of the above-mentioned deficiencies in the prior art, the present application provides a folding unit aluminum plate ceiling that mainly uses square tubes as the main keel and angle steel as the suspension rod. The keel and the aluminum plate are connected through a hanging system, which includes a ceiling panel, a J-shaped reinforcing side rib of the panel, a connection conversion device, and a ceiling adapter. The connection conversion device is formed by a combination of conversion parts such as threaded parts, single-hole parts, three-hole parts and five-hole parts. One end of the connection conversion device is connected to the ceiling panel through a J-shaped reinforcing side rib, and the other end is fixed to the embedded plate or ceiling keel of the main body of the building structure through a ceiling adapter. The connection conversion device includes two adjustment conversion steel plates and two threaded adjustment rods. Four threaded adjustment rods run through the corners of the adjustment conversion steel plate, and the middle part is connected to the adjustment conversion steel plate by running through one threaded adjustment rod, and then fixed to the ceiling adapter. The height of different building ceiling panels can be adapted by selecting ceiling adapters of appropriate length; the requirements of various special-shaped folded ceilings can be met by adjusting the bottom angle of the J-shaped reinforcing ribs of the panel; three-dimensional flexible adjustment can be achieved by connecting the conversion device, which is convenient for installation and construction.
[0005] This technology uses the ceiling connection conversion device to adjust the height of the ceiling panel. Through this device, the ceiling panel can be flexibly and multi-directionally adjusted to meet the requirements of various sizes of joints, facilitate installation and construction, and the J-shaped reinforced side ribs of the ceiling panel can be used to achieve the overall ceiling installation of large panels. This installation method has wide adaptability.
[0006] To achieve the above objectives, the utility model is implemented through the following technical solutions: a folding unit aluminum plate ceiling installation device, including a ceiling embedded plate, a ceiling adapter is fixedly arranged at the bottom of the ceiling embedded plate, an adjustment conversion steel plate 2 is fixedly arranged at the bottom of the ceiling adapter, a threaded adjustment rod 2 is arranged on the surface of the adjustment conversion steel plate 2, an adjustment conversion steel plate 1 is fixedly arranged on the end of the lower end of the threaded adjustment rod 2 away from the ceiling adapter, a plurality of threaded adjustment rods 1 are fixedly arranged on the surface of the adjustment conversion steel plate 1, an aluminum alloy J-shaped reinforcing side rib is fixedly arranged on the lower side of the adjustment conversion steel plate 1 through the threaded adjustment rod 1, a stainless steel bolt is fixedly arranged on the surface of the aluminum alloy J-shaped reinforcing side rib, and a ceiling aluminum plate panel is fixedly arranged on the lower side of the aluminum alloy J-shaped reinforcing side rib through fixed rivets.
[0007] Preferably, the ceiling embedded component plate is pre-embedded on the external fixing component.
[0008] Preferably, a plurality of the threaded adjustment rods are provided on the surface of the adjustment conversion steel plate, and are arranged in a rectangular array on the surface of the adjustment conversion steel plate.
[0009] A construction process of a folding unit type aluminum plate ceiling installation device comprises the following steps:
[0010] Step S1: Construction preparation; Technical preparation: The construction drawings are complete and have been reviewed and signed. Check that there is no conflict between the elevation and shape of the suspended ceiling and the hidden pipes and equipment on site and in the suspended ceiling. The construction plan is completed and approved, and the construction personnel are given safety technical instructions and records are kept; Material preparation: metal plates, connection conversion devices, hot-dip galvanized steel pipes, hot-dip galvanized angle steels, hot-dip galvanized steel plates, chemical bolts, etc.; Construction machinery and tools: theodolite, infrared level, steel ruler, white line, ink fountain, plumb bob, wrench, electric welder, grinding wheel cutter, impact drill, winch, etc. Electric machinery and equipment must have grounding protection and protective devices in good condition. Measuring tools should be tested and qualified by a testing unit with corresponding qualifications and used within the specified testing cycle.
[0011] Step S2: Measure and lay out; follow the principle of first the whole and then the part, according to the floor level control line and the floor plan, the keel position line and the lowest unified elevation horizontal line of the finished surface of the special-shaped perforated aluminum plate ceiling are projected onto the surrounding walls or columns, and the relevant lines should be straight and intersecting. According to the layout of the perforated aluminum plate, the hanging point position line is projected, and according to the grid size of the perforated aluminum plate, the plate seam control line is measured to the ceiling working surface using a theodolite or total station, and then extended to the ceiling finished surface elevation line of the wall or column. The angle steel control pile is placed at the back to facilitate the use of hanging lines later. In order to ensure the measurement accuracy, the originality of the accurate measurement of the data must be strictly reviewed, and the measurement and layout and calculation and verification work must be carried out simultaneously.
[0012] Step S3: Installation of rear embedded plate: After checking the accuracy of the laying out, determine the position of the rear embedded plate according to the laying out position. Select the rear embedded plate according to the design drawing, drill holes according to the position of the embedded plate, and install chemical bolts. Chemical bolts should be subjected to on-site pull-out tests according to the specifications. For those that do not meet the test standards, other reliable connection measures must be adopted according to relevant regulations.
[0013] Step S4: Installation and adjustment of adapters and keels; Before installing the keel, first install the connector on the keel with stainless steel bolts. The operator moves the keel to the installation work surface. According to the position line determined by the keel measurement and layout, the welder temporarily spot welds the connector on the embedded part, and then adjusts and corrects the position of the keel finished surface. After installation, check the accuracy of the position and the firmness of the installation. All distance deviations should meet the relevant requirements of the specification.
[0014] Step S5: Making the connection conversion device; the connection conversion device includes an adjustment conversion steel plate and a threaded adjustment rod. Conversion piece 1 is used for the part where the gap between the cross-joint of the middle aluminum plate is ≤30mm. Through this conversion piece, four aluminum plates can be hoisted at the same time with an angle steel suspension rod, and its long hole direction is perpendicular to the main keel direction; conversion piece 2 is used for the part where the two middle aluminum plates intersect and the gap between the plates is greater than 30mm, and the long side direction of this conversion piece is perpendicular to the direction of the main keel; conversion piece 3 is used for the outermost aluminum plate (short side direction) and the part where the gap between the aluminum plates is ≤30mm, and the long side direction of this conversion piece is consistent with the direction of the main keel; conversion piece 4 is used to connect the lower end of the suspension rod of the aluminum plate (this conversion piece is used in combination with pieces 2, 3, and 5, and cannot be used alone); conversion piece 5 is used for the outermost aluminum plate, or the part where the gap between the aluminum plates is greater than 30mm; conversion piece 6 is mass-produced after mold opening, connects the four hoisting points of the aluminum plate, and is used in combination with the above-mentioned conversion pieces 1 to 5.
[0015] Step S6: metal plate material extraction; according to the grid of the perforated aluminum plate in the drawing, a three-dimensional blanking model of a single piece of special-shaped folded perforated aluminum plate is established, and processing data is extracted, especially paying attention to the different folding angles of the panel J-shaped reinforcement side ribs. The types of special-shaped folded perforated aluminum plates should be preliminarily classified to reduce the mold opening processing volume.
[0016] Step S7: Installation of the connection conversion device; after the keel installation is accepted, fix the manufactured connection conversion device to the keel with stainless steel bolts according to the hanging point position determined by measurement and layout, preliminarily adjust the elevation position of the connection conversion device, control the vertical coincidence of the center of the connection conversion device and the hanging point position, and reduce the workload of subsequent installation and adjustment.
[0017] Step S8: Force calculation; (1) Force calculation of keel: The calculation point elevation is 6m, the keel span is 3000mm, and the upper and lower grids are 880mm. The model is established using 3D3S three-dimensional calculation software for force analysis. The strength and deflection calculation results meet the requirements of safety and economy; (2) Mechanical calculation of connection conversion device: The connection conversion device uses: one 80×60×8 steel plate, one 200×170×10 steel plate, four M10 bolts, and one M14 bolt, all made of Q235. The model is established using ANSYS three-dimensional calculation software for force analysis, and the stress and strain calculation results meet the requirements of safety and economy; (3) Stress calculation results of connection conversion device J-type aluminum alloy reinforcing side ribs, made of aluminum alloy. The model is established using ANSYS three-dimensional calculation software for force analysis, and the stress and strain calculation results meet the requirements of safety and economy.
[0018] Step S9: Installation of metal plates; transport a single piece of special-shaped folded perforated aluminum plate to the installation work surface, and the operator fixes the plate under the same hanging point to the connection conversion device through stainless steel bolts, and adjusts the threaded adjustment rod in the connection conversion device to control the elevation and gap of the finished surface of the special-shaped folded perforated aluminum plate. During the installation process, a two-way control line should be hung according to the positioning line during measurement, first test hanging, sample plate leading the way, and then large-scale construction. After the ceiling is installed, check the overall flatness, height difference between plates, and full-length straightness of the special-shaped folded perforated aluminum plate, and adjust and correct it according to the requirements of the specification. Beneficial Effects
[0019] The utility model provides a folding unit type aluminum plate ceiling installation device. Compared with the prior art, it has the following beneficial effects:
[0020] (1) Simple structure and strong adaptability. By selecting the appropriate length of the ceiling adapter to adapt to different building ceiling panel heights, the panel J-shaped reinforced side ribs can realize the overall large panel ceiling, and the arbitrary angle of its bottom can meet the requirements of various special-shaped folded ceilings.
[0021] (2) Flexible adjustment and easy installation. By connecting the conversion device, the technical requirements of flexible and three-dimensional adjustment can be achieved, meeting the requirements of various sizes of joints, and the construction is simple.
[0022] (3) Energy saving and environmental protection, high construction efficiency. It avoids the pollution of the construction site and the environment caused by welding construction, and the construction process is green and environmentally friendly, which reduces the input of engineering materials and labor, reduces the construction cost, and speeds up the construction process. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic diagram of the structure of the utility model;
[0024] Figure 2This is a front view of the structure of the utility model;
[0025] Figure 3 This is a construction process diagram of the utility model.
[0026] In the figure: 1. Ceiling embedded plate; 2. Ceiling adapter; 3. Threaded adjustment rod 2; 4. Adjustment conversion steel plate 2; 5. Threaded adjustment rod 1; 6. Adjustment conversion steel plate 1; 7. Stainless steel bolts; 8. Fixing rivets; 9. Aluminum alloy J-shaped reinforcing side ribs; 10. Ceiling aluminum panel. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0028] See also Figure 1-3 The utility model provides a technical solution: a folding unit type aluminum plate ceiling installation device, comprising a ceiling embedded plate 1, a ceiling adapter 2 is fixedly arranged at the bottom of the ceiling embedded plate 1, an adjustment conversion steel plate 4 is fixedly arranged at the bottom of the ceiling adapter 2, a threaded adjustment rod 3 is arranged on the surface of the adjustment conversion steel plate 4, an adjustment conversion steel plate 6 is fixedly arranged on the end of the lower end of the threaded adjustment rod 3 away from the ceiling adapter 2, a plurality of threaded adjustment rods 5 are fixedly arranged on the surface of the adjustment conversion steel plate 6, an aluminum alloy J-shaped reinforcing side rib 9 is fixedly arranged on the lower side of the adjustment conversion steel plate 6 through the threaded adjustment rod 5, a stainless steel bolt 7 is fixedly arranged on the surface of the aluminum alloy J-shaped reinforcing side rib 9, and a ceiling aluminum plate panel 10 is fixedly arranged on the lower side of the aluminum alloy J-shaped reinforcing side rib 9 through a fixing rivet 8.
[0029] The ceiling embedded component plate 1 is pre-embedded on the external fixing component.
[0030] The threaded adjustment rods 5 are provided in plurality on the surface of the adjustment conversion steel plate 6 and are arranged in a rectangular array on the surface of the adjustment conversion steel plate 6 .
[0031] A construction process of a folding unit type aluminum plate ceiling installation device comprises the following steps:
[0032] Step S1: Construction preparation; (1) Technical preparation: The construction drawings are complete and have been reviewed and signed. Check that the ceiling elevation and shape are not in conflict with the site and the hidden pipes and equipment in the ceiling. The construction plan is completed and approved, and the construction personnel are given safety and technical instructions and records are kept.
[0033] (2) Material preparation: metal plates, connection conversion devices, hot-dip galvanized steel pipes, hot-dip galvanized angle steels, hot-dip galvanized steel plates, chemical bolts, etc.
[0034] (3) Construction machinery and tools: theodolite, infrared level, steel ruler, white line, ink fountain, plumb bob, wrench, electric welder, grinding wheel cutter, impact drill, winch, etc. Electric machinery and equipment must have grounding protection and protective devices in good condition. Measuring tools must be tested and qualified by a qualified testing unit and used within the specified testing period.
[0035] Step S2: Measure and lay out; follow the principle of first the whole and then the part, according to the floor level control line and the floor plan, the keel position line and the lowest unified elevation horizontal line of the finished surface of the special-shaped perforated aluminum plate ceiling are projected onto the surrounding walls or columns, and the relevant lines should be straight and intersecting. According to the layout of the perforated aluminum plate, the hanging point position line is projected, and according to the grid size of the perforated aluminum plate, the plate seam control line is measured to the ceiling working surface using a theodolite or total station, and then extended to the ceiling finished surface elevation line of the wall or column. The angle steel control pile is placed at the back to facilitate the use of hanging lines later. In order to ensure the measurement accuracy, the originality of the accurate measurement of the data must be strictly reviewed, and the measurement and layout and calculation and verification work must be carried out simultaneously.
[0036] Step S3: Installation of rear embedded plate: After checking the accuracy of the laying out, determine the position of the rear embedded plate according to the laying out position. Select the rear embedded plate according to the design drawing, drill holes according to the position of the embedded plate, and install chemical bolts. Chemical bolts should be subjected to on-site pull-out tests according to the specifications. For those that do not meet the test standards, other reliable connection measures must be adopted according to relevant regulations.
[0037] Step S4: Installation and adjustment of adapters and keels; Before installing the keel, first install the connector on the keel with stainless steel bolts. The operator moves the keel to the installation work surface. According to the position line determined by the keel measurement and layout, the welder temporarily spot welds the connector on the embedded part, and then adjusts and corrects the position of the keel finished surface. After installation, check the accuracy of the position and the firmness of the installation. All distance deviations should meet the relevant requirements of the specification.
[0038] Step S5: Making the connection conversion device; the connection conversion device includes an adjustment conversion steel plate and a threaded adjustment rod. The conversion piece 1 is used for the part where the gap between the cross-joint of the middle aluminum plate is ≤30mm. Through this conversion piece, four aluminum plates can be hoisted at the same time with an angle steel suspension rod, and its long hole direction is perpendicular to the main keel direction; the conversion piece 2 is used for the part where the gap between the two middle aluminum plates is greater than 30mm, and the long side direction of the conversion piece is perpendicular to the direction of the main keel; the conversion piece 3 is used for the outermost aluminum plate (short side direction) and the part where the gap between the aluminum plates is ≤30mm, and the long side direction of the conversion piece is consistent with the direction of the main keel; the conversion piece 4 is used to connect the lower end of the suspension rod of the aluminum plate (this conversion piece is used in combination with 2, 3, and 5, and cannot be used alone); the conversion piece 5 is used for the outermost aluminum plate, or the part where the gap between the aluminum plates is greater than 30mm; the conversion piece 6 is mass-produced after the mold is opened, and the four hoisting points of the aluminum plate are connected, and it is used in combination with the above-mentioned conversion pieces 1 to 5.
[0039] Step S6: metal plate material extraction; according to the grid of the perforated aluminum plate in the drawing, a three-dimensional blanking model of a single piece of special-shaped folded perforated aluminum plate is established, and processing data is extracted, especially paying attention to the different folding angles of the panel J-shaped reinforcement side ribs. The types of special-shaped folded perforated aluminum plates should be preliminarily classified to reduce the mold opening processing volume.
[0040] Step S7: Installation of the connection conversion device; after the keel installation is accepted, fix the manufactured connection conversion device to the keel with stainless steel bolts according to the hanging point position determined by measurement and layout, preliminarily adjust the elevation position of the connection conversion device, control the vertical coincidence of the center of the connection conversion device and the hanging point position, and reduce the workload of subsequent installation and adjustment.
[0041] Step S8: Force calculation; (1) Force calculation of keel: The calculation point elevation is 6m, the keel span is 3000mm, and the upper and lower grids are 880mm. The model is established using 3D3S three-dimensional calculation software for force analysis. The strength and deflection calculation results meet the requirements of safety and economy; (2) Mechanical calculation of connection conversion device: The connection conversion device uses: one 80×60×8 steel plate, one 200×170×10 steel plate, four M10 bolts, and one M14 bolt, all made of Q235. The model is established using ANSYS three-dimensional calculation software for force analysis, and the stress and strain calculation results meet the requirements of safety and economy; (3) Stress calculation results of connection conversion device J-type aluminum alloy reinforcing side ribs, made of aluminum alloy. The model is established using ANSYS three-dimensional calculation software for force analysis, and the stress and strain calculation results meet the requirements of safety and economy.
[0042] Step S9: Installation of metal plates; transport a single piece of special-shaped folded perforated aluminum plate to the installation work surface, and the operator fixes the plate under the same hanging point to the connection conversion device through stainless steel bolts, and adjusts the threaded adjustment rod in the connection conversion device to control the elevation and gap of the finished surface of the special-shaped folded perforated aluminum plate. During the installation process, a two-way control line should be hung according to the positioning line during measurement, first test hanging, sample plate leading the way, and then large-scale construction. After the ceiling is installed, check the overall flatness, height difference between plates, and full-length straightness of the special-shaped folded perforated aluminum plate, and adjust and correct it according to the requirements of the specification.
[0043] Before construction, measurement and layout must be done, and the layout must be accurate. The responsibilities for leveling and acceptance of the keel before installing the aluminum plate should be clearly stated in the briefing. If the flatness of the keel does not meet the requirements, it is strictly forbidden to install the aluminum plate. Ensure that the horizontal and vertical flatness deviations of the keel are controlled within 2mm, accurately locate the coordinates of the control points of the finished surface of each perforated aluminum plate ceiling, ensure the outer dimensions of the finished surface of the ceiling, and control the coordinate positioning deviation within ±1mm. The allowable deviation pass rate is 97%. All kinds of holes such as inspection ports, lamp ports, sprinklers, broadcasting, and monitoring in the aluminum plate ceiling should be opened by the manufacturer, and the plates should be installed on site to avoid workers processing them twice on site. Be sure to use foam plastic paper to package and protect the aluminum plates leaving the factory to reduce damage during transportation, and strengthen the management of materials entering, entering, and leaving the warehouse.
[0044] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0045] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A folding unit type aluminum plate ceiling installation device, comprising a ceiling embedded plate (1), characterized in that: A ceiling adapter (2) is fixedly provided at the bottom of the ceiling embedded plate (1), an adjustment conversion steel plate (4) is fixedly provided at the bottom of the ceiling adapter (2), a threaded adjustment rod (3) is provided on the surface of the adjustment conversion steel plate (4), an adjustment conversion steel plate (6) is fixedly provided at the end of the lower end of the threaded adjustment rod (3) away from the ceiling adapter (2), a plurality of threaded adjustment rods (5) are fixedly provided on the surface of the adjustment conversion steel plate (6), an aluminum alloy J-shaped reinforcing edge rib (9) is fixedly provided on the lower side of the adjustment conversion steel plate (6) via the threaded adjustment rod (5), a stainless steel bolt (7) is fixedly provided on the surface of the aluminum alloy J-shaped reinforcing edge rib (9), and a ceiling aluminum plate panel (10) is fixedly provided on the lower side of the aluminum alloy J-shaped reinforcing edge rib (9) via a fixing rivet (8).
2. A folding unit type aluminum plate ceiling installation device according to claim 1, characterized in that: The ceiling embedded component plate (1) is pre-embedded on the external fixing component.
3. A folding unit type aluminum plate ceiling installation device according to claim 1, characterized in that: The threaded adjustment rods (5) are provided in plurality on the surface of the adjustment conversion steel plate (6), and are arranged in a rectangular array on the surface of the adjustment conversion steel plate (6).