Steel structure welding operation protection platform

By designing the steel structure welding operation protection platform, and using the design of rapid assembly and stable connection, the problem of long cycle and high cost of steel pipe operation frames in on-site welding assembly of steel structure columns is solved, achieving the reduction of construction efficiency and cost, while ensuring construction Safety.

CN222253010UActive Publication Date: 2024-12-27CHINA HUASHI ENTERPRISES CO LTD (SICHUAN) +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323576288.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-26
Publication Date
2024-12-27
Estimated Expiration
2033-12-26

AI Technical Summary

Technical Problem

During engineering construction, when installing steel structure columns in sections on-site welding and assembly, the installation of steel pipe operating frames is long, the cost is high, and the disassembly is time-consuming and laborious, resulting in high construction efficiency and cost.

Method used

A steel structure welding operation protection platform is designed, including an operating platform and a lifting device. The platform can be quickly assembled and formed a stable connection with the steel structure columns. It can be quickly lifted and fixed through the pin structure and the electro-hydraulic lifting device to ensure safe and reliable construction.

Benefits of technology

The platform can be quickly assembled and reused, significantly reducing construction period, reducing costs, and improving construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222253010U_ABST
    Figure CN222253010U_ABST
Patent Text Reader

Abstract

The utility model discloses a steel structure welding operation protection platform which comprises an operation platform and a lifting device, the operation platform comprises a platform A and a platform B, the platform A and the platform B are spliced and then surround a steel structure column to be tailor-welded, and the lifting device is connected with the platform A and the platform B respectively. And connecting structures are arranged between the platform A and the steel structure column and between the platform B and the steel structure column so that the platform A and the platform B can be fixedly connected with the steel structure column when the platform A and the platform B are lifted to the tailor-welding position. The protection platform can be quickly assembled, can be repeatedly used, is high in economic cost performance, can effectively shorten the project construction period, reduces the project construction cost, and guarantees the safety and reliability of construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of engineering construction, in particular to a steel structure welding operation protection platform. Background Art

[0002] In the field of engineering construction, the steel columns of public buildings such as large stadiums are high and numerous. Due to the limitation of the super-long components of municipal roads, the steel columns need to be processed and manufactured in sections, and the sections need to be welded and assembled on site. The welds of steel columns are usually high above the ground. At present, the welding construction is generally carried out by setting up a steel pipe operation frame. Due to the long period and high cost of setting up the steel pipe operation frame, the later disassembly is also time-consuming and labor-intensive. Utility Model Content

[0003] The purpose of the utility model is to provide a steel structure welding operation protection platform in view of the problems that the current construction method of setting up a steel pipe operating frame when high-altitude welding is performed on site of segmented steel structure columns has long cycle, high cost, time-consuming and labor-intensive disassembly, etc. The protection platform has fast assembly, strong practicality, saves construction time, and can effectively reduce project construction costs.

[0004] The utility model is realized by the following technical solutions:

[0005] The utility model provides a steel structure welding operation protection platform, comprising an operation platform and a lifting device, wherein the operation platform comprises a platform A and a platform B, wherein the platform A and the platform B are assembled to surround the outside of a steel structure column to be welded, and the lifting device is respectively connected to the platform A and the platform B to drive the platform A and the platform B to move up and down, and a connecting structure is provided between the platform A and the platform B and the steel structure column so that a fixed connection can be formed between the platform A and the platform B and the steel structure column when the platform A and the platform B are raised to a welding position.

[0006] In some embodiments, a latch structure is provided between the platform A and the platform B so as to connect them to form a whole after being assembled.

[0007] In some embodiments, the latch structure includes a socket disposed on the platform A and a movable latch disposed on the platform B.

[0008] In some embodiments, the operating platform is in a square structure and has a through hole in the center that is compatible with the steel structure column.

[0009] In some embodiments, the operating platform is divided into two parts, the platform A and the platform B, based on the center of the steel structure column.

[0010] In some embodiments, the connection structure includes a socket-and-spigot vertical rod arranged on the lower side of the platform A and the platform B, and a socket-and-spigot hole arranged on the outer circle of the steel structure column.

[0011] In some embodiments, the socket is formed by bending round steel into a U-shape and then welding the round steel to the outer wall of the steel structure column.

[0012] In some embodiments, protective railings are provided around the operating platform.

[0013] In some embodiments, the operating platform is paved with patterned steel plates.

[0014] In some embodiments, the lifting device is an electric hydraulic lifting platform vehicle.

[0015] Compared with the prior art, the utility model has the following advantages and beneficial effects:

[0016] The utility model uses a lifting device to respectively raise platform A and platform B to the welding position of the steel structure column. After platform A and platform B are assembled, an operating platform surrounding the steel structure column to be welded is formed, which is convenient for welding around the steel structure column. At the same time, a connecting structure is provided between platform A and platform B and the steel structure column to ensure a stable connection between the operating platform and the steel structure column during welding. The protective platform can be quickly assembled and can be repeatedly used. It has a high economic cost performance, can effectively shorten the project construction period, reduce the project construction cost, and ensure safe and reliable construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions of the exemplary embodiments of the present utility model, the following is a brief introduction to the drawings required for use in the embodiments. It should be understood that the following drawings only illustrate certain embodiments of the present utility model, and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without creative work. In the drawings:

[0018] Figure 1 It is a plan view of the steel structure welding operation protection platform in the utility model;

[0019] Figure 2 for Figure 1 AA section diagram in;

[0020] Figure 3 for Figure 2 Schematic diagram in use state;

[0021] Figure 4 for Figure 1 BB section diagram in;

[0022] Figure 5 for Figure 4 Schematic diagram of the device in use.

[0023] Marks and corresponding parts names in the attached drawings:

[0024] 1-operating platform, 11-platform A, 12-platform B, 2-lifting device, 31-sleeve, 32-movable latch, 41-socket and spigot vertical rod, 411-cross bar, 42-socket and spigot hole, 5-guardrail, 6-steel structure column, C-welding part. DETAILED DESCRIPTION

[0025] In order to make the purpose, technical solutions and advantages of the utility model more clearly understood, the utility model is further described in detail below in conjunction with embodiments and drawings. The schematic implementation manner of the utility model and its description are only used to explain the utility model and are not intended to limit the utility model.

[0026] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by technicians in the technical field to which this application belongs; the terms used herein are only for the purpose of describing specific embodiments and are not intended to limit this application; the terms "including" and "having" in the specification and claims of this application and the above-mentioned figure descriptions and any variations thereof are intended to cover non-exclusive inclusions.

[0027] In the description of the embodiments of the present application, technical terms such as "first" and "second" are only used to distinguish different objects and cannot be understood as indicating or implying relative importance or implicitly indicating the number, specific order or primary and secondary relationship of the indicated technical features.

[0028] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0029] In the description of the embodiments of the present application, the term "and / or" is only a description of the association relationship of associated objects, indicating that three relationships may exist. For example, A and / or B can represent: A exists, A and B exist at the same time, and B exists. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.

[0030] In the embodiments of the present application, the same reference numerals represent the same components, and for the sake of brevity, detailed descriptions of the same components are omitted in different embodiments. It should be understood that the thickness, length, width and other dimensions of various components in the embodiments of the present application shown in the drawings, as well as the overall thickness, length, width and other dimensions of the integrated device are only exemplary descriptions and should not constitute any limitation to the present application.

[0031] In the description of the embodiments of the present application, the term "multiple" refers to more than two (including two). Similarly, "multiple groups" refers to more than two groups (including two groups), and "multiple pieces" refers to more than two pieces (including two pieces), unless otherwise clearly and specifically defined.

[0032] In the description of the embodiments of the present application, the technical terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, which are only for the convenience of describing the embodiments of the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the embodiments of the present application.

[0033] In the description of the embodiments of the present application, unless otherwise clearly specified and limited, technical terms such as "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, and it can be the internal connection of two elements or the interaction relationship between two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the embodiments of the present application can be understood according to the specific circumstances.

[0034] Example

[0035] Please refer to Figure 1-Figure 5 A steel structure welding operation protection platform provided in an embodiment of the present application includes an operation platform 1 and a lifting device 2, wherein the operation platform 1 includes a platform A11 and a platform B12, wherein the platform A11 and the platform B12 are assembled and surround the steel structure column 6 to be welded, and the lifting device 2 is respectively connected to the platform A11 and the platform B12 to drive the platform A11 and the platform B12 to move up and down, and a connecting structure is provided between the platform A11 and the platform B12 and the steel structure column 6 so that a fixed connection can be formed between the platform A11 and the platform B12 and the steel structure column 6 when the platform A11 and the platform B12 are raised to the weld position C.

[0036] In the above scheme, the platform A and the platform B can be respectively raised to the welding position of the steel structure column by the lifting device. The platform A and the platform B are assembled to form an operating platform surrounding the steel structure column to be welded, which is convenient for welding around the steel structure column. At the same time, a connecting structure is arranged between the platform A and the platform B and the steel structure column to ensure the stable connection between the operating platform and the steel structure column during welding. The protective platform can be assembled quickly and can be repeatedly used. It is economical and cost-effective, can effectively shorten the project construction period, reduce the project construction cost, and ensure safe and reliable construction.

[0037] According to some embodiments of the present application, a latch structure is provided between the platform A11 and the platform B12 to connect them to form a whole after being assembled. By providing the latch structure, after the platform A and the platform B are connected to the steel structure column during use, the latch can be used to connect the platform A and the platform B to each other, further ensuring the safety of the operation platform construction.

[0038] According to some embodiments of the present application, the latch structure includes a socket 31 provided on the platform A11, and a movable latch 32 provided on the platform B12. Specifically, two sockets 31 are provided on each side of the platform A11, and the two sockets 31 on each side are arranged at intervals along the vertical direction. At the same time, movable latches 32 are provided at corresponding positions on the platform B12, for a total of four movable latches 32. After the platform A11 and the platform B are assembled 12, the connection between the platform A11 and the platform B12 is achieved by inserting the movable latch 32 into the socket 31. It can be understood that the positions of the socket and the movable latch can be exchanged, that is, the socket is provided on the platform B, and the movable latch is provided on the platform A.

[0039] According to some embodiments of the present application, the operating platform 1 is in a square structure, and has a through hole in the center adapted to the steel structure column 6. Specifically, the operating platform 1 may be in a square structure, and the internal through hole may be a square hole, and the size of the through hole is slightly larger than the diameter of the steel structure column 6, so as to smoothly surround the outside of the steel structure column 6.

[0040] According to some embodiments of the present application, the operation platform 1 is divided into two parts, the platform A11 and the platform B12, based on the center of the steel structure column 6. The platform A and the platform B formed in this way are similar to equal division, have similar structures, and are similar in weight, and the construction operation areas on the platform A and the platform B are roughly the same.

[0041] According to some embodiments of the present application, the connection structure includes a socket rod 41 disposed on the lower side of the platform A11 and the platform B12, and a socket hole 42 disposed on the outer circle of the steel structure column 6. When the platform A11 and the platform B12 are assembled, the socket rods 41 on the lower side of the platform A11 and the platform B12 are respectively inserted into the socket holes 42 on the outer circle of the steel structure column 6, which can limit the movement of the platform A and the platform B away from the steel structure column. Specifically, the socket rod 41 can be made of round steel with a diameter of 22 mm, and then welded to the platform A11 and the platform B12.

[0042] According to some embodiments of the present application, a cross bar 411 is radially arranged on the socket vertical rod 41, and after the socket vertical rod 41 is inserted into the socket hole 42 on the outer circle of the steel structure column 6, the cross bar 411 abuts against the upper end of the socket hole 42. By providing the cross bar, the insertion depth of the socket vertical rod in the socket hole can be limited. After the cross bar is designed to contact the upper end of the socket hole, it can serve as a load-bearing support point of the operating platform to prevent the operating platform from falling.

[0043] According to some embodiments of the present application, the socket 42 is formed by bending a round steel into a U-shape and welding its opening to the outer wall of the steel structure column 6. The formation method of the socket is simple. Specifically, a round steel with a diameter of 25 mm can be bent and formed and then welded to the outer wall of the steel structure column 6 to form two sockets 42, and the two sockets 42 are symmetrically arranged.

[0044] According to some embodiments of the present application, a guardrail 5 is arranged around the operating platform 1. By providing the guardrail, a fall prevention effect can be achieved, thereby better protecting the construction operators. Specifically, the guardrail 5 is made of round steel with a diameter of 22 mm and has a certain height from the operating table 1.

[0045] According to some embodiments of the present application, a patterned steel plate is laid on the operating platform 1. Specifically, the operating platform body can be formed by welding steel sections, and then 1.2 mm patterned steel plates are laid and welded on the operating platform body to form a table for construction workers to stand on.

[0046] According to some embodiments of the present application, the lifting device 2 may be an electric hydraulic lifting platform vehicle, so that the operating platform can be lifted to the socket position by using the sliding rails of the electric hydraulic lifting platform vehicle.

[0047] Before welding, platform A11 and platform B12 are respectively raised to the welding position of the steel structure column 6 by the lifting device 2. After platform A11 and platform B12 are assembled to form an operating platform 1 surrounding the steel structure column 6 to be welded, the steel structure column welding construction can be carried out. After welding is completed, platform A11 and platform B12 are separated and lowered to the ground by the lifting device 2 for dismantling.

[0048] The specific implementation methods described above further illustrate the purpose, technical solutions and beneficial effects of the utility model in detail. It should be understood that the above description is only the specific implementation method of the utility model and is not used to limit the protection scope of the utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the utility model should be included in the protection scope of the utility model.

Claims

1. A steel structure welding operation protection platform, characterized in that: It includes an operating platform and a lifting device. The operating platform includes platform A and platform B. After being assembled, platform A and platform B surround the steel structure column to be welded. The lifting device is connected to platform A and platform B respectively to drive the lifting movement of platform A and platform B. A connecting structure is set between platform A and platform B and the steel structure column so that a fixed connection can be formed between the platform A and the platform B and the steel structure column when it is raised to the welding position.

2. The steel structure welding operation protection platform according to claim 1 is characterized in that: A latch structure is provided between the platform A and the platform B so as to connect them to form a whole after being assembled.

3. The steel structure welding operation protection platform according to claim 2 is characterized in that: The latch structure includes a socket arranged on the platform A and a movable latch arranged on the platform B.

4. The steel structure welding operation protection platform according to claim 1 is characterized in that: The operating platform is in a square structure, and has a through hole in the center that matches the steel structure column.

5. The steel structure welding operation protection platform according to claim 1 is characterized in that: The operating platform is divided into two parts, the platform A and the platform B, based on the center of the steel structure column.

6. The steel structure welding operation protection platform according to claim 1 is characterized in that: The connection structure includes a socket-and-spigot vertical rod arranged on the lower sides of the platform A and the platform B, and a socket-and-spigot hole arranged on the outer circle of the steel structure column.

7. The steel structure welding operation protection platform according to claim 6 is characterized in that: The socket is formed by bending a round steel into a U-shape and then welding it to the outer wall of the steel structure column.

8. The steel structure welding operation protection platform according to claim 1 is characterized in that: Protective railings are arranged around the operating platform.

9. The steel structure welding operation protection platform according to claim 1, characterized in that: The operating platform is paved with a patterned steel plate.

10. The steel structure welding operation protection platform according to claim 1, characterized in that: The lifting device is an electric hydraulic lifting platform vehicle.