Supporting device for large pipeline installation
By designing support devices for large-scale pipeline installation, including support units and adjusting parts, the problem of inefficiency during pipeline installation is solved, and high-precision pipeline installation and welding quality is improved to meet pipeline needs of different sizes.
Patent Information
- Application Number
- CN202421025219.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-11
- Publication Date
- 2024-12-27
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the installation of large pipelines, staff cannot observe the changes in pipeline installation height at close range, resulting in the need of two staff members to cooperate in operation, which reduces the efficiency of pipeline positioning and welding quality.
A large-scale pipeline installation support device is designed, including support units, adjusting parts and support members. The high-precision installation height adjustment of the pipeline is achieved through hydraulic devices and adjusting parts on the forklift, allowing staff to adjust the installation position of the pipeline at close range. Improves installation efficiency and welding accuracy.
It realizes accurate fine-tuning of pipeline installation height, improves work efficiency and welding quality, reduces installation costs and time, adapts to pipes of different sizes, and meets high-precision installation requirements.
Smart Images

Figure CN222255294U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a supporting device for installing a large pipeline. Background Art
[0002] With the rapid development of urban construction, urban water consumption is increasing day by day. Underground integrated pipe corridors have become an important part of urban water supply. Their convenience, supply and other advantages are constantly highlighted, effectively alleviating the low pressure of urban water supply. However, the construction speed of urban underground integrated pipe corridors is accelerating, the scale is expanding, the functional requirements are becoming more and more perfect, the pipe diameter is getting larger and larger, the technical difficulty of pipe hoisting and transportation is getting greater and greater, and the quality of pipe docking and welding is difficult to be effectively guaranteed. In order to solve this problem, the use of hydraulic forklifts to transport pipes can safely and effectively transport pipes to designated locations, the use of hydraulic jack sets can effectively improve the efficiency of pipe docking, and the use of welding robots can effectively guarantee the welding quality.
[0003] The existing equipment has the following disadvantages: when welding the pipeline, the connection points at both ends of the pipeline need to be aligned. During the actual installation of the pipeline, it is found that when the installation height of the pipeline is adjusted by the hydraulic jack set on the forklift, the adjustment range of the pipeline is large. After the pipeline to be installed and the fixed pipeline are preliminarily positioned, it is only necessary to fine-tune the installation height of the pipeline. However, the hydraulic jack set on the forklift cannot be used to observe the changes in the installation height of the pipeline at close range during adjustment. Two workers are required to cooperate in the operation, resulting in low efficiency in pipeline positioning, thereby affecting the installation efficiency of the pipeline.
[0004] Therefore, the present application now proposes a support device for large-scale pipeline installation to solve the above-mentioned problems. Utility Model Content
[0005] The utility model aims to provide a support device for large-scale pipeline installation, so as to solve the problem that the above-mentioned workers cannot observe the changes in the installation height of the pipeline at close range, and two workers are required to cooperate in the operation, resulting in low efficiency in pipeline positioning, thereby affecting the installation efficiency of the pipeline.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solution: a large-scale pipeline installation support device, comprising a pipeline, a forklift for transporting the pipeline, and a support fixedly arranged on an installation site for supporting the pipeline, and further comprising:
[0007] A supporting unit, disposed at the upper end of the forklift, for supporting the pipeline;
[0008] The support unit comprises:
[0009] A frame portion, disposed at the upper end of the forklift;
[0010] A support member, disposed at the upper end of the frame portion, for supporting and limiting the pipeline;
[0011] An adjusting member is adjustably arranged on the frame portion and is used for fine-tuning the installation height of the pipeline.
[0012] The frame portion includes a base frame fixed to the upper end of the forklift in a square frame shape, a column fixed to the upper end of the base frame, and a top frame fixed to the upper end of the column and having the same shape as the base frame. A movable groove for the adjustment member to move is provided on the top frame at a position corresponding to the adjustment member, and the adjustment member is symmetrically arranged on the top frame.
[0013] Among them, the adjusting member includes a plurality of fixed rods fixed inside the movable groove, a guide rod sleeved on the fixed rod, a sliding block fixedly sleeved on the lower part of the guide rod and a lifting member arranged on the sliding block for adjusting the installation height of the pipeline, and a fixing groove for installing the fixed rod is opened at the position of the top frame corresponding to the fixed rod.
[0014] Among them, the lifting member includes a screw rod threadedly connected to the sliding block, a connecting block fixed at the lower end of the screw rod, an adjusting rod passed through the connecting block for driving the connecting block to rotate, and a top block arranged at the upper end of the screw rod, a V-shaped opening is arranged at the upper end of the top block, and a bearing is arranged at the connection between the top block and the screw rod.
[0015] Wherein, a guide groove for guiding the top block is provided at a position of the top block close to the guide rod and is slidably connected to the guide rod.
[0016] Among them, the support member includes a fixed frame symmetrically fixed on the upper end of the top frame and an inclined support roller arranged on the fixed frame, a screw rod is arranged on the side of the support roller close to the fixed frame, the screw rod is threadedly connected to the fixed frame, and a bearing is arranged at the connection between the support roller and the screw rod.
[0017] Compared with the prior art, the beneficial effects of the utility model are:
[0018] 1. The utility model measures and lays out at the construction site, determines the installation position where the temporary pier needs to be installed, and then hoists the pipeline on the supporting unit at the upper end of the forklift through the hoisting equipment. During transportation, two forklifts are set for simultaneous transportation, and the two forklifts are controlled to travel slowly. To prevent side slipping, the forklift and the pipeline can be temporarily bundled with straps and transported to the pipeline placement position. The pipeline to be installed and the fixed pipeline are then aligned by the forklift, and the forklift is pulled back and forth to align the front and back positions of the two pipelines. The installation height of the pipeline is then adjusted by the hydraulic device on the forklift, and the installation height of the pipeline is fine-tuned by the adjusting piece on the supporting unit, so that the fine-tuning process of the pipeline installation height is smoother and more accurate. This fine-tuning function can meet the requirements of high-precision installation and ensure the next step of welding accuracy of the pipeline.
[0019] 2. The utility model inserts two groups of adjusting parts into the movable groove at the upper end of the top frame respectively, and each group of adjusting parts includes two guiding rods. The guiding rods are inserted into the movable grooves, and the guiding rods are fitted with the inner wall of the movable grooves. Then the fixing rods are inserted into the fixing grooves, and the fixing rods pass through the guiding rods to fix the guiding rods inside the movable grooves. After the installation height of the pipeline is roughly adjusted, the installation height of the pipeline is fine-tuned by the lifting parts installed on the guiding rods, which can facilitate the staff to adjust the installation height of the pipeline at close range and improve the alignment efficiency of the pipeline. After the installation position of the pipeline is adjusted, the robot is used for automatic welding. After the connection is completed, the welding slag should be knocked off in time with a hammer.
[0020] 3. The utility model can adjust the installation position of the support roller by a screw rod, change the distance between the two support rollers, and the two symmetrical support rollers are set at a V-shaped angle, which can clamp the pipeline and improve the stability of the pipeline during transportation. The movable support roller can adapt to pipelines of different sizes. This design reduces the need to replace the support device, reduces installation cost and time, and improves work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 This is a schematic diagram of the main structure in one embodiment of the utility model;
[0022] Figure 2 This is a structural schematic diagram of pipes butted together in one embodiment of the utility model;
[0023] Figure 3 This is a structural schematic diagram of one side of the pipeline after being butted in one embodiment of the utility model;
[0024] Figure 4 This is a schematic diagram of the structure of the connection between the forklift and the support unit in one embodiment of the utility model;
[0025] Figure 5This is a structural schematic diagram of a support in one embodiment of the utility model;
[0026] Figure 6 This is a schematic diagram of the structure of the connection between the adjusting member and the top frame in one embodiment of the utility model;
[0027] Figure 7 This is a schematic diagram of the structure of the adjusting member in one embodiment of the utility model;
[0028] Figure 8 This is a structural schematic diagram of an upward movement of an adjusting member in an embodiment of the utility model;
[0029] Fig. 9 It is a schematic structural diagram of a support member in one embodiment of the utility model.
[0030] In the figure: 1. pipeline; 2. support; 21. vertical plate; 22. horizontal plate; 23. bottom plate; 24. limit block; 3. forklift; 31. lifting plate; 32. handle; 33. hydraulic lifting device; 34. steering wheel; 35. walking wheel; 4. support unit; 41. base frame; 42. column; 43. top frame; 431. moving groove; 432. fixed groove; 44. support member; 441. fixed frame; 442. support roller; 443. screw rod; 45. adjusting member; 451. guide rod; 452. fixed rod; 453. sliding block; 454. screw rod; 4541. connecting block; 455. adjusting rod; 456. top block. DETAILED DESCRIPTION
[0031] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0032] See also Figure 1-9 The utility model provides a technical solution: a large-scale pipeline installation support device, comprising a pipeline 1, a forklift 3 for transporting the pipeline 1, and a support 2 fixedly arranged on the installation site for supporting the pipeline 1, and also comprising:
[0033] A support unit 4 is provided at the upper end of the forklift 3 and is used to support the pipeline 1;
[0034] The support unit 4 comprises:
[0035] A frame portion, arranged at the upper end of the forklift 3;
[0036] A support member 44 is provided at the upper end of the frame portion and is used to support and restrict the pipeline 1;
[0037] The adjusting member 45 is adjustably arranged on the frame portion and is used to fine-tune the installation height of the pipeline 1 .
[0038] It should be noted that, during work, measurements and layout are carried out at the construction site to determine the installation position where the temporary pier needs to be installed, and then the pipeline 1 is hoisted on the support unit 4 at the upper end of the forklift 3 by means of lifting equipment. During transportation, two forklifts 3 are set up for simultaneous transportation, and the two forklifts 3 are controlled to move slowly. To prevent side slipping, the forklift 3 and the pipeline 1 can be temporarily bundled with straps and transported to the placement position of the pipeline 1. Then, the forklift 3 is used to align the pipeline 1 to be installed with the fixed pipeline 1, and the forklift 3 is pulled forward and backward to align the front and rear positions of the two pipelines 1. Then, the installation height of the pipeline 1 is adjusted by the hydraulic device on the forklift 3, and then the installation height of the pipeline 1 is fine-tuned by the adjustment member 45 on the support unit 4, so that the fine-tuning process of the installation height of the pipeline 1 is smoother and more accurate. This fine-tuning function can meet the requirements of high-precision installation and ensure the welding accuracy of the pipeline 1 in the next step.
[0039] In one embodiment, the frame portion includes a base frame 41 fixed to the upper end of the forklift 3 in a square frame shape, a column 42 fixed to the upper end of the base frame 41, and a top frame 43 fixed to the upper end of the column 42 and having the same shape as the base frame 41. A moving groove 431 for the adjusting member 45 to move is provided at the position of the top frame 43 corresponding to the adjusting member 45, and the adjusting member 45 is symmetrically arranged on the top frame 43.
[0040] With this design, the pipe 1 is placed on the support 44, and then the support 44 is movably arranged, so that the pipe 1 can be easily moved on the upper end of the top frame 43, and then the distance between the two pipes 1 can be adjusted, so that the two pipes 1 can be fitted together for the next step of welding.
[0041] In one embodiment, the adjusting member 45 includes a plurality of fixed rods 452 fixed inside the movable groove 431, a guide rod 451 sleeved on the fixed rod 452, a sliding block 453 fixedly sleeved on the lower part of the guide rod 451, and a lifting member arranged on the sliding block 453 for adjusting the installation height of the pipeline 1, and a fixing groove 432 for installing the fixing rod 452 is opened at the position of the top frame 43 corresponding to the fixed rod 452.
[0042] This design, see Figure 4 as well as Figure 6-8, insert the two sets of adjusting members 45 into the movable groove 431 at the upper end of the top frame 43 respectively, each set of adjusting members 45 includes two guiding rods 451, insert the guiding rods 451 into the movable groove 431, the guiding rods 451 fit the inner wall of the movable groove 431, and then insert the fixing rod 452 into the fixing groove 432, and the fixing rod 452 passes through the guiding rods 451, and the guiding rods 451 are fixed inside the movable groove 431. After the installation height of the pipeline 1 is roughly adjusted, the installation height of the pipeline 1 is fine-tuned by the lifting member installed on the guiding rods 451, which can facilitate the staff to adjust the installation height of the pipeline 1 at a close distance, thereby improving the alignment efficiency of the pipeline 1. After the installation position of the pipeline 1 is adjusted, automatic welding by a robot is adopted, and the welding slag should be knocked off in time with a hammer after the connection is completed.
[0043] In one embodiment, the lifting member includes a screw rod 454 threadedly connected to a sliding block 453, a connecting block 4541 fixed to the lower end of the screw rod 454, an adjusting rod 455 passing through the connecting block 4541 and used to drive the connecting block 4541 to rotate, and a top block 456 arranged at the upper end of the screw rod 454, a V-shaped opening is arranged at the upper end of the top block 456, and a bearing is arranged at the connection between the top block 456 and the screw rod 454.
[0044] This design, see Figure 6-8 , insert the adjusting rod 455 into the connecting block 4541, and then rotate the adjusting rod 455, so that the connecting block 4541 drives the screw rod 454 to rotate, and the screw rod 454 is threadedly connected with the sliding block 453, driving the top block 456 to move up, and the top block 456 extends out from the movable groove 431, lifts the pipe 1 on the support 44, and then adjusts the installation height of the pipe 1. After the installation height of the pipe 1 is adjusted, the pipe 1 is supported by a temporary pier, and then the support 2 is cast at the lower end of the pipe 1 to support the pipe 1. When the support 2 solidifies, the temporary pier fixed at the lower end of the pipe 1 is removed to complete the installation of the pipe 1.
[0045] In one embodiment, a guide groove for guiding the top block 456 is provided at a position of the top block 456 close to the guide rod 451 and is slidably connected to the guide rod 451 .
[0046] With this design, the top block 456 is clamped between the two guide rods 451. Under the restriction of the guide rods 451, the two top blocks 456 move up and down simultaneously between the guide rods 451, which can improve the stability of the movement of the top blocks 456, making it difficult for the pipeline 1 to deform or tilt when moving upward, thereby ensuring the safety and stability of the pipeline 1.
[0047] In one embodiment, the support member 44 includes a fixing frame 441 symmetrically fixed on the upper end of the top frame 43 and an inclined support roller 442 arranged on the fixing frame 441, a screw rod 443 is arranged on one side of the support roller 442 close to the fixing frame 441, the screw rod 443 is threadedly connected to the fixing frame 441, and a bearing is arranged at the connection between the support roller 442 and the screw rod 443.
[0048] This design, see Fig. 9 The installation position of the support roller 442 can be adjusted by the screw rod 443 to change the distance between the two support rollers 442. The two symmetrical support rollers 442 are set at a V-shaped angle, which can clamp the pipeline 1 and improve the stability of the pipeline 1 during transportation. The movable support roller 442 can adapt to pipelines 1 of different sizes. This design reduces the need to replace the support device, reduces installation cost and time, and improves work efficiency.
[0049] In a specific embodiment, the support 2 includes a vertical plate 21, a bottom plate 23 fixed to the lower end of the vertical plate 21 and supported and fixed to the ground, and a horizontal plate 22 fixed to the upper end of the vertical plate 21 for supporting the pipeline 1. A limit block 24 made of angle steel is symmetrically fixed to the upper end of the horizontal plate 22 for fixing the pipeline 1.
[0050] This design, see Figure 1-3 as well as Figure 5 After the temporary pier supports the pipeline 1, cast the support 2 at the measured position below the pipeline 1. The support 2 is divided into a vertical plate 21, a horizontal plate 22 and a bottom plate 23 fixed at the lower end of the vertical plate 21. After the support 2 is solidified as a whole, the limit block 24 is fixed on the horizontal plate 22 to limit the pipeline 1 on the horizontal plate 22. When the entire support 2 is installed, the temporary pier is removed.
[0051] In a specific embodiment, the forklift 3 includes a lifting plate 31 for placing a base frame 41, a handle 32 rotatably arranged on one side of the lifting plate 31, a hydraulic lifting device 33 arranged between the handle 32 and the lifting plate 31 for driving the lifting plate 31 to move up and down, and a steering wheel 34 arranged on the lifting plate 31 below the hydraulic lifting device 33, and a walking wheel 35 is arranged on the side of the lower end of the lifting plate 31 away from the steering wheel 34.
[0052] With this design, the base frame 41 is fixed on the lifting plate 31, so that the base frame 41 can move up and down with the lifting plate 31, and then the handle 32 is pushed to drive the pipeline 1 for transportation. The forklift 3 is an existing device for easy operation.
Claims
1. A support device for installing a large pipeline, comprising a pipeline (1), a forklift (3) for transporting the pipeline (1), and a support (2) fixedly arranged on an installation site for supporting the pipeline (1), characterized in that: Also includes: A support unit (4) is arranged at the upper end of the forklift (3) and is used to support the pipeline (1); The support unit (4) comprises: A frame portion, arranged at the upper end of the forklift (3); A support member (44) is arranged at the upper end of the frame portion and is used to support and restrict the pipeline (1); An adjusting member (45) is adjustably arranged on the frame portion and is used to fine-tune the installation height of the pipeline (1).
2. A large-scale pipeline installation support device according to claim 1, characterized in that: The frame portion comprises a base frame (41) fixed to the upper end of the forklift (3) in a square frame shape, a column (42) fixed to the upper end of the base frame (41), and a top frame (43) fixed to the upper end of the column (42) and having the same shape as the base frame (41), wherein the top frame (43) is provided with a moving groove (431) for the adjusting member (45) to move at a position corresponding to the adjusting member (45), and the adjusting member (45) is symmetrically arranged on the top frame (43).
3. A large-scale pipeline installation support device according to claim 2, characterized in that: The adjusting member (45) comprises a plurality of fixing rods (452) fixed inside the movable groove (431), a guiding rod (451) sleeved on the fixing rod (452), a sliding block (453) fixedly sleeved on the lower part of the guiding rod (451), and a lifting member arranged on the sliding block (453) for adjusting the installation height of the pipeline (1), and a fixing groove (432) for installing the fixing rod (452) is provided at a position of the top frame (43) corresponding to the fixing rod (452).
4. A large-scale pipeline installation support device according to claim 3, characterized in that: The lifting member comprises a screw rod (454) threadedly connected to the sliding block (453), a connecting block (4541) fixed to the lower end of the screw rod (454), an adjusting rod (455) passing through the connecting block (4541) and used to drive the connecting block (4541) to rotate, and a top block (456) arranged at the upper end of the screw rod (454), a V-shaped opening being arranged at the upper end of the top block (456), and a bearing being arranged at the connection between the top block (456) and the screw rod (454).
5. A large-scale pipeline installation support device according to claim 4, characterized in that: A guide groove for guiding the top block (456) is provided at a position of the top block (456) close to the guide rod (451) and is slidably connected to the guide rod (451).
6. A large-scale pipeline installation support device according to claim 2, characterized in that: The support member (44) comprises a fixing frame (441) symmetrically fixed to the upper end of the top frame (43) and a support roller (442) arranged on the fixing frame (441) and inclined thereon; a screw rod (443) is arranged on one side of the support roller (442) close to the fixing frame (441); the screw rod (443) is threadedly connected to the fixing frame (441); and a bearing is arranged at the connection between the support roller (442) and the screw rod (443).