Formwork hanging device for floor slab pouring

By designing a simplified mold lifting device, the combination of slots, insert plates and electric push rods is used to solve the complex problems of disassembly and assembly in the existing technology, the efficiency of floor slabs is improved, and the design of thread sleeves and leveling is ensured. Pouring quality.

CN222276165UInactive Publication Date: 2024-12-31SHANDONG LONGXING CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421605996.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-09
Publication Date
2024-12-31
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The disassembly and assembly process of existing floor slab pouring hanging mold devices is complicated and cumbersome, resulting in a decrease in floor slab pouring efficiency.

Method used

A mold lifting device including a mold frame, slot, plug board, connecting plate, lifting ring and electric push rod is designed. The lifting device is connected to the lifting equipment by fixing the lifting plate in advance. After the plug board is connected to the slot, the push rod drives the connecting plate. Move down to quickly remove the mold frame, simplifying the disassembly and adjusting the height through threaded sleeves and a level to ensure casting quality.

Benefits of technology

It realizes rapid disassembly and assembly, improves the efficiency of floor slabs, and ensures the level of concrete through horizontal ruler and thread adjustment, and improves the quality of pouring.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222276165U_ABST
    Figure CN222276165U_ABST
Patent Text Reader

Abstract

The utility model provides a suspended formwork device for floor slab pouring, and relates to the technical field of suspended formworks. During use, after the four hanging rings and a rope of hoisting equipment are connected and fixed in advance, the inserting plates are inserted into the four inserting grooves, close to the corners, of the bottom of the formwork from bottom to top, and after the inserting plates and the inserting grooves are connected, the four connecting plates can support the bottom of the formwork; the four hanging rings are hoisted to the appropriate height for floor slab pouring through hoisting equipment, then the formwork can complete supporting operation on concrete, when pouring is completed and formwork removal is needed, the formwork is moved to a support at the low position through the hoisting equipment, then four electric push rods are started to downwards push four connecting plates, and the formwork is moved to the support at the low position through the hoisting equipment; at the moment, the inserting plates move downwards along with the connecting plates and are separated from the inserting grooves, the overall structure is simple, the formwork and the hoisting equipment can be rapidly disassembled and assembled through the separated design, and the floor slab pouring efficiency is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of hanging formwork, in particular to a hanging formwork device for floor slab casting. Background Art

[0002] The hanging formwork device used for floor slab pouring is a special formwork structure. It is used to provide a formwork suspension system without lower support when there is insufficient lower space or obstacles during the floor slab pouring process. The hanging formwork device is suspended in the air through various fixing methods, bearing the weight of concrete and pouring pressure to ensure the smooth pouring of the floor slab.

[0003] When using a hanging formwork device during floor slab pouring, it is necessary to lift the hanging formwork frame through a lifting device to support the concrete. Each time the hanging formwork frame is used, it needs to be connected to the steel cable of the lifting device through multiple connecting parts and then dismantled after use. The disassembly and assembly process is complicated and cumbersome, resulting in a decrease in the efficiency of floor slab pouring. Therefore, in response to the above problems, we propose a new type of hanging formwork device for floor slab pouring. Utility Model Content

[0004] The utility model aims to solve the problem in the prior art that each time a hanging formwork frame is used, it needs to be connected to the steel cable of a lifting device by multiple connecting parts, and then dismantled after use, and the disassembly and assembly process is complicated and cumbersome, resulting in a decrease in the efficiency of floor slab casting, and a hanging formwork device for floor slab casting is proposed.

[0005] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a hanging formwork device for floor slab casting, including a formwork frame, wherein slots are provided at the bottom of the formwork frame near the four corners, and plug plates are inserted between the inner surface walls of the slots, and the bottom of the plug plates is fixedly connected to a connecting plate extending outward, and the top of the connecting plate is fixedly connected to a mounting plate at a position away from the plug plates, and the top of the mounting plate is fixedly connected to a hanging ring, and the outer surface of the mounting plate is in contact with the outer surface of the formwork near the corners.

[0006] Preferably, a mold groove is provided at the top of the mold frame, and a mounting groove is provided at the bottom of the mold frame at a position in the middle of the connecting plate.

[0007] Preferably, an electric push rod is installed at the inner top of the installation groove, and the telescopic end of the electric push rod does not contact the top of the connecting plate.

[0008] Preferably, a flange is installed near the middle of the bottom of the mold frame, and a circular sleeve is welded to the bottom of the flange.

[0009] Preferably, the circular sleeve and the mold frame are arranged perpendicular to each other, and the bottom of the circular sleeve is threadedly connected to a threaded sleeve.

[0010] Preferably, a threaded rod is threadedly connected to the bottom of the threaded sleeve, and a level ruler is fixedly installed on the bottom of the threaded rod.

[0011] Compared with the prior art, the advantages and positive effects of the utility model are:

[0012] 1. In the utility model, when in use, after the four lifting rings are connected and fixed with the ropes of the lifting equipment in advance, the plug plate is then inserted from bottom to top into the four slots near the corners at the bottom of the formwork. After the plug plate and the slot are connected, the four connecting plates will support the bottom of the formwork. Then, the four lifting rings are lifted to a suitable height for pouring the floor slab by the lifting equipment, and the formwork can complete the support operation for the concrete. When the pouring is completed and the formwork needs to be removed, the formwork is moved to a lower bracket by the lifting equipment, and then the four electric push rods are started to push the four connecting plates downward. At this time, the plug plate will move downward with the connecting plate and detach from the slot. The overall structure is simple, and the separate design allows for quick disassembly and assembly between the formwork and the lifting equipment, greatly improving the efficiency of floor pouring.

[0013] 2. In the utility model, when the formwork is hoisted to a suitable height for use during the floor slab casting process, the horizontal state of the formwork can be viewed through the level ruler at the bottom, and as needed, the threaded sleeve will move downward inside the circular sleeve when the threaded sleeve is rotated, and the threaded rod will move downward inside the threaded sleeve when the threaded rod is rotated, so that the height of the level ruler can be adjusted within a certain height range, thereby allowing the staff to directly judge the horizontality of the formwork at a low place, thereby ensuring the casting quality of the floor slab. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 A three-dimensional diagram of a hanging formwork device for floor slab pouring is provided for the utility model;

[0015] Figure 2 Another perspective view of a hanging formwork device for floor slab pouring proposed by the utility model;

[0016] Figure 3 A partial structural schematic diagram of a hanging formwork device for floor slab pouring is provided for the utility model;

[0017] Figure 4 The utility model provides a schematic diagram of the threaded sleeve structure of a hanging formwork device for floor slab casting.

[0018] Legend: 1. Mold frame; 11. Mold groove; 2. Mounting groove; 21. Slot; 3. Electric push rod; 31. Insert plate; 32. Connecting plate; 33. Mounting plate; 34. Lifting ring; 4. Flange; 41. Round sleeve; 42. Threaded sleeve; 43. Threaded rod; 44. Level. DETAILED DESCRIPTION

[0019] In order to more clearly understand the above-mentioned purpose, features and advantages of the utility model, the utility model is further described below in conjunction with the accompanying drawings and embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.

[0020] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways than those described herein. Therefore, the present invention is not limited to the specific embodiments of the following disclosure.

[0021] Embodiment 1, as Figure 1-Figure 4 As shown, the utility model provides a hanging formwork device for pouring floor slabs, including a formwork frame 1, slots 21 are provided at the bottom of the formwork frame 1 near the four corners, plug plates 31 are inserted between the inner surface walls of the slots 21, the bottom of the plug plate 31 is fixedly connected with a connecting plate 32 extending outward, the top of the connecting plate 32 is located at a position away from the plug plate 31 and is fixedly connected with a mounting plate 33, the top of the mounting plate 33 is fixedly connected with a hanging ring 34, the outer surface of the mounting plate 33 is fitted with the outer surface of the formwork frame 1 near the corner, a mold groove 11 is provided at the top of the formwork frame 1, a mounting groove 2 is provided at the bottom of the formwork frame 1 located in the middle of the connecting plate 32, an electric push rod 3 is installed at the inner top of the mounting groove 2, and the telescopic end of the electric push rod 3 does not contact the top of the connecting plate 32.

[0022] The effect achieved by the entire embodiment 1 is that the lifting ring 34, the mounting plate 33, the connecting plate 32 and the plug plate 31 in the device form a connecting piece as a whole. When in use, after the four lifting rings 34 are connected and fixed with the ropes of the lifting equipment in advance, a suitable formwork 1 is selected, and then the plug plate 31 is inserted from bottom to top into the four slots 21 near the corners at the bottom of the formwork 1. During the insertion process, the mounting plate 33 needs to be kept in the direction of the outside of the formwork 1. After the connection between the plug plate 31 and the slot 21 is completed, the four connecting plates 32 will support the bottom of the formwork 1. Subsequently, the four lifting rings 34 are lifted to a suitable height for pouring the floor slab by the lifting equipment, and then the formwork 1 can complete the support operation for the concrete. When the pouring is completed and the formwork needs to be removed, the lifting device is used to lift the four lifting rings 34 to a suitable height for pouring the floor slab. The heavy equipment moves the formwork 1 to the lower bracket, and then starts the four electric push rods 3 to push the four connecting plates 32 downward. At this time, the plug plate 31 will move downward with the connecting plate 32 and disengage from the slot 21. The overall structure is simple, and the separate design allows for quick disassembly and assembly between the formwork 1 and the lifting equipment, greatly improving the efficiency of floor slab casting. The mold groove 11 is designed mainly for placing templates. By placing different templates inside the mold groove 11, floors of different shapes and sizes can be cast. The formwork 1 has a variety of sizes, which can be replaced according to actual usage. The formwork 1 needs to be placed on a matching bracket in advance for use, and the four corners of the formwork 1 need not be blocked by the bracket.

[0023] Embodiment 2, as Figure 1-Figure 4 As shown, a flange 4 is installed near the middle of the bottom of the mold frame 1, a circular sleeve 41 is welded to the bottom of the flange 4, the circular sleeve 41 and the mold frame 1 are arranged perpendicular to each other, the bottom of the circular sleeve 41 is threadedly connected to a threaded sleeve 42, the bottom of the threaded sleeve 42 is threadedly connected to a threaded rod 43, and a level ruler 44 is fixedly installed on the bottom of the threaded rod 43.

[0024] The effect achieved by the entire embodiment 2 is that, since the circular sleeve 41 and the formwork 1 are perpendicular, and the level 44 and the threaded rod 43 are perpendicular, the level 44 and the formwork 1 are in a parallel state, and the level 44 can effectively detect the horizontality through the bubble tubes in the horizontal and vertical directions. When the formwork 1 is hoisted to a suitable height for use during the floor pouring process, the horizontal state of the formwork 1 can be viewed through the level 44 at the bottom, and as needed, by rotating the threaded sleeve 42, the threaded sleeve 42 will move downward inside the circular sleeve 41, and by rotating the threaded rod 43, the threaded rod 43 will move downward inside the threaded sleeve 42, so that the height of the level 44 can be adjusted within a certain height range, so that the staff can directly judge the horizontality of the formwork 1 at a low place, thereby ensuring the pouring quality of the floor, and the flange 4 is mainly used to connect the circular sleeve 41 and the formwork 1, and can be removed as needed.

[0025] Working principle: When in use, after connecting and fixing the four lifting rings 34 with the ropes of the lifting equipment in advance, select a suitable formwork 1, and then insert the plug plate 31 from bottom to top into the four slots 21 near the corners at the bottom of the formwork 1. During the insertion process, it is necessary to keep the mounting plate 33 located outside the formwork 1. After the plug plate 31 and the slot 21 are connected, the four connecting plates 32 will support the bottom of the formwork 1. Then, the four lifting rings 34 are lifted to a suitable height for pouring the floor slab by the lifting equipment, and then the formwork 1 can complete the support operation for the concrete. When the pouring is completed and the formwork needs to be removed, the formwork 1 is moved to a lower bracket by the lifting equipment, and then the four electric push rods 3 are started to push the four connecting plates 32 downward. At this time, the plug plate 31 will follow As the connecting plate 32 moves downward and disengages from the slot 21, the overall structure is simple, and the separate design allows for quick disassembly and assembly between the formwork 1 and the lifting equipment, greatly improving the efficiency of floor slab casting. At the same time, when the formwork 1 is hoisted to a suitable height for use during floor slab casting, the horizontal state of the formwork 1 can be viewed through the level ruler 44 at the bottom, and as needed, by rotating the threaded sleeve 42, the threaded sleeve 42 will move downward inside the circular sleeve 41, and by rotating the threaded rod 43, the threaded rod 43 will move downward inside the threaded sleeve 42, so that the height of the level ruler 44 can be adjusted within a certain height range, so that the staff can directly judge the horizontality of the formwork 1 at a low place, thereby ensuring the casting quality of the floor slab.

[0026] The wiring diagram of the electric push rod 3 in the present invention is common knowledge in the art, and its working principle is a known technology. The model is selected according to the actual use, so the control method and wiring arrangement of the electric push rod 3 are not explained in detail.

[0027] The above description is only a preferred embodiment of the present invention and does not limit the present invention in other forms. Any technician familiar with the profession may use the technical content disclosed above to change or modify it into an equivalent embodiment with equivalent changes and apply it to other fields. However, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.

Claims

1. A hanging formwork device for floor slab casting, comprising a formwork frame (1), characterized in that: The bottom of the mold frame (1) is provided with slots (21) near the four corners, and an inserting plate (31) is inserted between the inner surface walls of the slots (21). The bottom of the inserting plate (31) is fixedly connected to a connecting plate (32) extending outward, and the top of the connecting plate (32) is fixedly connected to a mounting plate (33) at a position away from the inserting plate (31). The top of the mounting plate (33) is fixedly connected to a lifting ring (34), and the outer surface of the mounting plate (33) is in contact with the outer surface of the mold frame (1) near the corner.

2. The hanging formwork device for floor slab pouring according to claim 1, characterized in that: The top of the mold frame (1) is provided with a mold groove (11), and the bottom of the mold frame (1) is provided with a mounting groove (2) at a position located in the middle of the connecting plate (32).

3. The hanging formwork device for floor slab casting according to claim 2 is characterized in that: An electric push rod (3) is installed at the inner top of the installation groove (2), and the telescopic end of the electric push rod (3) does not contact the top of the connecting plate (32).

4. The hanging formwork device for floor slab pouring according to claim 3, characterized in that: A flange (4) is installed near the middle of the bottom of the mold frame (1), and a circular sleeve (41) is welded to the bottom of the flange (4).

5. The hanging formwork device for floor slab pouring according to claim 4, characterized in that: The circular sleeve (41) and the mold frame (1) are arranged perpendicular to each other, and the bottom of the circular sleeve (41) is threadedly connected to a threaded sleeve (42).

6. The hanging formwork device for floor slab pouring according to claim 5, characterized in that: The bottom of the threaded sleeve (42) is threadedly connected to a threaded rod (43), and the bottom of the threaded rod (43) is fixedly mounted with a level ruler (44).