Pavement with good water permeability

By designing permeable holes and connecting pipes on municipal roads, combined with the permeable and drainage system of multi-layer structure, the problem of difficult road moisture discharge in rainy weather is solved, efficient permeable and rapid drainage of the road surface is achieved, and the service life of the road surface is extended. And improve water resource utilization efficiency.

CN222294597UActive Publication Date: 2025-01-03HONGTIAN CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421068832.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-16
Publication Date
2025-01-03
Estimated Expiration
2034-05-16

AI Technical Summary

Technical Problem

Existing municipal roads are difficult to effectively discharge moisture from the road during rainy weather, resulting in road erosion and damage.

Method used

A pavement with good permeability was designed. By setting permeable holes and connecting pipes on the pavement body, combining permeable layer, water transport layer, filter layer, anti-permeable layer and drainage layer, using permeable coating, permeable surface layer, and permeable water. The base layer and drainage layer improve water permeability, and quickly discharge water through water absorption cotton and water storage pits, reducing the damage to the road surface caused by accumulated water.

Benefits of technology

It effectively improves the water permeability efficiency of the road surface during rainwater erosion, reduces water accumulation, extends the service life of the road surface, and improves water resource utilization efficiency and ecosystem health.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222294597U_ABST
    Figure CN222294597U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of municipal roads, and discloses a pavement with good water permeability, which comprises a pavement body, a plurality of connecting pipes are arranged at the lower parts of the two sides of the pavement body in a penetrating manner, a plurality of water permeable holes are uniformly formed in the upper end surface of the pavement body, and the pavement body comprises a roadbed layer; a water conveying layer is fixedly arranged at the upper end of the roadbed layer, a water permeable layer is fixedly arranged at the upper end of the water conveying layer, a foundation layer is fixedly arranged at the lower end of the roadbed layer, the water permeable layer comprises a water permeable coating, a water permeable surface layer is fixedly arranged at the lower end of the water permeable coating, and a water permeable base layer is fixedly arranged at the lower end of the water permeable surface layer. A drainage layer is fixedly arranged at the lower end of the permeable base layer, the water conveying layer comprises a filtering layer, an anti-permeation layer, a water conveying pipe and a plurality of water storage pits, and a plurality of flow dividing pipes penetrate through the lower end of the water conveying pipe. According to the water permeable pavement, the water permeable effect of the pavement body is improved, water can be conveniently discharged, and damage to the pavement body is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of municipal roads, in particular to a road surface with good water permeability. Background Art

[0002] Municipal roads are the main transportation roads in the city, connecting various areas of the city and providing services for residents and transportation. These roads are usually planned, built and maintained by the government or municipal authorities. Municipal roads play an important role in urban development. They are not only the infrastructure for transportation, but also an important carrier of urban life and social activities. They have a significant impact on the development, prosperity and quality of life of residents in the city.

[0003] When existing municipal roads are hit by rainy weather, most of the water is drained through drainage channels, but the residual water on the road surface cannot be discharged, making the road surface susceptible to erosion and damage after long-term use.

[0004] Therefore, the utility model provides a pavement with good water permeability to solve the problems raised in the above background technology. Utility Model Content

[0005] The purpose of the utility model is to solve the shortcomings of the prior art and to propose a pavement with good permeability, which improves the effective permeability efficiency of the pavement body when it is eroded by rainwater, and facilitates the discharge of moisture to prevent long-term retention and damage to the pavement body.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a pavement with good water permeability, comprising a pavement body, a plurality of connecting pipes are provided through the lower sides of the pavement body, and a plurality of water permeable holes are evenly opened on the upper end surface of the pavement body;

[0007] The pavement body comprises a roadbed, a water delivery layer is fixedly arranged on the upper end of the roadbed, a water permeable layer is fixedly arranged on the upper end of the water delivery layer, and a foundation layer is fixedly arranged on the lower end of the roadbed;

[0008] The water-permeable layer comprises a water-permeable coating layer, a water-permeable surface layer is fixedly arranged at the lower end of the water-permeable coating layer, a water-permeable subbase layer is fixedly arranged at the lower end of the water-permeable surface layer, and a drainage layer is fixedly arranged at the lower end of the water-permeable subbase layer;

[0009] The water delivery layer includes a filter layer, an anti-permeability layer, a water delivery pipe and a plurality of water storage pits. A plurality of diversion pipes are provided through the lower end of the water delivery pipe, and absorbent cotton is fixedly provided inside the plurality of diversion pipes.

[0010] Through the above technical solution, the water-permeable holes arranged on the upper end surface of the pavement body facilitate the penetration of water into the pavement body when it is eroded by rainwater, and the connecting pipes arranged on both sides of the pavement body facilitate the connection with the sewer pipe to extract the water inside the pavement body;

[0011] The water-permeable layer is set in the pavement body, and the water-permeable coating in the water-permeable layer is used to enhance the water permeability of the pavement, and provide additional wear resistance and skid resistance. The water-permeable efficiency is improved by the water-permeable surface layer and the water-permeable subbase layer, while providing a certain support to the pavement body. The water source is conveniently discharged through the drainage layer, ensuring effective water penetration and drainage.

[0012] The impurity particles in the water are filtered through the filter layer arranged in the water delivery layer, and the water flows into the water storage pit above the anti-seepage layer. The absorbent cotton in the diversion pipe at the lower end of the water delivery pipe is pumped into the water storage pit through an external water pump to discharge the infiltrated water. The accumulated water can be quickly removed, reducing the damage to the road surface caused by the accumulated water, so as to improve the utilization efficiency of water resources and the health of the ecosystem.

[0013] Furthermore, the material used for the road base layer is crushed stone concrete, and the material used for the foundation layer is roadbed soil;

[0014] Through the above technical solution, crushed stone concrete helps to disperse and reduce vehicle loads, improve the stability and durability of the entire pavement structure, and the roadbed soil has sufficient bearing capacity and stability.

[0015] Furthermore, the material used for the water-permeable coating is water-permeable ceramsite, and the material used for the water-permeable surface layer is water-permeable asphalt;

[0016] Through the above technical solution, permeable expanded clay can allow rainwater to pass through the surface, reduce surface water accumulation, improve the drainage performance of the pavement itself, and provide additional wear resistance and skid resistance. Permeable asphalt has the effect of improving drainage and reducing the impact of urban rainwater runoff on the environment.

[0017] Furthermore, the material used for the permeable base layer is cement concrete, and the material used for the drainage layer is gravel;

[0018] Through the above technical solution, cement concrete is used to support and protect the surface of the road surface and ensure that water quickly penetrates to the bottom. Gravel has large particle gaps, which can effectively promote the rapid drainage of water and keep the road surface dry and stable.

[0019] Further, the material used for the filter layer is a fabric filter material, and the material used for the anti-permeability layer is a concrete sealant;

[0020] Through the above technical solution, the fabric filter material has good filtering performance and tensile strength. It can prevent particles from entering the surface of the road surface, while allowing moisture to penetrate freely, playing a role of filtering and isolation. The concrete sealant can form a waterproof film to prevent moisture from penetrating into the interior of the road surface.

[0021] Furthermore, the water delivery pipe is arranged through the anti-permeability layer, and the absorbent cotton is squeezed on the bottom surface of the water storage pit;

[0022] Through the above technical solution, the water pipe is penetrated through the anti-permeability layer, so that the absorbent cotton can absorb water in the water storage pit into the water pipe for discharge.

[0023] Furthermore, a plurality of connecting pipes are provided with connecting flanges fixedly sleeved at their ends;

[0024] Through the above technical solution, the connection flange is arranged at the end of the connecting pipe, so that the sewer pipe can be connected conveniently.

[0025] The utility model has the following beneficial effects:

[0026] 1. The utility model proposes a pavement with good water permeability, which enhances the water permeability of the pavement through a water-permeable layer arranged in the pavement body and a water-permeable coating in the water-permeable layer, and provides additional wear resistance and skid resistance. The water permeability efficiency is improved through a water-permeable surface layer and a water-permeable base layer, while providing certain support to the pavement body, and the water source is conveniently discharged through a drainage layer, thereby ensuring effective water penetration and drainage.

[0027] 2. The utility model proposes a road surface with good water permeability. The impurity particles in the water are filtered by the filter layer arranged in the water delivery layer, and the water flows into the water storage pit above the anti-seepage layer. The absorbent cotton in the diversion pipe at the lower end of the water delivery pipe is pumped into the water storage pit by an external water pump to discharge the infiltrated water. The accumulated water can be quickly discharged, reducing the damage of the accumulated water to the road surface, so as to improve the utilization efficiency of water resources and the health of the ecosystem. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a schematic diagram of the axial side of the utility model;

[0029] Figure 2 This is a schematic diagram of the pavement main body structure of the utility model;

[0030] Figure 3 This is a schematic diagram of the water-permeable layer structure of the utility model;

[0031] Figure 4 This is a schematic diagram of the water delivery layer structure of the utility model.

[0032] Legend:

[0033] 1. Pavement body; 2. Connecting flange; 3. Water permeable hole; 4. Connecting pipe; 101. Permeable layer; 102. Water transmission layer; 103. Road base layer; 104. Foundation layer; 10101. Permeable coating layer; 10102. Permeable surface layer; 10103. Permeable subbase layer; 10104. Drainage layer; 10201. Filter layer; 10202. Anti-seepage layer; 10203. Water transmission pipe; 10204. Absorbent cotton; 10205. Diversion pipe; 10206. Water storage pit. DETAILED DESCRIPTION

[0034] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0035] Reference Figure 1-4 The utility model provides an embodiment: a pavement with good permeability, including a pavement body 1, a plurality of connecting pipes 4 are arranged through the lower sides of the pavement body 1, and a plurality of permeable holes 3 are evenly opened on the upper end surface of the pavement body 1. Through the permeable holes 3 arranged on the upper end surface of the pavement body 1, it is convenient to penetrate moisture into the inside of the pavement body 1 when eroded by rainwater, and through the connecting pipes 4 arranged on both sides of the pavement body 1, it is convenient to connect with the sewer pipe to extract moisture from the inside of the pavement body 1.

[0036] The pavement body 1 includes a road base layer 103, a water supply layer 102 is fixedly arranged on the upper end of the road base layer 103, a permeable layer 101 is fixedly arranged on the upper end of the water supply layer 102, and a foundation layer 104 is fixedly arranged on the lower end of the road base layer 103. The road base layer 103 and the foundation layer 104 provide basic support for the pavement body 1, and the moisture of the pavement body 1 is infiltrated into the water supply layer 102 through the permeable layer 101, and the moisture is processed and discharged through the water supply layer 102.

[0037] The permeable layer 101 includes a permeable coating layer 10101, a permeable surface layer 10102 is fixedly arranged at the lower end of the permeable coating layer 10101, a permeable subbase layer 10103 is fixedly arranged at the lower end of the permeable surface layer 10102, and a drainage layer 10104 is fixedly arranged at the lower end of the permeable subbase layer 10103. The permeable layer 101 is arranged in the pavement body 1, and the permeable coating layer 10101 in the permeable layer 101 can enhance the permeability of the pavement, provide additional wear resistance and skid resistance, improve the permeability efficiency through the permeable surface layer 10102 and the permeable subbase layer 10103, and provide certain support to the pavement body 1, and conveniently discharge water through the drainage layer 10104, thereby ensuring effective water penetration and drainage.

[0038] The water supply layer 102 includes a filter layer 10201, an anti-permeation layer 10202, a water supply pipe 10203 and multiple water storage pits 10206. Multiple branch pipes 10205 are installed through the lower end of the water supply pipe 10203. Water-absorbing cotton 10204 is fixed inside the multiple branch pipes 10205. The impurity particles in the water are filtered by the filter layer 10201 arranged in the water supply layer 102, and the water flows into the water storage pit 10206 above the anti-permeation layer 10202. The water-absorbing cotton 10204 in the branch pipe 10205 at the lower end of the water supply pipe 10203 is pumped into the water storage pit 10206 by an external water pump to discharge the infiltrated water. The accumulated water can be quickly discharged, reducing the damage of the accumulated water to the pavement body 1, so as to improve the utilization efficiency of water resources and the health of the ecosystem.

[0039] The material used for the road base layer 103 is crushed stone concrete, and the material used for the base layer 104 is roadbed soil. The crushed stone concrete helps to disperse and reduce vehicle loads and improve the stability and durability of the entire pavement structure. The roadbed soil has sufficient bearing capacity and stability. The material used for the permeable coating 10101 is permeable expanded clay, and the material used for the permeable surface layer 10102 is permeable asphalt. The permeable expanded clay allows rainwater to pass through the surface layer, reduces surface water accumulation, improves the drainage performance of the pavement body 1, and provides additional wear resistance and skid resistance. The permeable asphalt has the effect of improving drainage and reducing the impact of urban rainwater runoff on the environment.

[0040] The material used for the permeable base layer 10103 is cement concrete, and the material used for the drainage layer 10104 is gravel. Cement concrete is used to support and protect the surface of the road surface and ensure that water quickly penetrates to the bottom. Gravel has large particle gaps, which can effectively promote the rapid drainage of water and keep the road surface dry and stable. The material used for the filter layer 10201 is fabric filter material, and the material used for the anti-permeability layer 10202 is concrete sealant. The fabric filter material has good filtering performance and tensile strength. It can prevent particles from entering the surface of the road surface while allowing water to penetrate freely, playing a role of filtering and isolation. The concrete sealant can form a waterproof film to prevent water from penetrating into the inside of the road surface body 1.

[0041] The water pipe 10203 is penetrated in the anti-permeability layer 10202, and the absorbent cotton 10204 is squeezed on the bottom surface of the water storage pit 10206. The water pipe 10203 is penetrated in the anti-permeability layer 10202, so that the absorbent cotton 10204 can absorb water in the water storage pit 10206 into the water pipe 10203 for discharge. A plurality of connecting pipes 4 are fixedly provided with connecting flanges 2 at the ends thereof. The connecting flanges 2 arranged at the ends of the connecting pipes 4 facilitate connection to the sewer pipes, so that rainwater can be collected and utilized after being discharged.

[0042] Working principle: When the pavement body 1 is used, the sewer pipe is pre-connected with the connecting pipe 4 through the connecting flange 2, so that when rainwater is on the pavement body 1, the permeable layer 101 improves the permeability of the pavement of rainwater, ensures effective water penetration efficiency, and stores water through the water transfer layer 102 below the permeable layer 101 and absorbs the connecting pipe 4 through the water pump of the sewer pipe, and discharges the water retained in the water transfer layer 102, thereby reducing the damage of water accumulation to the pavement, so as to improve the utilization efficiency of water resources and the health of the ecosystem.

[0043] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A pavement with good water permeability, comprising a pavement body (1), characterized in that: A plurality of connecting pipes (4) are provided through the lower sides of both sides of the pavement body (1), and a plurality of water-permeable holes (3) are evenly provided on the upper end surface of the pavement body (1); The pavement body (1) comprises a road base layer (103), a water transmission layer (102) is fixedly arranged on the upper end of the road base layer (103), a water permeable layer (101) is fixedly arranged on the upper end of the water transmission layer (102), and a foundation layer (104) is fixedly arranged on the lower end of the road base layer (103); The water-permeable layer (101) comprises a water-permeable coating layer (10101), a water-permeable surface layer (10102) is fixedly arranged at the lower end of the water-permeable coating layer (10101), a water-permeable bottom layer (10103) is fixedly arranged at the lower end of the water-permeable surface layer (10102), and a drainage layer (10104) is fixedly arranged at the lower end of the water-permeable bottom layer (10103); The water delivery layer (102) comprises a filter layer (10201), an anti-permeability layer (10202), a water delivery pipe (10203) and a plurality of water storage pits (10206); a plurality of diversion pipes (10205) are provided through the lower end of the water delivery pipe (10203); absorbent cotton (10204) is fixedly provided inside the plurality of diversion pipes (10205).

2. A pavement with good water permeability according to claim 1, characterized in that: The material used for the road base layer (103) is crushed stone concrete, and the material used for the foundation layer (104) is roadbed soil.

3. A pavement with good water permeability according to claim 1, characterized in that: The material used for the water-permeable coating (10101) is water-permeable expanded clay, and the material used for the water-permeable surface layer (10102) is water-permeable asphalt.

4. A pavement with good water permeability according to claim 1, characterized in that: The material used for the permeable base layer (10103) is cement concrete, and the material used for the drainage layer (10104) is gravel.

5. The pavement with good water permeability according to claim 1, characterized in that: The material used for the filter layer (10201) is fabric filter material, and the material used for the anti-permeability layer (10202) is concrete sealant.

6. The pavement with good water permeability according to claim 1, characterized in that: The water delivery pipe (10203) is arranged to penetrate the anti-permeability layer (10202), and the absorbent cotton (10204) is squeezed on the inner bottom surface of the water storage pit (10206).

7. The pavement with good water permeability according to claim 1, characterized in that: A plurality of connecting pipes (4) are all fixedly sleeved with connecting flanges (2) at their ends.