Binding die for ring reinforcement cage at top of air tower
By designing the wind tower top ring reinforced cage binding mold, the eight-side ring, fixing plate, telescopic rod and positioning rod are used to form a standardized steel ring, which solves the problem of time and non-standard preparation of the steel cage on the top of the wind tower, and realizes the Rapid and standardized steel cage production.
Patent Information
- Application Number
- CN202420872564.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-25
- Publication Date
- 2025-01-07
- Estimated Expiration
- 2034-04-25
AI Technical Summary
In the construction of the wind tower top, the preparation of the steel cage takes a long time and is not standard. The existing technology relies on manual binding of multiple steel rings, resulting in low operating efficiency and inconsistent product.
A wind tower top ring reinforced cage binding mold is designed, including eight-side ring, fixing plate, telescopic rod, binding plate and positioning rod. These components form nearly round reinforced rings, simplifying the binding process of the reinforced cage, and Allows the size of the rebar ring to suit different needs.
The rapid and standardized production of steel cages is achieved, which reduces preparation time and avoids non-standard problems, while improving the practicality and stability of the mold.
Smart Images

Figure CN222314623U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of steel bar binding, in particular to a wind tower top ring steel bar cage binding mould. Background Art
[0002] In wind tower construction, steel bars are very important materials. They can not only increase the strength and rigidity of concrete, but also increase its earthquake resistance, crack resistance and other properties, making it more stable and safe.
[0003] In the construction of the top of the wind tower, since its top is in a ring shape, a ring-shaped steel cage is required to be set up for the construction of its top. However, the preparation of the steel cage is currently done by manually preparing multiple steel rings first, and then tying the multiple steel rings together with wires. This operation method makes the preparation of the steel cage time-consuming, and the steel cage composed of multiple steel rings is non-standard. Utility Model Content
[0004] The utility model aims to solve the shortcomings in the prior art and proposes a wind tower top ring steel cage binding mould.
[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0006] The steel cage binding mold for the top ring of a wind tower comprises two octagonal rings, eight fixed plates are fixedly connected between the side walls of the two octagonal rings close to each other, eight first telescopic rods corresponding to the eight fixed plates are fixedly connected to the side walls of the upper octagonal rings, second telescopic rods are fixedly connected to the side walls of the fixed plates, the movable ends of the second telescopic rods and the movable ends of the corresponding first telescopic rods are jointly fixedly connected to a binding plate, a plurality of positioning rods are fixedly connected to the side walls of the binding plates away from the fixed plates, and the plurality of positioning rods are evenly distributed in the vertical direction.
[0007] Preferably, two stabilizing frames are fixedly connected to the inner side walls of the two octagonal rings respectively, and a stabilizing rod is fixedly connected between the side walls of the two stabilizing frames that are close to each other.
[0008] Preferably, the octagonal ring side wall located at the bottom is fixedly connected with eight bearing plates corresponding to the eight fixing plates one by one, and the lower end of the binding plate is fitted with the upper end of the corresponding bearing plate.
[0009] Preferably, the number of the positioning clamping rods is 14.
[0010] The utility model has the following beneficial effects:
[0011] The utility model arranges binding plates and positioning clamps, and the nearly circular shape formed by eight binding plates can make the steel bars present a ring shape, thereby forming a plurality of steel bar rings. Subsequently, the staff can bind the plurality of steel bar rings together by wire to form a steel bar cage. The operation is fast and standardized, avoiding the current long preparation time of the steel bar cage and the non-standardization of the steel bar cage composed of a plurality of steel bar rings. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 This is a structural schematic diagram of the wind tower top ring steel cage binding mold proposed by the utility model;
[0013] Figure 2 for Figure 1 Schematic diagram of the top view structure.
[0014] In the figure: 1 octagonal ring, 2 stabilizing frame, 3 fixing plate, 4 stabilizing rod, 5 bearing plate, 6 first telescopic rod, 7 second telescopic rod, 8 tying plate, 9 positioning clamp rod. DETAILED DESCRIPTION
[0015] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0016] Reference Figure 1-2 The steel cage binding mold for the top ring of a wind tower comprises two octagonal rings 1, eight fixed plates 3 are fixedly connected between the side walls of the two octagonal rings 1 close to each other, eight first telescopic rods 6 corresponding to the eight fixed plates 3 are fixedly connected to the side walls of the upper octagonal ring 1, second telescopic rods 7 are fixedly connected to the side walls of the fixed plates 3, and the movable ends of the second telescopic rods 7 and the corresponding movable ends of the first telescopic rods 6 are jointly fixedly connected with a binding plate 8, and the binding plate 8 is fixedly connected with a plurality of positioning rods 9 on the side walls away from the fixed plates 3, and the plurality of positioning rods 9 are evenly distributed in the vertical direction, and the number of the positioning rods 9 is 14.
[0017] Further, such as Figure 1As shown, when tying the steel cage ring on the top of the wind tower, first, a plurality of steel bars are respectively inserted between two adjacent positioning rods 9 located on the side walls of the eight tying plates 8. At this time, the nearly circular shape formed by the eight tying plates 8 can make the steel bar in a ring shape, and a plurality of steel bars can be arranged and inserted in the vertical direction to form a plurality of steel rings. Then, the staff can tie the plurality of steel rings by wire to form a steel cage. The operation is fast and standardized. After the operation is completed, the first telescopic rod 6 and the second telescopic rod 7 are adjusted to be telescopic so that the positioning rod 9 is away from the steel bar, thereby facilitating the removal of the steel cage, avoiding the current long preparation time of the steel cage and the non-standardization of the steel cage composed of a plurality of steel rings.
[0018] By adjusting the telescopic degrees of the first telescopic rod 6 and the second telescopic rod 7 at the same time, the size of the steel ring can be adjusted, and then the size of the steel cage can be adjusted, thereby increasing the practicality of the mold.
[0019] Two stabilizing frames 2 are fixedly connected to the inner side walls of the two octagonal rings 1, and a stabilizing rod 4 is fixedly connected between the side walls of the two stabilizing frames 2 that are close to each other, so as to increase the firmness of the mold during use.
[0020] The side wall of the octagonal ring 1 at the bottom is fixedly connected with eight bearing plates 5 corresponding to the eight fixing plates 3 one by one, and the lower end of the tying plate 8 is fitted with the upper end of the corresponding bearing plate 5 to support the tying plate 8 and increase its stability.
[0021] In the utility model, when preparing a steel cage for the top ring of the wind tower, the mold is first stably placed on the ground, and then a plurality of steel bars are respectively inserted between two adjacent positioning rods 9 located on the side walls of the eight binding plates 8. At this time, the nearly circular shape formed by the eight binding plates 8 can make the steel bars in a ring shape, thereby forming a plurality of steel rings. Then, the staff can bind the plurality of steel rings with iron wire to form a steel cage. The operation is fast and standardized. After the operation is completed, the first telescopic rod 6 and the second telescopic rod 7 are adjusted to be telescopic, so that the positioning rod 9 is away from the steel bars, thereby facilitating the removal of the steel cage, thereby avoiding the current long preparation time of the steel cage and the non-standardization of the steel cage composed of a plurality of steel rings.
[0022] Furthermore, during the operation, the staff can adjust the telescopic degrees of the first telescopic rod 6 and the second telescopic rod 7, and can adjust the size of the steel ring, and further adjust the size of the steel cage, thereby increasing the practicality of the mold.
[0023] The above are only preferred specific implementation methods of the utility model, but the protection scope of the utility model is not limited to this. Any technician familiar with the technical field within the technical scope disclosed by the utility model, who makes equivalent replacements or changes based on the technical scheme and utility model concept of the utility model, should be covered by the protection scope of the utility model.
Claims
1. The wind tower top ring steel cage binding mold is characterized by: The invention comprises two octagonal rings (1), eight fixed plates (3) being fixedly connected between the side walls of the two octagonal rings (1) close to each other, eight first telescopic rods (6) corresponding to the eight fixed plates (3) in a one-to-one manner being fixedly connected to the side wall of the octagonal ring (1) located above, a second telescopic rod (7) being fixedly connected to the side wall of the fixed plate (3), a binding plate (8) being fixedly connected to the movable end of the second telescopic rod (7) and the movable end of the first telescopic rod (6) corresponding thereto, and a plurality of positioning clamping rods (9) being fixedly connected to the side wall of the binding plate (8) away from the fixed plate (3), and the plurality of positioning clamping rods (9) being evenly distributed in the vertical direction.
2. The wind tower top ring steel cage binding mold according to claim 1 is characterized in that: Two stabilizing frames (2) are respectively fixedly connected to the inner side walls of the two octagonal rings (1), and a stabilizing rod (4) is fixedly connected between the side walls of the two stabilizing frames (2) that are close to each other.
3. The wind tower top ring steel cage binding mold according to claim 1 is characterized in that: The side wall of the octagonal ring (1) located at the bottom is fixedly connected to eight bearing plates (5) corresponding to the eight fixing plates (3) one by one, and the lower end of the binding plate (8) is in contact with the upper end of the corresponding bearing plate (5).
4. The wind tower top ring steel cage binding mold according to claim 1 is characterized in that: The number of the positioning clamping rods (9) is 14.