Overwater pile clamping device

By designing a water-based pile clamping device and using modular, prefabricated and flexible connection technologies, the problem of foundation pile stability and safety under harsh sea conditions is solved, and fast and safe pile clamping operations are achieved.

CN222375358UActive Publication Date: 2025-01-21CCCC THIRD HARBOR ENGINEERING CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420792362.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-17
Publication Date
2025-01-21
Estimated Expiration
2034-04-17

AI Technical Summary

Technical Problem

In harsh sea conditions, the prior art is difficult to ensure the stability and safety of foundation piles, especially under the influence of high waves and self-weight factors, foundation piles are prone to bias and de-welding.

Method used

Provide a water pile clamping device, including a working platform, fixed structure and limiting structure. Through modular and prefabricated design, no on-site welding is required, and the flexible connection of retractable horizontal chains and pull rings is used to ensure the stability of steel pipe piles. sex and safety.

Benefits of technology

It realizes rapid pile clamping under harsh sea conditions, ensures the quality of pile clamping and the safety of foundation piles, improves on-site work efficiency, and avoids the problems of desoldering and foundation pile instability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222375358U_ABST
    Figure CN222375358U_ABST
Patent Text Reader

Abstract

The utility model discloses an overwater pile clamping device, and relates to the technical field of overwater engineering. The utility model provides an overwater pile clamping device. The overwater pile clamping device comprises a working platform, a fixing structure and a limiting structure. The working platform comprises main beams and supporting beams, the main beams are connected along the edge of the working platform, and the supporting beams are connected into the main beams; the working platform comprises a plurality of through holes allowing the steel pipe piles to penetrate through. A fixing structure and a limiting structure are arranged around the through hole, the fixing structure is fixedly connected with the steel pipe pile, and the limiting structure is flexibly connected with the steel pipe pile. According to the overwater pile clamping device, on-site welding operation is not needed, modularization and prefabrication are achieved, and on-site work efficiency is greatly improved. According to the pile clamping device, rapid pile clamping can be conducted on the sea, especially under the severe sea condition with poor sea storm conditions, the pile clamping quality is guaranteed, and the foundation pile safety is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water engineering, and more specifically to an water pile clamping device. Background Art

[0002] Offshore wind power has the characteristics of abundant resources, high power generation utilization hours, no land occupation and suitability for large-scale development. It is the latest frontier of global wind power development.

[0003] In the prior art, after the piles of high-pile docks are sunk in water, the piles must be clamped as soon as possible to prevent the single foundation pile from being excessively displaced or even unstable due to factors such as waves and deadweight. Pile clamping is a temporary measure before the enclosure process. Generally, several foundation piles are connected into a whole by welding channel steel. However, under severe sea conditions, the quality of on-site welding is difficult to guarantee. The horizontal wave force causes the foundation piles to be displaced significantly. The rigidity of the connection is limited only by channel steel, and the welding phenomenon often occurs, which affects the safety of the foundation pile structure during the construction period. Utility Model Content

[0004] In view of this, the utility model provides an above-water pile clamping device, which can be used for pile clamping operations under severe sea conditions.

[0005] The utility model provides an above-water pile clamping device, comprising: a working platform, a fixing structure and a limiting structure;

[0006] The working platform comprises a main beam and a supporting beam, a plurality of the main beams are connected along the edge of the working platform, and the supporting beam is connected inside the plurality of the main beams;

[0007] The working platform includes a plurality of through holes for steel pipe piles to pass through;

[0008] The fixing structure and the limiting structure are arranged along a circumference of the through hole, the fixing structure is fixedly connected to the steel pipe pile, and the limiting structure is flexibly connected to the steel pipe pile.

[0009] In a possible implementation, the limiting structure includes a retractable horizontal chain and a pull ring connected to an end of the retractable horizontal chain;

[0010] The retractable horizontal chain surrounds the steel pipe pile, and the pull ring is fixed to a position of the working platform opposite to the overturning direction of the steel pipe pile.

[0011] In a possible implementation, the above-water pile clamping device is located at the top of the steel pipe pile and at least above the foundation pile anti-corrosion dividing line of the steel pipe pile.

[0012] In a possible implementation, the working platform is a polygon, and the plurality of through holes are symmetrically arranged about a geometric center of the working platform.

[0013] In a possible implementation manner, the number of the through holes is equal to the number of the steel pipe piles.

[0014] In a possible implementation, the steel pipe piles include three, which are distributed at an angle of 120° with respect to each other;

[0015] The working platform comprises three through holes, and any one of the through holes is opposite to one of the steel pipe piles;

[0016] The steel pipe pile overturns in a direction close to the geometric center, and the corresponding limiting structure is fixed in a direction away from the geometric center.

[0017] In a possible implementation, the retractable horizontal chain includes a plurality of links, and the plurality of pull rings are arranged at equal intervals on the same straight line, and the straight line where the plurality of pull rings are located is perpendicular to a line connecting the steel pipe pile and the geometric center.

[0018] In a possible implementation, any of the retractable horizontal chains wraps around the steel pipe pile for several times.

[0019] In a possible implementation, the fixing direction of the plurality of pull rings on the working platform is the same as the extending direction of the ends of the retractable horizontal chains to which they are connected.

[0020] In a possible implementation, along the horizontal direction, the thickness of the fixed structure is not less than 35 cm.

[0021] Compared with the prior art, the present invention provides at least the following beneficial effects:

[0022] The above-water pile clamping device provided by the utility model does not require on-site welding operations, realizes modularization and prefabrication, and greatly improves on-site work efficiency. It can quickly clamp piles at sea, especially in severe sea conditions with poor wind and wave conditions, to ensure the quality of pile clamping and the safety of foundation piles.

[0023] Of course, any product implementing the present utility model does not necessarily need to achieve all of the above-mentioned technical effects at the same time.

[0024] Other features and advantages of the present invention will become apparent from the following detailed description of exemplary embodiments of the present invention with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] The accompanying drawings, which are incorporated in and constitute a part of the specification, illustrate embodiments of the present invention and, together with the description, serve to explain the principles of the present invention.

[0026] Figure 1A schematic diagram of the top view of the structure of an above-water pile clamping device provided by the utility model;

[0027] Figure 2 The utility model is a schematic diagram of the side structure of an above-water pile clamping device. DETAILED DESCRIPTION

[0028] Various exemplary embodiments of the present invention will now be described in detail with reference to the accompanying drawings. It should be noted that unless otherwise specifically stated, the relative arrangements of components and steps, numerical expressions and numerical values ​​set forth in these embodiments do not limit the scope of the present invention.

[0029] The following description of at least one exemplary embodiment is merely illustrative in nature and is in no way intended to limit the invention, its application, or uses.

[0030] Technologies, methods, and equipment known to ordinary technicians in the relevant art may not be discussed in detail, but where appropriate, the technologies, methods, and equipment should be considered as part of the specification.

[0031] In all examples shown and discussed herein, any specific values ​​should be interpreted as merely exemplary and not limiting. Therefore, other examples of the exemplary embodiments may have different values.

[0032] It should be noted that like reference numerals and letters refer to similar items in the following figures, and therefore, once an item is defined in one figure, it need not be further discussed in subsequent figures.

[0033] The utility model provides an above-water pile clamping device, referring to Figure 1 and Figure 2 As shown, the embodiment of the utility model provides an above-water pile clamping device, comprising: a working platform 10, a fixing structure 20 and a limiting structure 30;

[0034] The working platform 10 includes a main beam and a supporting beam, a plurality of main beams are connected along the edge of the working platform, and the supporting beams are connected inside the plurality of main beams;

[0035] The working platform 10 includes a plurality of through holes for the steel pipe piles 40 to pass through;

[0036] A fixing structure 20 and a limiting structure 30 are arranged along a circumference of the through hole. The fixing structure 20 is fixedly connected to the steel pipe pile 40 , and the limiting structure 30 is flexibly connected to the steel pipe pile 40 .

[0037] It is understandable that the working platform 10 welded with the main beam and the supporting beam is used to provide a platform for operation. The working platform 10 adopts a steel structure, and its rigidity can resist the horizontal displacement of the foundation pile. The vertical load takes into account the construction load of the operators. The structure mainly adopts steel and mesh plates to provide a safe working platform for the subsequent enclosure process.

[0038] Furthermore, the working platform 10 is designed and constructed according to the planned number of pile clamps before the piles are sunk in the project. Generally speaking, the number of through holes in the working platform 10 is equal to the number of steel pipe piles 40. A fixing structure 20 and a limiting structure 30 are provided at the through holes.

[0039] When several foundation piles at sea have been sunk, the pile clamping operation is carried out. First, the multifunctional barge carries the water pile clamping device provided by the utility model into place, and re-measures the deviation of the steel pipe pile 40. If the deviation is too large, it needs to be corrected so that the water pile clamping device can be installed smoothly. The multifunctional barge lifts the water pile clamping device. The multifunctional barge is equipped with two cables and wind ropes, which can be adjusted in a small range. The water pile clamping device and the steel pipe pile 40 are initially limited. Then, the fixed structure 20 is fixedly connected to the steel pipe pile 40, and the limiting structure 30 is flexibly connected to the steel pipe pile 40. After the connection is completed, the multifunctional barge is withdrawn from the site.

[0040] The above-water pile clamping device provided by the utility model does not require on-site welding operations, realizes modularization and prefabrication, and greatly improves on-site work efficiency. It can quickly clamp piles at sea, especially in severe sea conditions with poor wind and wave conditions, to ensure the quality of pile clamping and the safety of foundation piles.

[0041] In an optional embodiment provided by the present utility model, the limiting structure 30 includes a retractable horizontal chain 31 and a pull ring 32 connected to the end of the retractable horizontal chain 31;

[0042] The retractable horizontal chain 31 surrounds the steel pipe pile 40 , and the pull ring 32 is fixed to the working platform 10 at a position opposite to the overturning direction of the steel pipe pile 40 .

[0043] It can be understood that the limiting structure 30 is used to realize the flexible connection between the steel pipe pile 40 and the above-water pile clamping device. Specifically, the retractable horizontal chain 31 of the limiting structure 30, after the retractable horizontal chain 31 surrounds the steel pipe pile 40, fixes the pull ring 32 on the working platform 10. In addition, the fixing direction of the pull ring 32 is opposite to the overturning direction of the steel pipe pile 40.

[0044] In an optional embodiment provided by the present invention, the above-water pile clamp device is located at the top of the steel pipe pile 40, and at least above the anti-corrosion demarcation line of the foundation pile of the steel pipe pile 40. The above-water pile clamp device is fixed within 0.8m-1.5m of the top of the steel pipe pile 40, and cannot damage the anti-corrosion layer.

[0045] In another optional embodiment provided by the present invention, the working platform 10 is polygonal, and the plurality of through holes are symmetrically arranged about the geometric center of the working platform 10 .

[0046] It is understandable that the water pile clamping device is prefabricated, and its shape and number of through holes correspond to the number of steel pipe piles 40 that need to be clamped. Generally speaking, the steel pipe piles 40 are also symmetrically arranged, so the working platform 10 is a polygon, which can be a regular polygon, or can be set according to actual conditions, and the utility model does not make specific restrictions. The multiple through holes are symmetrically arranged about the geometric center of the working platform 10, which can ensure that the water pile clamping device and the steel pipe piles 40 are evenly stressed and ensure the quality of the pile clamping.

[0047] In an optional embodiment provided by the present utility model, the steel pipe piles 40 include three, which are distributed at an angle of 120° with each other;

[0048] The working platform 10 includes three through holes, and any through hole is opposite to a steel pipe pile 40;

[0049] The steel pipe pile 40 overturns in a direction close to the geometric center, and the corresponding limiting structure 30 is fixed in a direction away from the geometric center.

[0050] In this embodiment, there are three steel pipe piles 40, so the working platform 10 is a symmetrical hexagon, the through holes are evenly arranged on the horizontal platform 10, arranged at an angle of 120°, and the steel pipe piles 40 are also arranged at an angle of 120°. The steel pipe pile 40 overturns toward the geometric center, and the retractable horizontal chain 31 of the limiting structure 30 surrounds the steel pipe pile 40 and fixes the pull ring 32 in a direction away from the geometric center, exerting an opposite force on the steel pipe pile 40.

[0051] In another optional embodiment provided by the present invention, the retractable horizontal chain 31 includes multiple pull rings 32 that are evenly spaced and arranged on the same straight line, and the straight line where the pull rings 32 are located is perpendicular to the line connecting the steel pipe pile 40 and the geometric center.

[0052] It is understandable that the retractable horizontal chain 31 includes a plurality of chains, and any retractable horizontal chain is wound around the steel pipe pile 40 for several turns. Due to the retractable performance, the pull ring 32 at the end of the retractable horizontal chain 31 can be fixed at any position and keep the chain relatively straight.

[0053] Furthermore, multiple pull rings 32 can be arranged on the same straight line, which is perpendicular to the line connecting the steel pipe pile 40 and the geometric center, to ensure that the steel pipe pile 40 receives the balanced pulling force of multiple retractable horizontal chains 31. The fixing direction of multiple pull rings 32 on the working platform 10 is the same as the extending direction of the ends of the retractable horizontal chains 31 connected thereto, which also ensures balanced force.

[0054] In another optional embodiment provided by the present invention, the thickness of the fixed structure 20 along the horizontal direction is not less than 35 cm, so as to ensure the clamping quality of the fixed structure 20 on the steel pipe pile 40 .

[0055] In summary, the above-water pile clamping device provided by the utility model achieves at least the following beneficial effects:

[0056] The above-water pile clamping device provided by the utility model does not require on-site welding operations, realizes modularization and prefabrication, and greatly improves on-site work efficiency. It can quickly clamp piles at sea, especially in severe sea conditions with poor wind and wave conditions, to ensure the quality of pile clamping and the safety of foundation piles.

[0057] Although some specific embodiments of the present invention have been described in detail by way of examples, it should be understood by those skilled in the art that the above examples are for illustration only and are not intended to limit the scope of the present invention. It should be understood by those skilled in the art that the above embodiments may be modified without departing from the scope and spirit of the present invention. The scope of the present invention is defined by the appended claims.

Claims

1. A pile clamp device on water, characterized in that: include: Working platforms, fixed structures and limiting structures; The working platform comprises a main beam and a supporting beam, a plurality of the main beams are connected along the edge of the working platform, and the supporting beam is connected inside the plurality of the main beams; The working platform includes a plurality of through holes for steel pipe piles to pass through; The fixing structure and the limiting structure are arranged along a circumference of the through hole, the fixing structure is fixedly connected to the steel pipe pile, and the limiting structure is flexibly connected to the steel pipe pile.

2. The above-water pile clamp device according to claim 1, characterized in that: The limiting structure includes a retractable horizontal chain and a pull ring connected to the end of the retractable horizontal chain; The retractable horizontal chain surrounds the steel pipe pile, and the pull ring is fixed to a position of the working platform opposite to the overturning direction of the steel pipe pile.

3. The above-water pile clamp device according to claim 1, characterized in that: The above-water pile clamping device is located at the top of the steel pipe pile and at least above the foundation pile anti-corrosion dividing line of the steel pipe pile.

4. The above-water pile clamping device according to claim 1, characterized in that: The working platform is polygonal, and the plurality of through holes are symmetrically arranged about the geometric center of the working platform.

5. The above-water pile clamping device according to claim 4, characterized in that: The number of the through holes is equal to the number of the steel pipe piles.

6. The above-water pile clamping device according to claim 5, characterized in that: The steel pipe piles include three, which are distributed at an angle of 120° to each other; The working platform comprises three through holes, and any one of the through holes is opposite to one of the steel pipe piles; The steel pipe pile overturns in a direction close to the geometric center, and the corresponding limiting structure is fixed in a direction away from the geometric center.

7. The above-water pile clamping device according to claim 2, characterized in that: The retractable horizontal chain comprises a plurality of pull rings, and the plurality of pull rings are arranged at equal intervals on the same straight line, and the straight line where the plurality of pull rings are located is perpendicular to the line connecting the steel pipe pile and the geometric center.

8. The above-water pile clamp device according to claim 2, characterized in that: Any of the retractable horizontal chains is wound around the steel pipe pile for several turns.

9. The above-water pile clamping device according to claim 2, characterized in that: The fixing direction of the plurality of pull rings on the working platform is the same as the extending direction of the ends of the retractable horizontal chains to which they are connected.

10. The above-water pile clamping device according to claim 1, characterized in that: In the horizontal direction, the thickness of the fixed structure is not less than 35 cm.