Anchor rod construction device

By designing an anchor construction device that includes reinforcement components, the problem that existing anchors cannot cope with holes of different depths and cannot reinforce concrete is solved, and the effective reinforcement and stability improvement of concrete are achieved.

CN222375397UActive Publication Date: 2025-01-21BINZHOU MUNICIPAL ENGINEERING SUPERVISION CONSULTING CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202420801381.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-18
Publication Date
2025-01-21
Estimated Expiration
2034-04-18

AI Technical Summary

Technical Problem

The existing anchor rod has a simple structure and a single function. It cannot cope with holes of different depths and cannot reinforce the concrete injected into the drilled hole, resulting in the concrete being easily broken when soil is extruded.

Method used

An anchor construction device is designed, including drill rods, connecting sleeves, drill bits, sleeves and reinforcement components. The reinforcement component is composed of multiple sets of struts, annular rods, movable grooves and springs. Through the action of rebound elastic force, the annular rod expands and fits the inner wall of the borehole, providing reinforcement support for the concrete.

Benefits of technology

The device can effectively deal with holes of different depths, and uses reinforcement components to reinforce the concrete injected into the drilled hole, improving the stress-extrusion stability of the concrete and preventing concrete from breaking.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222375397U_ABST
    Figure CN222375397U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of constructional engineering, in particular to an anchor rod construction device which comprises a drill rod. A connecting sleeve is installed at the left end of the drill rod through threads, a drill bit is installed at the left end of the connecting sleeve, four sets of protruding blocks are annularly installed at the left end of the connecting sleeve, the four sets of protruding blocks are inserted into the right end of the drill bit, a sleeve is inserted into the drill rod, a reinforcing assembly is annularly installed on the sleeve, and the reinforcing assembly is attached to the interior of the drill rod. The anchor rod is inserted into the sleeve on the drill rod, then the drill holes in the drill rod and the connecting sleeve are drawn out, concrete is injected into the drill holes when the drill rod and the connecting sleeve are drawn out, and when the drill rod and the connecting sleeve are separated from the sleeve and the annular rods, the concrete is injected into the drill holes. Multiple groups of springs of multiple groups of annular rods and multiple groups of movable rods pop up and expand from multiple groups of supporting rods under the action of resilience force, so that the multiple groups of annular rods expand to be attached to a drill hole, and concrete injected into the drill hole is processed through a sleeve and the multiple groups of annular rods.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction engineering, in particular to an anchor rod construction device. Background Art

[0002] In construction projects, soil reinforcement is often required in many construction activities such as opening tunnels and reinforcing foundations. When reinforcing the soil, anchor construction devices are often used for auxiliary work. Therefore, anchor construction devices are relatively important equipment in construction projects. When using anchors, it is necessary to first use a drilling machine to open multiple holes in the soil layer to be reinforced, and then use anchors to deliver cement to the opened holes. Sometimes, it is also necessary to set steel bars on the soil layer to further reinforce the soil layer. The existing anchor structure is relatively simple and has a single function. It cannot cope with different depths of holes opened and cannot reinforce the concrete injected into the drilled hole, resulting in the concrete wrapped on the anchor being easily squeezed and broken when the soil is squeezed. For this reason, we propose an anchor construction device to solve the above problems. Utility Model Content

[0003] The purpose of the utility model is to provide an anchor rod construction device to solve the problem that the existing anchor rod structure proposed in the above background technology is relatively simple, the function is relatively single, and it cannot cope with different depths of holes opened, and it is impossible to reinforce the concrete injected into the drilled hole, resulting in the concrete wrapped on the anchor rod being easily squeezed and broken when the soil is squeezed.

[0004] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an anchor construction device, comprising a drill rod;

[0005] A connecting sleeve is installed with a thread on the left end of the drill rod, a drill bit is installed on the left end of the connecting sleeve, four groups of protrusions are installed in a ring on the left end of the connecting sleeve, the four groups of protrusions are inserted in the right end of the drill bit, a sleeve is inserted in the drill rod, a reinforcement component is installed in a ring on the sleeve, and the reinforcement component fits inside the drill rod.

[0006] Preferably, the reinforcement assembly includes multiple groups of support rods, and the multiple groups of support rods are annularly installed on the outer wall of the sleeve, and the multiple groups of support rods are each provided with a first movable groove, and the multiple groups of first movable grooves are each provided with a spring, and the multiple groups of first movable grooves are each provided with a movable rod movably inserted therein, and the multiple groups of movable rods are each provided with an annular rod.

[0007] Preferably, a second movable groove is opened in each of the plurality of groups of the annular rods, a first connecting rod is installed in each of the plurality of groups of the second movable grooves, and the first connecting rods in the plurality of groups of the second movable grooves are connected to each other.

[0008] Preferably, a plug rod is provided on one side of the plurality of groups of annular rods opposite to the inner wall of the drill rod, and one end of the plurality of groups of plug rods that is in contact with the inner wall of the drill rod is tapered.

[0009] Preferably, a second connecting rod is fixedly installed between the multiple groups of annular rods.

[0010] Preferably, a fixing groove is provided in the right end of the drill bit, and a plurality of groups of grooves are provided in an annular manner on the inner wall of the drill rod and the inner wall of the fixing groove.

[0011] Compared with the prior art, the utility model has the following beneficial effects: the utility model inserts the anchor rod into the sleeve on the drill rod, then pulls the drill rod and the connecting sleeve out of the drill hole, and injects concrete into the drill hole when the drill rod and the connecting sleeve are pulled out, and when the drill rod and the connecting sleeve are detached from the sleeve and the multiple groups of annular rods, the multiple groups of annular rods and the multiple groups of movable rods are popped out and expanded from the multiple groups of support rods under the action of the multiple groups of spring restoring forces, so that the multiple groups of annular rods expand and fit the drill hole, and the concrete injected into the drill hole is processed by the sleeve and the multiple groups of annular rods, thereby improving the stability of the concrete under force extrusion. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0013] Figure 1 It is a schematic diagram of the structure of the utility model;

[0014] Figure 2 It is a schematic diagram of the structure of the utility model;

[0015] Figure 3 It is a right side cross-sectional schematic diagram of the structure of the utility model;

[0016] Figure 4 It is a schematic diagram of a front cross-section of the structure of the utility model;

[0017] Figure 5 For this utility model Figure 3 A is a partial enlarged schematic diagram;

[0018] Figure 6 For this utility model Figure 4 A partial enlarged schematic diagram of B in the figure.

[0019] In the figure: 1, drill rod; 2, connecting sleeve; 3, drill bit; 4, bump; 5, sleeve; 6, support rod; 7, first movable groove; 8, spring; 9, movable rod; 10, annular rod; 11, second movable groove; 12, first connecting rod; 13, second connecting rod; 14, insertion rod; 15, fixed groove; 16, clamping groove. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] See also Figure 1-6 , the utility model provides an embodiment: an anchor construction device, including a drill rod 1;

[0022] The left end of the drill rod 1 is provided with a connecting sleeve 2 through a thread, a drill bit 3 is provided at the left end of the connecting sleeve 2, four groups of protrusions 4 are provided in an annular manner at the left end of the connecting sleeve 2, and the four groups of protrusions 4 are inserted into the right end of the drill bit 3. A sleeve 5 is inserted into the drill rod 1, and a reinforcement component is provided in an annular manner on the sleeve 5. The reinforcement component fits in the drill rod 1. The device inserts the reinforcement component into the drill rod 1, and inserts the reinforcement component into the borehole through the drill rod 1, the connecting sleeve 2 and the drill bit 3, and reinforces the concrete injected into the borehole through the reinforcement component;

[0023] Furthermore, the reinforcement assembly includes multiple groups of support rods 6, which are annularly installed on the outer wall of the sleeve 5. First movable grooves 7 are opened in the multiple groups of support rods 6, springs 8 are installed in the multiple groups of first movable grooves 7, movable rods 9 are movably inserted in the multiple groups of first movable grooves 7, and annular rods 10 are installed on the multiple groups of movable rods 9. When this structure pulls the drill rod 1 and the connecting sleeve 2 out of the sleeve 5, the multiple groups of annular rods 10 and the multiple groups of movable rods 9 pop out and fit against the inner wall of the borehole under the action of the restoring elastic force of the multiple groups of springs 8, and the reinforcement support in the concrete can be shaped by the sleeve 5 and the multiple groups of annular rods 10.

[0024] Furthermore, multiple groups of annular rods 10 are each provided with a second movable groove 11, and multiple groups of second movable grooves 11 are each installed with a first connecting rod 12. The first connecting rods 12 in multiple groups of second movable grooves 11 are interconnected. This structure connects multiple groups of annular rods 10 in an annular manner through multiple groups of first connecting rods 12, so that when multiple groups of annular rods 10 are expanded, they are connected together through multiple groups of first connecting rods 12 to jointly support concrete.

[0025] Furthermore, the multiple groups of annular rods 10 are provided with plug rods 14 on the side opposite to the inner wall of the drill rod 1. The ends of the multiple groups of plug rods 14 that are in contact with the inner wall of the drill rod 1 are tapered. When the multiple groups of annular rods 10 are expanded to fit the inner wall of the borehole, the multiple groups of plug rods 14 are inserted into the soil, thereby improving the anti-pull-out effect of concrete in the borehole.

[0026] Furthermore, a second connecting rod 13 is fixedly installed between the multiple groups of annular rods 10. This structure connects the multiple groups of annular rods 10 on the left and right ends of the sleeve 5 in series through the second connecting rod 13, thereby improving the connection of the multiple groups of annular rods 10 from left to right on the multiple groups of sleeves 5.

[0027] Furthermore, a fixing groove 15 is provided in the right end of the drill bit 3, and a plurality of groups of grooves 16 are provided in an annular manner on the inner wall of the drill rod 1 and the inner wall of the fixing groove 15. When the anchor rod is inserted into the drill bit 3 and the sleeve 5, barbs are provided on the anchor rod to prevent the anchor rod from being pulled out when the anchor rod is inserted into the drill bit 3 and the sleeve 5.

[0028] Working principle: When installing the anchor rod, install the drill rod 1, the connecting sleeve 2 and the drill bit 3 on the drilling rig, drive the drill rod 1, the connecting sleeve 2 and the drill bit 3 into the ground through the drilling rig, pass the anchor rod through the sleeve 5, insert the anchor rod head into the fixing groove 15, then remove the drill rod 1 and the connecting sleeve 2 from the drill bit 3 and pull them out slowly. When the drill rod 1 and the connecting sleeve 2 are separated from the sleeve 5, as shown in the figure, the anchor rod 1 and the connecting sleeve 2 are removed from the sleeve 5. Figure 3 and Figure 5 As shown, multiple groups of annular rods 10 and multiple groups of movable rods 9 pop out and expand from multiple groups of first movable grooves 7 under the action of the restoring elastic force of multiple groups of springs 8, and when the multiple groups of annular rods 10 are expanded and opened, they drive multiple groups of first connecting rods 12 to slide from multiple groups of second movable grooves 11, so that after the multiple groups of annular rods 10 are expanded and unfolded, they are connected through multiple groups of first connecting rods 12, and when the multiple groups of annular rods 10 are expanded and unfolded, they drive multiple groups of insertion rods 14 to be inserted into the soil, and concrete is injected into the borehole from the drill rod 1, and the sleeve 5 and the multiple groups of annular rods 10 are wrapped therein, so that the anchor rods can be fixed. The above is the entire working principle of the utility model.

[0029] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.

Claims

1. An anchor construction device, comprising a drill rod (1); Features: The left end of the drill rod (1) is threadedly mounted with a connecting sleeve (2), the left end of the connecting sleeve (2) is mounted with a drill bit (3), the left end of the connecting sleeve (2) is annularly mounted with four groups of protrusions (4), the four groups of protrusions (4) are inserted into the right end of the drill bit (3), a sleeve (5) is inserted into the drill rod (1), a reinforcing component is annularly mounted on the sleeve (5), and the reinforcing component fits in the drill rod (1).

2. An anchor construction device according to claim 1, characterized in that: The reinforcement assembly comprises a plurality of groups of support rods (6), wherein the plurality of groups of support rods (6) are annularly mounted on the outer wall of the sleeve (5), a first movable groove (7) is provided in each of the plurality of groups of support rods (6), a spring (8) is installed in each of the plurality of groups of the first movable grooves (7), a movable rod (9) is movably inserted in each of the plurality of groups of the first movable grooves (7), and an annular rod (10) is installed on each of the plurality of groups of the movable rods (9).

3. An anchor construction device according to claim 2, characterized in that: A second movable groove (11) is provided in each of the plurality of groups of the annular rods (10), a first connecting rod (12) is installed in each of the plurality of groups of the second movable grooves (11), and the first connecting rods (12) in the plurality of groups of the second movable grooves (11) are connected to each other.

4. An anchor construction device according to claim 2, characterized in that: A plugging rod (14) is provided on the side of the plurality of groups of annular rods (10) opposite to the inner wall of the drill rod (1), and one end of the plurality of groups of plugging rods (14) that is in contact with the inner wall of the drill rod (1) is tapered.

5. The anchor rod construction device according to claim 2, characterized in that: A second connecting rod (13) is fixedly installed between the multiple groups of annular rods (10).

6. The anchor rod construction device according to claim 1, characterized in that: A fixing groove (15) is provided in the right end of the drill bit (3), and a plurality of groups of clamping grooves (16) are provided in an annular manner on the inner wall of the drill rod (1) and the inner wall of the fixing groove (15).

Citation Information

Cited By

  • River bank collapse sensing system and sensing method

    CN120176593A

  • Foundation reinforcing system

    CN120739126A