Glue receiving structure and glue pouring device

By designing the collagen structure with the opening of the corner opening and the rowing pores, the problem of leakage of the glue mechanism is solved, the automatic collection and discharge of the glue droplet is achieved, and the equipment pollution and damage are avoided.

CN222402131UActive Publication Date: 2025-01-28HENGDIAN GRP DMEGC MAGNETICS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420200037.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-26
Publication Date
2025-01-28
Estimated Expiration
2034-01-26

AI Technical Summary

Technical Problem

The existing glue filling mechanism is prone to leakage problems during operation, causing the glue to drip on the running table and other equipment, causing pollution and damage.

Method used

It is designed to design a glue structure, including the adhesive parts and fixed components. The adhesive parts have a corner opening and gel hole in the gel area to collect leakage and automatically discharge to avoid pollution.

Benefits of technology

Effectively avoid the pollution and damage to the equipment after leakage of the adhesive valve, and improve the efficiency and safety of the irrigation process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222402131U_ABST
    Figure CN222402131U_ABST
Patent Text Reader

Abstract

The utility model relates to a glue receiving structure and a glue pouring device. The glue receiving structure comprises a glue receiving piece and a fixing assembly. The glue receiving piece is provided with an operation area and a glue discharging area which are arranged back to back in the first direction in the horizontal plane, the glue receiving piece is provided with a corner opening and a glue discharging hole in the glue discharging area, the corner opening and the glue discharging hole are arranged side by side in the second direction, and the second direction intersects with the first direction; the distance between the corner opening and the glue discharging hole in the second direction is smaller than or equal to 15 mm. The fixing assembly is used for fixing the glue receiving piece. According to the glue receiving structure provided by the embodiment of the invention, when the glue valve is used, glue leaks, the glue drops drop on the glue receiving piece and flow on the glue receiving piece, and the glue discharging hole is used for collecting and discharging the glue drops, so that unnecessary pollution and damage to equipment after the glue valve leaks the glue are avoided. After the glue valve is used, the glue valve moves to the corner opening for automatic glue discharging, and the glue discharging hole is arranged close to the corner opening, so that leaked glue drops and automatically discharged glue can be conveniently collected at the same time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of glue potting, and in particular to a glue joint structure and a glue potting device. Background Art

[0002] Photovoltaic module products need to be glued during the production process, and a glue filling mechanism is often used. Generally, a glue valve is used to fill the components to be glued on the water flow table.

[0003] The glue valve will leak glue during operation and may continue until the glue filling is completed. The leaked glue will drip onto other equipment on the flow table, causing unnecessary pollution to the equipment and even damaging the equipment. Utility Model Content

[0004] Based on this, it is necessary to provide a glue connection structure and a glue filling device.

[0005] The embodiment of the present disclosure provides a glue connection structure, which includes a glue connection piece and a fixing assembly. The glue connection piece has an operation area and a glue discharge area which are arranged in a horizontal plane in a first direction in opposite directions. The glue connection piece is provided with a corner opening and a glue discharge hole in the glue discharge area. The corner opening and the glue discharge hole are arranged in parallel along a second direction, and the second direction intersects the first direction. The spacing between the corner opening and the glue discharge hole along the second direction is less than or equal to 15 mm. The fixing assembly is used to fix the glue connection piece.

[0006] In the glue connection structure provided by the embodiment of the present disclosure, when the glue valve leaks glue during use, the glue drops fall on the glue connection part and flow on the glue connection part, and the glue discharge hole is used to collect and discharge the glue drops, so as to avoid unnecessary pollution and damage to the equipment caused by the glue valve leaking. When the glue valve is finished using, the glue valve moves to the corner opening for automatic glue discharge, and the glue discharge hole is arranged close to the corner opening to facilitate the collection of the leaked glue drops and the automatically discharged glue at the same time.

[0007] In some of the embodiments, the glue connection member is provided with a glue injection opening in the working area, and the glue injection opening is located in the middle part of the working area along the second direction.

[0008] With such arrangement, glue is poured into the component to be poured through the glue pouring opening, and the rest of the component to be poured is shielded by the glue connection piece, so that glue leakage from the glue valve is avoided and dripped onto the component to be poured, thereby reducing the glue cleaning process of the component to be poured.

[0009] In some embodiments, the material of the adhesive joint is acrylic. The shape of the adhesive discharge hole in the horizontal plane is semicircular, and the adhesive discharge hole is connected to the corner opening.

[0010] The adhesive droplets have poor adhesion to acrylic materials, which improves the fluidity of the adhesive droplets on the adhesive joint. The semicircular setting facilitates the dripping of the adhesive droplets flowing on the adhesive joint, and the glue discharge hole connected to the corner opening is conducive to the discharge of leaked glue from the glue discharge hole.

[0011] In some embodiments, the fixing assembly includes a fixing frame and a plurality of fixing feet, the plurality of fixing feet are distributed on both sides of the fixing frame along the second direction, the fixing frame is connected to the adhesive joint along the vertical direction, the plurality of fixing feet are connected to the fixing frame along the vertical direction, and the fixing direction of the plurality of fixing feet is the second direction.

[0012] With this arrangement, the fixing frame is in contact with the adhesive joint piece in the vertical direction, so that the bottom surface of the adhesive joint piece has good flatness, which is conducive to the flow of dripping glue on the adhesive joint piece. The multiple fixing legs are fixed along the second direction, which improves the stability of the adhesive joint structure.

[0013] In some embodiments, a plurality of fixing legs are located on a side of the fixing frame facing the adhesive bonding member.

[0014] Such arrangement prevents the movement of the glue-joined component from causing the fixing frame and the glue-joining piece to shake, thereby improving the stability of the glue-joining structure. At the same time, it facilitates the movement of the glue-joined component on the side of the fixing frame facing away from the glue-joining piece.

[0015] In some embodiments, the fixing frame includes two first fixing bars and two second fixing bars, the two first fixing bars are spaced apart along a first direction, the two second fixing bars are spaced apart along a second direction, and the second fixing bars overlap the first fixing bars.

[0016] In this way, the first fixing strip and the second fixing strip are arranged to reduce the area of ​​the support frame and lower the cost.

[0017] In some embodiments, the number of the fixing legs is four, and along the second direction, every two fixing legs are connected to a first fixing strip.

[0018] With such arrangement, the stability of the fixing assembly is increased along the second direction.

[0019] In some embodiments, each of the two first fixing bars, the two second fixing bars and the plurality of fixing legs is in the shape of a flat iron.

[0020] The flat iron facilitates the connection between the first fixing bar, the second fixing bar and the fixing foot, and at the same time increases the supporting flatness of the fixing frame.

[0021] In some embodiments, the first fixing bar is connected to the second fixing bar by welding. The first fixing bar is connected to the fixing foot by welding.

[0022] The welding method increases the connection strength between the fixed components and improves the supporting strength of the fixed components.

[0023] In some embodiments, the fixing frame and the adhesive joint are connected by bolts.

[0024] The bolt connection can ensure that the bottom of the glue joint part and the fixing frame have a good fit, which is beneficial to ensure that the glue joint part has a good flatness and is conducive to the flow of glue drops.

[0025] The disclosed embodiment also provides a glue filling device, which includes the above-mentioned glue connection structure and a glue filling mechanism. The glue filling mechanism can be movably located on the glue connection structure; the glue filling mechanism can be moved to the working area, and the glue filling mechanism can be moved to the glue discharge area.

[0026] The glue pouring device provided in the embodiment of the present disclosure has a glue pouring mechanism located above the glue connecting structure when working. The glue connecting structure facilitates the glue pouring operation of the glue pouring mechanism and collects and discharges the leaked glue when the glue pouring mechanism leaks glue, thereby avoiding unnecessary pollution and damage to other equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 is a top view of the adhesive bonding structure in the embodiment of the present disclosure;

[0028] Figure 2 is a side view of the adhesive bonding structure in an embodiment of the present disclosure;

[0029] Figure 3 Schematic diagram of a glue filling device in an embodiment of the present disclosure.

[0030] Reference numerals:

[0031] 1000, glue filling device; 100, glue connection structure; 10, glue connection parts; 11, working area; 111, glue filling opening; 12, glue discharge area; 121, corner opening; 122, glue discharge hole; 20, fixing component; 21, fixing frame; 211, first fixing strip; 212, second fixing strip; 22, fixing foot; 30, connecting piece; 200, glue filling mechanism. DETAILED DESCRIPTION

[0032] In order to make the above-mentioned purposes, features and advantages of the embodiments of the present disclosure more obvious and understandable, the specific implementation of the embodiments of the present disclosure is described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the embodiments of the present disclosure. However, the embodiments of the present disclosure can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the embodiments of the present disclosure, so the embodiments of the present disclosure are not limited by the specific embodiments disclosed below.

[0033] In the description of the embodiments of the present disclosure, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "perpendicular", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the embodiments of the present disclosure and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the embodiments of the present disclosure.

[0034] In the embodiments of the present disclosure, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0035] In addition, the terms "first", "second", "third", etc. are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. Exemplarily, the first fixing bar may also be referred to as the second fixing bar, and the second fixing bar may also be referred to as the first fixing bar. In the description of the present utility model, "multiple" means at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0036] In the embodiments of the present disclosure, unless otherwise clearly specified and limited, the terms "connected", "connection", and the like should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integrated connection; it can be a flexible connection, or a rigid connection along at least one direction; it can be a mechanical connection or an electrical connection; it can be directly connected, or indirectly connected through an intermediate medium, or directly connected with the presence of an intermediate medium, or it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly limited. The terms "installed", "fixed", and the like can be broadly understood as connection. For those of ordinary skill in the art, the specific meanings of the above terms in the present utility model can be understood according to the specific circumstances.

[0037] Photovoltaic module products need to be glued during the production process, and automatic glue filling machines are often used. Automatic glue filling machines fill the objects to be glued from top to bottom. When the automatic glue filling machine leaks glue, although it does not affect the normal operation of the equipment, if the leaked glue drips on other parts of the object to be glued, it is necessary to wait for the glue to dry before cleaning it; when the leaked glue drips on the belt, it will cause batch glass marks or scrap the belt, and when it drips on the line, it will corrode the line. Leaking glue will cause unnecessary pollution to the equipment and even damage the equipment.

[0038] Based on this, it is necessary to provide a glue connection structure and a glue filling device to avoid unnecessary pollution and damage to the equipment after the glue valve leaks glue.

[0039] refer to Figure 1 , Figure 1 The top view of the adhesive bonding structure 100 provided in the embodiment of the present disclosure is shown. The embodiment of the present disclosure provides an adhesive bonding structure 100 , which includes an adhesive bonding member 10 and a fixing assembly 20 .

[0040] The adhesive joint 10 has an operation area 11 and an adhesive discharge area 12 which are arranged in opposite directions along a first direction in a horizontal plane. Figure 1 In the up-down direction shown in the drawing, the operation area 11 is located at the upper part of the adhesive joint 10 , and the adhesive discharge area 12 is located at the lower part of the adhesive joint 10 .

[0041] The adhesive connection member 10 is provided with a corner opening 121 and an adhesive discharge hole 122 in the adhesive discharge area 12. The corner opening 121 and the adhesive discharge hole 122 are arranged in parallel along a second direction, and the second direction intersects the first direction. Figure 1 In the left-right direction shown in the drawing, the corner opening 121 is located at the lower left corner of the adhesive joint 10 , and the adhesive discharge hole 122 is located on the right side of the corner opening 121 in the horizontal plane.

[0042] The distance between the corner opening 121 and the glue discharge hole 122 along the second direction is less than or equal to 15 mm. The fixing assembly 20 is used to fix the glue joint 10 .

[0043] The glue connection structure 100 provided in the embodiment of the present disclosure has an operation area 11 for filling glue on the glue filling equipment. When the glue valve leaks glue during use, the glue droplets can drip onto other areas of the glue connection part 10 and flow on the glue connection part 10, and then flow to the glue discharge hole 122 and be discharged. When the glue valve is finished using, the glue valve moves to the corner opening 121 of the glue discharge area 12 for automatic glue discharge, and the glue discharge hole 122 is arranged close to the corner opening 121 to facilitate the collection of the leaked glue droplets and the automatically discharged glue at the same time.

[0044] The glue connection structure 100 provided in the embodiment of the present disclosure can receive and discharge leaked glue, thereby avoiding unnecessary contamination and damage to the equipment caused by glue leakage from the glue valve.

[0045] Exemplarily, the corner opening 121 may be opened at the lower right corner, and the glue discharge hole 122 is located on the left side of the corner opening 121 in the horizontal plane.

[0046] Exemplarily, a rubber collecting piece may be provided below the corner opening 121 in the vertical direction for recycling waste rubber.

[0047] Exemplarily, the adhesive joint 10 is made of a rectangular flat plate with a thickness of 10 mm and a size of 1640 mm*1350 mm.

[0048] Exemplarily, the glue discharge hole 122 is circular and has a diameter no greater than 20 mm.

[0049] Exemplarily, the distance between the corner opening 121 and the glue discharge hole 122 along the left-right direction may be 0 mm, 5 mm, 10 mm or 15 mm.

[0050] See also Figure 1 In some embodiments, the glue connection member 10 is provided with a glue injection opening 111 in the working area 11 , and the glue injection opening 111 is located in the middle part of the working area 11 along the second direction.

[0051] With such arrangement, the component to be glued is glued through the glue injection opening 111, and the rest of the component to be glued is shielded by the glue connection member 10, so as to prevent glue from leaking from the glue valve and dripping onto the component to be glued, thereby reducing the glue cleaning process of the component to be glued.

[0052] Exemplarily, the glue filling port of the glue valve moves in the glue filling opening 111 for glue filling operation.

[0053] For example, Figure 1 As shown, the glue pouring opening 111 is a rectangular opening with a length of 800 mm and a width of 30 mm.

[0054] For example, Figure 1 As shown, the distance between the uppermost edge of the glue filling opening 111 and the uppermost edge of the rectangular flat plate is 50 mm.

[0055] In some embodiments, the material of the adhesive connection member 10 is acrylic. The shape of the adhesive discharge hole 122 in the horizontal plane is semicircular, and the adhesive discharge hole 122 is connected to the corner opening 121 .

[0056] The adhesive droplets have poor adhesion to acrylic materials, which improves the fluidity of the adhesive droplets on the adhesive connection part 10. The semicircular arrangement facilitates the dripping of the adhesive droplets flowing on the adhesive connection part 10, and the adhesive discharge hole 122 is connected to the corner opening 121, which is conducive to the discharge of the leaked adhesive from the adhesive discharge hole 122.

[0057] Exemplarily, the center of the semicircle is located on the side of the corner opening 121 , and the straight side of the semicircle is limited by the side of the corner opening 121 .

[0058] refer to Figure 1 and Figure 2 In some embodiments, the fixing assembly 20 includes a fixing frame 21 and a plurality of fixing legs 22, the plurality of fixing legs 22 are distributed on both sides of the fixing frame 21 along the second direction, the fixing frame 21 is connected to the adhesive joint 10 along the vertical direction, the plurality of fixing legs 22 are connected to the fixing frame 21 along the vertical direction, and the fixing direction of the plurality of fixing legs 22 is the second direction.

[0059] In this way, the fixing frame 21 is vertically attached to the adhesive joint 10, so that the bottom surface of the adhesive joint 10 has good flatness, which is conducive to the flow of dripping glue on the adhesive joint 10. The plurality of fixing legs 22 are fixed along the second direction to improve the stability of the adhesive joint structure 100.

[0060] Exemplarily, along the vertical direction, the fixing frame 21 is located below the adhesive joint 10 , and the fixing frame 21 supports the adhesive joint 10 .

[0061] Exemplarily, the fixing legs 22 are located at two sides of the adhesive joint 10 along the left-right direction, and the fixing legs 22 are connected to the fixing frame 21 along the vertical direction.

[0062] Exemplarily, the fixed foot 22 on the left side is fixed to the water table or wall on the left side. The fixed foot 22 on the right side is fixed to the water table or wall on the right side.

[0063] refer to Figure 2 In some embodiments, a plurality of fixing legs 22 are located on a side of the fixing frame 21 facing the adhesive bonding member 10 .

[0064] This arrangement prevents the movement of the adhesive assembly to be bonded from causing the fixing frame 21 and the adhesive bonding member 10 to shake, thereby improving the stability of the adhesive bonding structure 100. At the same time, it facilitates the movement of the adhesive assembly to be bonded on the side of the fixing frame 21 facing away from the adhesive bonding member 10.

[0065] Exemplarily, a plurality of fixing legs 22 are located on the fixing frame 21 in the vertical direction, so as to facilitate the movement of the adhesive assembly to be bonded under the fixing frame 21 .

[0066] refer to Figure 1 In some embodiments, the fixing frame 21 includes two first fixing bars 211 and two second fixing bars 212 , the two first fixing bars 211 are spaced apart along the first direction, the two second fixing bars 212 are spaced apart along the second direction, and the second fixing bars 212 overlap with the first fixing bars 211 .

[0067] In this way, the first fixing bar 211 and the second fixing bar 212 are arranged to reduce the area of ​​the support frame and lower the cost.

[0068] Exemplarily, the two first fixing bars 211 and the two second fixing bars 212 divide the glue joint 10 into nine parts. The part between the upper first fixing bar 211 and the upper edge of the flat plate is divided from left to right into the first part, the second part and the third part by the two second fixing bars 212, the working area 11 is located in the second part, and the glue filling opening 111 is also located in the second part. The part between the two first fixing bars 211 is divided from left to right into the fourth part, the fifth part and the sixth part by the two second fixing bars 212. The part between the lower first fixing bar 211 and the lower edge of the flat plate is divided from left to right into the seventh part, the eighth part and the ninth part by the two second fixing bars 212, and the corner opening 121 and the glue discharge hole 122 are located in the seventh part.

[0069] In other embodiments, the corner opening 121 and the glue discharge hole 122 may also be located in the ninth portion. It is understood that the working area 11 may include the first portion, the second portion and the third portion. The glue discharge area 12 may include the seventh portion, the eighth portion and the ninth portion.

[0070] Exemplarily, the fixing frame 21 is a well-shaped fixing frame. In other embodiments, the fixing frame 21 can be a sub-shaped fixing frame.

[0071] Exemplarily, the fixing frame 21 may further include a third fixing bar, which is stacked on the first fixing bar 211 and on the second fixing bar 212. The supporting strength and supporting stability of the fixing frame 21 are increased.

[0072] In other embodiments, the number of the second fixing bars 212 may be three or more.

[0073] refer to Figure 1 In some embodiments, the number of the fixing legs 22 is four, and along the second direction, every two fixing legs 22 are connected to a first fixing bar 211 .

[0074] With such configuration, the stability of the fixing assembly 20 is increased along the second direction.

[0075] Exemplarily, the two fixing feet 22 on the left side are respectively connected to the left ends of the first fixing bar 211 and the second fixing bar 212 , and the two fixing feet 22 on the right side are respectively connected to the right ends of the first fixing bar 211 and the second fixing bar 212 .

[0076] Exemplarily, the middle portion of the fixing foot 22 is connected to the first fixing bar 211 and the second fixing bar 212 , and the fixing foot 22 extends to both sides of the fixing bar in a vertical direction.

[0077] refer to Figure 1 and Figure 2In some embodiments, each of the two first fixing bars 211, the two second fixing bars 212 and the plurality of fixing legs 22 is in the shape of a flat iron.

[0078] The flat iron facilitates the connection between the first fixing bar 211 , the second fixing bar 212 and the fixing foot 22 , while increasing the supporting flatness of the fixing frame 21 .

[0079] Exemplarily, the width of the flat iron is 40 mm.

[0080] Exemplarily, each of the two first fixing bars 211 , the two second fixing bars 212 and the plurality of fixing legs 22 is in the shape of an angle iron, which increases the connection strength and support strength of the fixing frame 21 .

[0081] Exemplarily, the first fixing bar 211, the second fixing bar 212 and the fixing foot 22 are all angle irons of 40 mm*40 mm.

[0082] In some embodiments, the first fixing bar 211 and the second fixing bar 212 are connected by welding. The first fixing bar 211 and the fixing foot 22 are connected by welding.

[0083] The welding method increases the connection strength between the fixing components 20 and improves the supporting strength of the fixing components 20 .

[0084] In some embodiments, the fixing frame 21 and the adhesive joint 10 are connected by bolts.

[0085] The bolt connection can ensure that the bottom of the glue joint 10 and the fixing frame 21 have a good fit, thereby ensuring that the glue joint 10 has a good flatness and is conducive to the flow of glue drops.

[0086] Reference again Figure 1 Exemplarily, the glue joint structure 100 also includes a connecting piece 30, and the connecting piece 30 includes a fixing screw and a fixing nut. The glue joint piece 10 and the fixing frame 21 are both provided with corresponding fixing through holes. The fixing screw passes through the fixing through hole from the bottom to the top and cooperates with the fixing nut to fix the glue joint piece 10 to the fixing frame 21, so that there are multiple connection points between the fixing frame 21 and the glue joint piece 10, thereby ensuring that the glue joint piece 10 has a good fit with the fixing frame 21, which is conducive to the flow of leaked glue.

[0087] In other embodiments, the fixing screw can pass through the fixing through hole from the top to the bottom and then cooperate with the fixing nut to fix the glue joint 10 to the fixing frame 21. The upper part of the glue joint 10 is not penetrated by the fixing screw so as to remain flat and facilitate the flow of leaking glue. For example, a φ8 circular hole is opened on the upper part of each fixing foot 22 for fixing the fixing foot 22 to the external wall. Figure 3The embodiment of the present disclosure also provides a glue filling device 1000, which includes the above-mentioned glue connection structure 100 and a glue filling mechanism 200. The glue filling mechanism 200 is movably located on the glue connection structure 100; the glue filling mechanism can be moved to the working area 11, and the glue filling mechanism 200 can be moved to the glue discharge area 12.

[0088] The glue pouring device 1000 provided in the embodiment of the present disclosure has a glue pouring mechanism 200 located above the glue connecting structure 100 when in operation. The glue connecting structure 100 facilitates the glue pouring operation of the glue pouring mechanism 200 and collects and discharges the leaked glue when the glue pouring mechanism 200 leaks glue, thereby avoiding unnecessary pollution and damage to other equipment.

[0089] Exemplarily, during the glue pouring operation, the glue pouring mechanism 200 contains glue inside, and the glue pouring mechanism 200 moves to the glue pouring operation area 11, and moves the glue valve in the glue pouring opening 111 to pour glue into the component to be poured. At this time, the leaked glue of the glue pouring mechanism 200 will drip into other areas of the glue connection part 10, and the leaked glue will flow on the glue connection part 10 to the glue discharge hole 122 of the glue discharge area 12 and flow out. After the glue pouring operation is completed, the glue pouring mechanism 200 moves to the corner opening 121 of the glue discharge area 12 to discharge the remaining unused glue to prevent the glue from solidifying in the glue pouring mechanism 200 and causing damage, so as to facilitate the next operation of the glue pouring mechanism 200.

[0090] The technical features of the embodiments disclosed above can be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the embodiments described above are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0091] The above disclosed embodiments only express several implementation methods of the utility model, and the description is relatively specific and detailed, but it cannot be understood as limiting the patent scope of the utility model. It should be pointed out that for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the utility model, which all belong to the protection scope of the utility model. Therefore, the protection scope of the utility model patent shall be based on the attached claims.

Claims

1. Glue joint structure, characterized in that: include: A glue connection piece, comprising an operation area and a glue discharge area arranged in opposite directions along a first direction in a horizontal plane, wherein the glue connection piece is provided with a corner opening and a glue discharge hole in the glue discharge area, wherein the corner opening and the glue discharge hole are arranged in parallel along a second direction, and the second direction intersects the first direction; and a spacing between the corner opening and the glue discharge hole along the second direction is less than or equal to 15 mm; and A fixing component is used to fix the adhesive joint.

2. The adhesive bonding structure according to claim 1, characterized in that: The glue connection piece is provided with a glue injection opening in the working area, and the glue injection opening is located in the middle part of the working area along the second direction.

3. The adhesive bonding structure according to claim 2, characterized in that: The material of the adhesive joint is acrylic; The shape of the glue discharge hole in the horizontal plane is semicircular, and the glue discharge hole is connected to the corner opening.

4. The adhesive bonding structure according to claim 1, characterized in that: The fixing assembly includes a fixing frame and a plurality of fixing feet, the plurality of fixing feet are distributed on both sides of the fixing frame along the second direction, the fixing frame is connected to the adhesive joint along the vertical direction, the plurality of fixing feet are connected to the fixing frame along the vertical direction, and the fixing direction of the plurality of fixing feet is the second direction.

5. The adhesive bonding structure according to claim 4, characterized in that: The plurality of fixing legs are located on a side of the fixing frame facing the adhesive bonding member.

6. The adhesive bonding structure according to claim 5, characterized in that: The fixing frame includes two first fixing bars and two second fixing bars, the two first fixing bars are arranged at intervals along the first direction, the two second fixing bars are arranged at intervals along the second direction, and the second fixing bars overlap with the first fixing bars.

7. The adhesive bonding structure according to claim 6, characterized in that: The number of the fixing legs is four, and along the second direction, every two fixing legs are connected to one of the first fixing bars.

8. The adhesive bonding structure according to claim 7, characterized in that: Each of the two first fixing bars, the two second fixing bars and the plurality of fixing legs is in the shape of a flat iron.

9. The adhesive bonding structure according to claim 8, characterized in that: The first fixing bar and the second fixing bar are connected by welding; The first fixing bar and the fixing foot are connected by welding; The fixing frame and the adhesive joint are connected by bolts.

10. Glue filling device, characterized in that, It comprises the glue connection structure and glue injection mechanism described in any one of claims 1 to 9, wherein the glue injection mechanism can be movably located on the glue connection structure; the glue injection mechanism can be moved to the working area, and the glue injection mechanism can be moved to the glue discharge area.