Mounting equipment for assembling ALC (autoclaved lightweight concrete) aerated concrete wallboards
By designing a installation equipment that contains limited rods and hanging components, it solves the problem of shaking and safety hazards during hanging during hanging, and realizes more efficient and secure ALC Aegle concrete wall panel installation.
Patent Information
- Application Number
- CN202323586944.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-27
- Publication Date
- 2025-01-28
- Estimated Expiration
- 2033-12-27
AI Technical Summary
When installing ALC aerated concrete wall panels in large buildings, traditional installation equipment is prone to shaking, posing safety hazards, and is imperfect in installation, requiring manual correction, affecting work efficiency.
The installation equipment including the box, the extension and the connecting plate is designed. It uses a limited rod and a hanging component to ensure that the wall plate is not shaken when hanging, and accurate adjustment and installation is achieved through the thread rod and hand wheel.
It improves the safety of ALC's gas -added concrete wall plate when hanging, avoiding the problem of incomplete installation, reducing the demand for artificial correction, improving the efficiency of work, and applicable to wall plates of different widths.
Smart Images

Figure CN222410672U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of installation equipment for assembling ALC aerated concrete wall panels, in particular to installation equipment for assembling ALC aerated concrete wall panels. Background Art
[0002] ALC aerated concrete wallboard is a building material with light bulk density, good sound insulation effect, relatively simple installation process and short construction period. It is mainly used in the internal and external walls and roofs of various buildings. It can be used as a load-bearing wall in some low-rise buildings. A double-layer bidirectional steel structure is embedded in the ALC aerated concrete wallboard. The ALC aerated concrete wallboard material is mostly large-plate surface, and the wallboard thickness is about 100mm. Due to the internal double-layer bidirectional steel support feature, the overall collapse risk is relatively small in the event of a fire. ALC aerated concrete wallboard is made of silica sand, cement, lime, aluminum powder and other raw materials. After high temperature, high pressure and steam curing, the reaction produces a porous crystallized concrete forming plate. The internal configuration is a bidirectional reinforced steel mesh that has been rust-proofed and anti-corrosion treated. Its density is smaller than that of general cement materials, and it has the advantages of light weight, high strength, good ductility and strong earthquake resistance. ALC aerated concrete wall panels are inorganic and non-flammable, which enhances the thermal insulation, sound insulation, fire resistance, water penetration resistance and frost resistance of the wall.
[0003] When installing ALC aerated concrete wall panels in large buildings, the manual method is extremely laborious, so installation equipment is required. Traditional installation equipment is prone to shaking when hoisting ALC aerated concrete wall panels, which poses certain safety hazards and makes the installation imperfect. Manual correction is also required, affecting work efficiency.
[0004] Therefore, we made improvements on this and proposed an installation device for assembling ALC aerated concrete wall panels. Utility Model Content
[0005] The purpose of the utility model is to address the existing problem that the lifting device is easy to shake during lifting, which has certain safety hazards and makes the installation imperfect, and requires manual correction, which affects the work efficiency.
[0006] In order to achieve the above-mentioned utility model purpose, the utility model provides the following technical solutions:
[0007] Equipment is installed during the assembly of ALC aerated concrete wall panels to improve the above problems.
[0008] The specific application is as follows:
[0009] It includes a box body, an extension plate and a connecting plate, the extension plate is fixedly connected to the front side of the box body, a first slide groove is opened on the extension plate, the connecting plate is fixedly installed on the extension plate, a threaded rod is threadedly connected to the connecting plate, one end of the threaded rod is connected to a limiting rod through a bearing, the end of the threaded rod away from the limiting rod is fixedly connected to a handwheel, a lifting assembly is arranged on the box body, storage assemblies are arranged on both sides of the box body, a moving assembly is arranged at the bottom of the box body, and a handle is arranged on the back of the box body.
[0010] As a preferred technical solution of the present application, the lifting assembly includes a reel, a bracket, a mounting plate, a first rope and a pulley. The reel and the bracket are fixedly mounted on the top of the box, the mounting plate is fixedly mounted on the top of the bracket, and the pulley is fixedly mounted on the bottom of the mounting plate. One end of the first rope is fixed on the reel, the first rope is wrapped around the pulley, and a fixing mechanism is provided at the end of the first rope away from the reel.
[0011] As a preferred technical solution of the present application, the fixing mechanism includes a second rope fixedly connected to one end of the first rope, and an anti-slip cloth is sewn onto the second rope.
[0012] As a preferred technical solution of the present application, an auxiliary plate is fixedly connected to the bracket, and a second sliding groove is provided on the auxiliary plate.
[0013] As a preferred technical solution of the present application, a first slider is fixedly connected to the bottom of the limit rod, a second slider is fixedly connected to the back of the limit rod, the first slider cooperates with the first slide groove, the second slider cooperates with the second slide groove, and a rotating wheel is arranged on the top of the limit rod.
[0014] As a preferred technical solution of the present application, the storage assembly includes a storage box arranged on the left side wall of the box body, circular grooves are evenly opened on the storage box, and a drawer is arranged on the right side wall of the box body.
[0015] As a preferred technical solution of the present application, the moving assembly includes universal wheels fixedly arranged at the bottom of the box body and the bottom of the extension plate.
[0016] As a preferred technical solution of the present application, a motor is also provided on the top of the box, and the output end of the motor is fixedly connected to the reel.
[0017] Compared with the prior art, the utility model has the following beneficial effects:
[0018] In the scheme of this application:
[0019] 1. By setting the limit rod, the ALC aerated concrete wall panels are hoisted with higher safety, and the ALC aerated concrete wall panels will not shake during hoisting, causing safety hazards. This solves the problem in the prior art that the ALC aerated concrete wall panels are easy to shake during hoisting, which has certain safety hazards and makes the installation imperfect, requiring manual correction, affecting work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 A schematic diagram of the structure of the installation equipment for assembling the ALC aerated concrete wall panels provided in this application;
[0021] Figure 2 A schematic diagram of the top view of the installation equipment for assembling the ALC aerated concrete wall panels provided in this application;
[0022] Figure 3 A schematic diagram of the structure of the limit rod and hoisting assembly of the installation equipment when assembling the ALC aerated concrete wall panel provided in this application;
[0023] Figure 4 A schematic diagram of the right side structure of the installation equipment for assembling the ALC aerated concrete wall panels provided in this application;
[0024] Figure 5 This is a schematic diagram of the left side structure of the installation equipment during the assembly of the ALC aerated concrete wall panel provided in this application.
[0025] Indicated in the figure:
[0026] 1. Box body; 2. Extension plate; 3. Connecting plate; 4. Threaded rod; 5. Limit rod; 6. Handwheel; 7. Reel; 8. Bracket; 9. Mounting plate; 10. First rope; 11. Auxiliary plate; 12. Second slide groove; 13. Second slider; 14. First slide groove; 15. First slider; 16. Pulley; 17. Motor; 18. Storage box; 19. Round groove; 20. Drawer; 21. Handle; 22. Universal wheel; 23. Second rope; 24. Anti-slip cloth; 25. Rotating wheel. DETAILED DESCRIPTION
[0027] To make the purpose, technical solution and advantages of the embodiment of the utility model clearer, the technical solution in the embodiment of the utility model will be described clearly and completely in conjunction with the accompanying drawings. Obviously, the described embodiment is a part of the embodiment of the utility model, not all of the embodiments.
[0028] Therefore, the following detailed description of the embodiments of the present invention is not intended to limit the scope of the present invention to be protected, but merely represents some embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0029] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features and technical solutions in the embodiments may be combined with each other.
[0030] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0031] In the description of the present utility model, it should be noted that the orientation or position relationship indicated by the terms "upper", "lower", etc. is based on the orientation or position relationship shown in the drawings, or the orientation or position relationship in which the invention product is usually placed when in use, or the orientation or position relationship commonly understood by those skilled in the art. Such terms are only for the convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first", "second", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.
[0032] Example:
[0033] like Figure 1-Figure 5 As shown, this embodiment proposes an installation device for assembling an ALC aerated concrete wall panel, including a box body 1, an extension plate 2 and a connecting plate 3, wherein the extension plate 2 is fixedly connected to the front of the box body 1, the extension plate 2 is provided with a first slide groove 14, the connecting plate 3 is fixedly installed on the extension plate 2, a threaded rod 4 is threadedly connected to the connecting plate 3, one end of the threaded rod 4 is connected to a limiting rod 5 through a bearing, and the end of the threaded rod 4 away from the limiting rod 5 is fixedly connected to a hand wheel 6, the hand wheel 6 rotates to drive the threaded rod 4 to rotate, and the threaded rod 4 drives the limiting rod 5 When the rod 5 moves, the limiting rod 5 drives the first sliding block 15 to slide in the first sliding groove 14. A lifting component is arranged on the box body 1, and storage components are arranged on both sides of the box body 1. A moving component is arranged at the bottom of the box body 1, and a handle 21 is arranged on the back of the box body 1. The ALC aerated concrete wall panel assembly installation equipment of the present application has high safety during lifting, and the ALC aerated concrete wall panel will not shake during lifting to cause safety hazards. In addition, the limiting rod 5 is adjustable and can be used for ALC aerated concrete wall panels of different widths.
[0034] In order to save more effort during the installation process, the lifting assembly includes a reel 7, a bracket 8, a mounting plate 9, a first rope 10 and a pulley 16. The reel 7 and the bracket 8 are fixedly mounted on the top of the box body 1, the mounting plate 9 is fixedly mounted on the top of the bracket 8, and the pulley 16 is fixedly mounted on the bottom of the mounting plate 9. One end of the first rope 10 is fixed on the reel 7, and the motor 17 is started. The output end of the motor 17 drives the reel 7 to rotate, and the reel 7 rotates to reel the first rope 10. The first rope 10 is wound around the pulley 16, and the first rope 10 drives the second rope 23 through the pulley 16. The second rope 23 pulls the wall panel, and a fixing mechanism is provided at the end of the first rope 10 away from the reel 7.
[0035] In order to bind the wall panels more firmly, the fixing mechanism includes a second rope 23 fixedly connected to one end of the first rope 10, and the wall panels are tied with the second rope 23. The second rope 23 is sewn with an anti-slip cloth 24, and the anti-slip cloth 24 on the second rope 23 can increase friction.
[0036] In order to adjust the limiting rod 5 , an auxiliary plate 11 is fixedly connected to the bracket 8 . The auxiliary plate 11 is provided with a second sliding groove 12 , and a second sliding block 13 slides in the second sliding groove 12 .
[0037] In order to adjust the limit rod 5, a first slider 15 is fixedly connected to the bottom of the limit rod 5, and a second slider 13 is fixedly connected to the back of the limit rod 5. The first slider 15 cooperates with the first slide groove 14, and the limit rod 5 drives the first slider 15 to slide in the first slide groove 14. The second slider 13 cooperates with the second slide groove 12 and drives the second slider 13 to slide in the second slide groove 12 at the same time. A rotating wheel 25 is provided on the top of the limit rod 5. The rotating wheel 25 prevents the corners of the limit rod 5 from scratching the wall panel when the wall panel is high.
[0038] In order to make the device more convenient, the storage component includes a storage box 18 arranged on the left side wall of the box body 1, and circular grooves 19 are evenly opened on the storage box 18. The circular grooves 19 can be used to place the staff's water cups. A drawer 20 is provided on the right side wall of the box body 1. The drawer 20 on the right side of the box body 1 can be used to place some tools used for installing wall panels, so as to facilitate the storage of tools.
[0039] In order to facilitate the movement of the device, the moving assembly includes universal wheels 22 fixedly arranged at the bottom of the box body 1 and the bottom of the extension plate 2.
[0040] In order to save effort during the installation process, a motor 17 is further provided on the top of the box body 1 , and the output end of the motor 17 is fixedly connected to the reel 7 . The output end of the motor 17 drives the reel 7 to rotate, and the reel 7 rotates to reel in the first rope 10 .
[0041] Specifically, when the installation device for assembling an ALC aerated concrete wall panel is used: first, the hand wheel 6 is turned for adjustment, and the rotation of the hand wheel 6 drives the threaded rod 4 to rotate, and the threaded rod 4 drives the limit rod 5 to move, and the limit rod 5 drives the first slider 15 to slide in the first slide groove 14, and at the same time drives the second slider 13 to slide in the second slide groove 12, and is adjusted to be consistent with the width of the ALC aerated concrete wall panel installed this time; after placing the wall panel in a suitable position, the handle 21 is held to move the device to the desired position, so that the bottom of the wall panel is stationary, and the top is placed between the limit rods 5, and then the wall panel is tied with the second rope 23, and the anti-slip cloth 24 on the second rope 23 can increase the friction force, and then the motor 17 is started, and the output end of the motor 17 drives the reel 7 to rotate, and the rotation of the reel 7 is applied to the first rope 10 The first rope 10 is wound up, and the second rope 23 is driven by the pulley 16. The second rope 23 pulls the wall panel, and the top of the wall panel moves upward along the limit rod 5. While pulling, the device is pushed forward to rotate the wall panel ninety degrees with its bottom as the center. After the wall panel is perpendicular to the ground, the second rope 23 is untied to complete the installation; the circular groove 19 on the left side of the box body 1 can be used to place the staff's water cup, and the drawer 20 on the right side of the box body 1 can be used to place some tools used to install the wall panel, which is convenient for storing the tools; the ALC aerated concrete wall panel assembly installation equipment of the present application has high safety during hoisting, and the ALC aerated concrete wall panel will not shake during hoisting, causing safety hazards, and the limit rod 5 is adjustable, so it can be used when encountering ALC aerated concrete wall panels of different widths.
[0042] All technical features in this embodiment can be freely combined according to actual needs.
[0043] The above embodiments are preferred implementation schemes of the present invention. In addition, the present invention can also be implemented in other ways. Any obvious replacement without departing from the concept of the present technical solution is within the protection scope of the present invention.
Claims
1. An installation device for assembling an ALC aerated concrete wall panel, comprising a box body (1), an extension plate (2) and a connecting plate (3), characterized in that: The extension plate (2) is fixedly connected to the front side of the box body (1); a first slide groove (14) is provided on the extension plate (2); the connection plate (3) is fixedly mounted on the extension plate (2); a threaded rod (4) is threadedly connected to the connection plate (3); one end of the threaded rod (4) is connected to a limit rod (5) via a bearing; one end of the threaded rod (4) away from the limit rod (5) is fixedly connected to a hand wheel (6); a lifting assembly is provided on the box body (1); storage assemblies are provided on both sides of the box body (1); a moving assembly is provided at the bottom of the box body (1); and a handle (21) is provided on the back of the box body (1).
2. The ALC aerated concrete wall panel assembly installation device according to claim 1 is characterized in that: The hoisting assembly comprises a reel (7), a bracket (8), a mounting plate (9), a first rope (10) and a pulley (16); the reel (7) and the bracket (8) are fixedly mounted on the top of the box body (1); the mounting plate (9) is fixedly mounted on the top of the bracket (8); the pulley (16) is fixedly mounted on the bottom of the mounting plate (9); one end of the first rope (10) is fixed on the reel (7); the first rope (10) is wound around the pulley (16); and a fixing mechanism is provided at one end of the first rope (10) away from the reel (7).
3. The ALC aerated concrete wall panel assembly installation device according to claim 2 is characterized in that: The fixing mechanism comprises a second rope (23) fixedly connected to one end of the first rope (10), and an anti-slip cloth (24) is sewn onto the second rope (23).
4. The ALC aerated concrete wall panel assembly installation device according to claim 2 is characterized in that: An auxiliary plate (11) is fixedly connected to the bracket (8), and a second sliding groove (12) is provided on the auxiliary plate (11).
5. The ALC aerated concrete wall panel assembly installation device according to claim 1 is characterized in that: The bottom of the limiting rod (5) is fixedly connected to a first slider (15), the back of the limiting rod (5) is fixedly connected to a second slider (13), the first slider (15) cooperates with a first slide groove (14), the second slider (13) cooperates with a second slide groove (12), and a rotating wheel (25) is arranged on the top of the limiting rod (5).
6. The ALC aerated concrete wall panel assembly installation device according to claim 1 is characterized in that: The storage assembly comprises a storage box (18) arranged on the left side wall of the box body (1), circular grooves (19) are evenly arranged on the storage box (18), and a drawer (20) is arranged on the right side wall of the box body (1).
7. The ALC aerated concrete wall panel assembly installation device according to claim 1 is characterized in that: The moving assembly comprises universal wheels (22) fixedly arranged at the bottom of the box body (1) and the bottom of the extension plate (2).
8. The ALC aerated concrete wall panel assembly installation device according to claim 1 is characterized in that: A motor (17) is also provided on the top of the box body (1), and an output end of the motor (17) is fixedly connected to the reel (7).