Brick unloading mechanism for black brick production line
By designing a brick -unloading mechanism that includes clamping arm and fixed mechanism on the green brick production line, the problem of damage and safety hazards caused by the brick blocks caused by clamping control errors in the existing technology, and realized more uniform support and support More stable brick unloading process.
Patent Information
- Application Number
- CN202421040788.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-14
- Publication Date
- 2025-01-28
- Estimated Expiration
- 2034-05-14
AI Technical Summary
The brick unloader in the existing blue brick production line adopts clamping method on both sides, but there is an error in the clamping force control, which causes damage to the brick or not clamping firmly, which can easily damage the surface quality of the brick or cause the brick to fall. Causes safety hazards.
A brick -unloading mechanism is designed, including the holding arm and fixed mechanism. The fixed mechanism consists of a supporting board, gear, tooth strip, mobile board, and wear -resistant plate. The board is fixed to ensure that the blue bricks remain neat and stable during the process of unloading the bricks.
By supporting the bricks uniformly to reduce the risk of damage, ensure that the blue bricks do not drop during the unloading and transfer of the bricks, protect the integrity of the brick, and improve the efficiency and safety of work.
Smart Images

Figure CN222410921U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of blue brick production, in particular to a brick unloading mechanism for a blue brick production line. Background Art
[0002] Green bricks are made of fired clay, which contains iron. When completely oxidized during the firing process, ferric oxide is generated, which is red, the most commonly used red brick. If water is added to cool the clay during the firing process, the iron in the clay is not completely oxidized, which turns blue, i.e. green bricks. Green brick production line refers to the equipment and process flow used to produce green bricks, in which a special brick unloading mechanism is required in the brick unloading process, and forklifts are often used to assist in brick unloading.
[0003] However, in the prior art, brick unloading machines unload bricks by clamping on both sides and then moving. However, there are errors in the control of clamping force, and long-distance clamping can cause bricks to be damaged or clamped loosely, which can easily damage the surface quality of bricks, or bricks can fall and cause injuries to workers, requiring additional adjustments and maintenance. In view of the above problems, a brick unloading mechanism for a green brick production line is proposed. Utility Model Content
[0004] The utility model aims to solve the problem that the brick unloading machine in the prior art adopts the two-side clamping method to unload bricks, but there is an error in the clamping force control, which may cause the bricks to be damaged or the clamping is not firm, and proposes a brick unloading mechanism for a green brick production line.
[0005] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a brick unloading mechanism for a green brick production line, comprising a clamping arm and two groups of connecting blocks, a forklift is arranged on one side of the clamping arm, the forklift comprises a door frame and a fork frame, a fixing mechanism is arranged on the top of the fork frame, the fixing mechanism comprises a motor 1, a supporting plate, a supporting frame and a wear-resistant plate, the top of the supporting plate is rotatably connected with a gear ring, four groups of gears are meshed inside the gear ring, the outer walls of the four groups of gears are meshed with racks, the bottoms of the four groups of racks are fixedly installed with support rods, the tops of the four groups of racks are fixedly installed with moving plates, one side of the four groups of moving plates is fixedly installed with rubber pads, the output end of the motor 1 is transmission-connected with the bottom of a group of gears, the tops of the four groups of gears are rotatably connected with the bottom of the supporting frame, and the tops of the four groups of racks are slidably connected with the bottom of the supporting frame.
[0006] Preferably, the clamping arm is installed through the inside of the two groups of connecting blocks, the bottom of the supporting plate is fixedly connected to the top of the fork frame, and the top of the motor 1 is fixedly connected to the bottom of the supporting plate.
[0007] Preferably, the four groups of movable plates are respectively arranged at the four corners of the supporting plate, and the four groups of movable plates are arranged around the supporting frame.
[0008] Preferably, the bottom of the wear-resistant plate is fixedly connected to the top of the support frame, the four groups of movable plates are arranged below the wear-resistant plate, and the bottom of the support frame is fixedly connected to the top of the supporting plate.
[0009] Preferably, an adjustment mechanism is provided above the clamping arm, and the adjustment mechanism comprises a movable frame, two groups of electric cylinders and a second motor, and the two groups of electric cylinders are fixedly mounted on both sides of the door frame.
[0010] Preferably, the inner wall of the mobile frame is slidably connected to the outer wall of the door frame, the output ends of the two groups of electric cylinders are fixedly connected to the bottom of the mobile frame, one side of the motor 2 is fixedly connected to one side of the mobile frame, and the output end of the motor 2 is transmission-connected with a screw.
[0011] Preferably, both ends of the screw are rotatably connected to the inside of the movable frame, a movable seat is fixedly installed on the top of the two groups of connecting blocks, a threaded sleeve is fixedly installed on the top of the movable seat, and the inner wall of the threaded sleeve is threadedly connected to the outer wall of the screw.
[0012] Compared with the prior art, the advantages and positive effects of the utility model are:
[0013] 1. In the utility model, by setting a fixing mechanism and using a supporting plate to support the bottom of the green bricks, the bricks can be supported more evenly, the possibility of damage to the bricks can be reduced, the integrity of the bricks can be protected, and work interruptions due to shaking or instability can be reduced. Four sets of movable plates are used to fix and limit the green bricks to ensure that the green bricks maintain a neat shape during the unloading and transportation process, and avoid the green bricks from falling due to bumps or machine jams during movement.
[0014] 2. In the utility model, by setting up an adjusting mechanism, the blue bricks with different stacking heights can be integrated, clamped and unloaded, and in conjunction with the fixing mechanism, the stress-bearing time of the side wall of the blue brick at the bottom is shortened, and the stacked blue bricks can be transferred to the top of the wear-resistant plate at a faster speed, avoiding damage or falling caused by the stress on the side wall of the blue brick, and facilitating the unloading and transportation of the blue bricks. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 The utility model provides a three-dimensional structural schematic diagram of a brick unloading mechanism for a green brick production line;
[0016] Figure 2 The utility model provides a three-dimensional structural schematic diagram of an adjusting mechanism in a brick unloading mechanism for a green brick production line;
[0017] Figure 3 The utility model provides a first three-dimensional structural schematic diagram of a fixing mechanism in a brick unloading mechanism for a green brick production line;
[0018] Figure 4 This is a second three-dimensional structural schematic diagram of a fixing mechanism in a brick unloading mechanism for a green brick production line proposed by the utility model;
[0019] Figure 5 The utility model provides a three-dimensional structural explosion diagram of a fixing mechanism in a brick unloading mechanism for a green brick production line.
[0020] Legend: 1. Forklift; 2. Gantry; 3. Fork frame; 4. Fixing mechanism; 41. Motor 1; 42. Support plate; 43. Ring gear; 44. Gear; 45. Rack; 46. Support rod; 47. Moving plate; 48. Rubber pad; 49. Support frame; 410. Wear-resistant plate; 5. Adjusting mechanism; 51. Moving frame; 52. Electric cylinder; 53. Motor 2; 54. Screw; 55. Moving seat; 56. Threaded sleeve; 6. Clamping arm; 7. Connecting block. DETAILED DESCRIPTION
[0021] In order to more clearly understand the above-mentioned purpose, features and advantages of the utility model, the utility model is further described below in conjunction with the accompanying drawings and embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.
[0022] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways than those described herein. Therefore, the present invention is not limited to the specific embodiments of the following disclosure.
[0023] Embodiment 1
[0024] like Figure 1-5As shown, the utility model provides a brick unloading mechanism for a green brick production line, including a clamping arm 6 and two groups of connecting blocks 7. A forklift 1 is arranged on one side of the clamping arm 6. The forklift 1 includes a door frame 2 and a fork frame 3. A fixing mechanism 4 is arranged on the top of the fork frame 3. The fixing mechanism 4 includes a motor 41, a supporting plate 42, a support frame 49 and a wear-resistant plate 410. The top of the supporting plate 42 is rotatably connected with a gear ring 43. Four groups of gears 44 are meshed inside the gear ring 43. Racks 45 are meshed on the outer walls of the four groups of gears 44. Support rods 46 are fixedly installed at the bottom of the four groups of racks 45. Moving plates 47 are fixedly installed on the tops of the four groups of racks 45. Rubber pads 48 are fixedly installed on one side of the four groups of moving plates 47. The top of the motor 41 is connected to the bottom of the support frame 49 for sliding, the output end of the motor 41 is connected to the bottom of a group of gears 44 for transmission, the tops of the four groups of gears 44 are connected to the bottom of the support frame 49 for rotation, the clamping arm 6 is installed inside the two groups of connecting blocks 7, the bottom of the supporting plate 42 is fixedly connected to the top of the fork frame 3, the top of the motor 41 is fixedly connected to the bottom of the supporting plate 42, the four groups of moving plates 47 are respectively arranged at the four corners of the supporting plate 42, the four groups of moving plates 47 are arranged around the support frame 49, the bottom of the wear-resistant plate 410 is fixedly connected to the top of the support frame 49, the four groups of moving plates 47 are arranged below the wear-resistant plate 410, and the bottom of the support frame 49 is fixedly connected to the top of the supporting plate 42.
[0025] The specific settings and functions of this embodiment are described in detail below. When it is necessary to unload the green bricks, the forklift 1 is driven to the edge of the brick pile, the adjustment mechanism 5 is started, and the clamping arm 6 is driven to clamp the stacked green bricks. At the same time, the fork frame 3 of the forklift 1 is started, so that the fork frame 3 drives the supporting plate 42 to move to the height of unloading bricks, and the clamping arm 6 moves the stacked green bricks to the top of the wear-resistant plate 410. At this time, the motor 41 is started to drive a group of gears 44 to rotate, and then the gear 44 drives the ring gear 43 to rotate on the top of the supporting plate 42. Therefore, the ring gear 43 simultaneously drives the other three groups of gears 44 to rotate, so that the four groups of gears 44 rotate synchronously, and the top of the gear 44 does not contact the bottom of the moving plate 47. The four groups of gears 44 drive the four groups of racks 45 to slide at the bottom of the support frame 49. The rack 45 drives four groups of support rods 46 to slide on the top of the supporting plate 42, and the rack 45 drives four groups of movable plates 47 to move. The four groups of movable plates 47 approach the center position synchronously until multiple groups of rubber pads 48 contact the side walls of the blue bricks and apply a slight pressure to make the blue bricks stacked neatly and compactly. Then the forklift 1 is started to unload and move the blue bricks away. By setting a fixing mechanism 4 and using the supporting plate 42 to support the bottom of the blue bricks, the bricks can be supported more evenly, reducing the possibility of damage to the bricks, protecting the integrity of the bricks, and reducing work interruptions caused by shaking or instability. The four groups of movable plates 47 are used to fix and limit the blue bricks to ensure that the blue bricks remain in a neat shape during the unloading and transportation process, and to avoid the blue bricks falling due to bumps or machine jams during movement.
[0026] Embodiment 2
[0027] like Figure 1 and Figure 2 As shown, an adjusting mechanism 5 is arranged above the clamping arm 6, and the adjusting mechanism 5 includes a moving frame 51, two groups of electric cylinders 52 and a second motor 53. The two groups of electric cylinders 52 are fixedly installed on both sides of the door frame 2, and the inner wall of the moving frame 51 is slidably connected to the outer wall of the door frame 2. The output ends of the two groups of electric cylinders 52 are fixedly connected to the bottom of the moving frame 51, and one side of the second motor 53 is fixedly connected to one side of the moving frame 51. The output end of the second motor 53 is transmission-connected with a screw rod 54, and both ends of the screw rod 54 are rotationally connected to the inside of the moving frame 51. A moving seat 55 is fixedly installed on the top of the two groups of connecting blocks 7, and a threaded sleeve 56 is fixedly installed on the top of the moving seat 55. The inner wall of the threaded sleeve 56 is threadedly connected to the outer wall of the screw rod 54.
[0028] The effect achieved by the entire embodiment is that the forklift 1 is driven to one side of the brick pile, at which time the clamping arm 6 is in an open state, and the electric cylinder 52 is started to drive the mobile frame 51 to slide up and down on one side of the door frame 2, so that the mobile frame 51 moves to a suitable height, and then the motor 2 53 is started to drive the screw 54 to rotate, and then the threaded sleeve 56 moves horizontally inside the mobile frame 51, and at the same time drives the moving seat 55, the connecting block 7 and the clamping arm 6 to move to the side of the stacked blue bricks, and then the two sides of the clamping arm 6 gradually approach and contact the side wall of the lowest blue brick, and apply pressure to clamp and lift the piled blue bricks, and at the same time the fork frame 3 drives the moving plate 47 to move in the vertical direction, so that the clamping arm 6 horizontally transports the blue bricks to Above the wear-resistant plate 410, the four groups of movable plates 47 are in an open state, the movable frame 51 drives the blue bricks to move downward, and the fork frame 3 drives the wear-resistant plate 410 to move upward until the bottom of the blue brick contacts the top of the wear-resistant plate 410, and the clamping arm 6 reduces the pressure on the blue brick, but is still on both sides of the blue brick. The forklift 1 transfers the blue brick. By setting an adjustment mechanism 5, the blue bricks of different stacking heights can be integrated, clamped and unloaded, and in conjunction with the fixing mechanism 4, the stress time of the side wall of the blue brick at the bottom is shortened, and the stacked blue bricks can be transferred to the top of the wear-resistant plate 410 at a faster speed, avoiding damage or falling caused by the stress on the side wall of the blue brick, which is convenient for unloading and transferring the blue bricks.
[0029] The method of using and working principle of this device are as follows: drive the forklift 1 to one side of the brick pile, at which time the clamping arm 6 is in an open state, start the electric cylinder 52 to drive the moving frame 51 to slide up and down on one side of the door frame 2, so that the moving frame 51 moves to a suitable height, then start the motor 2 53 to drive the screw 54 to rotate, and then the threaded sleeve 56 moves horizontally inside the moving frame 51, and at the same time drives the moving seat 55, the connecting block 7 and the clamping arm 6 to move to one side of the stacked blue bricks, and then the two sides of the clamping arm 6 gradually approach and contact the side wall of the lowest blue brick, apply pressure to clamp and lift the piled blue bricks, and at the same time the fork frame 3 drives the moving plate 47 to move in the vertical direction, so that the clamping arm 6 horizontally transports the blue bricks to the top of the wear-resistant plate 410, at this time the four groups of moving plates 47 are in an open state, the moving frame 51 drives the blue bricks to move downward, the fork frame 3 drives the wear-resistant plate 410 to move upward, until the bottom of the blue brick contacts the top of the wear-resistant plate 410, the clamping arm 6 reduces the pressure on the blue bricks, but is still on both sides of the blue bricks , start the adjustment mechanism 5, drive the clamping arm 6 to clamp the stacked green bricks, and at the same time start the fork frame 3 of the forklift 1, so that the fork frame 3 drives the supporting plate 42 to move to the height of unloading bricks, and the clamping arm 6 moves the stacked green bricks to the top of the wear-resistant plate 410. At this time, start the motor 41 to drive a set of gears 44 to rotate, and then the gear 44 drives the ring gear 43 to rotate on the top of the supporting plate 42. Therefore, the ring gear 43 drives the other three sets of gears 44 to rotate at the same time, so that the four sets of gears 44 rotate simultaneously. The top of the gear 44 does not contact the bottom of the moving plate 47, and the four groups of gears 44 drive the four groups of racks 45 to slide at the bottom of the support frame 49. The racks 45 drive the four groups of support rods 46 to slide on the top of the supporting plate 42, and the racks 45 drive the four groups of moving plates 47 to move. The four groups of moving plates 47 move toward the center synchronously until the multiple groups of rubber pads 48 contact the side walls of the blue bricks and apply a slight pressure to make the blue bricks stacked neatly and compactly, and then start the forklift 1 to unload and move the blue bricks away.
[0030] The above description is only a preferred embodiment of the present invention and does not limit the present invention in other forms. Any technician familiar with the profession may use the technical content disclosed above to change or modify it into an equivalent embodiment with equivalent changes and apply it to other fields. However, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.
Claims
1. A brick unloading mechanism for a green brick production line, comprising a clamping arm (6) and two sets of connecting blocks (7), characterized in that: A forklift (1) is arranged on one side of the clamping arm (6), and the forklift (1) comprises a door frame (2) and a fork frame (3). A fixing mechanism (4) is arranged on the top of the fork frame (3), and the fixing mechanism (4) comprises a motor 1 (41), a support plate (42), a support frame (49) and a wear-resistant plate (410). A gear ring (43) is rotatably connected to the top of the support plate (42), and four groups of gears (44) are meshed inside the gear ring (43), and the outer walls of the four groups of gears (44) are meshed with racks ( The bottoms of the four groups of racks (45) are all fixedly mounted with support rods (46), the tops of the four groups of racks (45) are all fixedly mounted with moving plates (47), one side of the four groups of moving plates (47) are all fixedly mounted with rubber pads (48), the output end of the motor 1 (41) is transmission-connected to the bottom of a group of gears (44), the tops of the four groups of gears (44) are all rotationally connected to the bottom of a support frame (49), and the tops of the four groups of racks (45) are slidingly connected to the bottom of the support frame (49).
2. The brick unloading mechanism for a green brick production line according to claim 1 is characterized in that: The clamping arm (6) is installed through the inside of the two groups of connecting blocks (7), the bottom of the supporting plate (42) is fixedly connected to the top of the fork frame (3), and the top of the motor 1 (41) is fixedly connected to the bottom of the supporting plate (42).
3. The brick unloading mechanism for a green brick production line according to claim 1 is characterized in that: The four groups of movable plates (47) are respectively arranged at the four corners of the supporting plate (42), and the four groups of movable plates (47) are arranged around the supporting frame (49).
4. The brick unloading mechanism for a green brick production line according to claim 1 is characterized in that: The bottom of the wear-resistant plate (410) is fixedly connected to the top of the support frame (49), the four groups of movable plates (47) are arranged below the wear-resistant plate (410), and the bottom of the support frame (49) is fixedly connected to the top of the supporting plate (42).
5. The brick unloading mechanism for a green brick production line according to claim 1 is characterized in that: An adjustment mechanism (5) is arranged above the clamping arm (6), and the adjustment mechanism (5) comprises a moving frame (51), two groups of electric cylinders (52) and a second motor (53), and the two groups of electric cylinders (52) are fixedly mounted on both sides of the door frame (2).
6. The brick unloading mechanism for a green brick production line according to claim 5 is characterized in that: The inner wall of the movable frame (51) is slidably connected to the outer wall of the door frame (2), the output ends of the two groups of electric cylinders (52) are fixedly connected to the bottom of the movable frame (51), one side of the second motor (53) is fixedly connected to one side of the movable frame (51), and the output end of the second motor (53) is transmission-connected with a screw rod (54).
7. The brick unloading mechanism for a green brick production line according to claim 6 is characterized in that: Both ends of the screw rod (54) are rotatably connected to the inside of the moving frame (51); a moving seat (55) is fixedly installed on the top of the two groups of connecting blocks (7); a threaded sleeve (56) is fixedly installed on the top of the moving seat (55); and the inner wall of the threaded sleeve (56) is threadedly connected to the outer wall of the screw rod (54).
Citation Information
Cited By
Roadway stacker
CN120817563A