Ultrahigh pier concrete pump pipe mounting structure

By setting up connectors on the ultra -high -pier embedded bolt, and using the pressure plate and load -bearing structure to fix the pump tube steel pipe, the existing pump pipe brackets are prone to collapse and installation efficiency, and the more efficient construction process is achieved.

CN222412681UActive Publication Date: 2025-01-28ROAD & BRIDGE INT CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421175550.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-27
Publication Date
2025-01-28
Estimated Expiration
2034-05-27

AI Technical Summary

Technical Problem

In the construction of ultra-high piers, existing pump pipe brackets are prone to collapse and have low installation efficiency, resulting in an extended construction period.

Method used

Design a ultra -high -pier concrete pump pump installation structure, including connecting boards fixed with the embedded bolt, fix the pump steel pipe on the connecting plate through the pressure plate and load -bearing structure, and pass the gravity to the embedded bolt to avoid the power of the steel pipe force. Too big.

Benefits of technology

Effectively prevent the collapse of pump pipe brackets, simplify the installation process, improve construction efficiency, and shorten the construction period.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222412681U_ABST
    Figure CN222412681U_ABST
Patent Text Reader

Abstract

An ultrahigh pier concrete pump pipe mounting structure comprises a connecting plate fixedly connected with two embedded bolts at the same height, one ends of a plurality of pressing plates are rotationally arranged on the connecting plate, and a connecting structure is fixedly arranged between the other ends of the pressing plates and the connecting plate; a plurality of pump pipe assemblies are further included, each pump pipe assembly comprises a plurality of steel pipes connected end to end, the steel pipes are fixedly arranged between the pressing plate and the connecting plate, and a bearing structure is further arranged between the steel pipes and the connecting plate; the connecting plate is arranged on the ultrahigh pier embedded bolt, then each section of steel pipe of the pump pipe is pressed on the limiting connecting plate through the pressing plate, installation of the pump pipe is achieved, then the gravity of each section of steel pipe is transmitted to the connecting plate through the bearing structure, and then the gravity is transmitted to the embedded bolt. And meanwhile, the installation structure of the connecting plate is simple, the situation of collapse is not prone to occurring, the installation speed is high, and the efficiency is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of bridge pier construction, and in particular to a super-high pier concrete pump pipe installation structure. Background Art

[0002] As my country's bridge construction level continues to improve, super-high pier and large-section structural bridges continue to emerge, and super-high pumped concrete has been widely used. As the construction height continues to increase, the height of concrete pumping has also continued to increase, and the pumping height can even reach 200 meters.

[0003] In the prior art, during the construction of such super-high piers, a pump pipe is used to pump concrete, and the pump pipe is installed through a mounting bracket arranged on one side of the super-high pier. Such mounting bracket rises with the increase of the height of the super-high pier. When the height is too large, the load-bearing capacity of the steel pipe at the bottom of the bracket is close to the limit, and bending deformation is likely to occur, thereby causing the risk of collapse of the entire bracket. In addition, the construction of the bracket is time-consuming and labor-intensive. After the construction is completed, the pump pipe must be installed on the bracket again. The operation is complicated and inefficient, which greatly prolongs the construction period.

[0004] Therefore, the inventor needs to design a new super-high pier concrete pump pipe installation structure to overcome the above problems. Summary of the invention

[0005] The main purpose of the present application is to provide a super-high pier concrete pump pipe installation structure to solve the problems of easy collapse and low installation efficiency of the pump pipe support in the related art.

[0006] In order to achieve the above-mentioned purpose, the present application provides an ultra-high pier concrete pump pipe installation structure, including a connecting plate fixedly connected to two embedded bolts at the same height, one end of a plurality of pressure plates being rotatably arranged on the connecting plate, and a connecting structure being fixedly arranged between the other end of the pressure plate and the connecting plate; and also including a plurality of pump pipe assemblies, the pump pipe assemblies including a plurality of steel pipes connected end to end, the steel pipes being fixedly arranged between the pressure plate and the connecting plate, and a load-bearing structure being also arranged between the steel pipes and the connecting plate.

[0007] Preferably, a rotation groove is opened on the front side of the connecting plate, a rotation pin is fixedly arranged in the rotation groove, connecting arms are fixedly arranged at both ends of the pressure plate, both connecting arms are located in the rotation groove, and one of the connecting arms is rotationally connected to the rotation pin.

[0008] Preferably, the connection structure comprises a screw rod, which passes through the connection plate and the other connection arm and is fixedly connected via a first nut.

[0009] Preferably, the connecting plate is sleeved on the outside of the embedded bolts, and a second nut is threadedly connected to the embedded bolts, and the second nut presses the connecting plate against the outer wall of the super-high pier.

[0010] Preferably, the connecting plate is provided with an arc-shaped groove matched with the outer wall of the steel pipe, and the pressing plate is an arc-shaped plate matched with the steel pipe.

[0011] Preferably, two adjacent steel pipes are fixedly connected by threads.

[0012] Preferably, the load-bearing structure is a load-bearing ring, which is fixedly arranged on the outer wall of the steel pipe, and the bottom of the load-bearing ring is in contact with the top of the connecting plate.

[0013] Preferably, the spacing between the load-bearing rings on two adjacent steel pipes is equal to the spacing between several layers of embedded bolts.

[0014] Preferably, the top of the pressing plate and the top of the connecting plate are in the same horizontal plane, and the bottom of the load-bearing ring is in contact with the top of the pressing plate.

[0015] The utility model provides a super-high pier concrete pump pipe installation structure, which has the following beneficial effects compared with the prior art:

[0016] The installation of the pump pipe is achieved by setting a connecting plate on the embedded bolts of the super-high pier and then pressing each section of the steel pipe of the pump pipe onto the limiting connecting plate through a pressure plate. The gravity of each section of the steel pipe is then transferred to the connecting plate through the load-bearing structure, and then to the embedded bolts, so that the force on the bottom steel pipe is smaller and the pump pipe is not easy to collapse. At the same time, the installation structure of the connecting plate is simple and not prone to collapse. The connecting plate of each layer of steel pipe is installed separately, and the installation speed is fast and the efficiency is high. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The drawings constituting a part of this application are used to provide a further understanding of this application, so that other features, purposes and advantages of this application become more obvious. The schematic embodiment drawings and their descriptions of this application are used to explain this application and do not constitute an improper limitation on this application. In the drawings:

[0018] Figure 1 It is the overall structure diagram of the utility model;

[0019] Figure 2 This is an exploded view of the structure of the connecting plate of the utility model;

[0020] Figure 3 This utility model Figure 2 A magnified view of the structure in the middle.

[0021] Among them: 1. embedded bolts; 2. connecting plate; 3. pressure plate; 4. steel pipe; 5. rotating groove; 7. rotating pin; 8. connecting arm; 9. screw rod; 10. first nut; 11. second nut; 12. arc groove; 13. load-bearing ring. DETAILED DESCRIPTION

[0022] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.

[0023] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0024] In the present application, the terms "upper", "lower", "left", "right", "front", "back", "top", "bottom", "inner", "outer", "middle", "vertical", "horizontal", "lateral", "longitudinal" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings. These terms are mainly used to better describe the present application and its embodiments, and are not used to limit the indicated devices, elements or components to have a specific orientation, or to be constructed and operated in a specific orientation.

[0025] In addition, some of the above terms may be used to express other meanings in addition to indicating orientation or positional relationship. For example, the term "on" may also be used to express a certain dependency or connection relationship in some cases. For those of ordinary skill in the art, the specific meanings of these terms in this application can be understood according to specific circumstances.

[0026] In addition, the term "plurality" shall mean two or more.

[0027] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0028] like Figures 1 to 3 As shown, a super-high pier concrete pump pipe installation structure includes a connecting plate 2 fixedly connected to two embedded bolts 1 at the same height, one end of a plurality of pressing plates 3 is rotatably arranged on the connecting plate 2, and a connecting structure is fixedly arranged between the other end of the pressing plate 3 and the connecting plate 2; it also includes a plurality of pump pipe assemblies, and the pump pipe assemblies include a plurality of steel pipes 4 connected end to end, the steel pipes 4 are fixedly arranged between the pressing plates 3 and the connecting plates 2, and a load-bearing structure is also arranged between the steel pipes 4 and the connecting plates 2; during operation, in the process of raising the super-high pier layer by layer, embedded bolts 1 are evenly arranged on the outside of the super-high pier, and these embedded bolts 1 can provide a safe fixing point , used to fix equipment or accessories on the bridge, or for maintenance and repair of the bridge. In the process of raising the pump pipe layer by layer, each layer of the raised pump pipe is fixedly connected to the embedded bolt 1 through the connecting plate 2. During installation, first fix the connecting plate 2 on the embedded bolt 1 and put the pressing plate 3 in an open state, and then install the newly added steel pipe 4 so that it is docked with the steel pipe 4 of the next layer. Then rotate the pressing plate 3 so that the steel pipe 4 is clamped and then use the connecting structure to fix the pressing plate 3, thereby realizing the installation of the steel pipe 4. After the steel pipe 4 is installed, the gravity of the steel pipe 4 is transmitted to the connecting plate 2 through the load-bearing structure, and then transmitted to the embedded bolt 1, so as to avoid excessive force on the steel pipe 4 of the lower layer and cause danger.

[0029] A rotation groove 5 is provided on the front side of the connecting plate 2, and a rotation pin 7 is fixedly arranged in the rotation groove 5. Connecting arms 8 are fixedly arranged at both ends of the pressing plate 3, and the two connecting arms 8 are both located in the rotation groove 5, and one of the connecting arms 8 is rotatably connected to the rotating pin 7; the connecting structure includes a screw rod 9, and the screw rod 9 passes through the connecting plate 2 and the other connecting arm 8 and is fixedly connected by a first nut 10; when working, after the pressing plate 3 is rotated to clamp the steel pipe 4 between the pressing plate 3 and the connecting plate 2, the screw rod 9 is inserted between the connecting plate 2 and the connecting arm 8 of the pressing plate 3, so that the pressing plate 3 cannot be rotated open, thereby realizing the clamping of the steel pipe 4.

[0030] The connecting plate 2 is sleeved on the outside of the embedded bolt 1, and the embedded bolt 1 is threadedly connected with a second nut 11, and the second nut 11 presses the connecting plate 2 against the outer wall of the super-high pier; during operation, when the connecting plate 2 is inserted into the two embedded bolts 1, the two second nuts 11 are used to fix it.

[0031] The connecting plate 2 is provided with an arc groove 12 which is adapted to the outer wall of the steel pipe 4, and the pressing plate 3 is an arc plate which is adapted to the steel pipe 4; when working, the arc groove 12 and the inner wall of the arc plate are in contact with the outer wall of the steel pipe 4 to limit the steel pipe 4, and the contact surface is large, which has a better effect in preventing the steel pipe 4 from vibrating.

[0032] The two adjacent steel pipes 4 are fixedly connected by threads; during operation, when a new steel pipe 4 is added, the new steel pipe 4 can be butted and installed by screwing.

[0033] The load-bearing structure is a load-bearing ring 13, which is fixedly arranged on the outer wall of the steel pipe 4, and the bottom of the load-bearing ring 13 is in contact with the top of the connecting plate 2; the top of the pressure plate 3 is in the same horizontal plane as the top of the connecting plate 2, and the bottom of the load-bearing ring 13 is in contact with the top of the pressure plate 3; the spacing between the load-bearing rings 13 on two adjacent steel pipes 4 is equal to the spacing between several layers of the embedded bolts 1; during operation, for each newly added section of steel pipe 4, the position of its load-bearing ring 13 just corresponds to the position of the new connecting plate 2. When the new steel pipe 4 is screwed to connect with the steel pipe 4 below, the bottom of the load-bearing ring 13 should be in contact with the connecting plate 2 and the pressure plate 3, so that the gravity of the steel pipe 4 can be transmitted to the embedded bolts 1 through the connecting plate 2, avoiding the risk of the steel pipe 4 breaking due to the pressure on the lower layer of the steel pipe 4.

[0034] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A super-high pier concrete pump pipe installation structure, characterized in that: It comprises a connecting plate (2) fixedly connected to two embedded bolts (1) at the same height, one end of a plurality of pressing plates (3) being rotatably arranged on the connecting plate (2), and a connecting structure being fixedly arranged between the other end of the pressing plate (3) and the connecting plate (2); It also includes a plurality of pump pipe assemblies, wherein the pump pipe assemblies include a plurality of steel pipes (4) connected end to end, wherein the steel pipes (4) are fixedly arranged between the pressure plate (3) and the connecting plate (2), and a load-bearing structure is also arranged between the steel pipes (4) and the connecting plate (2).

2. The super-high pier concrete pump pipe installation structure according to claim 1, characterized in that: The front side of the connecting plate (2) is provided with a rotation groove (5), a rotation pin (7) is fixedly arranged in the rotation groove (5), and connecting arms (8) are fixedly arranged at both ends of the pressing plate (3), both connecting arms (8) are located in the rotation groove (5), and one of the connecting arms (8) is rotationally connected to the rotation pin (7).

3. The super-high pier concrete pump pipe installation structure according to claim 2, characterized in that: The connection structure comprises a screw rod (9), and the screw rod (9) passes through the connection plate (2) and the other connection arm (8) and is fixedly connected via a first nut (10).

4. The super-high pier concrete pump pipe installation structure according to claim 1, characterized in that: The connecting plate (2) is sleeved on the outside of the embedded bolt (1), and a second nut (11) is threadedly connected to the embedded bolt (1), and the second nut (11) presses the connecting plate (2) onto the outer wall of the super-high pier.

5. The super-high pier concrete pump pipe installation structure according to claim 1, characterized in that: The connecting plate (2) is provided with an arc-shaped groove (12) adapted to the outer wall of the steel pipe (4), and the pressing plate (3) is an arc-shaped plate adapted to the steel pipe (4).

6. The super-high pier concrete pump pipe installation structure according to claim 1, characterized in that: Two adjacent steel pipes (4) are fixedly connected via threads.

7. The super-high pier concrete pump pipe installation structure according to claim 5, characterized in that: The load-bearing structure is a load-bearing ring (13), which is fixedly arranged on the outer wall of the steel pipe (4), and the bottom of the load-bearing ring (13) is in contact with the top of the connecting plate (2).

8. The super-high pier concrete pump pipe installation structure according to claim 7, characterized in that: The distance between the load-bearing rings (13) on two adjacent steel pipes (4) is equal to the distance between several layers of embedded bolts (1).

9. The super-high pier concrete pump pipe installation structure according to claim 7, characterized in that: The top of the pressing plate (3) and the top of the connecting plate (2) are in the same horizontal plane, and the bottom of the load-bearing ring (13) is in contact with the top of the pressing plate (3).