Safety protection device for workers in installation process of power plant
By designing a worker safety protective device including a fixed ring, protective rod, protective rod, support rod and transmission structure, solve the problem of safe ropes in power workers during high -altitude operations, and achieve more efficient safety Protection effect.
Patent Information
- Application Number
- CN202421134219.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-22
- Publication Date
- 2025-01-28
- Estimated Expiration
- 2034-05-22
AI Technical Summary
During the installation of the power plant, power workers are prone to slipping off due to incomplete surface treatment of the pole when working at high altitudes, which poses safety risks.
Design a worker safety protection device including fixed ring, protective rod, protective rod, support rod and transmission structure, fixed at the lower end of the wire rod to form a complete mesh protection structure to improve the safety of workers.
This device can be folded when not in use, occupying small volume, easy to carry and stored; it can be expanded quickly during use to form a stable protective net, which significantly improves the safety of power workers in high -altitude operations.
Smart Images

Figure CN222414157U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction protection devices, in particular to a safety protection device for workers in the installation process of a power plant. Background Art
[0002] During the installation of power plants, power workers often need to climb up some very high poles to perform their work. These poles are usually more than ten meters high, and some are even more than twenty meters high. Such high-altitude work poses a great threat to the health and safety of workers.
[0003] In actual operation, in order to ensure the personal safety of power workers, we usually wear safety belts on the workers and connect them to the poles through safety ropes. In this way, even if an unexpected situation occurs, the workers can rely on the safety protection measures of the safety belts and safety ropes to ensure their life safety. However, since the surface treatment of the poles is often not completely anti-slip, the safety ropes can easily slide down from the poles, posing a safety hazard to the workers.
[0004] In summary, the inventors believe that in order to further ensure the safety of electric workers during high-altitude installation, it is necessary to further improve and perfect the existing safety protection devices. Utility Model Content
[0005] The utility model provides a worker safety protection device during the installation process of a power plant, which is installed at the lower end of a columnar pole such as an electric pole, and provides further safety protection for power workers during the power installation.
[0006] In order to achieve the above-mentioned purpose, the utility model provides a worker safety protection device during the installation process of a power plant, comprising:
[0007] A fixing ring, composed of two semicircular half hoops, used to be fixed on the side of the electric pole, one end of the two half hoops is connected with a connecting shaft, and the other end of the two half hoops is connected with a connecting bolt;
[0008] A protection rod, one end of which is fixed with a shaft 1, and is rotatably mounted on the side of the fixing ring through the shaft 1;
[0009] A protective net connected between adjacent protective poles;
[0010] The support rod comprises a rotating rod, a telescopic rod and a buffer spring, wherein a second shaft is fixed to one end of the rotating rod, the rotating rod is rotatably connected to an end of the protective rod away from the fixing ring through the second shaft, the upper end of the telescopic rod is slidably connected to the lower end of the rotating rod, and the buffer spring is connected between the lower end of the rotating rod and the upper end of the telescopic rod;
[0011] The transmission structure is connected between the first shaft and the second shaft for transmission.
[0012] Preferably, one end of the two half hoops is connected to a connecting shaft, and the other end of the two half hoops is connected to a connecting bolt.
[0013] Preferably, a first fixing bolt is connected between the protective rod and the fixing ring.
[0014] Preferably, the support rod includes a rotating rod, a telescopic rod and a buffer spring, one end of the rotating rod is fixed with shaft 2, and is rotatably connected to an end of the protective rod away from the fixing ring through shaft 2, the upper end of the telescopic rod and the lower end of the rotating rod are slidably connected, and the buffer spring is connected between the lower end of the rotating rod and the upper end of the telescopic rod.
[0015] Preferably, a second fixing bolt is connected between the rotating rod and the protective rod.
[0016] Preferably, a roller is installed at the lower end of the support rod.
[0017] Preferably, one end of the half hoop connected by the connecting bolt is a free end, one side of the protective net corresponding to the free end is fixedly connected to the protective rod at the corresponding position, and the other side of the protective net corresponding to the free end is detachably connected to the protective rod at the corresponding position.
[0018] Preferably, a rubber pad is fixed to the inner surface of the half hoop.
[0019] Compared with the prior art, the utility model has the following beneficial effects: when not in use, the utility model can be folded multiple times, and the folded device occupies a small volume and is convenient to carry; when in use, it is convenient to unfold and can be pushed to move; after being fixed on the electric pole, it can form a complete mesh protection structure near the lower end of the electric pole, thereby further improving the safety of pole climbing construction workers. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a side structural schematic diagram of the utility model.
[0021] Figure 2 It is a schematic diagram of the top structure of the utility model.
[0022] Figure 3 For this utility model Figure 2 Enlarged structural diagram at A in the middle.
[0023] Figure 4 It is a schematic diagram of the transmission mechanism structure of the utility model.
[0024] In the figure: 1-fixing ring; 2-half hoop; 3-telephone pole; 4-protective rod; 41-axis one; 411-driving gear; 412-transmission gear; 413-sprocket mechanism; 414-steering gear; 5-protective net; 6-support rod; 61-rotating rod; 610-axis two; 62-telescopic rod; 63-buffer spring; 64-second fixing bolt; 65-roller; 7 connecting shaft; 8-connecting bolt; 9 first fixing bolt; 10, rubber pad. DETAILED DESCRIPTION
[0025] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0026] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it can be directly on the other element or indirectly on the other element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or indirectly connected to the other element.
[0027] It should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "leaf flat", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the utility model.
[0028] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present utility model, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0029] See also Figure 1-4 , a worker safety protection device during power plant installation, comprising
[0030] The fixing ring 1 is composed of two semicircular half hoops 2. The two half hoops 2 are put together to be fixed on the side of the electric pole 3. Specifically, one end of the two half hoops 2 is connected with a connecting shaft 7, and the other end of the two half hoops 2 is connected with a connecting bolt 8. When installing, the two half hoops 2 are rotated to open, and after the half hoops 2 are put on the electric pole 3 from the side, the half hoops 2 are closed, and the half hoops 2 are fixed by the connecting bolt 8, so that the device is fixed on the electric pole 3;
[0031] The number of the protective rods 4 is at least 3, one end of which is fixed with a shaft 41, and is rotatably mounted on the side of the fixing ring 1 through the shaft 41. When not in use, the protective rod 4 can be folded, and the length direction after folding coincides with the axial direction of the fixing ring 1, so as to facilitate carrying. When in use, the protective rod 4 is rotated and unfolded so that it and the fixing ring 1 are on the same horizontal plane to form a support surface;
[0032] The protection net 5 is connected between adjacent protection poles 4 to play a protective role. When the electrician accidentally slips from the electric pole 3, the protection net 5 can catch the electrician and reduce the injury.
[0033] The support rod 6 is folded and connected to the other end of the protection rod 4 connected to the fixing ring 1. When not in use, the support rod 6 is folded on the side of the protection rod 4 and then rotated and stored together with the protection rod 4. When in use, the support rod 6 is unfolded and supported on the ground.
[0034] The following is a specific embodiment of the support rod 6, which includes a rotating rod 61, a telescopic rod 62 and a buffer spring 63. A second shaft 610 is fixed to one end of the rotating rod 61. The rotating rod 61 is rotatably connected to the end of the protective rod 4 away from the fixed ring 1 through the second shaft 610. The upper end of the telescopic rod 62 is slidably connected to the lower end of the rotating rod 61. The buffer spring 63 is connected between the lower end of the rotating rod 61 and the upper end of the telescopic rod 62. When the electrician accidentally falls, the fixed ring 1 may not be enough to support him, so it can play a buffering role when the support rod 6 is retracted;
[0035] It is worth mentioning that the protective device also includes a transmission structure, which is connected between the shaft 1 41 and the shaft 2 610 for transmission. The transmission structure includes a driving gear 411, a transmission gear 412, a sprocket mechanism 413 and a steering gear 414. The driving gear 411 is fixedly connected to one end of the shaft 1 41, and the transmission gear 412 and the steering gear 414 are rotatably installed on the side of the fixed ring 1. The two sides of the steering gear 414 are respectively meshed with the driving gear 411 and the transmission gear 412. The sprocket mechanism 413 is connected between the shaft portion of the transmission gear 412 and the shaft 2 610 for transmission. When the protective rod 4 is rotated to open, the shaft 1 41 drives the driving gear 411 to rotate, the driving gear 411 drives the steering gear 414 to rotate, and the steering gear 414 rotates to drive the transmission gear 412 to rotate. The transmission gear 412 drives the shaft 2 610 to rotate through the sprocket mechanism 413, so that the rotating rod 61 is rotated, and the support rod 6 is also rotated and opened together for easy use.
[0036] A first fixing bolt 9 is connected between the protection rod 4 and the fixing ring 1 for fixing the angle when the protection rod 4 is unfolded.
[0037] A second fixing bolt 64 is connected between the rotating rod 61 and the protection rod 4 , and is used to fix the rotating rod 61 perpendicular to the ground when the supporting rod 6 supports the ground.
[0038] In order to facilitate the movement of the device, a roller 65 is installed at the lower end of the support rod 6. When the device is fully unfolded, the setting of the roller 65 makes it convenient to push the device to move. When it moves to the position of the telephone pole 3, the half hoop 2 is unfolded and fixed on the side of the telephone pole 3.
[0039] One end of the half hoop 2 connected by the connecting bolt 8 is a free end, one side of the protective net 5 corresponding to the free end is fixedly connected to the protective rod 4 at the corresponding position, and the other side of the protective net 5 corresponding to the free end is detachably connected to the protective rod 4 at the corresponding position. The setting of the free end is to facilitate the installation of the fixing ring 1 on the electric pole 3, and the detachable connection method can be a connecting hook method.
[0040] A rubber pad 10 is fixed to the inner surface of the half hoop 2 .
[0041] Working principle: When the utility model is used, the protective rod 4 on the side of the fixed ring 1 is rotated to unfold. When the protective rod 4 is unfolded, the support rod 6 is automatically opened through the transmission mechanism, and is supported on the ground by the roller 65 at the lower end of the support rod 6, so that one end is convenient, and then the device is pushed to move to the position of the electric pole 3. When the power workers climb up the electric pole 3 to carry out power construction, the construction workers on the ground can fix the fixed ring 1 to the electric pole 3, so that the protective net 5 forms a complete protective structure near the bottom of the electric pole 3, thereby further improving safety.
[0042] The embodiment and drawings of the present utility model are only for illustrating the design concept of the present utility model, and the protection scope of the present utility model should not be limited to this embodiment.
[0043] It can be seen from the above description that the design purpose of the utility model can be effectively implemented. The embodiment part shows the purpose of the utility model and the implementation function and structural theme, and includes other equivalent replacements.
[0044] Therefore, the rights of the present utility model include other equivalent implementations, and the specific scope of rights is referred to the claims.
Claims
1. A worker safety protection device during the installation process of a power plant, characterized in that: include A fixing ring (1) is composed of two semicircular half hoops (2) and is used to be fixed on the side of a telegraph pole (3); one end of the two half hoops (2) is connected to a connecting shaft (7), and the other end of the two half hoops (2) is connected to a connecting bolt (8); A protection rod (4) having a shaft (41) fixed at one end thereof and rotatably mounted on the side of the fixing ring (1) via the shaft (41); A protection net (5) connected between adjacent protection bars (4); The support rod (6) comprises a rotating rod (61), a telescopic rod (62) and a buffer spring (63); one end of the rotating rod (61) is fixed with a second shaft (610); the rotating rod (61) is rotatably connected to an end of the protective rod (4) away from the fixed ring (1) through the second shaft (610); the upper end of the telescopic rod (62) and the lower end of the rotating rod (61) are slidably connected; and the buffer spring (63) is connected between the lower end of the rotating rod (61) and the upper end of the telescopic rod (62); The transmission structure is connected between the first shaft (41) and the second shaft (610) for transmission.
2. The worker safety protection device during the installation of a power plant according to claim 1, characterized in that: A first fixing bolt (9) is connected between the protection rod (4) and the fixing ring (1).
3. The worker safety protection device during the installation of a power plant according to claim 1 is characterized by: A second fixing bolt (64) is connected between the rotating rod (61) and the protection rod (4).
4. The worker safety protection device during the installation of a power plant according to claim 1, characterized in that: A roller (65) is installed at the lower end of the support rod (6).
5. The worker safety protection device during the installation of a power plant according to claim 1, characterized in that: One end of the half hoop (2) connected by the connecting bolt (8) is a free end, one side of the protective net (5) corresponding to the free end is fixedly connected to the protective rod (4) at the corresponding position, and the other side of the protective net (5) corresponding to the free end is detachably connected to the protective rod (4) at the corresponding position.
6. The worker safety protection device during the installation of a power plant according to claim 1, characterized in that: A rubber pad (10) is fixed to the inner surface of the half hoop (2).