High-airtightness through-wall pipeline structure
By using the structure of embedded wing pipes and fixed sealing parts in the wall pipeline, it solves the problem that the traditional direct penetration method is difficult to ensure gas tightness and stability, and realize the structure of high -gas and beautiful wall pipeline pipeline structures. Essence
Patent Information
- Application Number
- CN202421415220.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-20
- Publication Date
- 2025-01-28
- Estimated Expiration
- 2034-06-20
AI Technical Summary
The traditional direct-through method is difficult to ensure the airtightness of the through-wall pipes, and it is easy to send due to external force collision during later use, affecting the airtightness; increasing the external bolt structure will damage the beauty of the wall, and the pipeline angle requires high construction requirements.
The connection components including concrete walls, wing ring tubes, polyurethane foam layers and sealing membrane layers, as well as insulation components of thermal insulation layer, wall pipe and fixed sealing parts, ensure through the embedded wing tube and fixed sealing parts Vertical stability and qi.
The high air tightness and stability of the wall pipeline is realized, and the problem of delivery caused by the collision of the external force is avoided. The overall appearance is beautiful and convenient.
Smart Images

Figure CN222416427U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of through-wall pipeline construction, and in particular to a high-air-tightness through-wall pipeline structure. Background Art
[0002] Building energy conservation specifically refers to the implementation of energy-saving standards, the use of energy-saving technologies, processes, equipment, materials and products, the improvement of thermal insulation performance and the efficiency of heating and air conditioning systems, the strengthening of the operation and management of building energy systems, the use of renewable energy, and the increase of indoor and outdoor energy exchange thermal resistance under the premise of ensuring the quality of the indoor thermal environment, so as to reduce the energy consumption caused by the large amount of heat consumption of the heating system, air conditioning, lighting and hot water supply. Thermal bridges can reduce the thermal insulation performance of houses, resulting in energy waste and loss; as an indispensable component in house construction, how to avoid thermal bridges caused by the installation of through-wall pipes is increasingly receiving attention.
[0003] At present, the walls of buildings often need to be equipped with pipes that penetrate the walls for later use, and some walls often have insulation walls outside. This further increases the requirements for the layout of the pipes. The traditional direct penetration method is difficult to ensure air tightness. During the later use of the installation, the pipes may collide with the external strong winds and rainstorms or other external forces, causing the pipes to move and affect the air tightness. If an external bolt structure is added, it will damage the wall and affect the appearance. The angle of the pipe also has high construction requirements. Summary of the invention
[0004] In order to overcome the existing deficiencies, the embodiment of the present application provides a high airtightness wall-penetrating pipe structure, which can solve the problem that the traditional direct penetration method is difficult to ensure airtightness, and during the later use process of installation, the pipeline may be collided with by external strong winds and rainstorms or other external forces, causing the pipeline to move and affect the airtightness. If an external bolt structure is added, it will damage the wall and affect the appearance. The angle of the pipeline also has high requirements for construction.
[0005] The technical solution adopted by the embodiment of the present application to solve the technical problem is:
[0006] A high-air-tight wall-penetrating pipeline structure comprises a connecting component and a heat-insulating component.
[0007] The connection assembly includes a concrete wall, a wing ring tube, a polyurethane foam layer and a sealing film layer. The wing ring tube is pre-buried in the concrete wall, the polyurethane foam layer is arranged in the wing ring tube, and the sealing film layer is arranged on the wall surface of the concrete wall.
[0008] The insulation component comprises an insulation layer, a wall-penetrating pipe and a fixed seal. The insulation layer is located outside the concrete wall, the wall-penetrating pipe runs through the insulation layer, and the fixed seal is arranged between the insulation layer and the wall-penetrating pipe.
[0009] In a specific embodiment, the sealing membrane layer includes a waterproof breathable membrane and a waterproof vapor barrier membrane, the waterproof breathable membrane is located on the outside of the concrete wall, and the waterproof vapor barrier membrane is located on the inside of the concrete wall.
[0010] In a specific embodiment, the wing ring tube includes a wing ring plate and a pipe, the wing ring plate and the pipe are integrally formed, the wing ring plate is pre-buried in the concrete wall, and the pipe runs through the concrete wall.
[0011] In a specific embodiment, the fixed seal includes a first pre-compression expansion sealing band and a second pre-compression expansion sealing band, and the first pre-compression expansion sealing band and the second pre-compression expansion sealing band are both sleeved on the outside of the wall-penetrating pipe, the first pre-compression expansion sealing band is located on one side of the insulation layer, and the second pre-compression expansion sealing band is located on the other side of the insulation layer.
[0012] In a specific embodiment, the wall-penetrating tube and the first pre-pressure expansion sealing band are interference fit, and the wall-penetrating tube and the second pre-pressure expansion sealing band are interference fit.
[0013] In a specific embodiment, the thermal insulation layer is provided with a through hole and a limiting groove, the wall-penetrating pipe passes through the through hole, and the first pre-compression expansion sealing belt and the second pre-compression expansion sealing belt are respectively arranged in the two limiting grooves.
[0014] In a specific embodiment, the thermal insulation assembly further includes an adhesive layer, and the adhesive layer is located between the concrete wall and the thermal insulation layer.
[0015] In a specific embodiment, a waterproof coating reinforcement layer is provided on the outside of the thermal insulation layer.
[0016] The advantages of the embodiments of the present application are: by setting up a concrete wall, a wing ring pipe, a polyurethane foam layer, a sealing film layer, an insulation layer, a wall-penetrating pipe and a fixed sealing structure, the insulation layer, the wall-penetrating pipe and the fixed sealing, the problem solving process, the pre-buried wing ring pipe has high stability, and the wall-penetrating pipe is first stably and vertically penetrated into the insulation layer by means of a fixed seal. When installing the insulation layer, the wall-penetrating pipe passes through the wing ring pipe, and then the polyurethane foam filler is injected to form a polyurethane foam layer. Finally, the sealing film layer is used to seal the inside and outside of the wall, thereby not only utilizing the construction accuracy and convenience, but also ensuring the verticality of the wall-penetrating pipe, ensuring the stability and airtightness in the later stage, and the overall exterior is smooth and beautiful. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the structure of a high-air-tight wall-penetrating pipeline provided in an embodiment of the present application;
[0018] Figure 2 A schematic diagram of the structure of the connection assembly provided in the embodiment of the present application;
[0019] Figure 3 A schematic diagram of the wall-penetrating pipe structure provided in an embodiment of the present application;
[0020] Figure 4 A schematic diagram of the insulation layer structure provided for an implementation manner of the present application.
[0021] In the figure: 100-connecting assembly; 110-concrete wall; 120-wing ring pipe; 121-wing ring plate; 122-pipeline; 130-polyurethane foam layer; 150-sealing membrane layer; 151-waterproof breathable membrane; 152-waterproof vapor barrier membrane; 200-insulation assembly; 210-insulation layer; 211-through hole; 212-limiting groove; 220-wall pipe; 230-fixed sealing element; 231-first pre-compression expansion sealing tape; 232-second pre-compression expansion sealing tape; 240-adhesive layer; 250-waterproof coating reinforcement layer. DETAILED DESCRIPTION
[0022] In order to make the purpose, technical solutions and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with embodiments.
[0023] It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0024] In the examples, unless otherwise specified, all the means used are conventional means in the art.
[0025] See also Figure 1-Figure 4 A high airtight wall-penetrating pipeline structure includes a connecting component 100 and an insulation component 200.
[0026] See also Figure 1 and 2 The connection assembly 100 includes a concrete wall 110, a wing ring tube 120, a polyurethane foam layer 130 and a sealing film layer 150. The wing ring tube 120 is pre-buried in the concrete wall 110, the polyurethane foam layer 130 is arranged in the wing ring tube 120, and the sealing film layer 150 is arranged on the wall surface of the concrete wall 110.
[0027] The wing ring tube 120 includes a wing ring plate 121 and a pipe 122. The wing ring plate 121 and the pipe 122 are integrally formed. The wing ring plate 121 is embedded in the concrete wall 110. The pipe 122 runs through the concrete wall 110. By setting the wing ring plate 121 and the pipe 122, the wing ring plate 121 is set on the outside of the pipe 122 and embedded in the concrete wall 110 in a radial manner, which can improve the axial stability of the pipe 122.
[0028] Among them, the sealing membrane layer 150 includes a waterproof and breathable membrane 151 and a waterproof and vapor-proof membrane 152. The waterproof and breathable membrane 151 is located on the outside of the concrete wall 110, and the waterproof and vapor-proof membrane 152 is located on the inside of the concrete wall 110. By arranging the waterproof and vapor-proof membrane 152 on the inside of the concrete wall 110, it is possible to isolate indoor water vapor and prevent water vapor from invading the interior and causing mold and the like.
[0029] See also Figure 1 , 2 , 3 and 4, the insulation assembly 200 includes an insulation layer 210, a wall-penetrating pipe 220 and a fixed seal 230, the insulation layer 210 is located on the outside of the concrete wall 110, the wall-penetrating pipe 220 penetrates the insulation layer 210, and the fixed seal 230 is arranged between the insulation layer 210 and the wall-penetrating pipe 220.
[0030] Among them, the fixed sealing member 230 includes a first pre-compression expansion sealing band 231 and a second pre-compression expansion sealing band 232. The first pre-compression expansion sealing band 231 and the second pre-compression expansion sealing band 232 are both sleeved on the outside of the wall-penetrating pipe 220. The first pre-compression expansion sealing band 231 is located on one side of the insulation layer 210, and the second pre-compression expansion sealing band 232 is located on the other side of the insulation layer 210. By setting the first pre-compression expansion sealing band 231 and the second pre-compression expansion sealing band 232, the wall-penetrating pipe 220 is vertically and stably fixed in the insulation layer 210 by utilizing the first pre-compression expansion sealing band 231 and the second pre-compression expansion sealing band 232. It can be installed in advance to avoid temporary installation on site and improve on-site installation efficiency.
[0031] It should be noted that the wall-penetrating tube 220 and the first pre-pressure expansion sealing belt 231 are interference fit, and the wall-penetrating tube 220 and the second pre-pressure expansion sealing belt 232 are interference fit. By setting the wall-penetrating tube 220 and the pre-pressure expansion sealing belt connected by interference fit, not only the restraining and fixing ability of the wall-penetrating tube 220 is guaranteed, but also the sealing is guaranteed to prevent the intrusion of water vapor.
[0032] Specifically, the insulation layer 210 is provided with a through hole 211 and a limiting groove 212, the wall-penetrating pipe 220 passes through the through hole 211, the first pre-pressure expansion sealing belt 231 and the second pre-pressure expansion sealing belt 232 are respectively arranged in the two limiting grooves 212, and by providing the through hole 211 and the limiting groove 212, the limiting groove 212 is used to limit and accommodate the pre-pressure expansion sealing belt, thereby limiting the axial movement of the wall-penetrating pipe 220.
[0033] In this embodiment, the insulation component 200 further includes an adhesive layer 240 , and the adhesive layer 240 is located between the concrete wall 110 and the insulation layer 210 . The adhesive layer 240 is provided to achieve connection between the insulation layer 210 and the concrete wall 110 .
[0034] Among them, a waterproof coating reinforcement layer 250 is arranged on the outside of the insulation layer 210. By setting the waterproof coating reinforcement layer 250, not only the first pre-compression expansion sealing belt 231 is shielded and covered, but also the risk of leakage is further reduced, bringing a better use experience to the user.
[0035] The working principle of the high airtight wall-penetrating pipeline structure is as follows: first, by pre-embedding, when constructing the concrete wall 110, the wing ring plate 121 is arranged on the outside of the pipeline 122 and pre-embedded into the concrete wall 110 in a radial manner, which can improve the axial stability of the pipeline 122. When installing the insulation layer 210, the wall-penetrating pipe 220 is first passed through the through hole 211, and the first pre-pressure expansion sealing belt 231 and the second pre-pressure expansion sealing belt 232 are both sleeved on the wall-penetrating pipe 220, and the two pre-pressure expansion sealing belts The waterproof and breathable membrane 151 is laid on the outside of the concrete wall 110. When the insulation layer 210 is installed, the wall-penetrating pipe 220 passes through the pipe 122. Then, a polyurethane foam sealant is injected between the wall-penetrating pipe 220 and the pipe 122 to form a polyurethane foam layer 130. The wall-penetrating pipe 220 and the pipe 122 are fixedly bonded by the adhesiveness of the polyurethane foam. If the concrete wall 110 is directly bonded, the adhesiveness is poor and the sealing is poor. Also poor, finally laying waterproof vapor barrier membrane 152, can isolate indoor water vapor, prevent water vapor from invading the interior, causing mold and other phenomena, a waterproof coating reinforcement layer 250 is arranged outside the thermal insulation layer 210, not only to cover the first pre-compression expansion sealing belt 231, but also to further reduce the risk of leakage, bringing better user experience, the first pre-compression expansion sealing belt 231 and the second pre-compression expansion sealing belt 232 are used to vertically and stably fix the through-wall pipe 220 in the thermal insulation layer 210, which can be installed in advance to avoid temporary installation on site, improve the on-site installation efficiency, and at the same time ensure the verticality of the through-wall pipe 220, even if the wing ring pipe 120 is tilted a little in the embedded type, the through-wall pipe 220 can also ensure the vertical angle, the wing ring plate 121 is arranged on the outside of the pipe 122, and is radially embedded in the concrete wall 110, and the pipe 122 and the pipe 122 are bonded by the polyurethane foam layer 130, which effectively ensures the stability and airtightness in the later stage, and the overall exterior is smooth and beautiful.
[0036] Finally, it should be noted that: Obviously, the above embodiments are only examples for clearly explaining the present invention, and are not intended to limit the implementation methods. For ordinary technicians in the relevant field, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived from this are still within the scope of protection of the present invention.
Claims
1. A high airtight wall-penetrating pipeline structure, characterized in that: include A connection assembly (100), the connection assembly (100) comprising a concrete wall (110), a wing ring tube (120), a polyurethane foam layer (130) and a sealing film layer (150), the wing ring tube (120) being pre-buried in the concrete wall (110), the polyurethane foam layer (130) being arranged in the wing ring tube (120), and the sealing film layer (150) being arranged on the surface of the concrete wall (110); A thermal insulation component (200), the thermal insulation component (200) comprising a thermal insulation layer (210), a wall-penetrating pipe (220) and a fixed sealing member (230), the thermal insulation layer (210) being located outside the concrete wall (110), the wall-penetrating pipe (220) penetrating the thermal insulation layer (210), and the fixed sealing member (230) being arranged between the thermal insulation layer (210) and the wall-penetrating pipe (220).
2. A high airtight wall-penetrating pipeline structure according to claim 1, characterized in that: The sealing membrane layer (150) comprises a waterproof breathable membrane (151) and a waterproof vapor barrier membrane (152); the waterproof breathable membrane (151) is located on the outside of the concrete wall (110), and the waterproof vapor barrier membrane (152) is located on the inside of the concrete wall (110).
3. A high airtight wall-penetrating pipeline structure according to claim 1, characterized in that: The wing ring pipe (120) comprises a wing ring plate (121) and a pipe (122); the wing ring plate (121) and the pipe (122) are integrally formed; the wing ring plate (121) is pre-buried in the concrete wall (110); and the pipe (122) passes through the concrete wall (110).
4. A high airtight wall-penetrating pipeline structure according to claim 1, characterized in that: The fixed sealing member (230) comprises a first pre-compression expansion sealing band (231) and a second pre-compression expansion sealing band (232); the first pre-compression expansion sealing band (231) and the second pre-compression expansion sealing band (232) are both sleeved on the outside of the wall-penetrating pipe (220); the first pre-compression expansion sealing band (231) is located on one side of the thermal insulation layer (210), and the second pre-compression expansion sealing band (232) is located on the other side of the thermal insulation layer (210).
5. A high airtight wall-penetrating pipeline structure according to claim 4, characterized in that: The wall-penetrating tube (220) and the first pre-pressure expansion sealing belt (231) are in interference fit, and the wall-penetrating tube (220) and the second pre-pressure expansion sealing belt (232) are in interference fit.
6. A high airtight wall-penetrating pipeline structure according to claim 5, characterized in that: The thermal insulation layer (210) is provided with a through hole (211) and a limiting groove (212); the wall-penetrating pipe (220) passes through the through hole (211); and the first pre-compression expansion sealing belt (231) and the second pre-compression expansion sealing belt (232) are respectively arranged in the two limiting grooves (212).
7. A high airtight wall-penetrating pipeline structure according to claim 1, characterized in that: The thermal insulation component (200) further comprises an adhesive layer (240), wherein the adhesive layer (240) is located between the concrete wall (110) and the thermal insulation layer (210).
8. A high airtight wall-penetrating pipeline structure according to claim 1, characterized in that: A waterproof coating reinforcement layer (250) is provided outside the thermal insulation layer (210).