Small boiler heating cavity structure

By using the design of the barrier plate and heating runner in the heating chamber structure of the small boiler, the problem of insufficient water flow partitioning and low heating efficiency in the existing boiler heating chamber is solved, and the rapid heating of the water flow and continuous gasification output is achieved. Effect.

CN222459478UActive Publication Date: 2025-02-11ZHONGSHAN LEITAI ELECTRIC APPLIANCE MFG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420276517.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-04
Publication Date
2025-02-11
Estimated Expiration
2034-02-04

AI Technical Summary

Technical Problem

The water flow partition in the heating chamber of the existing electric heating boiler is not obvious, resulting in a long heating time, interruption of water vapor supply, low heating efficiency and low water vapor output efficiency.

Method used

A small boiler heating chamber structure is designed, adopting a combination structure of a barrier plate and a heating runner. The water flow enters from the water inlet and flows through multiple heating runners, which increases the flow path and heating area of ​​the water flow and improves heating. efficiency.

Benefits of technology

It realizes rapid heating and continuous gasification output of water flow, improves heating efficiency and stable supply of water vapor, and has wide applicability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222459478U_ABST
    Figure CN222459478U_ABST
Patent Text Reader

Abstract

The utility model discloses a small boiler heating cavity structure which comprises a main body shell and an upper cover, a heating cavity used for heating water flow is arranged in the main body shell, a plurality of baffles are arranged in the heating cavity, a plurality of heating flow channels are formed among the baffles, and the water flow enters from a water inlet, can flow through all the heating flow channels and is output from an output port. The heating chamber is provided with a baffle plate and a heating runner, water flow flows in from the water inlet and sequentially flows through the heating runner, the flowing path of the water flow is increased as much as possible in the limited space of the heating chamber, and the water flow is heated by the heating runner, is gradually heated to be gasified and is output from the output port; water flow in the heating chamber can continuously flow in from the water inlet, water vapor can be continuously output from the output port, the applicability is wide, the heating flow channel increases the heating area of the water flow, the temperature of the water flow rises fast, and the heating efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water heaters for heat generating devices, in particular to a small boiler heating chamber structure. Background Art

[0002] Steam boilers are commonly used in homes, restaurants, hotels and other scenarios, such as heating, steaming and baking. Existing electric heating boilers generally include a water inlet, water enters the heating cavity, the cavity is powered to heat the water, and finally vaporizes and sprays out from the water outlet. The water flow division in the existing boiler heating cavity is not obvious. It takes a while for the water to heat up, and then it is sprayed out to use water vapor when it reaches the vaporization temperature. When it is used at peak time, it takes time for the cavity to heat the water, and the water vapor supply is prone to intermittent interruption, making the supply unsustainable. On the other hand, the heating efficiency of the heating cavity of the existing electric heating pot is not high, the surface area in contact with water is small, the water vapor production efficiency is low, the water intake and water vapor output of the cavity cannot be carried out at the same time, and water vapor cannot be output continuously. Utility Model Content

[0003] In view of this, the purpose of the utility model is to provide a small boiler heating chamber structure, which has the characteristics of high heating efficiency and continuous output of water vapor.

[0004] The technical solution adopted by the utility model to solve its technical problems is:

[0005] A small boiler heating chamber structure comprises a main body shell, an upper cover installed on the main body shell, a water inlet is arranged on the upper cover, an outlet is arranged at the bottom of the main body shell, a heating chamber for heating water flow is arranged in the main body shell, a plurality of baffles are arranged in the heating chamber, a plurality of heating flow channels are formed between the baffles, water flows in from the water inlet, can flow through all the heating flow channels, and is output from the outlet.

[0006] A plurality of protrusions are arranged at the bottom of the heating flow channel.

[0007] The baffles include a plurality of first baffles in the form of straight plates and a plurality of second baffles in the form of annular plates. A straight first heating channel is formed between the first baffles, and an annular second heating channel is formed between the second baffles.

[0008] The main body shell is in a circular basin shape, and at least two first baffles are arranged in a semicircle on one side of the circular basin of the main body shell, and at least two second baffles are arranged in a semicircle on the other side of the circular basin of the main body shell.

[0009] The second baffle plate is semicircular and evenly distributed from the middle to the outside along the radial direction in the other semicircle of the main shell circular basin. The second heating channel is connected to the first heating channel, and water can flow from the outer circle of the disc to the center of the circular basin along the second heating channel.

[0010] The output port is arranged in the middle of the circular basin of the main body shell and is connected to the second heating flow channel. There are two output ports.

[0011] The water inlet is connected to the first heating flow channel.

[0012] A heating device is installed at the bottom of the main body shell, and a fixing clip for fixing the heating device is installed at the bottom of the main body shell.

[0013] The fixing clip is provided with a plurality of elastic abutting ears for abutting against the bottom surface of the heating device for fixing.

[0014] The heating device is an MCH heating sheet.

[0015] The beneficial effects of the utility model are:

[0016] 1. The heating chamber is provided with baffles and heating channels. Water flows in from the water inlet and flows through the heating channels in sequence. In the limited heating chamber space, the water flow path is increased as much as possible. After being heated by the heating channels, the water gradually heats up and finally heats up to vaporization and is output from the output port. The water in the heating chamber can flow in from the water inlet continuously, and the water vapor can be continuously output from the output port, which has wide applicability; the heating channel increases the heating area of ​​the water flow, the water flow heats up quickly, and the heating efficiency is improved.

[0017] 2. Several protrusions are arranged at the bottom of the heating flow channel, which can further increase the contact area between the water flow and the heating chamber, so that the water flow heats up faster and the heating efficiency is further improved.

[0018] 3. Water flows into the heating chamber from the water inlet, and first flows through the first heating channel for preliminary heating. After flowing through all the first heating channels, the water flows into the second heating channel. The second heating channel is designed to be annular. Compared with the straight first heating channel, the space distribution in the disc-shaped heating chamber is more reasonable, the volume utilization rate is higher, the path of the second heating channel is increased, and the annular second heating channel has a larger contact area with the water flow, which can fully heat the water body. At the same time, after the water flow is heated by the first heating channel, the water temperature entering the second heating channel increases, the water viscosity decreases, the friction of the water on the second heating channel decreases, and the fluidity increases. The longer second heating channel can fully heat the water flow and improve the heating efficiency. At the same time, the first heating channel is designed to be straight because the water flow has just entered from the water inlet, the water temperature is low, and the fluidity is relatively low. The straight water channel can facilitate the flow of water. After preliminary heating, it enters the annular second heating channel. The design of the straight first heating channel and the annular second heating channel can well coordinate the changes in water flow rate at different temperatures, so that the input and output of water flow are more balanced and stable, and the output of water vapor is more stable and linear.

[0019] 4. The heating device is installed at the bottom of the main body shell by means of a fixed clip. The heating device is an efficient and environmentally friendly MCH heating sheet. The upper part of the fixed clip adopts an elastic abutment ear to fix the MCH heating sheet, so that the MCH heating sheet is fully in contact with the bottom of the main body shell. At the same time, the contact between the MCH heating sheet and other parts is reduced as much as possible, so that the heat generated by the MCH heating sheet is absorbed by the main body shell to the maximum extent, further improving the heating efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is the structural diagram of this small boiler;

[0021] Figure 2 This is a schematic diagram of the explosion structure of the upper cover of this small boiler;

[0022] Figure 3 It is a schematic diagram of the heating flow channel structure of the heating chamber in the main body shell;

[0023] Figure 4 is a cross-sectional view of a heating chamber;

[0024] Figure 5 It is a structural diagram of the small boiler from the bottom perspective;

[0025] Figure 6 is an exploded schematic diagram of the heating device and the fixing clip;

[0026] Figure 7 It is a schematic diagram of the structure of the fixing clip. DETAILED DESCRIPTION

[0027] In order to make the technical problems solved by the present invention, the technical solutions adopted and the technical effects achieved clearer, the technical solutions of the present invention are further described below in conjunction with the accompanying drawings and through specific implementation methods. It is understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for the convenience of description, only the parts related to the present invention are shown in the accompanying drawings, rather than all of them.

[0028] Reference Figure 1 , Figure 2 , Figure 3 The utility model proposes a small boiler heating chamber structure, including a main body shell 1, an upper cover 2 installed on the main body shell 1, a water inlet 20 is arranged on the upper cover 2, an output port 11 is arranged at the bottom of the main body shell 1, a heating chamber 10 for heating water flow is arranged in the main body shell 1, a plurality of baffles 101 are arranged in the heating chamber 10, a plurality of heating channels 102 are formed between the baffles 101, and water flows in from the water inlet 20, can flow through all the heating channels 102, and output from the output port 11. Preferably, the main body shell 1 and the upper cover 2 are installed by screw connection, and a high-temperature sealing rubber ring 5 is arranged between the main body shell 1 and the upper cover 2.

[0029] Furthermore, the heating chamber 10 is provided with a baffle 101 and a heating channel 102. Water flows in from the water inlet 20 and flows through the heating channel 102 in sequence. In the limited space of the heating chamber 10, the flow path of the water flow is increased as much as possible. After being heated by the heating channel 102, the water flow gradually heats up and is finally heated to vaporization and output from the output port 11. The water flow in the heating chamber 10 can flow in continuously from the water inlet 20, and the water vapor can be continuously output from the output port 11, which has wide applicability; the heating channel 102 increases the heating area of ​​the water flow, the water flow heats up quickly, and the heating efficiency is improved.

[0030] Reference Figure 3 , a plurality of protrusions 12 are provided at the bottom of the heating channel 102. Further, a plurality of protrusions 12 are provided at the bottom of the heating channel 102, which can further increase the contact area between the water flow and the heating chamber, so that the water flow heats up faster and the heating efficiency is further improved.

[0031] Reference Figure 3 , Figure 4 The baffle plates 101 include a plurality of first baffle plates 1010 in the form of straight plates and a plurality of second baffle plates 1011 in the form of annular plates. A straight first heating channel 1020 is formed between the first baffle plates 1010 , and an annular second heating channel 1021 is formed between the second baffle plates 1011 .

[0032] Reference Figure 3Furthermore, the main body shell 1 is in a round basin shape, at least two first baffle plates 1010 are arranged in a semicircle on one side of the round basin of the main body shell 1, and at least two second baffle plates 1011 are arranged in a semicircle on the other side of the round basin of the main body shell 1.

[0033] Reference Figure 3 Furthermore, the second baffle plate 1011 is semicircular and evenly distributed from the middle along the radial direction outward in the other semicircle of the circular basin of the main shell 1. The second heating channel 1021 is connected to the first heating channel 1020, and the water flow can flow from the outer circle of the disc to the center of the circular basin along the second heating channel 1021.

[0034] Furthermore, water flows into the heating chamber 10 from the water inlet 20, first flows through the first heating channel 1020 for preliminary heating, and then flows through all the first heating channels 1020, and then enters the second heating channel 1021. The second heating channel 1021 is designed to be annular. Compared with the straight first heating channel 1020, the space distribution in the disc-shaped heating chamber 10 is more reasonable, the volume utilization rate is higher, the path of the second heating channel 1021 is increased, and the annular second heating channel 1021 has a larger contact area with the water flow, which can fully heat the water body.

[0035] At the same time, after the water is heated by the first heating channel 1020, the water temperature entering the second heating channel 1021 increases, the water viscosity decreases, the friction of the water on the second heating channel 1021 decreases, and the fluidity increases. The longer second heating channel 1021 can fully heat the water flow and improve the heating efficiency.

[0036] At the same time, the first heating channel 1020 is designed to be straight because the water has just entered from the water inlet 20, the water temperature is relatively low, the fluidity is relatively low, and the straight channel can facilitate the flow of water. After preliminary heating, it enters the annular second heating channel 1021. The design of the straight first heating channel 1020 and the annular second heating channel 1021 can well coordinate the changes in water flow velocity at different temperatures, so that the input and output of the water flow are more balanced and stable, and the output of water vapor is more stable and linear.

[0037] Reference Figure 3 The output port 11 is arranged in the middle of the circular basin of the main body shell 1 and is connected to the second heating flow channel 1021. There are two output ports 11. When the water reaches the vicinity of the output port, it gradually vaporizes and increases in volume. The increase of the output port ratio water inlet can increase the output efficiency and coordinate the balance between output and input.

[0038] Reference Figure 4 The water inlet 20 is connected to the first heating channel 1020 .

[0039] Reference Figure 5 and Figure 6A heating device 3 is installed at the bottom of the main body shell 1, and a fixing clip 4 for fixing the heating device 3 is installed at the bottom of the main body shell 1.

[0040] Preferably, the fixing clip 4 is provided with screw holes at four corners, and the fixing clip 4 is connected and fixed to the main shell 1 by screws.

[0041] Reference Figure 7 The fixing clip 4 is provided with a plurality of elastic abutting ears 40 for abutting against the bottom surface of the heating device 3 for fixing.

[0042] Preferably, the heating device 3 is an MCH heating sheet, which has the advantages of corrosion resistance, high temperature resistance, long life, high efficiency and energy saving, uniform temperature, good thermal conductivity, and fast thermal compensation speed.

[0043] Furthermore, the heating device 3 is installed at the bottom of the main body shell 1 by means of a fixed clip 4. The heating device 3 is a high-efficiency and environmentally friendly MCH heating plate. The upper part of the fixed clip 4 uses an elastic abutment ear 40 to fix the MCH heating plate, so that the MCH heating plate is fully in contact with and close to the bottom of the main body shell 1. At the same time, the contact between the MCH heating plate and other parts is reduced as much as possible, so that the heat generated by the MCH heating plate is absorbed by the main body shell to the maximum extent, thereby further improving the heating efficiency.

Claims

1. A small boiler heating chamber structure, characterized in that: The invention comprises a main body shell (1), an upper cover (2) mounted on the main body shell (1), a water inlet (20) being arranged on the upper cover (2), an outlet (11) being arranged at the bottom of the main body shell (1), a heating chamber (10) for heating water being arranged inside the main body shell (1), a plurality of baffles (101) being arranged inside the heating chamber (10), a plurality of heating channels (102) being formed between the baffles (101), water entering from the water inlet (20), flowing through all the heating channels (102), and being output from the outlet (11).

2. A small boiler heating chamber structure according to claim 1, characterized in that: A plurality of protrusions (12) are arranged at the bottom of the heating flow channel (102).

3. A small boiler heating chamber structure according to claim 1, characterized in that: The baffle plates (101) include a plurality of first baffle plates (1010) in the form of straight plates and a plurality of second baffle plates (1011) in the form of annular plates, a straight first heating flow channel (1020) being formed between the first baffle plates (1010), and an annular second heating flow channel (1021) being formed between the second baffle plates (1011).

4. A small boiler heating chamber structure according to claim 3, characterized in that: The main body shell (1) is in the shape of a circular basin, and at least two of the first baffle plates (1010) are arranged in a semicircle on one side of the circular basin of the main body shell (1), and at least two of the second baffle plates (1011) are arranged in a semicircle on the other side of the circular basin of the main body shell (1).

5. A small boiler heating chamber structure according to claim 4, characterized in that: The second baffle plate (1011) is in the shape of a semicircle and is evenly distributed from the middle along the radial direction outward in the other semicircle of the circular basin of the main shell (1). The second heating flow channel (1021) is connected to the first heating flow channel (1020), and water can flow from the outer circle of the disk to the center of the circular basin along the second heating flow channel (1021).

6. A small boiler heating chamber structure according to claim 5, characterized in that: The output port (11) is arranged in the middle of the circular basin of the main body shell (1) and is connected to the second heating flow channel (1021), and there are two output ports (11).

7. A small boiler heating chamber structure according to claim 3, characterized in that: The water inlet (20) is connected to the first heating flow channel (1020).

8. A small boiler heating chamber structure according to claim 1, characterized in that: A heating device (3) is installed at the bottom of the main body shell (1), and a fixing clip (4) for fixing the heating device (3) is installed at the bottom of the main body shell (1).

9. A small boiler heating chamber structure according to claim 8, characterized in that: The fixing clip (4) is provided with a plurality of elastic abutting ears (40) for abutting against the bottom surface of the heating device (3) for fixing.

10. A small boiler heating chamber structure according to claim 8, characterized in that: The heating device (3) is an MCH heating sheet.