Water tank for heat treatment of annular forgings

By setting multiple cooling zones and operating zones in the sink, using a support frame with a avoiding groove to support the material frame, and optimizing the operation of the robot arm through the operating zone, the problem of low quenching operation in the traditional sink is solved, and multiple furnaces are realized simultaneously Quenching improves production efficiency.

CN222499293UActive Publication Date: 2025-02-18GATD-SICHUAN DELAN CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421227948.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-31
Publication Date
2025-02-18
Estimated Expiration
2034-05-31

AI Technical Summary

Technical Problem

The quenching operation of the ring forgings in the traditional sink requires the operation vehicle robot arm, and only one furnace of workpieces can be quenched, affecting production efficiency.

Method used

A water tank for heat treatment of ring forgings is designed, including at least two cooling zones and an operating zone, each cooling zone is provided with a support frame at the bottom, and a avoiding groove is arranged side by side on the support frame, and an operating zone in adjacent cooling zones is used for the mechanical arm operate.

Benefits of technology

The quenching operation of two furnaces or more annular forgings in the same sink is achieved simultaneously, which improves the efficiency of heat treatment operation, reduces the time of robotic arm consumption, and improves the continuity of the production line.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222499293U_ABST
    Figure CN222499293U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of heat treatment of annular forgings, in particular to a water tank for heat treatment of annular forgings, which comprises a tank body, at least two cooling areas are arranged in the tank body, an operation area is arranged between every two adjacent cooling areas, a support frame is arranged at the bottom of each cooling area, and a plurality of avoiding grooves are arranged on the support frame side by side. The receding groove is communicated with the operation area. Two or more cooling areas are arranged in the water tank, the material frame is supported by the supporting frame with the avoiding groove in each cooling area, and the operation area facilitating ascending, descending, transverse moving and other operation of the mechanical arm of the operation vehicle is arranged between every two adjacent cooling areas; and two or more than two furnaces of quenching operation of the annular forgings can be simultaneously carried out in the same water tank, so that the heat treatment operation efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of heat treatment of annular forgings, in particular to a water tank for heat treatment of annular forgings. Background Art

[0002] Heat treatment is an indispensable part of the production of ring forgings. The heat treatment production line includes tracks and an operating vehicle that can move along the tracks. A robotic arm is set on one side of the operating vehicle. The robotic arm is shaped like the forearm of a forklift and has functions such as lifting and retracting. A water trough is arranged under the track and a heat treatment furnace is arranged on one side of the track. The operating vehicle uses the robotic arm to take out the rack loaded with ring forgings from the heat treatment furnace, then moves it to the top of the water trough, and uses the lifting function of the robotic arm to send the rack into the water trough for quenching.

[0003] During the above quenching process, the robot arm of the operating vehicle needs to be immersed in the water tank with the material rack all the time, so that the material rack can be taken out of the water tank conveniently after the quenching is completed. In this way, the quenching operation needs to occupy the operating vehicle, and only one furnace of workpieces can be quenched in the water tank, which affects the continuity of the heat treatment production line and is not conducive to improving production efficiency.

[0004] Therefore, a technical solution is currently needed to solve the technical problem that the traditional quenching operation of annular forgings in a water tank requires the use of an operating vehicle robotic arm and can only perform the quenching operation of one furnace of workpieces, thus affecting production efficiency. Utility Model Content

[0005] The invention purpose of the utility model is to provide a water tank for heat treatment of annular forgings in order to solve the technical problem that the quenching operation of annular forgings in a traditional water tank needs to occupy the robot arm of the operating vehicle and can only perform the quenching operation of one furnace of workpieces, which affects the production efficiency.

[0006] In order to achieve the above purpose, the technical solution adopted by the utility model is:

[0007] A water trough for heat treatment of annular forgings comprises a trough body, wherein at least two cooling zones are arranged in the trough body, an operating zone is arranged between two adjacent cooling zones, a support frame is arranged at the bottom of each cooling zone, a plurality of avoidance grooves are arranged side by side on the support frame, and the avoidance grooves are connected to the operating zone.

[0008] The utility model discloses a water trough for heat treatment of annular forgings. When in use, an operating vehicle on a track forks out a material rack loaded with annular forgings in a heat treatment furnace and moves it above the water trough. A mechanical arm descends above an operating area of ​​the water trough, and a portion of the mechanical arm close to the forklift falls into the operating area. The front end of the mechanical arm falls into the cooling area and descends through an avoidance groove, so that the material rack falls onto a support frame in the cooling area, and then is drawn out from the side of the avoidance groove, and the next material rack is placed into another cooling area by the operating vehicle. The present application arranges more than two cooling zones in the water trough, and each cooling zone supports the material rack by a support frame with an avoidance groove. An operating area is arranged between two adjacent cooling zones, which is convenient for the operating vehicle mechanical arm to perform operations such as rising, descending, and lateral movement. This realizes simultaneous quenching operations of two or more annular forgings in the same water trough, thereby improving the efficiency of heat treatment operations.

[0009] As a preferred solution of the utility model, the support frame includes a plurality of vertical plates arranged side by side, the vertical plates are connected to the bottom wall of the tank body, and the avoidance groove is formed between two adjacent vertical plates. By arranging a plurality of vertical plates side by side at the bottom of the cooling zone to form a support frame, the support of the annular forging material rack is achieved, and the avoidance groove formed between the vertical plates enables the operating vehicle to put the material rack into the support frame through the mechanical arm, and the mechanical arm can be pulled out from the avoidance groove, and the material rack on the support frame can also be lifted by inserting the operating vehicle mechanical arm into the avoidance groove.

[0010] As a preferred solution of the utility model, a limiting rod is provided on the side of the vertical plate close to the operating area. The limiting rod has a limiting effect on the material rack on the support frame to prevent the cooling water in the water tank from vibrating and causing the material rack to shift or detach from the support frame.

[0011] As a preferred solution of the utility model, a water changing area is provided on the side of the cooling area, and a partition net is provided in the water changing area, and the partition net and the inner wall of the tank body are enclosed to form the water changing area. The water changing area is formed in the water tank by the partition net and the inner wall of the tank body, so that the cooling water in the water tank can be replaced in the water changing area to keep the water temperature in the water tank within a suitable range. The partition net can isolate the debris falling off the annular forging to prevent the debris from entering the water pump, pipeline or cooling water tank.

[0012] As a preferred solution of the utility model, two water exchange areas are correspondingly arranged in each cooling zone, and the two water exchange areas are respectively arranged on both sides of the cooling zone. The two water exchange areas respectively replace the cooling water in the water tank from both sides of the cooling zone, thereby improving the cooling water circulation efficiency and the fluidity of the cooling water in the water tank, so that the quenching effect of the annular forging is more uniform and the quenching efficiency is higher.

[0013] As a preferred solution of the utility model, the inner wall of the tank body is connected with a plurality of wall guard plates, the wall guard plates are arranged one by one with the partition nets, and the ends of the partition nets are connected with the wall guard plates. The wall guard plates support the partition nets located on the inner wall of the tank body, which can improve the structural strength of the partition nets and prevent deformation during the cooling water oscillation process.

[0014] As a preferred solution of the utility model, it also includes a cooling water tank, the cooling water tank is connected with a water inlet pipe and a water outlet pipe, the water inlet pipe and the water outlet pipe are respectively connected with the water exchange area. A heat exchange plate is arranged in the cooling water tank, which can cool the hot water drawn from the water tank and then send it back to the water tank through the water outlet pipe, so that the water temperature in the water tank is kept within a suitable range, so as to achieve the purpose of recycling cooling water.

[0015] As a preferred solution of the utility model, the water inlet pipe and the water outlet pipe are respectively connected with water pumps, which improves the running efficiency of cooling water and provides a higher pressure for the water sent back to the water tank from the cooling water tank, so that the returned cooling water impacts the cooling water in the original water tank, thereby achieving the effect of stirring the cooling water in the water tank, thereby making the cooling water contact with the annular forging more uniformly, and improving the quenching efficiency and quenching quality.

[0016] As a preferred solution of the utility model, there are two cooling zones, which are respectively arranged near the inner walls at both ends of the tank body. When two cooling zones are arranged in the water tank, two furnaces of annular forgings can be quenched at the same time, and the two cooling zones share one operating area, which reduces the floor space of the water tank and improves the heat treatment production efficiency.

[0017] As a preferred solution of the utility model, there are three cooling zones, which are respectively arranged at both ends and the middle of the inner cavity of the tank body. By setting three cooling zones in the water tank, the cooling operation of three furnaces of annular forgings can be carried out simultaneously. When the length of the production line increases, the number of heat treatment furnaces increases accordingly. The increase of cooling zones in the water tank is to meet the demand of production capacity. The adjacent cooling zones are separated by the operating zone to ensure that the operating vehicle mechanical arm can exit after entering each cooling zone to avoid occupying the operating vehicle.

[0018] In summary, due to the adoption of the above technical solution, the beneficial effects of the utility model are:

[0019] The present application sets up more than two cooling zones in a water tank, and in each cooling zone, a material rack is supported by a support frame with an avoidance groove. An operating area is set between two adjacent cooling zones to facilitate the operation of the robot arm of the operating vehicle to perform operations such as rising, lowering, and lateral movement. This enables quenching operations of two or more ring forgings in the same water tank to be carried out simultaneously, thereby improving the efficiency of heat treatment operations. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 This is a schematic diagram of the structure of a water tank for heat treatment of an annular forging of the utility model in Example 1;

[0021] Figure 2 yes Figure 1 Enlarged view of area A in the middle;

[0022] Figure 3 It is a schematic diagram of the structure of a water tank for heat treatment of an annular forging of the utility model in Example 2;

[0023] Figure 4 This is a schematic diagram of the structure of a water tank for heat treatment of an annular forging of the utility model in Example 3;

[0024] Markings in the figure: 1-tank body, 11-cooling area, 12-operating area, 13-water exchange area, 2-support frame, 201-avoidance groove, 21-vertical board, 211-limit rod, 3-partition net, 4-wall guard plate, 5-cooling water tank, 51-water inlet pipe, 52-water outlet pipe, 6-water pump. DETAILED DESCRIPTION

[0025] The present invention is further described in detail below in conjunction with specific embodiments. However, this should not be understood as the scope of the above subject matter of the present invention being limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.

[0026] In the description of the specific embodiments of the present invention, unless otherwise specified, the terms indicating the orientation or position relationship such as "upper", "lower", "left", "right", "center", "inside", "outside", etc. are all expressions based on the orientation or position relationship shown in the drawings, or the orientation or position relationship when the product / equipment / device of the utility model is usually used. These terms of orientation or position relationship are only for the convenience of describing the scheme of the utility model or simplifying the description in the specific embodiments, so that technicians can quickly understand the scheme, rather than indicating or implying that a specific device / component / element must have a specific orientation, or be constructed and operated in a specific position relationship, and therefore cannot be understood as a limitation on the present invention.

[0027] In addition, if the terms "horizontal", "vertical", "overhanging", "parallel" and the like appear, it does not mean that the corresponding devices / components / elements are required to be absolutely horizontal or vertical or overhanging or parallel, but may be slightly tilted or have deviations. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but may be slightly tilted. Alternatively, it can be simplified to mean that the corresponding devices / components / elements are set in directions such as "horizontal", "vertical", "overhanging", "parallel", etc., and can have an error / deviation of ±10% relative to the corresponding direction setting, more preferably an error / deviation within ±8%, more preferably an error / deviation within ±6%, more preferably an error / deviation within ±5%, and more preferably an error / deviation within ±4%. As long as the corresponding devices / components / elements are within the error / deviation range, they can still achieve their functions in the solution of the utility model.

[0028] In addition, the expressions “first”, “second”, “third”, etc., which appear in the terms, are merely used to distinguish the description of the same or similar components and should not be understood as emphasizing or implying the relative importance of specific components.

[0029] In addition, in the description of the embodiments of the present invention, "several", "multiple" and "a number" represent at least 2. It can be any number such as 2, 3, 4, 5, 6, 7, 8, 9, and even more than 9.

[0030] In addition, in the description of the technical solution of the utility model, unless otherwise clearly specified / defined / restricted, the terms "set", "install", "connect", "connected", "provided with", "laid", and "arranged" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection, and can be welding, riveting, bolting, threading, and other commonly used connection means in the field. This connection can be a mechanical connection, an electrical connection, or a communication connection; it can be a direct connection, or an indirect connection through an intermediate medium, and it can be the internal communication of two components.

[0031] Example 1

[0032] like Figure 1 and Figure 2As shown, the present embodiment is a water trough for heat treatment of annular forgings, comprising a trough body 1, wherein at least two cooling zones 11 are arranged in the trough body 1, an operating zone 12 is arranged between two adjacent cooling zones 11, a support frame 2 is arranged at the bottom of each cooling zone 11, a plurality of avoidance grooves 201 are arranged side by side on the support frame 2, and the avoidance grooves 201 are connected to the operating zone 12. In the present embodiment, the number of cooling zones 11 is set to two, which are respectively arranged near the inner walls at both ends of the trough body 1, so that quenching operations can be performed on two furnaces of annular forgings at the same time, and one operating zone is shared, thereby reducing the floor space occupied by the water trough 1 and improving the heat treatment production efficiency.

[0033] When in use, the operating vehicle on the track forks out the material rack loaded with annular forgings in the heat treatment furnace and moves it above the water tank 1. The mechanical arm descends above the operating area 12 of the water tank 1, and the part of the mechanical arm close to the forklift falls into the operating area 12. The front end of the mechanical arm falls into the cooling zone 11 and descends through the avoidance groove 201, so that the material rack falls on the support frame 2 in the cooling zone 11, and then is pulled out from the side of the avoidance groove 201, and then the next material rack is placed into another cooling by the operating vehicle; the present application arranges more than two cooling zones 11 in the water tank 1, and each cooling zone 11 supports the material rack by a support frame 2 with an avoidance groove 201, and an operating area 12 is arranged between two adjacent cooling zones 11 to facilitate the operating vehicle mechanical arm to perform operations such as rising, falling, and lateral movement, thereby realizing the simultaneous quenching of annular forgings in two or more furnaces in the same water tank 1, thereby improving the efficiency of heat treatment operations.

[0034] Specifically, the support frame 2 includes a plurality of vertical plates 21 arranged side by side, the bottom of the vertical plates 21 is connected to the bottom wall of the trough body 1, and an avoidance groove 201 is formed between two adjacent vertical plates 21. By arranging a plurality of vertical plates 21 side by side at the bottom of the cooling zone 11 to form the support frame 2, support for the annular forging material rack is achieved. The avoidance groove 201 formed between the vertical plates 21 enables the robotic arm to be pulled out from the avoidance groove 201 when the operating vehicle places the material rack into the support frame 2 through the robotic arm, and the operating vehicle robotic arm can also be inserted into the avoidance groove 201 to lift the material rack on the support frame 2; further, a limiting rod 211 is provided on the side of the vertical plate 21 close to the operating zone 12, and the limiting rod 211 has a limiting effect on the material rack on the support frame 2 to prevent the cooling water in the water tank 1 from oscillating and causing the material rack to shift or detach from the support frame 2.

[0035] Example 2

[0036] like Figure 3 As shown, the difference between this embodiment and embodiment 1 is that the number of the cooling zones 12 is three, which are respectively arranged at the two ends and the middle of the inner cavity of the tank body 1.

[0037] In this embodiment, three cooling zones 11 are set in the water tank 1 to meet the cooling operation of three furnaces of annular forgings at the same time. When the length of the production line increases, the number of heat treatment furnaces increases accordingly. The cooling zone 11 in the water tank 1 is increased to meet the production capacity requirements. Two adjacent cooling zones 11 are separated by the operating area 12 to ensure that the operating vehicle's mechanical arm can exit after entering each cooling zone 11 to avoid occupying the operating vehicle.

[0038] Example 3

[0039] like Figure 4 As shown, in this embodiment, the difference from Embodiment 1 is that a water exchange area 13 is provided on the side of the cooling area 11, and a partition net 3 is provided in the water exchange area 13. The partition net 3 and the inner wall of the trough body 1 are enclosed to form the water exchange area 13, and also includes a cooling water tank 5. The cooling water tank 5 is connected with a water inlet pipe 51 and a water outlet pipe 52, and the water inlet pipe 51 and the water outlet pipe 52 are respectively connected to the water exchange area 13.

[0040] In this embodiment, a water exchange area 13 is formed in the water tank 1 by the partition net 3 and the inner wall of the tank body 1, so that the cooling water in the water tank 1 can be replaced in the water exchange area 13 to keep the water temperature in the water tank 1 within a suitable range. The partition net 3 can isolate the debris falling off the annular forging to prevent the debris from entering the water pump, pipeline or cooling water tank 5.

[0041] Furthermore, each of the cooling zones 11 is provided with two water changing zones 13, and the two water changing zones 13 are respectively arranged on both sides of the cooling zone 11. The two water changing zones 11 respectively replace the cooling water in the water tank 1 from both sides of the cooling zone 11, thereby improving the cooling water circulation efficiency and improving the fluidity of the cooling water in the water tank 1, so that the quenching effect of the annular forging is more uniform and the quenching efficiency is higher.

[0042] Furthermore, a plurality of wall panels 4 are connected to the inner wall of the trough body 1. The wall panels 4 are arranged one-to-one corresponding to the partition nets 3. The ends of the partition nets 3 are connected to the wall panels 4. The wall panels 4 support the partition nets 3 located on the inner wall of the trough body 1, thereby improving the structural strength of the partition nets 3 and avoiding deformation during the cooling water oscillation process.

[0043] Furthermore, the water inlet pipe 51 and the water outlet pipe 52 are respectively connected to a water pump 6, which improves the operating efficiency of the cooling water and provides a higher pressure for the water sent back to the water tank 1 by the cooling water tank 5, so that the returned cooling water impacts the cooling water in the original water tank 1, thereby achieving the effect of stirring the cooling water in the water tank 1, thereby making the cooling water contact with the annular forging more evenly, thereby improving the quenching efficiency and quenching quality.

[0044] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A water tank for heat treatment of annular forgings, characterized in that: The invention comprises a tank body (1), wherein at least two cooling zones (11) are arranged in the tank body (1), an operating zone (12) is arranged between two adjacent cooling zones (11), a support frame (2) is arranged at the bottom of each cooling zone (11), a plurality of avoidance grooves (201) are arranged side by side on the support frame (2), and the avoidance grooves (201) are connected to the operating zone (12).

2. The water tank for heat treatment of annular forgings according to claim 1, characterized in that: The support frame (2) comprises a plurality of vertical plates (21) arranged side by side, wherein the vertical plates (21) are connected to the inner bottom wall of the trough body (1), and the avoidance groove (201) is formed between two adjacent vertical plates (21).

3. The water tank for heat treatment of annular forgings according to claim 2, characterized in that: A limiting rod (211) is provided on one side of the vertical plate (21) close to the operating area (12).

4. The water tank for heat treatment of annular forgings according to claim 1, characterized in that: A water exchange area (13) is provided on the side of the cooling area (11), a partition net (3) is provided in the water exchange area (13), and the partition net (3) and the inner wall of the tank body (1) are enclosed to form the water exchange area (13).

5. The water tank for heat treatment of annular forgings according to claim 4, characterized in that: Two water exchange areas (13) are correspondingly arranged in each cooling area (11), and the two water exchange areas (13) are respectively arranged on both sides of the cooling area (11).

6. The water tank for heat treatment of annular forgings according to claim 4, characterized in that: The inner wall of the trough body (1) is connected to a plurality of wall panels (4), the wall panels (4) are arranged in one-to-one correspondence with the partition nets (3), and the ends of the partition nets (3) are connected to the wall panels (4).

7. The water tank for heat treatment of annular forgings according to claim 4, characterized in that: It also comprises a cooling water tank (5), the cooling water tank (5) being connected to a water inlet pipe (51) and a water outlet pipe (52), the water inlet pipe (51) and the water outlet pipe (52) being respectively connected to the water exchange area (13).

8. The water tank for heat treatment of annular forgings according to claim 7, characterized in that: The water inlet pipe (51) and the water outlet pipe (52) are respectively connected to a water pump (6).

9. The water tank for heat treatment of annular forgings according to any one of claims 1 to 8, characterized in that: The number of the cooling zones (11) is two, and they are respectively arranged close to the inner walls at both ends of the tank body (1).

10. The water tank for heat treatment of annular forgings according to any one of claims 1 to 8, characterized in that: The number of the cooling zones (11) is three, which are respectively arranged at the two ends and the middle of the inner cavity of the tank body (1).