Geotechnical engineering geophysical prospecting device
By using multiple sets of anti-swing support components in geotechnical engineering geophysical exploration and exploration equipment to assist in supporting the drill rod, the swing problem caused by excessive length of the drill rod is solved, and the stability and efficiency of geophysical exploration and exploration are improved.
Patent Information
- Application Number
- CN202421267258.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-05
- Publication Date
- 2025-02-18
- Estimated Expiration
- 2034-06-05
AI Technical Summary
During geotechnical exploration and exploration, due to the long length of the drill rod, the drill rod will swing violently during use, resulting in reduced accuracy, reduced efficiency and equipment wear.
A geotechnical engineering geophysical exploration and exploration device is designed, and multiple sets of anti-swing support components are used to assist in supporting the descending and rotating drill rod, and the swing amplitude of the drill rod is reduced through arcuate grooves and spring mechanisms.
It effectively reduces the swing amplitude caused by excessive length of the drill rod, and improves the stability, efficiency and safety of geophysical exploration exploration.
Smart Images

Figure CN222501716U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of geotechnical engineering geophysical prospecting and exploration, in particular to a geotechnical engineering geophysical prospecting and exploration device. Background Art
[0002] Geotechnical engineering geophysical prospecting equipment is an auxiliary equipment in the process of geotechnical engineering geophysical prospecting. During the geotechnical prospecting operation, due to the deep location of the geophysical prospecting, a longer drill rod is required for geophysical prospecting. Due to the long length of the drill rod, the rotating drill rod will swing violently during use, which will further cause problems such as decreased accuracy, reduced efficiency, and equipment wear.
[0003] Therefore, a geotechnical engineering geophysical prospecting device is urgently needed to solve the above problems. Utility Model Content
[0004] The purpose of the utility model is to provide a geotechnical engineering geophysical prospecting device to solve the problems raised in the above background technology.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a geotechnical engineering geophysical prospecting device, comprising a mounting frame, a base is fixed at the bottom of the mounting frame, a lifting plate is connected to the mounting frame for lifting and pulling by a lifting assembly, a drill rod is rotatably connected to the lifting plate, a driving motor for driving the drill rod is installed at the upper end of the lifting plate, and also includes a plurality of anti-swing support assemblies arranged on the base for supporting the drill rod against sway during work, the anti-swing support assembly comprises a mounting seat, a pushing assembly for pushing the mounting seat is arranged on the base, one side of the mounting seat is detachably connected to a support plate through the mounting assembly, and one side of the support plate is provided with an arc groove for abutting against the outer side of the drill rod.
[0006] The anti-sway support components are arranged in a circular array on the base.
[0007] The upper end of the support plate is provided with an inclined surface.
[0008] The pushing assembly includes a plurality of sleeves fixed on the inner side of the base, each sleeve is slidably connected with a slide rod, one end of the slide rod is fixed to the mounting seat, and a spring is sleeved on the outer side of each sleeve, and the two ends of the spring are respectively set against the base and the mounting seat.
[0009] The installation assembly includes threaded holes opened on the installation seat and the support plate, bolts are threadedly engaged on the threaded holes, and a positioning assembly for positioning and guiding during the installation process is arranged between the installation seat and the support plate.
[0010] The positioning assembly includes a plurality of positioning holes formed on the mounting seat, and a plurality of positioning pins matched with the positioning holes are fixed on one side of the support plate.
[0011] Compared with the prior art, the beneficial effects of the utility model are:
[0012] The utility model discloses a geotechnical exploration device for geotechnical engineering. When the geotechnical exploration device is used to carry out geotechnical exploration operations in the field of geotechnical engineering, a plurality of anti-sway support components cooperate with each other to provide auxiliary support for a descending and rotating drill rod, thereby reducing the amplitude of violent swing of the drill rod caused by the long length of the drill rod, and facilitating the device to carry out geotechnical exploration operations in the field of geotechnical engineering in a more stable, efficient and safe manner. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a schematic diagram of the overall appearance structure of the utility model;
[0014] Figure 2 It is a schematic diagram of the structure of the installation component and the positioning component of the utility model;
[0015] Figure 3 It is a schematic diagram of the structure of the anti-sway support component and the pushing component of the utility model.
[0016] In the figure: 101, mounting frame; 102, lifting plate; 103, drill rod; 104, driving motor; 105, base; 201, mounting seat; 202, support plate; 203, arc groove; 3, inclined surface; 401, casing; 402, sliding rod; 403, spring; 501, threaded hole; 502, bolt; 601, positioning hole; 602, positioning pin. DETAILED DESCRIPTION
[0017] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0018] See also Figure 1-3The utility model provides a geotechnical engineering geophysical prospecting device, including a mounting frame 101, a base 105 is fixed at the bottom of the mounting frame 101, a lifting plate 102 is connected to the mounting frame 101 through a lifting assembly to be lifted and pulled, a drill rod 103 is rotatably connected to the lifting plate 102, a driving motor 104 for driving the drill rod 103 is installed at the upper end of the lifting plate 102, and a plurality of anti-swing support components for supporting the drill rod 103 against sway during work are arranged on the base 105, and the anti-swing support components include a mounting seat 201, a pushing component for pushing the mounting seat 201 is arranged on the base 105, a support plate 202 is detachably connected to one side of the mounting seat 201 through the mounting assembly, and an arc groove 203 for abutting against the outer side of the drill rod 103 is opened on one side of the support plate 202;
[0019] It should be noted here that when using a geophysical exploration device to carry out geophysical exploration operations in geotechnical engineering, multiple sets of anti-sway support components cooperate with each other to provide auxiliary support for the descending and rotating drill rod 103, thereby reducing the amplitude of the violent swing of the drill rod 103 caused by the long length of the drill rod 103, making it easier for the device to carry out geotechnical engineering geophysical exploration operations more stably, efficiently and safely.
[0020] The anti-sway support components are arranged in a circular array on the base 105;
[0021] It should be noted here that the support effect is improved by providing multiple anti-sway support components in an annular array.
[0022] The upper end of the support plate 202 is provided with an inclined surface 3; the pushing assembly includes a plurality of sleeves 401 fixed to the inner side of the base 105, each sleeve 401 is slidably connected with a slide rod 402, one end of the slide rod 402 is fixed to the mounting seat 201, and a spring 403 is sleeved on the outer side of each sleeve 401, and the two ends of the spring 403 are respectively set against the base 105 and the mounting seat 201;
[0023] It should be noted here that: during the downward movement of the drill rod 103, the front end of the drill rod 103 abuts against the inclined surface 3 on the support plate 202 on each anti-sway support assembly, pushing each support plate 202 to move away from each other under force. During the movement of each support plate 202 away from each other, the mounting seat 201 pushes each sliding rod 402 to slide on each casing 401 respectively, causing the spring 403 to deform under force and generate elastic force. As the drill rod 103 continues to move downward, under the pushing action of the elastic force of each spring 403, the arc groove 203 on one side of the support plate 202 on the mounting seat 201 abuts against the outer side of the drill rod 103.
[0024] The mounting assembly includes a threaded hole 501 provided on the mounting seat 201 and the support plate 202, a bolt 502 is threadedly engaged with the threaded hole 501, and a positioning assembly for positioning and guiding during the installation process is provided between the mounting seat 201 and the support plate 202;
[0025] It should be noted here that: through the cooperation between the bolts 502 and the threaded holes 501 , it is convenient to replace and install different support plates 202 on the mounting seat 201 .
[0026] The positioning assembly includes a plurality of positioning holes 601 formed on the mounting seat 201, and a plurality of positioning pins 602 matching the positioning holes 601 are fixed to one side of the support plate 202;
[0027] It should be noted here that the support plate 202 is positioned during the installation process through a plurality of positioning holes 601 and positioning pins 602 .
[0028] Working principle: When using the geophysical prospecting device to perform geophysical prospecting operations in geotechnical engineering, the entire device is moved to a designated position. After the movement is completed, the lifting plate 102 is driven to move downward by the lifting assembly. During the downward movement of the lifting plate 102, the drill rod 103 is driven to rotate by the driving motor 104. During the downward and rotating process of the drill rod 103, the rock and soil at the designated position are transported out to assist subsequent geophysical prospecting operations;
[0029] During the downward movement of the drill rod 103, the front end of the drill rod 103 abuts against the inclined surface 3 on the support plate 202 on each anti-sway support assembly, pushing each support plate 202 to move away from each other under force. During the movement of each support plate 202 away from each other, the mounting seat 201 pushes each slide bar 402 to slide on each casing 401 respectively, causing the spring 403 to deform under force to generate elastic force. As the drill rod 103 continues to move downward, under the pushing action of the elastic force of each spring 403, the arc groove 203 on one side of the support plate 202 on the mounting seat 201 abuts against the outer side of the drill rod 103, providing auxiliary support for the descending and rotating drill rod 103, reducing the amplitude of the violent swing of the drill rod 103 caused by the long use length of the drill rod 103, and facilitating the device to perform geotechnical engineering prospecting and exploration operations more stably, efficiently and safely.
[0030] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.
Claims
1. A geotechnical engineering geophysical prospecting device, comprising: A mounting frame (101), a base (105) being fixed at the bottom of the mounting frame (101), a lifting plate (102) being connected to the mounting frame (101) for lifting and lowering by a lifting assembly, a drill rod (103) being rotatably connected to the lifting plate (102), and a driving motor (104) for driving the drill rod (103) being installed at the upper end of the lifting plate (102); It is characterized by further comprising: A plurality of anti-sway support components are arranged on a base (105) for supporting a drill rod (103) against sway during operation, the anti-sway support components comprising a mounting seat (201), a pushing component for pushing the mounting seat (201) is arranged on the base (105), a support plate (202) is detachably connected to one side of the mounting seat (201) via the mounting component, and an arc-shaped groove (203) for abutting against the outer side of the drill rod (103) is provided on one side of the support plate (202).
2. A geotechnical engineering geophysical exploration device according to claim 1, characterized in that: The anti-sway support components are arranged in a ring array on the base (105).
3. A geotechnical engineering geophysical prospecting device according to claim 1, characterized in that: The upper end of the support plate (202) is provided with an inclined surface (3).
4. A geotechnical engineering geophysical prospecting device according to claim 1, characterized in that: The pushing assembly comprises a plurality of sleeves (401) fixed on the inner side of the base (105), each of the sleeves (401) being slidably connected with a slide rod (402), one end of the slide rod (402) being fixed to the mounting seat (201), and a spring (403) being sleeved on the outer side of each sleeve (401), and two ends of the spring (403) being respectively disposed against the base (105) and the mounting seat (201).
5. A geotechnical engineering geophysical prospecting device according to claim 1, characterized in that: The installation assembly comprises threaded holes (501) provided on the installation seat (201) and the support plate (202), the threaded holes (501) being threadedly engaged with bolts (502), and a positioning assembly for positioning and guiding during the installation process is provided between the installation seat (201) and the support plate (202).
6. A geotechnical engineering geophysical prospecting device according to claim 5, characterized in that: The positioning assembly comprises a plurality of positioning holes (601) formed on the mounting seat (201), and a plurality of positioning pins (602) matched with the positioning holes (601) are fixed on one side of the support plate (202).