Water supply and drainage pipeline connecting structure
By using the connecting structure of clamps and locks, the problems of pipe connection offset and water leakage in the existing flange connection method are solved, and stable pipe connection is achieved.
Patent Information
- Application Number
- CN202421429527.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-21
- Publication Date
- 2025-02-18
- Estimated Expiration
- 2034-06-21
AI Technical Summary
The existing drainage pipe connection method uses flange connection, which requires precise alignment. If the threaded holes are misaligned, they cannot be fixedly installed, which is prone to deviation and lead to water leakage.
Using a connecting assembly consisting of the first clamp and the second clamp, it is connected by a hinge and is installed internally. When the pipe is connected, the pipe is inserted into the sleeve, the clamp is merged and latched with the pin rod through the lock. , fixed connection.
The pipe connection process is simplified, offset and water leakage are avoided, and stable pipe connection is achieved.
Smart Images

Figure CN222503026U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pipeline connection, in particular to a water supply and drainage pipeline connection structure. Background Art
[0002] The water supply and drainage pipeline is a pipeline system project that transports and distributes industrial water supply and domestic drinking water, and collects, transports and discharges industrial wastewater, domestic sewage and rainwater. Water is an indispensable substance in daily life, and the transportation of water depends on the transportation of drainage pipes. Therefore, it is often necessary to install various drainage pipes on buildings. For the convenience of construction, drainage pipes often need to be spliced. Most of the existing pipes are connected by flanges. When connecting two pipes, the two flanges need to be accurately aligned first. If the threaded holes are misaligned, they cannot be fixed and installed. The installation method is relatively complicated and prone to offset, which will cause some gaps between the two flanges and cause water leakage at the connection of the drainage pipe. Utility Model Content
[0003] The purpose of the utility model is to provide a water supply and drainage pipe connection structure to solve the problem that most of the existing pipes proposed in the above background technology are connected by flanges, and two flanges need to be accurately aligned first. If the threaded holes are misaligned, fixed installation cannot be carried out, and deviation is likely to occur, thereby causing some gaps between the two flanges, causing water leakage at the connection of the drainage pipe.
[0004] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a water supply and drainage pipe connection structure, including a connection component and a locking component;
[0005] The connection assembly includes a first clamp and a second clamp, one end of the first clamp and the second clamp are hingedly connected by a hinge, a connecting sleeve is installed inside the first clamp and the second clamp, and both ends of the connecting sleeve are connected to a drainage pipe;
[0006] The locking assembly includes a mounting base fixedly installed at the other end of the first clamp and the second clamp, a pin rod is installed in the middle of the two mounting bases, and a lock buckle is rotatably installed on the surface of the two pin rods. A buckle groove is opened at the bottom of the front end of the lock buckle, and the lock buckle is engaged with the pin rod surface at the corresponding end through the buckle groove.
[0007] As a preferred solution of the utility model: the lock is composed of a fixed seat and a movable seat, the buckle groove is opened at the bottom of the movable seat, the movable seat is slidably inserted into the fixed seat, a nut is fixedly installed on the inner wall of the movable seat, a screw is rotatably installed inside the fixed seat, the screw is threadedly connected to the inside of the nut, and a rotating knob is fixedly installed on one end of the screw.
[0008] As a preferred solution of the utility model: sliding grooves are provided on both sides of the inner wall of the fixed seat, and sliding bars are fixedly installed on both sides of the movable seat, and the sliding bars are slidably connected inside the sliding grooves.
[0009] As a preferred solution of the utility model: a limiting block is fixedly installed on the other end of the screw rod.
[0010] As a preferred solution of the utility model: two water stop rings are fixedly installed on the inner wall of the connecting sleeve, and the ends of the two drainage pipes are provided with annular grooves, and the water stop rings are embedded in the annular grooves.
[0011] As a preferred solution of the utility model: the inner walls of the first clamp and the second clamp are both provided with mounting grooves, and the connecting sleeve is embedded in the mounting grooves.
[0012] As a preferred solution of the utility model: the outer wall of the connecting sleeve is provided with anti-slip grooves.
[0013] As a preferred solution of the utility model: the surfaces of the first clamp and the second clamp are subjected to hot-dip galvanizing treatment.
[0014] Compared with the prior art, the beneficial effects of the utility model are:
[0015] (1) The connection body is composed of a first clamp and a second clamp, one end of the first clamp and the second clamp are hingedly connected by a hinge, and a connecting sleeve is installed inside the first clamp and the second clamp. When connecting the pipes, the two pipes are inserted into the connecting sleeve, and the first clamp and the second clamp are combined to fix the two pipes in the connecting sleeve. At this time, the lock buckles provided at the other ends of the first clamp and the second clamp are engaged with the pin rod at the corresponding end, and the lock buckle is engaged with the pin rod through the buckle groove to fix the first clamp and the second clamp. The connection structure replaces the connection method of the flange bolt, and the installation method is simple to avoid the deviation of the pipe connection and thus prevent water leakage;
[0016] (2) Through the provided locking assembly, when the first clamp and the second clamp are combined, the mounting seats at the other ends of the first clamp and the second clamp are close to each other, and a pin rod is installed in the middle of each of the two mounting seats. Lock buckles are rotatably installed on the surfaces of the two pin rods, and the lock buckles installed on the respective surfaces are engaged with the corresponding pin rods through the buckle grooves provided at the bottom of the front end, thereby fixing the first clamp and the second clamp, so that the connecting sleeve and the pipeline are fixed together. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0018] Figure 2 This is a schematic diagram of the split structure of the utility model;
[0019] Figure 3 This is a schematic diagram of the pin rod installation structure of the utility model;
[0020] Figure 4 This is a schematic diagram of the locking assembly structure of the utility model.
[0021] In the figure: 100, connecting assembly; 101, first clamp; 102, second clamp; 103, hinge; 104, connecting sleeve; 1041, water stop ring; 1042, anti-slip pattern; 200, drainage pipe; 300, locking assembly; 301, mounting seat; 302, pin rod; 303, lock; 3031, fixed seat; 3032, movable seat; 3033, nut; 3034, screw; 3035, rotating knob; 3036, slide groove; 3037, slide bar; 3038, limit block; 304, buckle groove; 400, mounting groove. DETAILED DESCRIPTION
[0022] In order to make the purpose, technical solution and advantages of the implementation of the utility model clearer, the technical solution in the implementation of the utility model will be clearly and completely described below in conjunction with the drawings in the implementation of the utility model. Obviously, the described implementation is a part of the implementation of the utility model, not all of the implementations. Based on the implementation of the utility model, all other implementations obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] See also Figure 1-Figure 4 , a water supply and drainage pipe connection structure, comprising: a connection assembly 100 and a locking assembly 300;
[0024] See also Figure 1 , Figure 2 The connection assembly 100 includes a first clamp 101 and a second clamp 102. One end of the first clamp 101 and the second clamp 102 are hingedly connected by a hinge 103. A connecting sleeve 104 is installed inside the first clamp 101 and the second clamp 102. Both ends of the connecting sleeve 104 are connected to the drainage pipe 200.
[0025] During specific use: a connecting sleeve 104 is installed inside the first clamp 101 and the second clamp 102 which are hinged together by a hinge 103. When two drainage pipes 200 are connected, the connecting sleeve 104 is sleeved on one end of the two pipes. At this time, the first clamp 101 and the second clamp 102 are combined to fix the connecting sleeve 104 and the drainage pipe 200. This connection method replaces the connection method of flange bolts, avoids the offset caused by the synchronous tightening of the bolts, and prevents water leakage.
[0026] See also Figure 3 , Figure 4The locking assembly 300 includes a mounting base 301 fixedly mounted on the other end of the first clamp 101 and the second clamp 102, a pin rod 302 is installed in the middle of the two mounting bases 301, and a lock buckle 303 is rotatably mounted on the surface of the two pin rods 302. A buckle groove 304 is opened at the bottom of the front end of the lock buckle 303, and the lock buckle 303 is engaged with the surface of the pin rod 302 at the corresponding end through the buckle groove 304.
[0027] During specific use: when the first clamp 101 and the second clamp 102 are combined, the mounting seats 301 at the other ends of the first clamp 101 and the second clamp 102 are close to each other, and a pin rod 302 is installed in the middle of the two mounting seats 301. The surfaces of the two pin rods 302 are rotatably installed with lock buckles 303, and the lock buckles 303 installed on each surface are engaged with the corresponding pin rods 302 through the buckle grooves 304 opened at the bottom of the front end, so that the first clamp 101 and the second clamp 102 are fixed, so that the connecting sleeve 104 and the drainage pipe 200 are fixed and locked.
[0028] See also Figure 3 , Figure 4 The lock buckle 303 is composed of a fixed seat 3031 and a movable seat 3032. The buckle groove 304 is opened at the bottom of the movable seat 3032. The movable seat 3032 slides and inserts into the fixed seat 3031. A nut 3033 is fixedly installed on the inner wall of the movable seat 3032. A screw rod 3034 is rotatably installed inside the fixed seat 3031. The screw rod 3034 is threadedly connected to the inside of the nut 3033. A rotating knob 3035 is fixedly installed on one end of the screw rod 3034. Slide grooves 3036 are opened on both sides of the inner wall of the fixed seat 3031. Slide bars 3037 are fixedly installed on both sides of the movable seat 3032. The slide bar 3037 is slidably connected to the inside of the slide groove 3036. A limit block 3038 is fixedly installed on the other end of the screw rod 3034.
[0029] When used specifically, the lock buckle 303 is composed of a fixed seat 3031 and a movable seat 3032. Slide bars 3037 are installed on both sides of the movable seat 3032. A slide groove 3036 is provided on the inner wall of the fixed seat 3031. The movable seat 3032 slides inside the fixed seat 3031 through the slide bar 3037. A nut 3033 is installed inside the movable seat 3032. A screw rod 3034 is rotatably installed inside the fixed seat 3031. The screw rod 3034 is threadedly connected to the inside of the nut 3033. By turning the rotating knob 3034 at one end of the screw rod 3034, the movable seat 3032 slides inside the fixed seat 3031. 035 drives the screw rod 3034 to rotate. The rotation of the screw rod 3034 causes the nut 3033 to drive the movable seat 3032 to move inside the fixed seat 3031. When the buckle groove 304 at the bottom of the movable seat 3032 is engaged with the surface of the pin rod 302, the screw rod 3034 is rotated to drive the movable seat 3032 to slide toward the inside of the fixed seat 3031, so that the buckle groove 304 is tightly engaged with the surface of the pin rod 302. The limit block 3038 installed at the other end of the screw rod 3034 plays a limiting role to prevent the screw rod 3034 from detaching from the nut 3033 during rotation.
[0030] Please refer to FIG. 2 . Two water stop rings 1041 are fixedly installed on the inner wall of the connecting sleeve 104 . An annular groove is formed at the ends of the two drainage pipes 200 . The water stop rings 1041 are embedded in the annular groove.
[0031] During specific use: two water-stop rings 1041 are installed on the inner wall of the connecting sleeve 104. When two drainage pipes 200 are connected to the connecting sleeve 104, the water-stop rings 1041 on the inner wall of the connecting sleeve 104 are embedded in the annular groove opened at the end of the drainage pipe 200. The water-stop rings 1041 are made of a material that expands when exposed to water, so that they have better sealing properties and prevent water seepage at the connection.
[0032] See also Figure 2 The inner walls of the first clamp 101 and the second clamp 102 are both provided with a mounting groove 400 , the connecting sleeve 104 is embedded in the mounting groove 400 , and the outer wall of the connecting sleeve 104 is provided with an anti-slip pattern 1042 .
[0033] During specific use: the inner walls of the first clamp 101 and the second clamp 102 are provided with an installation groove 400, and the connecting sleeve 104 is embedded in the installation groove 400. At the same time, the outer wall of the connecting sleeve 104 is provided with anti-slip grooves 1042, so as to increase the friction force at the connection between the connecting sleeve 104 and the first clamp 101 and the second clamp 102, thereby ensuring that the connecting sleeve 104 is installed stably.
[0034] See also Figure 2 The surfaces of the first clamp 101 and the second clamp 102 are hot-dip galvanized.
[0035] During specific use: the surfaces of the first clamp 101 and the second clamp 102 are treated by hot-dip galvanizing process, so that the structural parts have better corrosion resistance and the service life is improved.
[0036] The connecting body is composed of a first clamp 101 and a second clamp 102, and one end of the first clamp 101 and the second clamp 102 are hingedly connected by a hinge 103. A connecting sleeve 104 is installed inside the first clamp 101 and the second clamp 102. When connecting the pipes, the two drainage pipes 200 are inserted into the connecting sleeve 104, and the first clamp 101 and the second clamp 102 are merged to fix the two pipes in the connecting sleeve 104. At this time, the lock buckle 303 provided at the other end of the first clamp 101 and the second clamp 102 is engaged with the pin rod 302 at the corresponding end. The lock buckle 303 is engaged with the pin rod 302 through the buckle groove 304 to fix the first clamp 101 and the second clamp 102. The connection structure replaces the connection method of flange bolts, and the installation method is simple to avoid pipe connection deviation and water leakage.
[0037] The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in the field. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for technical personnel in the field to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.
Claims
1. A water supply and drainage pipe connection structure, characterized in that: include: A connection assembly (100), the connection assembly (100) comprising a first clamp (101) and a second clamp (102), one end of the first clamp (101) and the second clamp (102) being hingedly connected via a hinge (103), a connection sleeve (104) being installed inside the first clamp (101) and the second clamp (102), and both ends of the connection sleeve (104) being connected to a drainage pipe (200); The locking assembly (300) comprises a mounting seat (301) fixedly mounted on the other end of the first clamp (101) and the second clamp (102), a pin rod (302) being mounted in the middle of the two mounting seats (301), a lock buckle (303) being rotatably mounted on the surface of the two pin rods (302), a buckle groove (304) being provided at the bottom of the front end of the lock buckle (303), and the lock buckle (303) being engaged with the surface of the pin rod (302) at the corresponding end through the buckle groove (304).
2. A water supply and drainage pipe connection structure according to claim 1, characterized in that: The lock buckle (303) is composed of a fixed seat (3031) and a movable seat (3032), the buckle groove (304) is opened at the bottom of the movable seat (3032), the movable seat (3032) is slidably inserted into the fixed seat (3031), a nut (3033) is fixedly installed on the inner wall of the movable seat (3032), a screw rod (3034) is rotatably installed inside the fixed seat (3031), the screw rod (3034) is threadedly connected to the inside of the nut (3033), and a rotating knob (3035) is fixedly installed on one end of the screw rod (3034).
3. A water supply and drainage pipe connection structure according to claim 2, characterized in that: Slide grooves (3036) are provided on both sides of the inner wall of the fixed seat (3031), and slide bars (3037) are fixedly installed on both sides of the movable seat (3032), and the slide bars (3037) are slidably connected inside the slide grooves (3036).
4. A water supply and drainage pipe connection structure according to claim 2, characterized in that: A limit block (3038) is fixedly mounted on the other end of the screw rod (3034).
5. A water supply and drainage pipe connection structure according to claim 1, characterized in that: Two water stop rings (1041) are fixedly mounted on the inner wall of the connecting sleeve (104), and annular grooves are formed at the ends of the two drainage pipes (200), and the water stop rings (1041) are embedded in the annular grooves.
6. A water supply and drainage pipe connection structure according to claim 1, characterized in that: The inner walls of the first clamp (101) and the second clamp (102) are both provided with mounting grooves (400), and the connecting sleeve (104) is embedded in the mounting grooves (400).
7. A water supply and drainage pipe connection structure according to claim 1, characterized in that: The outer wall of the connecting sleeve (104) is provided with anti-slip grooves (1042).
8. A water supply and drainage pipe connection structure according to claim 1, characterized in that: The surfaces of the first clamp (101) and the second clamp (102) are subjected to hot-dip galvanizing treatment.
Citation Information
Cited By
Water supply and drainage pipeline connecting structure
CN223740271U