Benzene compound continuous evaporation device

By designing a continuous evaporation device of benzene compounds including an evaporation assembly and a preheating assembly, the problem of interruption of the generation of benzene compounds vapor after the temperature drop after the supplementary material is solved, and stable operation and continuous evaporation are achieved.

CN222534090UActive Publication Date: 2025-02-28HUBEI GEHUA HUAXIANG CHEM CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421128035.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-22
Publication Date
2025-02-28
Estimated Expiration
2034-05-22

AI Technical Summary

Technical Problem

The existing continuous evaporation device of benzene compound can easily cause a temperature drop after replenishing the material, and cannot reach the boiling point, which will interrupt the generation of benzene compound vapor.

Method used

A continuous evaporation device for benzene compounds including an evaporation assembly and a preheating assembly is designed. The evaporation assembly consists of a first furnace body and a first heating member, and the preheating assembly consists of a second furnace body, a second heating member and a shut-off valve. By preheating the material before replenishing it, the temperature in the first furnace body is ensured to be stable.

Benefits of technology

After replenishing the material, the material is preheated by the preheating assembly to ensure that the temperature in the first furnace does not decrease, thereby avoiding interruption of the generation of benzene compound vapor, and achieving stable operation of the continuous evaporation device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

The benzene compound continuous evaporation device comprises an evaporation assembly and a preheating assembly, the evaporation assembly comprises a first furnace body and a first heating piece, the top of the first furnace body is provided with an air guide port, the first furnace body is further provided with a guide-in port, the first heating piece is arranged in the first furnace body, and the preheating assembly is arranged in the first furnace body. And the heater is used for heating materials in the first furnace body. The preheating assembly comprises a second furnace body, a second heating piece and a stop valve, the second furnace body is provided with a feeding port and a leading-out port, the leading-out port is communicated with the leading-in port, the second heating piece is arranged in the second furnace body and used for heating materials in the second furnace body, and the stop valve is arranged between the leading-out port and the leading-in port and used for heating the materials in the second furnace body. And the material channel between the leading-out port and the leading-in port is closed or opened. By means of the technical scheme, the materials can be preheated before being supplemented into the first furnace body, the temperature in the first furnace body cannot be reduced after new materials enter the first furnace body, the first furnace body can continuously generate material steam, and the situation that the material steam is generated in an interrupted mode after the materials are supplemented is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of chemical equipment, in particular to a continuous evaporation device for benzene compounds. Background Art

[0002] In the production process of spunbonded nonwoven fabrics, a benzene compound continuous evaporation device is often used to heat the benzene compound. The existing benzene compound continuous evaporation device can be found in the patent application number CN202211161546.6, which uses a heating device to heat the benzene compound in the furnace body, so that the benzene compound is gasified to form benzene compound vapor.

[0003] It usually takes 22-24 hours to heat benzene compounds to the vaporization temperature. Under normal circumstances, the benzene compound boiler temperature rises above 258°C to vaporize. However, when it is necessary to add materials to the benzene compound continuous evaporation device, the temperature inside the benzene compound continuous evaporation device will drop, making the materials in the benzene compound continuous evaporation device unable to reach the boiling point, thereby interrupting the generation of benzene compound vapor.

[0004] Therefore, how to prevent the continuous evaporation device of benzene compounds from interrupting the generation of benzene compound vapor after replenishing materials is a technical problem that needs to be solved urgently. Utility Model Content

[0005] The purpose of the utility model is to overcome the above technical deficiencies, to provide a continuous evaporation device for benzene compounds, and to solve the technical problem in the prior art of how to prevent the continuous evaporation device for benzene compounds from interrupting the generation of benzene compound vapor after replenishing materials.

[0006] In order to achieve the above technical purpose, the technical solution of the utility model includes a continuous evaporation device for benzene compounds, which includes:

[0007] An evaporation assembly comprises a first furnace body and a first heating element, wherein the top of the first furnace body is provided with an air guide port, and the first furnace body is also provided with an inlet port, and the first heating element is built into the first furnace body and is used to heat the material in the first furnace body;

[0008] The preheating assembly includes a second furnace body, a second heating element and a stop valve. The second furnace body is provided with a feed port and a lead-out port, the lead-out port is connected to the lead-in port, the second heating element is built into the second furnace body and is used to heat the material in the second furnace body, and the stop valve is installed between the lead-out port and the lead-in port to close or open the material channel between the lead-out port and the lead-in port.

[0009] Preferably, the preheating assembly further comprises an inlet pump, and the inlet pump is arranged between the inlet and the outlet to pressurize the material in the second furnace body into the first furnace body.

[0010] Preferably, the preheating assembly further comprises a one-way valve, and the one-way valve is installed between the introduction pump and the introduction port.

[0011] Preferably, the second heating element comprises an electric heating plate, which is installed at the bottom end of the second furnace body, and the electric heating plate radiates heat to heat the material in the second furnace body.

[0012] Preferably, the first heating element comprises a plurality of electric heating rods, and the electric heating rods are vertically arranged in the first furnace body to heat the material in the first furnace body.

[0013] Preferably, the electric heating rod has a plurality of heat sinks on its periphery.

[0014] Preferably, a water vapor port is provided at the top of the second furnace body, and a water vapor valve is installed at the water vapor port.

[0015] Preferably, the outlet is located at the bottom end of the second furnace body.

[0016] Preferably, the first furnace body has a conical guide plate surrounding the guide outlet.

[0017] Preferably, both the first furnace body and the second furnace body are metal furnace bodies.

[0018] Compared with the prior art, the beneficial effects of the utility model include: firstly, the stop valve is closed, and the material in the first furnace body is heated by the first heating element. The material in the first furnace body is heated, and the material vapor generated by the evaporation of the material will be discharged from the outlet. When it is necessary to replenish the material in the first furnace body, the material can be put into the second furnace body first, and the material in the second furnace body is heated by the heating action of the second heating element. When the temperature in the second furnace body is equal to the temperature in the first furnace body, the stop valve can be opened to introduce the material in the second furnace body into the first furnace body, and then the material replenishment in the first furnace body can be completed. By using the continuous evaporation device for benzene compounds provided by the utility model, the material can be preheated before replenishing the material in the first furnace body. Therefore, after the new material enters the first furnace body, the temperature in the first furnace body will not drop, ensuring that the first furnace body can continuously generate material vapor and avoiding the interruption of material vapor after replenishing the material. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a schematic diagram of the structure of a continuous evaporation device for benzene compounds according to an embodiment of the utility model;

[0020] Among them, the evaporation component 100, the first furnace body 110, the air guide port 111, the inlet port 112, the first heating element 120, the electric heating rod 121, the heat sink 1211, the preheating component 200, the second furnace body 210, the feed port 211, the outlet port 212, the water vapor port 213, the water vapor valve 214, the second heating element 220, the electric heating plate 221, the stop valve 230, the inlet pump 240, and the one-way valve 250. DETAILED DESCRIPTION

[0021] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.

[0022] The present invention provides a benzene compound continuous evaporation device, which belongs to the field of chemical equipment. The benzene compound continuous evaporation device is used to heat benzene compounds, benzene compound ethers, etc., and then the material can be heated by the benzene compound continuous evaporation device to generate material vapor. The benzene compound continuous evaporation device can be used to preheat the material before replenishing the material, avoiding interruption of material vapor after replenishing the material.

[0023] In some preferred embodiments, the benzene compound continuous evaporation device includes an evaporation component 100 and a preheating component 200. The evaporation component 100 includes a first furnace body 110 and a first heating element 120. The top of the first furnace body 110 is provided with an air guide port 111, and the first furnace body 110 is also provided with an inlet port 112. The first heating element 120 is built into the first furnace body 110 and is used to heat the material in the first furnace body 110. The preheating component 200 includes a second furnace body 210, a second heating element 220 and a stop valve 230. The second furnace body 210 is provided with a feed port 211 and a discharge port 212. The discharge port 212 is connected to the inlet port 112. The second heating element 220 is built into the second furnace body 210 and is used to heat the material in the second furnace body 210. The stop valve 230 is installed between the discharge port 212 and the inlet port 112 to close or open the material passage between the discharge port 212 and the inlet port 112.

[0024] In the above embodiment, the stop valve 230 is first closed, and the material in the first furnace body 110 is heated by the first heating element 120. The material in the first furnace body 110 is heated, and the material vapor generated by the evaporation of the material is discharged from the outlet 212. When it is necessary to replenish the material in the first furnace body 110, the material can be first put into the second furnace body 210. Under the heating effect of the second heating element 220, the material in the second furnace body 210 is heated. When the temperature in the second furnace body 210 is equal to the temperature in the first furnace body 110, the stop valve 230 can be opened to introduce the material in the second furnace body 210 into the first furnace body 110, and then the material replenishment in the first furnace body 110 can be completed. By using the continuous evaporation device for benzene compounds provided by the utility model, the material can be preheated before replenishing the material in the first furnace body 110. Therefore, after the new material enters the first furnace body 110, the temperature in the first furnace body 110 will not drop, ensuring that the first furnace body 110 can continuously generate material vapor, avoiding interruption of material vapor after replenishing the material.

[0025] If the pressure in the first furnace body 110 is higher than that in the second furnace body 210, it will make it difficult to introduce the material in the second furnace body 210 into the second furnace body 210. In some preferred embodiments, the preheating assembly 200 also includes an introduction pump 240, which is arranged between the introduction port 112 and the outlet port 212 to pressurize the material in the second furnace body 210 into the first furnace body 110.

[0026] In the above embodiment, after the stop valve 230 is opened, the material in the second furnace body 210 can be introduced into the first furnace body 110 by the introduction pump 240, and then under the pressure of the introduction pump 240, it can be ensured that the material in the second furnace body 210 can be smoothly introduced into the first furnace body 110.

[0027] Based on the above embodiments, in some preferred embodiments, the preheating assembly 200 further includes a one-way valve 250, which is installed between the introduction pump 240 and the introduction port 112. The one-way valve 250 can be used to prevent the material in the first furnace body 110 from flowing back into the second furnace body 210.

[0028] Any implementation method that can heat the material in the second furnace body 210 is feasible. In some preferred embodiments, the second heating element 220 includes an electric heating plate 221, which is installed at the bottom of the second furnace body 210 and emits heat to heat the material in the second furnace body 210. Since the second furnace body 210 only serves as a preheating function, the evaporation rate of the material does not need to be considered, and therefore only the electric heating plate 221 with a simple structure can be used.

[0029] Any implementation method is feasible as long as the material in the first furnace body 110 can be heated. In some preferred embodiments, the first heating element 120 includes a plurality of electric heating rods 121, which are vertically arranged in the first furnace body 110 to heat the material in the first furnace body 110. The use of a plurality of vertically arranged electric heating rods 121 can make the material in the first furnace body 110 evaporate quickly.

[0030] Based on the above embodiments, in some preferred embodiments, the outer periphery of the electric heating rod 121 has a plurality of heat sinks 1211. The heat sinks 1211 are used to increase the heating area of ​​the material, so that the material in the first furnace body 110 can evaporate quickly, thereby increasing the evaporation speed of the material.

[0031] In some preferred embodiments, a water vapor port 213 is provided at the top of the second furnace body 210, and a water vapor valve 214 is installed at the water vapor port 213. As the material is heated in the second furnace body 210, water vapor will be continuously generated, and water will be vaporized first due to its low boiling point. At this time, the water vapor valve 214 can be opened to discharge the water vapor.

[0032] In some preferred embodiments, the outlet 212 is located at the bottom of the second furnace body 210 to facilitate complete outlet of the materials in the second furnace body 210 .

[0033] In some preferred embodiments, the first furnace body 110 has a conical guide plate surrounding the outlet 212, so that the material vapor in the first furnace body 110 can be more smoothly discharged through the conical guide plate.

[0034] In some preferred embodiments, the first furnace body 110 and the second furnace body 210 are both metal furnace bodies, so that the first furnace body 110 and the second furnace body 210 have sufficient structural strength.

[0035] First, the stop valve 230 is closed, and a plurality of vertically arranged electric heating rods 121 are used to quickly evaporate the material in the first furnace body 110. The material in the first furnace body 110 is heated, and the material vapor generated by the evaporation of the material will be discharged from the outlet 212. When it is necessary to replenish the material in the first furnace body 110, the material can be first put into the second furnace body 210, and the electric heating plate 221 is installed at the bottom of the second furnace body 210, and the electric heating plate 221 emits heat to heat the material in the second furnace body 210. The material in the second furnace body 210 is heated. When the temperature in the second furnace body 210 is equal to the temperature in the first furnace body 110, the stop valve 230 can be opened. Under the pressure of the introduction pump 240, it can be ensured that the material in the second furnace body 210 can be smoothly introduced into the first furnace body 110. Then, the material replenishment in the first furnace body 110 can be completed. By using the continuous evaporation device for benzene compounds provided by the utility model, the material can be preheated before replenishing the material into the first furnace body 110. Therefore, after the new material enters the first furnace body 110, the temperature inside the first furnace body 110 will not drop, ensuring that the first furnace body 110 can continuously generate material vapor and avoiding interruption of material vapor generation after replenishing the material.

[0036] The specific implementation methods of the utility model described above do not constitute a limitation on the protection scope of the utility model. Any other corresponding changes and modifications made according to the technical concept of the utility model should be included in the protection scope of the claims of the utility model.

Claims

1. A continuous evaporation device for benzene compounds, characterized in that: include: An evaporation assembly comprises a first furnace body and a first heating element, wherein the top of the first furnace body is provided with an air guide port, and the first furnace body is also provided with an inlet port, and the first heating element is built into the first furnace body and is used to heat the material in the first furnace body; The preheating assembly includes a second furnace body, a second heating element and a stop valve. The second furnace body is provided with a feed port and a lead-out port, the lead-out port is connected to the lead-in port, the second heating element is built into the second furnace body and is used to heat the material in the second furnace body, and the stop valve is installed between the lead-out port and the lead-in port to close or open the material channel between the lead-out port and the lead-in port.

2. The continuous evaporation device for benzene compounds according to claim 1, characterized in that: The preheating assembly further includes an inlet pump, which is disposed between the inlet and the outlet to pressurize the material in the second furnace body into the first furnace body.

3. The continuous evaporation device for benzene compounds according to claim 2, characterized in that: The preheating assembly further comprises a one-way valve, which is installed between the introduction pump and the introduction port.

4. The continuous evaporation device for benzene compounds according to claim 1, characterized in that: The second heating element comprises an electric heating plate, which is installed at the bottom end of the second furnace body and emits heat to heat the material in the second furnace body.

5. The continuous evaporation device for benzene compounds according to claim 1, characterized in that: The first heating element includes a plurality of electric heating rods, and the electric heating rods are vertically arranged in the first furnace body to heat the material in the first furnace body.

6. The continuous evaporation device for benzene compounds according to claim 5, characterized in that: The outer periphery of the electric heating rod is provided with a plurality of heat sinks.

7. The continuous evaporation device for benzene compounds according to claim 1, characterized in that: A water vapor port is provided at the top of the second furnace body, and a water vapor valve is installed at the water vapor port.

8. The continuous evaporation device for benzene compounds according to claim 1, characterized in that: The guide outlet is located at the bottom end of the second furnace body.

9. The continuous evaporation device for benzene compounds according to claim 1, characterized in that: The first furnace body has a conical guide plate surrounding the guide outlet.

10. The continuous evaporation device for benzene compounds according to claim 1, characterized in that: The first furnace body and the second furnace body are both metal furnace bodies.