Raw areca nut sorting equipment
By designing a betel nut original fruit sorting equipment including X-ray machine detection and high-frequency solenoid valve, the problem of difficult to detect and sort betel nut seed wall thickness in the prior art is solved, and the quality and taste of betel nut food is improved.
Patent Information
- Application Number
- CN202421140704.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-23
- Publication Date
- 2025-03-07
- Estimated Expiration
- 2034-05-23
Smart Images

Figure CN222568472U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of betel nut raw fruit sorting, in particular to a betel nut raw fruit sorting device. Background Art
[0002] At present, the betel nut food manufacturing industry is still a labor-intensive industry. Most of the processes need to be completed manually. The lack of labor and the increase in labor costs have become the biggest bottleneck in the development of the betel nut industry. This has put forward an urgent need for the automated production of betel nut food. The quality of betel nut seeds directly determines the taste and quality of betel nut food. In the processing and production of betel nut, sorting betel nut seeds is the first step and a crucial step. Whether it is green fruit or smoked fruit, betel nut seeds need to be sorted and graded according to the size, surface texture and other characteristics of betel nut seeds to ensure that the processed betel nut products have a good quality grade. However, what really determines the taste is the quality of the betel nut seeds. What is important is not the external size, but the wall thickness of the betel nut. There is basically no detection of betel nut wall thickness in the domestic market. Currently, the detection and screening of betel nut is mainly through camera photography to identify the appearance and size of the betel nut, as well as texture classification. There is no identification and sorting of the internal structure of the betel nut. However, from the perspective of consumers, they chew betel nut mainly based on the wall thickness of the betel nut. If the wall thickness of the betel nut is too thick, it will be difficult to chew. If the wall thickness of the betel nut is too thin, it will feel a bit prickly when chewing. Thickness is an important factor affecting the taste for consumers, and there is almost no detection equipment for the thickness of betel nut. Therefore, we designed and developed equipment for betel nut wall thickness detection. Utility Model Content
[0003] In view of the deficiencies in the prior art, the utility model provides a betel nut raw fruit sorting device for solving the above problems.
[0004] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0005] A betel nut raw fruit sorting equipment comprises an equipment frame, wherein the equipment frame is provided with a hopper, a chain plate conveyor line assembly is installed below the hopper, the chain plate conveyor line assembly is provided with a chain plate, a dust removal assembly is provided below the chain plate conveyor line assembly, a vibration plate assembly is provided below one side of the chain plate conveyor line assembly, an acceleration conveyor line assembly is provided on one side of the vibration plate assembly, an acceleration conveyor belt is provided on the acceleration conveyor line assembly, six main conveyor line assemblies are provided on one side of the acceleration conveyor line assembly, a first belt is provided on the six main conveyor line assemblies, an X-ray machine detection assembly is provided above the six main conveyor line assemblies, an X-ray machine transmitter is provided on the X-ray machine detection assembly, a four-channel discharge conveyor line assembly is provided below the six main conveyor line assemblies, the four-channel discharge conveyor line assembly is located on one side of the X-ray machine detection assembly, and a second belt is provided on the four-channel discharge conveyor line assembly.
[0006] Preferably, the chain conveyor line assembly includes a first servo motor installed on an equipment frame, a first reducer is provided on one side of the first servo motor, a first driving shaft and a driven shaft are installed on the equipment frame, a driving sprocket and a driven sprocket are fixedly sleeved on the first driving shaft and the driven shaft, the chain plate is sleeved on the driving sprocket and the driven sprocket, the output end of the first reducer is fixedly connected to one end of the first driving shaft, a first side guard plate and a second side guard plate are installed on the equipment frame, the first side guard plate and the second side guard plate are located above the chain plate, and a plurality of small holes are provided on the chain plate.
[0007] Preferably, the dust removal assembly includes a blower installed on the equipment frame, the blower is connected to a dust collecting pipe, the top of the dust collecting pipe is connected to a dust hood, and the dust hood is located below the chain plate.
[0008] Preferably, the vibration plate assembly includes a vibrating body mounted on an equipment frame, to which a primary vibration sheet metal and a secondary vibration sheet metal are connected, and both the primary vibration sheet metal and the secondary vibration sheet metal are inclined, with the primary vibration sheet metal being located below the chain plate and the secondary vibration sheet metal being located above the acceleration conveyor belt.
[0009] Preferably, the acceleration conveyor line assembly includes a second servo motor installed on one side of the equipment frame, a second reducer is connected to one side of the second servo motor, the output end of the second reducer is connected to the second driving shaft, a plum blossom coupling is connected to the second driving shaft, a fixed bracket is installed on the equipment frame, the second reducer and the plum blossom coupling are installed on the fixed bracket, and the acceleration conveyor belt is sleeved on the second driving shaft.
[0010] Preferably, the six main conveyor line assemblies include a third servo motor installed on an equipment frame, a third reducer is connected to one side of the third servo motor, a chain coupling is connected to the output end of the third reducer, a third driving shaft is connected to the chain coupling, the first belt is sleeved on the third driving shaft, an air blowing groove is installed on the equipment frame, an end cover is provided on one side of the air blowing groove, a blanking groove is provided between adjacent air blowing grooves, conveyor line side panels are provided on both sides of the first belt, a reflux hopper is provided at the end of the first belt, a rubber is provided on the reflux hopper, a high-frequency solenoid valve is installed on the equipment frame, and a blowing plate and a friction strip are provided on one side of the first belt.
[0011] Preferably, the four-channel discharging conveyor line assembly includes a fourth servo motor installed on the equipment frame, one side of the fourth servo motor is connected to a fourth reducer, one side of the fourth reducer is provided with a cross slider coupling, a fourth driving shaft is connected to the cross slider coupling, the second belt is sleeved on the fourth driving shaft, side vertical plates are installed on the equipment frame, side guards are installed on the side vertical plates, one end of the second belt is provided with a discharge trough, a pad is installed between the side vertical plates, and the pad is located below the second belt.
[0012] Preferably, the X-ray machine transmitter includes an X-ray machine outer shield installed on the equipment frame, a lead curtain is provided on one side of the X-ray machine outer shield, a second belt movably passes through the lead curtain, a touch screen and a muffler are provided on the X-ray machine outer shield, a display screen is provided on one side of the X-ray machine outer shield, a lead protective plate is provided on the rear side of the X-ray machine outer shield, a lower lead protective door and an upper lead protective door are provided on one side of the X-ray machine outer shield, the upper lead protective door is located above the lower lead protective door, a hanging ring and an X-ray machine power switch are installed on the top side of the X-ray machine outer shield, and an air Pipe joint, an elbow clamp is installed on the outer shield of the X-ray machine, and a baffle, a cylindrical locating pin and a diamond locating pin are provided on the elbow clamp, and a locating plate is provided on the diamond locating pin, a receiver mounting plate is installed on one side of the elbow clamp, a receiver is installed on one side of the receiver mounting plate, and an adjustment plate is provided on one side of the receiver, a beam cover is installed on the outer shield of the X-ray machine, the X-ray machine transmitter is installed on the outer shield of the X-ray machine, an air cooling device and a gas bus are installed on the outer shield of the X-ray machine, and a limit plate is installed in the outer shield of the X-ray machine, and the limit plate is located on one side of the gas bus.
[0013] Preferably, a sheet metal rack is installed on the equipment rack, a shooting sensor is installed on the equipment rack, multiple sets of rollers are installed on the equipment rack, a blow box bracket, a gas storage tank and a diversion gas exhaust are installed on the equipment rack, a guide welding plate is installed on the equipment rack, a Fomar wheel is provided on the bottom side of the equipment rack, multiple welding drawers are provided on one side of the equipment rack, and a pneumatic triplet, a safety valve and a pressure gauge are installed on the equipment rack.
[0014] Compared with the prior art, the utility model has the following beneficial effects: the betel nut raw fruit sorting equipment is manually loaded, and the betel nuts are poured into the hopper. As the chain plate conveyor line assembly rotates, the betel nuts move forward. At the same time, there is a dust cover connected to the blower directly below the chain plate conveyor line assembly, which sucks the dust in the betel nuts and sucks it into the dust bag of the blower through the small holes of the chain plate conveyor line assembly. The betel nuts with dust removed continue to move forward with the chain plate conveyor line assembly and fall forward into the vibration disk assembly. The vibration disk assembly is composed of a vibration body and a vibration disk assembly made of sheet metal. The betel nuts slowly move forward in the vibration disk assembly through the vibration of the vibration body. The vibration disk assembly has two levels. The first stage is connected to the chain plate conveyor line assembly, the second stage is connected to the first stage vibration plate assembly and the lower stage is connected to the acceleration conveyor line. The betel nut falls into the second stage vibration sheet metal through the first stage vibration sheet metal, and then falls into the acceleration conveyor line assembly from the second stage vibration sheet metal. The betel nut is accelerated on the acceleration conveyor line assembly to improve efficiency. The accelerated betel nut falls into the six main conveyor line assemblies. The betel nut moves along the conveyor line to the bottom of the X-ray machine detection assembly. The X-ray machine detection assembly takes a photo of the moving betel nut and calculates the wall thickness and length of the betel nut through the program, and displays the value on the display screen. At the same time, it gives a signal to which level the betel nut wall thickness belongs to the high-frequency solenoid valve behind it. The betel nut passes the X-ray machine inspection After the measuring component passes through the sensor, the X-ray machine transmitter takes a picture of the betel nut moving directly below, and the receiver calculates its actual size on the software based on the size of the betel nut projection. The principle of recognition is similar to that of the hospital's filming. The actual size is calculated and then the betel nut is divided into grades according to its wall thickness, length, and width, and the divided results are given to the PLC. After the betel nut passes through the through-beam sensor, the sensor gives a position signal to the PLC. The two signals are combined to determine the blowing time, which is given by the PLC to the solenoid valve. The high-frequency solenoid valve controls the on and off of the air. After receiving the signal, the high-frequency solenoid valve is electrically attracted, and the blowing block starts to blow air to make the betel nut fall. After blowing for a period of time, the high-frequency solenoid valve is turned on and off. The high-frequency solenoid valve is powered off and the gas supply is disconnected, the blowing block stops blowing, and the sensor detects the presence of betel nut and gives a signal of the high-frequency solenoid valve blowing time. The two signals work together to make the high-frequency solenoid valve blow the betel nut off at the exact wall thickness level and at the exact time. The blown-off betel nut falls onto the four-channel discharging conveyor line assembly. The four-channel discharging conveyor line assembly is divided into four different wall thickness grades of betel nut. The conveyor line brings together betel nuts of the same wall thickness grade for easy collection. Betel nuts that are not identified or do not meet any wall thickness grade will be transported to the reflux hopper at the back by the six main conveyor line assemblies, and then collected into the collection basket. At this point, the entire betel nut wall thickness detection is completed. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a left-side perspective structural diagram of the utility model;
[0016] Figure 2 It is a schematic diagram of the structure of the utility model from the right side;
[0017] Figure 3 It is a schematic diagram of the structure of the utility model in a three-dimensional top view;
[0018] Figure 4 This is a schematic diagram of the structure of the chain conveyor line assembly of the utility model;
[0019] Figure 5 It is a partial structural diagram of the chain conveyor line assembly of the utility model;
[0020] Figure 6 It is a structural schematic diagram of the lower part of the chain conveyor line assembly of the utility model;
[0021] Figure 7 This is a schematic diagram of the structure of the vibration plate assembly of the utility model;
[0022] Figure 8 This is a schematic diagram of the structure of the acceleration conveyor line assembly of the utility model;
[0023] Fig. 9 It is a three-dimensional structural schematic diagram of six main conveyor line components of the utility model;
[0024] Fig.10 It is a top view structural schematic diagram of six main conveyor line components of the utility model;
[0025] Fig.11 This is a front view structural diagram of six main conveyor line components of the utility model;
[0026] Fig.12 This is a structural schematic diagram of a four-channel discharging conveyor line assembly of the utility model;
[0027] Fig.13 It is a partial structural diagram of a four-channel discharging conveyor line assembly of the utility model;
[0028] Fig.14 This is a front-view stereoscopic structural diagram of the X-ray machine detection assembly of the utility model;
[0029] Fig.15 This is a schematic diagram of the rear-view stereoscopic structure of the X-ray machine detection assembly of the utility model;
[0030] Fig.16 This is a schematic diagram of the structure inside the X-ray machine detection component of the utility model;
[0031] Fig.17 It is a partial three-dimensional structural diagram of the X-ray machine detection component of the utility model;
[0032] Fig.18 This is a schematic diagram of the structure of the equipment frame of the utility model from a top view;
[0033] Fig.19 It is a three-dimensional structural schematic diagram of the equipment frame of the utility model.
[0034] In the figure: 1. Equipment frame; 2. Hopper; 3. Chain conveyor line assembly; 4. Vibrating plate assembly; 5. Accelerating conveyor line assembly; 6. Six main conveyor line assemblies; 7. X-ray machine detection assembly; 8. Four-channel discharge conveyor line assembly; 9. First servo motor; 10. First reducer; 11. First side guard plate; 12. Chain plate; 13. Second side guard plate; 14. First driving shaft; 15. Driven shaft; 16. Driving sprocket; 17. Driven sprocket; 18. Dust hood; 19. Dust collection pipe; 20. Blower; 21. Vibrator; 22 1. First-stage vibration sheet metal; 23. Second-stage vibration sheet metal; 24. Second servo motor; 25. Second reducer; 26. Acceleration conveyor belt; 27. Second driving shaft; 28. Plum blossom coupling; 29. Fixed bracket; 30. Third servo motor; 31. Third reducer; 32. Blowing slot; 33. End cover; 34. Blanking slot; 35. Conveyor line side plate; 36. Reflux hopper; 37. Rubber; 38. High-frequency solenoid valve; 39. Blowing plate; 40. Friction strip; 41. First belt; 42. Chain coupling; 43. Third driving shaft shaft; 44, fourth servo motor; 45, fourth reducer; 46, cross slider coupling; 47, side plate; 48, second belt; 49, side rib; 50, feed chute; 51, fourth driving shaft; 52, pad; 53, lead curtain; 54, X-ray machine outer cover; 55, touch screen; 56, display screen; 57, muffler; 58, lead protection plate; 59, lower lead protection door; 60, upper lead protection door; 61, lifting ring; 62, X-ray machine power switch; 63, trachea joint; 64, elbow clamp; 65, receiver; 66, Adjustment plate; 68. Beam cover; 69. X-ray machine transmitter; 70. Air cooling device; 71. Gas bus; 72. Limit plate; 73. Cylindrical locating pin; 74. Baffle; 75. Diamond locating pin; 76. Locating plate; 77. Receiver mounting plate; 78. Sheet metal frame; 79. Through-beam sensor; 80. Roller; 81. Blow box bracket; 82. Gas storage tank; 83. Diverter gas exhaust; 84. Guide welding plate; 85. Forma wheel; 86. Welding drawer; 87. Pneumatic triplex; 88. Safety valve; 89. Pressure gauge. DETAILED DESCRIPTION
[0035] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0036] Example: Refer to Figure 1-19 A betel nut raw fruit sorting equipment comprises an equipment frame 1, a hopper 2 is provided on the equipment frame 1, a chain plate conveyor line assembly 3 is installed below the hopper 2, a chain plate 12 is provided on the chain plate conveyor line assembly 3, a dust removal assembly is provided below the chain plate conveyor line assembly 3, a vibration plate assembly 4 is provided below one side of the chain plate conveyor line assembly 3, an acceleration conveyor line assembly 5 is provided on one side of the vibration plate assembly 4, an acceleration conveyor belt 26 is provided on the acceleration conveyor line assembly 5, six main conveyor line assemblies 6 are provided on one side of the acceleration conveyor line assembly 5, a first belt 41 is provided on the six main conveyor line assemblies 6, an X-ray machine detection assembly 7 is provided above the six main conveyor line assemblies 6, an X-ray machine transmitter 69 is provided on the X-ray machine detection assembly 7, a four-channel discharge conveyor line assembly 8 is provided below the six main conveyor line assemblies 6, the four-channel discharge conveyor line assembly 8 is located on one side of the X-ray machine detection assembly 7, and a second belt 48 is provided on the four-channel discharge conveyor line assembly 8.
[0037] Specifically, the chain conveyor line assembly 3 includes a first servo motor 9 installed on the equipment frame 1, a first reducer 10 is provided on one side of the first servo motor 9, a first driving shaft 14 and a driven shaft 15 are installed on the equipment frame 1, a driving sprocket 16 and a driven sprocket 17 are fixedly sleeved on the first driving shaft 14 and the driven shaft 15, a chain plate 12 is sleeved on the driving sprocket 16 and the driven sprocket 17, an output end of the first reducer 10 is fixedly connected to one end of the first driving shaft 14, a first side guard plate 11 and a second side guard plate 13 are installed on the equipment frame 1, the first side guard plate 11 and the second side guard plate 13 are located above the chain plate 12, and a plurality of small holes are provided on the chain plate 12, and a dust removal assembly includes a blower 20 installed on the equipment frame 1, a dust collecting pipe 19 is connected to the blower 20, and the dust collecting pipe The top of 19 is connected with a dust hood 18, which is located below the chain plate 12. The chain plate conveyor line assembly 3 and the dust removal assembly, the total power of the chain plate conveyor line assembly 3 is the first servo motor 9. The operation of this mechanism is that the first servo motor 9 is connected to the first reducer 10 to increase the torque to drive the driving sprocket 16 on the first driving shaft 14 to rotate. The driving sprocket 16 is connected to the chain plate 12, and the chain plate 12 rotates with the driving sprocket 16 to realize the movement of betel nut on the chain plate 12. At the same time, there are many small holes on the chain plate 12, which is convenient for the dust on the betel nut to fall from the small holes under the action of the dust removal device below. The dust removal device provides negative pressure suction through the blower 20, which is connected to the dust collection pipe 19 and transmitted to the dust hood 18, and then the dust hood 18 sucks all the ash falling from the chain plate 12 and collects it in the dust bag.
[0038] Specifically, the vibration disk assembly 4 includes a vibrating body 21 installed on the equipment frame 1, and a primary vibration sheet metal 22 and a secondary vibration sheet metal 23 are connected to the vibrating body 21. The primary vibration sheet metal 22 and the secondary vibration sheet metal 23 are both arranged at an angle. The primary vibration sheet metal 22 is located below the chain plate 12, and the secondary vibration sheet metal 23 is located above the acceleration conveyor belt 26. The vibration disk assembly 4 is powered by the vibrating body 21. The vibration of the vibrating body 21 drives the upper vibration sheet metal to vibrate back and forth. The betel nut falls into the primary vibration sheet metal 22 with the chain plate conveyor line assembly 3. The vibration of the vibrating body 21 drives the primary vibration sheet metal 22 to vibrate. The betel nut moves forward on the primary vibration sheet metal 22 with the vibration and falls into the secondary vibration sheet metal 23. The secondary vibration sheet metal 23 vibrates under the drive of the bottom vibrating body 21, pushing the betel nut forward again. The betel nut moves forward step by step and falls into the next level mechanism.
[0039] Specifically, the acceleration conveyor line assembly 5 includes a second servo motor 24 installed on one side of the equipment frame 1, a second reducer 25 is connected to one side of the second servo motor 24, an output end of the second reducer 25 is connected to a second driving shaft 27, a plum blossom coupling 28 is connected to the second driving shaft 27, a fixed bracket 29 is installed on the equipment frame 1, the second reducer 25 and the plum blossom coupling 28 are installed on the fixed bracket 29, the acceleration conveyor belt 26 is sleeved on the second driving shaft 27, the acceleration conveyor line assembly 5 is powered by the second servo motor 24, and the torque is increased or decreased by the second reducer 25 and transmitted to the second driving shaft 27, the second driving shaft 27 rotates with the acceleration conveyor belt 26, the six conveyor lines are connected and transmitted power through the plum blossom coupling 28, the entire mechanism is locked on the frame through the fixed bracket 29, and the betel nut falls into the acceleration conveyor belt 26 from the secondary vibration sheet metal 23 of the upper level, accelerates on the acceleration conveyor belt 26, thereby improving the feeding efficiency, and falls into the next level mechanism after being accelerated by the acceleration conveyor belt 26.
[0040] Specifically, the six main conveyor line components 6 include a third servo motor 30 installed on the equipment frame 1, one side of the third servo motor 30 is connected to a third reducer 31, the output end of the third reducer 31 is connected to a chain coupling 42, the chain coupling 42 is connected to a third driving shaft 43, the first belt 41 is sleeved on the third driving shaft 43, an air blowing slot 32 is installed on the equipment frame 1, one side of the air blowing slot 32 is provided with an end cover 33, a blanking slot 34 is provided between adjacent air blowing slots 32, and the third air blowing slots 32 are provided with a third driving shaft 43. A conveyor line side plate 35 is provided on both sides of a belt 41, a return hopper 36 is provided at the end of the first belt 41, and a rubber 37 is provided on the return hopper 36. A high-frequency electromagnetic valve 38 is installed on the equipment frame 1. A blowing plate 39 and a friction strip 40 are provided on one side of the first belt 41. The six main conveyor line components 6 are powered by the third servo motor 30, and the torque is increased by the third reducer 31 and transmitted to the third driving shaft 43. The third driving shafts 43 of the six conveyor lines are connected through a chain coupling 42. The chain coupling The chain coupling 42 is easy to disassemble, and when replacing the first belt 41, the chain coupling 42 can be directly removed to take out the entire conveyor belt. The third driving shaft 43 is connected to the first belt 41. The betel nut falls from the acceleration conveyor belt 26 of the previous level into the first belt 41, moves on the first belt 41, and is identified and calculated by the X-ray machine detection component 7, and a signal is given to the solenoid valve to control the air on and off. The air is blown toward the blanking trough 34 through the blowing plate 39, and the passing betel nut will be blown away by the blowing and slide down the slope of the blanking trough 34 to The four-channel discharging conveyor line assembly 8 at the bottom, the unrecognized or unqualified betel nuts will be brought to the return hopper 36 at the rear by the first belt 41 for centralized collection and processing. There is a rubber 37 in the return hopper 36 to prevent the betel nuts from hitting the sheet metal and generating noise. The friction strip 40 on the conveyor line side panel 35 is to prevent the first belt 41 from jumping during operation, causing the betel nuts to be unstable, thereby affecting the X-ray machine's photo recognition. The solenoid valve is a high-frequency solenoid valve 38, which has a faster response speed and can blow more accurately.
[0041] Specifically, the four-channel discharging conveyor line assembly 8 includes a fourth servo motor 44 installed on the equipment frame 1, a fourth reducer 45 is connected to one side of the fourth servo motor 44, a cross slider coupling 46 is provided on one side of the fourth reducer 45, a fourth driving shaft 51 is connected to the cross slider coupling 46, a second belt 48 is sleeved on the fourth driving shaft 51, a side vertical plate 47 is installed on the equipment frame 1, a side retaining edge 49 is installed on the side vertical plate 47, a material discharge chute 50 is provided at one end of the second belt 48, a pad 52 is installed between the side vertical plates 47, and the pad 52 is located below the second belt 48. The four-channel discharging conveyor line assembly 8 is provided by the fourth servo motor 44. The power is transmitted to the fourth driving shaft 51 connected by the cross slider coupling 46 through the fourth reducer 45 to increase the torque. The two fourth driving shafts 51 of the two conveyor lines on one side are connected by the cross slider coupling 46. The fourth driving shaft 51 is provided with a groove. The bottom of the second belt 48 is bonded with ribs, which just match the grooves on the shaft. The ribs are stuck in the grooves to prevent the belt from running off the track. The belt is provided with side guard edges 49 to prevent the second belt 48 from jumping during operation. After being blown and falling into the second belt 48, the betel nut moves with the belt to the discharge chute 50, and is guided into the collection frame through the discharge chute 50. The four channels can be divided into four grades of betel nut, and each grade of betel nut is collected separately and enters the next process.
[0042] Specifically, the X-ray machine transmitter 69 includes an X-ray machine outer shield 54 installed on the equipment frame 1, a lead curtain 53 is provided on one side of the X-ray machine outer shield 54, a second belt 48 movably passes through the lead curtain 53, a touch screen 55 and a muffler 57 are provided on the X-ray machine outer shield 54, a display screen 56 is provided on one side of the X-ray machine outer shield 54, a lead protection plate 58 is provided on the rear side of the X-ray machine outer shield 54, a lower lead protection door 59 and an upper lead protection door 60 are provided on one side of the X-ray machine outer shield 54, and the upper lead protection door 60 is located at the lower lead protection door 59. 9, a lifting ring 61 and an X-ray machine power switch 62 are installed on the top side of the X-ray machine outer shield 54, a trachea joint 63 is provided on the lead protection plate 58, a toggle clamp 64 is installed on the X-ray machine outer shield 54, a baffle 74, a cylindrical positioning pin 73 and a diamond positioning pin 75 are provided on the toggle clamp 64, a positioning plate 76 is provided on the diamond positioning pin 75, a receiver mounting plate 77 is installed on one side of the toggle clamp 64, a receiver 65 is installed on one side of the receiver mounting plate 77, an adjustment plate 66 is provided on one side of the receiver 65, and the X-ray machine outer shield 54 is provided with a plurality of air pipes. The shield 54 is provided with a beam shield 68, the X-ray machine transmitter 69 is provided with the X-ray machine outer shield 54, the X-ray machine outer shield 54 is provided with an air cooling device 70 and a gas bus 71, the X-ray machine outer shield 54 is provided with a limit plate 72, the limit plate 72 is located at one side of the gas bus 71, the X-ray machine detection assembly 7 is mainly composed of three parts: a display screen 56 part; an X-ray machine outer shield 54 part; an X-ray machine internal main body part; the display screen 56 part is mainly used to operate and control the X-ray machine switch and take pictures Parameters, the wall thickness and length data of the betel nut passing under the X-ray machine can be seen in real time on the display screen 56; the outer shield 54 of the X-ray machine is mainly used to protect the internal lead plate. In addition, a lead curtain 53 is arranged at the outlet of the conveyor belt to block the emission of X-ray rays. A touch screen 55 is arranged on the door panel of the outer shield 54 of the X-ray machine. The touch screen 55 is used to control all power components outside the X-ray machine. A muffler 57 is arranged on the top of the outer shield 54 of the X-ray machine to discharge gas when the X-ray machine cools and dissipates heat;The main body of the X-ray machine has a protective plate with lead plates inside on the outside. The lower lead protective door 59 and the upper lead protective door 60 also have lead plates inside, which are mainly used to block the radiation of the X-ray machine from escaping and protect the external environment and operators. There are two air pipe joints 63 on the side of the lead protective plate 58, which are the interfaces for connecting the total air outside the equipment to the air cooling device 70 inside the lead plate. There are two joints, one is the air inlet joint, and the other is the air outlet joint. One end of the air inlet joint is connected to the air pipe connected to the equipment gas tank 82, and the other end is connected to the gas bus 71, and then the bus is ventilated to the air cooling device 70. The air outlet joint is One end is connected to the silencer 57 on the top of the outer shield for exhaust, and the other end is connected to the gas bus 71. There are two buses in total, one is for the intake bus and then distributed to each heat sink, and the other is for the exhaust bus, which collects the gas discharged from each heat sink and then discharges it from the silencer 57 on the top. Four lifting rings 61 are arranged on the top of the lead protection plate 58. The lifting rings 61 are for easy loading and unloading. In addition, an X-ray machine power switch 62 is also installed on the top of the lead protection plate 58 to facilitate switching on and off the X-ray machine and to facilitate the maintenance of the X-ray machine. The interior of the lead protection plate 58 is mainly divided into two parts, the upper part is the X-ray machine transmitter 69, and the upper part is the X-ray machine transmitter 69. The outside is an air cooling device 70, which is used to dissipate heat when the X-ray machine is in operation. A limit plate 72 is set on the back and one side of the X-ray machine transmitter 69. The limit plate 72 is convenient for positioning the X-ray machine transmitter 69 when it is installed. Connected to the bottom of the X-ray machine transmitter 69 is a beam shield 68, which is used to constrain the propagation trajectory of the rays. There is a 5mm gap under the beam beam for emitting rays to the receiver 65 below. There are two plates at the bottom of the receiver 65, one is the receiver mounting plate 77 and the other is the adjustment plate 66. The receiver mounting plate 77 is used to locate and determine the overall position. The adjustment plate 66 is used to cooperate with the waist groove of the receiver 65 to achieve adjustable It can be adjusted in two directions to avoid the problem that the receiver 65 cannot receive the signal due to the error of the welding parts. The positioning of the receiver mounting plate 77 is through the two pins on the rear baffle 74. The two pins of the cylindrical and diamond positioning pins 75 ensure the accuracy of the position. There are also elbow clamps 64 on the positioning plate 76. There are two elbow clamps 64 on a receiver mounting plate 77. The elbow clamps 64 are used to fix the receiver mounting plate 77. The elbow clamps 64 are used to facilitate the removal of the belt. The receiver 65 is pulled out first when removing the belt. When removing the belt, the receiver mounting plate 77 needs to be pulled out first, and then the conveyor line that needs to be replaced on the six main conveyor line components 6 is pulled out. After pulling it out, the belt can be replaced. ;
[0043] Specifically, a sheet metal frame 78 is installed on the equipment frame 1, a through-beam sensor 79 is installed on the equipment frame 1, multiple groups of rollers 80 are installed on the equipment frame 1, a blow box bracket 81, a gas storage tank 82 and a diversion gas exhaust 83 are installed on the equipment frame 1, a guide welding plate 84 is installed on the equipment frame 1, a Foma wheel 85 is provided on the bottom side of the equipment frame 1, and multiple welding drawers 86 are provided on one side of the equipment frame 1. A pneumatic triplet 87, a safety valve 88 and a pressure gauge 89 are installed on the equipment frame 1. All the mechanism components of the equipment frame 1 are installed on this sheet metal frame 78, and rollers 80 and guide welding plates 84 are installed on the frame. The rollers 80 are convenient for easier insertion and removal of the six main conveyor line components 6 during assembly and disassembly. The guide welding plate 84 is to play a positioning and guiding role in assembling the conveyor belt, which is convenient for assembly and positioning. Device 79 senses the presence of betel nut when it passes by and gives a signal of the blowing position to the high-frequency solenoid valve 38. The welding drawer 86 is for the convenience of cleaning the residual betel nut in the equipment and for easy cleaning. The pneumatic triplet 87 is a transition component that transfers the total gas from the customer to the equipment, and plays the role of pressure regulation for filtering and drying. The total gas passes through the triplet to the gas tank 82, and the gas tank 82 supplies gas to the entire equipment. The X-ray machine part needs to be blown all the time to dissipate heat, and the gas consumption is relatively large. The diversion air exhaust 83 is a blowing mechanism that receives air from the gas tank 82 and distributes it to the six main conveyor line components 6 above. The safety valve 88 ensures that the maximum pressure of the gas tank 82 does not exceed a certain value, and plays a protective role for the pneumatic components of the equipment. The pressure gauge 89 can see the pressure of the gas tank 82 in real time to ensure that the air pressure of the equipment is normal. The Fomar wheel 85 at the bottom of the sheet metal frame 78 is for the convenience of moving the equipment.
[0044] During use: manual loading, pour the betel nuts into the hopper 2, and as the chain plate conveyor line assembly 3 rotates, the betel nuts move forward. At the same time, there will be a dust cover 18 connected to the blower 20 directly below the chain plate conveyor line assembly 3, which will suck the dust in the betel nuts and suck it into the dust bag of the blower 20 through the small holes of the chain plate conveyor line assembly 3. The betel nuts with dust removed will continue to move forward with the chain plate conveyor line assembly 3 and fall forward into the vibration disk assembly 4. The vibration disk assembly 4 is composed of a vibrating body 21 and a vibration disk assembly 4 made of sheet metal. The betel nuts move slowly forward in the vibration disk assembly 4 through the vibration of the vibrating body 21. The vibration disk assembly 4 has two stages, and the first stage is connected to the chain plate conveyor line assembly 3. The second stage is connected to the first stage vibration plate assembly 4 at the top and the acceleration conveyor line at the bottom. The betel nut falls into the second stage vibration plate metal 23 through the first stage vibration plate metal 22, and then falls into the acceleration conveyor line assembly 5 from the second stage vibration plate metal 23. The betel nut is accelerated on the acceleration conveyor line assembly 5 to improve efficiency. The accelerated betel nut falls into the six main conveyor line assemblies 6. The betel nut moves along the conveyor line to the bottom of the X-ray machine detection assembly 7. The X-ray machine detection assembly 7 takes a photo to identify the moving betel nut, calculates the wall thickness and length of the betel nut through the program, and displays the value on the display screen 56. At the same time, a signal is given by the high-frequency electromagnetic valve 38 at the back to indicate which level the betel nut wall thickness belongs to. After the betel nut passes through the X-ray machine detection assembly 7 After passing through the sensor, the X-ray machine transmitter 69 takes a picture of the betel nut moving directly below, and the receiver 65 calculates its actual size on the software based on the size of the betel nut projection. The recognition principle is similar to that of the hospital's filming. The actual size is calculated and then the betel nut is divided into grades according to its wall thickness, length, and width, and the divided results are given to the PLC. After the betel nut passes through the through-beam sensor 79, the sensor gives a position signal to the PLC. The two signals are combined to determine the blowing time, which is given by the PLC to the solenoid valve. The high-frequency solenoid valve 38 controls the on and off of the air. After receiving the signal, the high-frequency solenoid valve 38 is electrically attracted, and the blowing block starts to blow air to make the betel nut fall. After blowing for a period of time, the high-frequency solenoid valve 38 is turned on and off. The valve 38 is powered off to disconnect the gas supply, and the blowing block stops blowing. When the sensor detects the presence of betel nut, it gives a signal of the blowing time of the high-frequency solenoid valve 38. The two signals work together to make the high-frequency solenoid valve 38 blow the betel nut off at the exact wall thickness level and at the exact time. The blown-off betel nut falls onto the four-channel discharging conveyor line assembly 8. The four-channel discharging conveyor line assembly 8 is divided into four types of betel nuts with different wall thickness levels. The conveyor line brings together betel nuts of the same wall thickness level for easy collection. Betel nuts that are not identified or do not meet any wall thickness level will be transported to the reflux hopper 36 at the back by the six main conveyor line assemblies 6, and then collected into the collection basket. At this point, the entire betel nut wall thickness detection is completed.
[0045] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A betel nut raw fruit sorting device, comprising a device frame (1), characterized in that: The equipment frame (1) is provided with a hopper (2), a chain plate conveyor assembly (3) is installed below the hopper (2), a chain plate (12) is provided on the chain plate conveyor assembly (3), a dust removal assembly is provided below the chain plate conveyor assembly (3), a vibration plate assembly (4) is provided below one side of the chain plate conveyor assembly (3), an acceleration conveyor assembly (5) is provided on one side of the vibration plate assembly (4), an acceleration conveyor belt (26) is provided on the acceleration conveyor assembly (5), and one side of the acceleration conveyor assembly (5) Six main conveyor line assemblies (6) are provided, and a first belt (41) is provided on the six main conveyor line assemblies (6); an X-ray machine detection assembly (7) is provided above the six main conveyor line assemblies (6), and an X-ray machine transmitter (69) is provided on the X-ray machine detection assembly (7); a four-channel discharge conveyor line assembly (8) is provided below the six main conveyor line assemblies (6), and the four-channel discharge conveyor line assembly (8) is located on one side of the X-ray machine detection assembly (7); and a second belt (48) is provided on the four-channel discharge conveyor line assembly (8).
2. A betel nut raw fruit sorting equipment according to claim 1, characterized in that: The chain conveyor assembly (3) comprises a first servo motor (9) mounted on an equipment frame (1), a first reducer (10) being provided on one side of the first servo motor (9), a first driving shaft (14) and a driven shaft (15) being mounted on the equipment frame (1), a driving sprocket (16) and a driven sprocket (17) being fixedly sleeved on the first driving shaft (14) and the driven shaft (15), a chain plate (12) being sleeved on the driving sprocket (16) and the driven sprocket (17), an output end of the first reducer (10) being fixedly connected to one end of the first driving shaft (14), a first side guard plate (11) and a second side guard plate (13) being mounted on the equipment frame (1), the first side guard plate (11) and the second side guard plate (13) being located above the chain plate (12), and a plurality of small holes being provided on the chain plate (12).
3. A betel nut raw fruit sorting equipment according to claim 1, characterized in that: The dust removal assembly comprises a blower (20) mounted on an equipment frame (1), the blower (20) is connected to a dust collecting pipe (19), the top end of the dust collecting pipe (19) is connected to a dust hood (18), and the dust hood (18) is located below the chain plate (12).
4. A betel nut raw fruit sorting device according to claim 1, characterized in that: The vibration plate assembly (4) comprises a vibration body (21) mounted on an equipment frame (1), a primary vibration sheet metal (22) and a secondary vibration sheet metal (23) being connected to the vibration body (21), the primary vibration sheet metal (22) and the secondary vibration sheet metal (23) being arranged in an inclined manner, the primary vibration sheet metal (22) being located below the chain plate (12), and the secondary vibration sheet metal (23) being located above the acceleration conveyor belt (26).
5. The betel nut raw fruit sorting equipment according to claim 1, characterized in that: The accelerating conveyor line assembly (5) comprises a second servo motor (24) mounted on one side of the equipment frame (1); a second reducer (25) is connected to one side of the second servo motor (24); an output end of the second reducer (25) is connected to a second driving shaft (27); a plum blossom coupling (28) is connected to the second driving shaft (27); a fixed bracket (29) is mounted on the equipment frame (1); the second reducer (25) and the plum blossom coupling (28) are mounted on the fixed bracket (29); and the accelerating conveyor belt (26) is sleeved on the second driving shaft (27).
6. The betel nut raw fruit sorting equipment according to claim 1, characterized in that: The six main conveyor line components (6) include a third servo motor (30) mounted on the equipment frame (1), one side of the third servo motor (30) is connected to a third reducer (31), the output end of the third reducer (31) is connected to a chain coupling (42), the chain coupling (42) is connected to a third driving shaft (43), the first belt (41) is sleeved on the third driving shaft (43), and the equipment frame (1) is equipped with an air blowing groove (32) An end cover (33) is provided on one side of the blowing groove (32), a material drop groove (34) is provided between adjacent blowing grooves (32), conveyor line side plates (35) are provided on both sides of the first belt (41), a return hopper (36) is provided at the end of the first belt (41), and a rubber (37) is provided on the return hopper (36), a high-frequency electromagnetic valve (38) is installed on the equipment frame (1), and a blowing plate (39) and a friction strip (40) are provided on one side of the first belt (41).
7. The betel nut raw fruit sorting equipment according to claim 1, characterized in that: The four-channel discharge conveyor line assembly (8) comprises a fourth servo motor (44) mounted on an equipment frame (1); a fourth reducer (45) is connected to one side of the fourth servo motor (44); a cross slider coupling (46) is provided on one side of the fourth reducer (45); a fourth driving shaft (51) is connected to the cross slider coupling (46); a second belt (48) is sleeved on the fourth driving shaft (51); a side plate (47) is mounted on the equipment frame (1); a side retaining edge (49) is mounted on the side plate (47); a material discharge chute (50) is provided at one end of the second belt (48); a pad (52) is mounted between the side plates (47); and the pad (52) is located below the second belt (48).
8. The betel nut raw fruit sorting equipment according to claim 1, characterized in that: The X-ray machine transmitter (69) includes an X-ray machine outer shield (54) installed on the equipment frame (1), a lead curtain (53) is provided on one side of the X-ray machine outer shield (54), a second belt (48) movably passes through the lead curtain (53), a touch screen (55) and a muffler (57) are provided on the X-ray machine outer shield (54), a display screen (56) is provided on one side of the X-ray machine outer shield (54), a lead protection plate (58) is provided on the rear side of the X-ray machine outer shield (54), a lower lead protection door (59) and an upper lead protection door (60) are provided on one side of the X-ray machine outer shield (54), the upper lead protection door (60) is located above the lower lead protection door (59), a hanging ring (61) and an X-ray machine power switch (62) are installed on the top side of the X-ray machine outer shield (54), an air pipe joint (63) is provided on the lead protection plate (58), The X-ray machine outer shield (54) is provided with a toggle clamp (64), and a baffle (74), a cylindrical positioning pin (73) and a diamond positioning pin (75) are provided on the toggle clamp (64), and a positioning plate (76) is provided on the diamond positioning pin (75). A receiver mounting plate (77) is installed on one side of the toggle clamp (64), and a receiver (65) is installed on one side of the receiver mounting plate (77). An adjustment plate (66) is provided on one side of the receiver (65). A beam cover (68) is installed on the X-ray machine outer shield (54), and an X-ray machine transmitter (69) is installed on the X-ray machine outer shield (54). An air cooling device (70) and a gas bus (71) are installed on the X-ray machine outer shield (54). A limit plate (72) is installed in the X-ray machine outer shield (54), and the limit plate (72) is located on one side of the gas bus (71).
9. The betel nut raw fruit sorting equipment according to claim 1, characterized in that: The equipment frame (1) is provided with a sheet metal frame (78), a beam sensor (79) is provided on the equipment frame (1), a plurality of rollers (80) are provided on the equipment frame (1), a blow box bracket (81), a gas storage tank (82) and a split air exhaust (83) are provided on the equipment frame (1), a guide welding plate (84) is provided on the equipment frame (1), a Foma wheel (85) is provided on the bottom side of the equipment frame (1), a plurality of welding drawers (86) are provided on one side of the equipment frame (1), and a pneumatic triplet (87), a safety valve (88) and a pressure gauge (89) are provided on the equipment frame (1).