Green building curtain wall heat preservation plate installation structure
By adopting the design of continuous clamping blocks, slots and fixed structures in the insulation board installation structure, the problem of inclination and joints during the installation process is solved, and the installation efficiency and insulation effect are improved.
Patent Information
- Application Number
- CN202421400038.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-19
- Publication Date
- 2025-03-14
- Estimated Expiration
- 2034-06-19
AI Technical Summary
During the installation process, existing insulation boards are prone to inclination and joint problems, which affects the insulation effect and is inefficient in installation.
A green building curtain wall insulation board installation structure is designed, using continuous clamping blocks, slots and fixed structures. Through the coordination of knobs and screws, the bonding mortar is achieved to reduce the tilt adjustment requirement during the installation process, and the spacing between the seams is reduced through the design of the clamps and slots.
The installation efficiency of the insulation board is improved, the number of adjustments caused by tilt is reduced, and the spacing at the joints is reduced, thereby improving the insulation effect.
Smart Images

Figure CN222614579U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of installation structures, in particular to an installation structure of a green building curtain wall thermal insulation board. Background Art
[0002] Insulation board is simply a board used for insulation of buildings. It is made of polystyrene resin as raw material, other raw and auxiliary materials and polymers. It is heated and mixed while injecting catalysts, and then extruded and pressed to form a hard foam plastic board. It has moisture-proof and waterproof properties, and can reduce the thickness of the building's external protective structure, thereby increasing the indoor usable area.
[0003] At present, during installation, the insulation board is initially connected to the wall through bonding mortar, and then gaskets and insulation nails are driven in for secondary reinforcement. However, due to the presence of joints in the process of splicing the insulation board on the wall, the insulation effect is affected. In addition, due to the thickness and uneven distribution of the bonding mortar, the insulation board is tilted during the connection with the wall, requiring constant adjustment by the staff, resulting in low installation efficiency.
[0004] Therefore, in response to the above problems, we propose a green building curtain wall insulation board installation structure. Utility Model Content
[0005] The utility model aims to provide a green building curtain wall insulation board installation structure to solve the problems raised by the above-mentioned background technology.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a green building curtain wall insulation board installation structure, comprising a first insulation board and a second insulation board distributed in parallel, a card slot is opened on the outer wall on the same side of the first insulation board and the second insulation board, a card block is fixedly installed on the outer wall of the first insulation board and the second insulation board away from the card slot, a first installation slot is opened on the front side wall of the first insulation board and the second insulation board, a connecting device is arranged inside the first installation slot, a second installation slot is opened on the top and bottom of the first insulation board and the second insulation board, and a fixed structure is arranged inside the second installation slot.
[0007] As a further description of the utility model: the connecting device includes a connecting plate, gaskets are fixedly installed at both ends of the connecting plate, the gasket is circular, and a heat-insulating nail is rotatably connected inside the gasket.
[0008] As a further description of the utility model: the cross-sections of the card block and the card slot are both rectangular and the same size, the first installation slot is located directly in front of the card slot, and the first insulation board, the second insulation board and the card block are provided with circular holes for insulation nails to pass through.
[0009] As a further description of the utility model: the fixing structure includes a first fixed block located inside the second mounting groove, a moving block is arranged on the back of the first fixed block, a screw rod is threadedly connected inside the moving block, a knob is rotatably connected inside the first fixed block, and one end of the knob is fixedly connected to the screw rod.
[0010] As a further description of the present invention: measuring rods are fixedly installed on both sides of the knob inside the first fixed block, and sliding holes for the measuring rods to slide are opened inside the movable block.
[0011] As a further description of the utility model: a second fixed block is fixedly installed on the upper surface of the moving block, a first fixed hole is opened inside the second fixed block, and two second fixed holes are opened inside the first fixed block.
[0012] Compared with the prior art, the beneficial effects of the utility model are:
[0013] The utility model designs a connecting card block, a card slot and a fixing structure on a green building curtain wall insulation board installation structure. When in use, the second fixing block fixes the first insulation board and the wall, and then the knob and the screw are synchronously turned to drive the moving block to approach the first fixing block, so that the bonding mortar is evenly distributed between the first insulation board and the wall through pressure, reducing the situation that the insulation board needs to be constantly adjusted due to inclination during installation, thereby improving installation efficiency, and the card block and the card slot can connect the boards, reducing the situation that the insulation effect is poor due to excessive spacing at the joints. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0015] Figure 2 It is a schematic diagram of the fixing structure of the utility model;
[0016] Figure 3 It is a schematic diagram of the structure of the connecting device of the utility model.
[0017] In the figure: 1. first thermal insulation board; 2. second thermal insulation board; 3. slot; 4. block; 5. first mounting slot; 6. connecting device; 601. connecting plate; 602. gasket; 603. thermal insulation nail; 7. second mounting slot; 8. fixing structure; 801. first fixing block; 802. moving block; 803. screw rod; 804. knob; 805. measuring rod; 806. second fixing block; 807. first fixing hole. DETAILED DESCRIPTION
[0018] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0019] See also Figure 1-Figure 3 The utility model provides a technical solution: a green building curtain wall insulation board installation structure, including a first insulation board 1 and a second insulation board 2 distributed in parallel, a card slot 3 is opened on the outer wall on the same side of the first insulation board 1 and the second insulation board 2, a card block 4 is fixedly installed on the outer wall of the first insulation board 1 and the second insulation board 2 away from the card slot 3, a first installation groove 5 is opened on the front side wall of the first insulation board 1 and the second insulation board 2, a connecting device 6 is arranged inside the first installation groove 5, a second installation groove 7 is opened on the top and bottom of the first insulation board 1 and the second insulation board 2, and a fixing structure 8 is arranged inside the second installation groove 7.
[0020] In this embodiment, the connecting device 6 includes a connecting plate 601 , with gaskets 602 fixedly installed at both ends of the connecting plate 601 . The gasket 602 is circular, and a heat preservation nail 603 is rotatably connected inside the gasket 602 .
[0021] During specific use: the insulation nails 603 can be fixed to the wall through the first insulation board 1, the second insulation board 2 and the block 4, thereby cooperating with the connecting plate 601 and the gasket 602 to strengthen the connection strength at the joint between the first insulation board 1 and the second insulation board 2.
[0022] In this embodiment: the cross-sections of the block 4 and the slot 3 are both rectangular and of the same size, the first installation slot 5 is located directly in front of the slot 3, and circular holes for the insulation nails 603 to pass through are opened inside the first insulation board 1, the second insulation board 2 and the block 4.
[0023] During specific use: the clamping block 4 and the clamping slot 3 are connected to the first thermal insulation board 1 to reduce the situation where the spacing at the joint is too large and the thermal insulation effect is poor.
[0024] In this embodiment: the fixing structure 8 includes a first fixing block 801 located inside the second mounting groove 7, a moving block 802 is arranged on the back of the first fixing block 801, a screw rod 803 is threadedly connected inside the moving block 802, a knob 804 is rotatably connected inside the first fixing block 801, and one end of the knob 804 is fixedly connected to the screw rod 803.
[0025] During specific use: fix the first insulation board 1 to the wall through the second fixed block 806, and then simultaneously turn the knob 804 and the screw 803 to drive the moving block 802 close to the first fixed block 801, so that the bonding mortar is evenly distributed between the first insulation board 1 and the wall, reducing the need for constant adjustment of the insulation board due to tilt during installation, thereby improving installation efficiency.
[0026] In this embodiment: measuring rods 805 are fixedly installed on both sides of the knob 804 inside the first fixed block 801, and sliding holes for the measuring rods 805 to slide are opened inside the moving block 802.
[0027] During specific use: the measuring rod 805 is engraved with scales to measure the distances between the upper and lower sides of the first thermal insulation board 1 and the second thermal insulation board 2 and the wall.
[0028] In this embodiment: a second fixing block 806 is fixedly installed on the upper surface of the moving block 802 , a first fixing hole 807 is defined inside the second fixing block 806 , and two second fixing holes 808 are defined inside the first fixing block 801 .
[0029] During specific use: the second fixing block 806 can be fixed to the wall through the first fixing hole 807 , and the first fixing block 801 can be fixed to the first thermal insulation board 1 and the second thermal insulation board 2 through the second fixing hole 808 .
[0030] Working principle: When in use, apply bonding mortar on the back of the first insulation board 1, and fix the first insulation board 1 to the wall through the second fixing block 806, then turn the knob 804 and the screw 803 synchronously to drive the moving block 802 close to the first fixing block 801, so that the bonding mortar is evenly distributed between the first insulation board 1 and the wall, reducing the need for constant adjustment of the insulation board due to tilt during installation, thereby improving installation efficiency, then apply bonding mortar on the back of the second insulation board 2, and dock it with the first insulation board 1 through the clamping block 4 and the clamping slot 3, and repeat the above steps of using the fixing structure 8 to make the first insulation board 1 and the second insulation board 2 level.
[0031] The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in the field. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for technical personnel in the field to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.
Claims
1. A green building curtain wall insulation board installation structure, comprising a first insulation board (1) and a second insulation board (2) arranged in parallel, characterized in that: The first thermal insulation board (1) and the second thermal insulation board (2) are provided with a card slot (3) on the same side outer wall, and a card block (4) is fixedly installed on the outer wall of the first thermal insulation board (1) and the second thermal insulation board (2) away from the card slot (3). The first thermal insulation board (1) and the second thermal insulation board (2) are provided with a first installation groove (5) on the front side wall, and a connecting device (6) is arranged inside the first installation groove (5). The first thermal insulation board (1) and the second thermal insulation board (2) are provided with a second installation groove (7) on the top and bottom, and a fixing structure (8) is arranged inside the second installation groove (7).
2. A green building curtain wall insulation board installation structure according to claim 1, characterized in that: The connecting device (6) comprises a connecting plate (601), gaskets (602) are fixedly mounted at both ends of the connecting plate (601), the gasket (602) is circular, and a heat-insulating nail (603) is rotatably connected inside the gasket (602).
3. A green building curtain wall insulation board installation structure according to claim 2, characterized in that: The cross-sections of the clamping block (4) and the clamping slot (3) are both rectangular and of the same size; the first mounting slot (5) is located directly in front of the clamping slot (3); and circular holes for the insulation nails (603) to pass through are provided inside the first insulation board (1), the second insulation board (2) and the clamping block (4).
4. A green building curtain wall insulation board installation structure according to claim 1, characterized in that: The fixing structure (8) comprises a first fixing block (801) located inside the second mounting groove (7); a moving block (802) is arranged on the back of the first fixing block (801); a screw rod (803) is internally threadedly connected to the moving block (802); a knob (804) is rotatably connected to the inside of the first fixing block (801), and one end of the knob (804) is fixedly connected to the screw rod (803).
5. A green building curtain wall insulation board installation structure according to claim 4, characterized in that: Measuring rods (805) are fixedly mounted on both sides of the knob (804) inside the first fixed block (801), and sliding holes for the measuring rods (805) to slide are provided inside the movable block (802).
6. A green building curtain wall insulation board installation structure according to claim 4, characterized in that: A second fixed block (806) is fixedly mounted on the upper surface of the moving block (802), a first fixed hole (807) is provided inside the second fixed block (806), and two second fixed holes (808) are provided inside the first fixed block (801).