Partition strip fixing structure
Through the combined structure of the partition strip, the first connector and the second connector, the partition strip is quickly fixed, which solves the problem of long construction time in the prior art and achieves a more efficient construction process.
Patent Information
- Application Number
- CN202421015706.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-10
- Publication Date
- 2025-03-18
- Estimated Expiration
- 2034-05-10
AI Technical Summary
The existing separation strip fixing method requires waiting for the cement slurry to solidify, resulting in a longer construction time.
The combined structure of the partition strip, the first connector and the second connector is adopted, and the first connector is connected to the partition strip and the ground through the first connector, and the second connector is connected to the ground to achieve rapid fixation of the partition strip.
Avoid waiting for the cement slurry to set, shorten the construction time, and ensure a solid connection of the partition strips.
Smart Images

Figure CN222632729U_ABST
Abstract
Description
Technical Field
[0001] The embodiment of the utility model relates to the technical field of building construction, and in particular to a partition bar fixing structure. Background Art
[0002] In order to release stress and reduce cracks, terrazzo floors usually require the use of partition strips. That is, after several partition strips are spliced and fixed on the ground, concrete is poured in the space enclosed by the partition strips to complete the construction of the entire terrazzo floor.
[0003] The existing method of fixing the dividing strips is usually to use cement slurry, which is poured on the ground and the sides of the dividing strips to fix the dividing strips on the ground. Usually, the slurry is applied 3mm to 5mm lower than the dividing strips. After the cement slurry solidifies, it has sufficient strength to support the fixing of the dividing strips.
[0004] However, when using cement slurry to fix the dividing strips, after the cement slurry is applied, it needs to solidify before it can have a certain supporting strength to fix the dividing strips, which will result in a longer construction time. Utility Model Content
[0005] In order to solve the above technical problem or at least partially solve the above technical problem, an embodiment of the utility model provides a partition bar fixing structure.
[0006] The embodiment of the utility model provides a partition bar fixing structure, comprising a partition bar, a first connecting member and a second connecting member;
[0007] The dividing strip comprises a first dividing strip segment and a second dividing strip segment which are arranged perpendicular to each other, the second dividing strip segment is used to be attached to the ground to be paved, and the first dividing strip segment and the second dividing strip segment together enclose a casting space for casting terrazzo concrete;
[0008] The first connecting member is connected to a side of the first dividing strip segment facing away from the casting space, and the first connecting member is connected to the ground to be paved. Part of the second connecting member is laid on a side of the second dividing strip segment facing the casting space, and the second connecting member is inclined in a direction away from the casting space and connected to the ground to be paved.
[0009] In some embodiments, a first connecting hole is provided on the first connecting member, a second connecting hole is provided on the first dividing strip segment at a position corresponding to the first connecting hole, and the first connecting member is connected to the first dividing strip segment by a first fastener passing through the first connecting hole and the second connecting hole.
[0010] In some embodiments, a third connecting hole is provided on the first connecting member, and a fourth connecting hole is provided at a position on the ground to be paved corresponding to the third connecting hole. The first connecting member is fixed to the ground to be paved by a second fastener passing through the third connecting hole and the fourth connecting hole.
[0011] In some embodiments, there are at least two third connection holes, at least two of which are spaced apart along the width direction of the second dividing strip segment, and there are at least two fourth connection holes, which correspond one-to-one to the third connection holes.
[0012] In some embodiments, the first connecting member is a first fixing steel plate;
[0013] The first connecting member includes a first plate body, a second plate body and a third plate body. The first plate body is attached to the side of the first dividing strip segment facing away from the casting space, and the first connecting hole is arranged on the first plate body; the third plate body is attached to the ground to be paved, and the third connecting hole is arranged on the third plate body. The second plate body is respectively connected to an end of the first plate body away from the second dividing strip segment and an end of the third plate body close to the second dividing strip segment.
[0014] In some embodiments, the first plate body, the second plate body and the third plate body are integrally formed.
[0015] In some embodiments, the first connecting members include at least two, and the at least two first connecting members are spaced apart along the length direction of the partition strip.
[0016] In some embodiments, a fifth connecting hole is provided on the second connecting member, a sixth connecting hole is provided at a position on the ground to be paved corresponding to the fifth connecting hole, and the second connecting member is fixed to the ground to be paved by a third fastener passing through the fifth connecting hole and the sixth connecting hole.
[0017] In some embodiments, the second connecting member is a second fixing steel plate.
[0018] In some embodiments, the angle between the second fixed steel plate and the second dividing strip segment is an acute angle.
[0019] Compared with the prior art, the technical solution provided by the embodiment of the utility model has the following advantages:
[0020] The embodiment of the utility model provides a partition strip fixing structure, including a partition strip, a first connecting member and a second connecting member. The partition strip includes a first partition strip segment and a second partition strip segment arranged perpendicular to each other, the second partition strip segment is used to fit on the ground to be laid, and the first partition strip segment and the second partition strip segment jointly enclose to form a pouring space for pouring terrazzo concrete. The first connecting member is connected to the side of the first partition strip segment away from the pouring space, and the first connecting member is connected to the ground to be laid, and part of the second connecting member is laid on the side of the second partition strip segment facing the pouring space, and the second connecting member is inclined in the direction away from the pouring space and connected to the ground to be laid. That is to say, the partition strip fixing structure of the embodiment of the utility model, by setting the first connecting member and the second connecting member, makes the first connecting member connected to the first partition strip segment of the partition strip and the ground to be laid respectively, and makes the second connecting member connected to the ground to be laid, so as to achieve the purpose of fixing the partition strip on the ground to be laid, thereby avoiding the problem that the partition strip needs to be fixed after the cement slurry solidifies when the cement slurry is used to fix the partition strip, so the whole construction time is long. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] The accompanying drawings herein are incorporated in and constitute a part of the specification, illustrate embodiments consistent with the embodiments of the utility model, and together with the description, are used to explain the principles of the embodiments of the utility model.
[0022] In order to more clearly illustrate the technical solutions in the embodiments of the utility model or the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.
[0023] Figure 1 It is a side view of the partition bar fixing structure described in the embodiment of the utility model;
[0024] Figure 2 It is a top view of the partition bar fixing structure described in an embodiment of the utility model.
[0025] Among them, 1. dividing strip; 11. first dividing strip segment; 12. second dividing strip segment; 13. casting space; 2. first connecting piece; 21. first plate body; 22. second plate body; 23. third plate body; 3. second connecting piece; 4. terrazzo concrete; 5. second fastener; 6. third fastener. DETAILED DESCRIPTION
[0026] In order to more clearly understand the above-mentioned purposes, features and advantages of the embodiments of the present invention, the scheme of the embodiments of the present invention will be further described below. It should be noted that the embodiments of the present invention and the features in the embodiments can be combined with each other without conflict.
[0027] In the following description, many specific details are set forth to facilitate a full understanding of the embodiments of the utility model, but the embodiments of the utility model can also be implemented in other ways different from those described herein; obviously, the embodiments in the specification are only part of the embodiments of the utility model, rather than all of the embodiments.
[0028] Reference Figure 1 to Figure 2 As shown, this embodiment provides a partition bar fixing structure, including a partition bar 1, a first connecting member 2 and a second connecting member 3;
[0029] The dividing strip 1 includes a first dividing strip segment 11 and a second dividing strip segment 12 which are arranged perpendicular to each other. The second dividing strip segment 12 is used to fit on the ground to be paved. The first dividing strip segment 11 and the second dividing strip segment 12 together enclose a casting space 13 for casting terrazzo concrete 4.
[0030] The first connecting member 2 is connected to the side of the first dividing strip segment 11 facing away from the casting space 13, and the first connecting member 2 is connected to the ground to be paved. Part of the second connecting member 3 is laid on the side of the second dividing strip segment 12 facing the casting space 13, and the second connecting member 3 is inclined in the direction away from the casting space 13 and connected to the ground to be paved.
[0031] When implementing it, refer to Figure 1 The vertical direction and the left and right direction of the partition bar 1 are set to include a vertical direction (refer to Figure 1 The first dividing strip segment 11 extending in the vertical direction (as shown) and the horizontal direction (as shown) Figure 1 The second dividing strip segment 12 is used to be attached to the ground to be laid on which the terrazzo concrete 4 is to be laid. At this time, the entire dividing strip 1 can be presented as follows Figure 1 Furthermore, the first dividing strip segment 11 and the second dividing strip segment 12 can be enclosed together to form a casting space 13, and after the dividing strip 1 is fixed, the terrazzo concrete 4 can be cast in the casting space 13, thereby completing the construction operation of the entire terrazzo floor.
[0032] Specifically, the first connector 2 can be connected to the side of the first dividing strip segment 11 away from the pouring space 13, that is, the first connector 2 can be located on the right side or the right side of the first dividing strip segment 11, and the first connector 2 is respectively connected to the first dividing strip segment 11 and the ground to be laid, so that the dividing strip 1 can be fixed to the ground to be laid to a certain extent. At the same time, part of the second connector 3 is laid on the second dividing strip segment 12 and can be connected to the ground to be laid after being tilted along the lower left side, so that the dividing strip 1 can be reliably fixed to the ground to be laid by the first connector 2 and the second connector 3 at the same time, so as to ensure that the dividing strip 1 will not shift after being fixed, and the way of fixing the dividing strip 1 by the first connector 2 and the second connector 3 can avoid the use of cement slurry for fixing, so the construction time can be shortened.
[0033] Exemplarily, the sizes and specifications of the first dividing strip segment 11 and the second dividing strip segment 12 can be set to be consistent, and the first dividing strip segment 11 and the second dividing strip segment 12 can be integrally formed to save manufacturing steps and improve the structural strength of the entire dividing strip 1.
[0034] For example, in addition to fixing the partition bar 1 by using the first connecting member 2 and the second connecting member 3 , cement glue may also be poured at a part of the partition bar 1 for fixing.
[0035] The present embodiment provides a partition bar fixing structure, including a partition bar 1, a first connecting member 2, and a second connecting member 3. The partition bar 1 includes a first partition bar segment 11 and a second partition bar segment 12 arranged perpendicular to each other, the second partition bar segment 12 is used to fit on the ground to be paved, and the first partition bar segment 11 and the second partition bar segment 12 together enclose a casting space 13 for casting terrazzo concrete 4. The first connecting member 2 is connected to a side of the first partition bar segment 11 that is away from the casting space 13, and the first connecting member 2 is connected to the ground to be paved, and a portion of the second connecting member 3 is placed on a side of the second partition bar segment 12 that is facing the casting space 13, and the second connecting member 3 is inclined in a direction away from the casting space 13 and connected to the ground to be paved. That is to say, the dividing strip fixing structure of the present embodiment achieves the purpose of fixing the dividing strip 1 on the ground to be laid by providing the first connecting member 2 and the second connecting member 3, so that the first connecting member 2 is respectively connected to the first dividing strip segment 11 of the dividing strip 1 and the ground to be paved, and the second connecting member 3 is connected to the ground to be paved, thereby avoiding the problem of using cement slurry to fix the dividing strip 1, which results in the need to wait for the cement slurry to solidify before the dividing strip 1 can be fixed, and thus the entire construction time is longer.
[0036] Reference Figure 1 and Figure 2As shown, in some embodiments, a first connecting hole is provided on the first connecting member 2, and a second connecting hole is provided on the first dividing strip segment 11 at a position corresponding to the first connecting hole, and the first connecting member 2 is connected to the first dividing strip segment 11 by a first fastener passed through the first connecting hole and the second connecting hole.
[0037] For example, the first connection hole and the second connection hole may both be threaded holes, and the first fastener may be a screw or a screw adapted to the threaded hole. Alternatively, the first connection hole and the second connection hole may both be plain holes, and the first fastener may be a fastening pin adapted to the plain hole.
[0038] Alternatively, in other implementations, the first connecting member 2 and the first dividing strip segment 11 may also be fixed by clamping or welding.
[0039] Reference Figure 1 and Figure 2 As shown, in some embodiments, a third connecting hole is provided on the first connecting member 2, and a fourth connecting hole is provided at a position on the ground to be paved corresponding to the third connecting hole, and the first connecting member 2 is fixed to the ground to be paved by a second fastener 5 passing through the third connecting hole and the fourth connecting hole.
[0040] For example, the third connection hole and the fourth connection hole may both be threaded holes, and the second fastener 5 may be a screw or a screw adapted to the threaded hole. Alternatively, the third connection hole and the fourth connection hole may both be smooth holes, and the second fastener 5 may be a fastening pin adapted to the smooth hole.
[0041] In some embodiments, there are at least two third connection holes, and the at least two third connection holes are arranged along the width direction of the second dividing strip segment 12 (refer to Figure 1 The fourth connecting holes are arranged at intervals (in the left and right directions as shown), and there are at least two fourth connecting holes, and the fourth connecting holes correspond to the third connecting holes one by one, so that the connection stability between the first connecting member 2 and the ground to be paved can be further improved by the cooperation of at least two third connecting holes and at least two fourth connecting holes.
[0042] In some embodiments, the first connecting member 2 is a first fixed steel plate, or in other implementations, it may also be a first fixed iron plate.
[0043] When the first connecting member 2 is set as the first fixed steel plate, the first fixed steel plate includes a first plate body 21, a second plate body 22 and a third plate body 23. The first plate body 21 is attached to the side of the first dividing strip segment 11 that is away from the casting space 13, and the first connecting hole is arranged on the first plate body 21; the third plate body 23 is attached to the ground to be paved, and the third connecting hole is arranged on the third plate body 23. The second plate body 22 is respectively connected to the end of the first plate body 21 away from the second dividing strip segment 12 and the end of the third plate body 23 close to the second dividing strip segment 12.
[0044] In specific implementation, the first plate 21 may be extended in the vertical direction and connected to the first dividing strip segment 11 by a first fastener, and the third plate 23 may be extended in the horizontal direction and connected to the ground to be laid by a second fastener 5. The left end of the second plate 22 is connected to the top of the first plate 21, and the right end of the second plate 22 is connected to the left end of the third plate 23. At this time, the second plate 22 is tilted downward to the right, so that the overall structural stability of the entire first connecting member 2 is stronger.
[0045] In some embodiments, the first plate body 21, the second plate body 22 and the third plate body 23 are integrally formed to save manufacturing steps and improve the structural strength of the entire first connecting steel plate.
[0046] Reference Figure 2 As shown, in some embodiments, the first connecting member 2 includes at least two, and the at least two first connecting members 2 are arranged along the length direction of the partition bar 1 (refer to Figure 2 The dividing strips 1 are arranged at intervals in the x direction (as shown), so that the dividing strips 1 can be firmly connected and fixed on the ground to be laid by at least two first connecting members 2, ensuring that the dividing strips 1 will not shift.
[0047] Reference Figure 1 and Figure 2 As shown, in some embodiments, a fifth connecting hole is provided on the second connecting member 3, and a sixth connecting hole is provided at a position on the ground to be paved corresponding to the fifth connecting hole. The second connecting member 3 is fixed to the ground to be paved by a third fastener 6 passing through the fifth connecting hole and the sixth connecting hole.
[0048] Exemplarily, the fifth connection hole and the sixth connection hole may both be threaded holes, and the third fastener 6 may be a screw or a screw adapted to the threaded hole. Alternatively, the fifth connection hole and the sixth connection hole may both be smooth holes, and the third fastener 6 may be a fastening pin adapted to the smooth hole.
[0049] In some embodiments, the second connecting member 3 is a second fixed steel plate, or the second connecting member 3 may also be a second fixed iron plate.
[0050] Reference Figure 1 As shown, in some embodiments, the angle between the second fixed steel plate and the second dividing strip segment 12 is an acute angle, so that the entire second fixed steel plate portion can be placed on the upper surface of the second dividing strip segment 12 and tilted toward the lower left as a whole to facilitate connection with the ground to be paved.
[0051] It should be noted that, in this article, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0052] The above description is only a specific implementation of the embodiment of the utility model, so that those skilled in the art can understand or implement the embodiment of the utility model. Various modifications to these embodiments will be obvious to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the embodiment of the utility model. Therefore, the embodiment of the utility model will not be limited to these embodiments described herein, but will conform to the widest range consistent with the principles and novel features of the embodiment of the utility model described herein.
Claims
1. A partition bar fixing structure, characterized in that: It comprises a partition bar (1), a first connecting member (2) and a second connecting member (3); The dividing strip (1) comprises a first dividing strip segment (11) and a second dividing strip segment (12) which are arranged perpendicular to each other, the second dividing strip segment (12) being used to fit on the ground to be laid, and the first dividing strip segment (11) and the second dividing strip segment (12) together enclose a casting space (13) for casting terrazzo concrete (4); The first connecting member (2) is connected to a side of the first dividing strip segment (11) facing away from the casting space (13), and the first connecting member (2) is connected to the ground to be paved; a portion of the second connecting member (3) is laid on a side of the second dividing strip segment (12) facing the casting space (13), and the second connecting member (3) is inclined in a direction away from the casting space (13) and connected to the ground to be paved.
2. The partition bar fixing structure according to claim 1, characterized in that: The first connecting member (2) is provided with a first connecting hole, and the first dividing strip segment (11) is provided with a second connecting hole at a position corresponding to the first connecting hole, and the first connecting member (2) is connected to the first dividing strip segment (11) via a first fastener penetrating through the first connecting hole and the second connecting hole.
3. The partition bar fixing structure according to claim 2, characterized in that: The first connecting member (2) is provided with a third connecting hole, and a fourth connecting hole is provided at a position on the ground to be paved corresponding to the third connecting hole. The first connecting member (2) is fixed to the ground to be paved by means of a second fastener (5) which is inserted through the third connecting hole and the fourth connecting hole.
4. The partition bar fixing structure according to claim 3, characterized in that: There are at least two third connection holes, and at least two of the third connection holes are arranged at intervals along the width direction of the second dividing strip segment (12). There are at least two fourth connection holes, and the fourth connection holes correspond to the third connection holes one by one.
5. The partition bar fixing structure according to claim 3, characterized in that: The first connecting member (2) is a first fixing steel plate; The first connecting member (2) comprises a first plate body (21), a second plate body (22) and a third plate body (23); the first plate body (21) is attached to a side of the first dividing strip segment (11) facing away from the casting space (13); the first connecting hole is arranged on the first plate body (21); the third plate body (23) is attached to the ground to be laid; the third connecting hole is arranged on the third plate body (23); the second plate body (22) is respectively connected to an end of the first plate body (21) away from the second dividing strip segment (12) and an end of the third plate body (23) close to the second dividing strip segment (12).
6. The partition bar fixing structure according to claim 5, characterized in that: The first plate body (21), the second plate body (22) and the third plate body (23) are integrally formed.
7. The partition bar fixing structure according to any one of claims 1 to 6, characterized in that: The first connecting members (2) include at least two, and the at least two first connecting members (2) are arranged at intervals along the length direction of the partition strip (1).
8. The partition bar fixing structure according to any one of claims 1 to 6, characterized in that: The second connecting member (3) is provided with a fifth connecting hole, and a sixth connecting hole is provided at a position on the ground to be paved corresponding to the fifth connecting hole. The second connecting member (3) is fixed to the ground to be paved by means of a third fastener (6) which is inserted through the fifth connecting hole and the sixth connecting hole.
9. The partition bar fixing structure according to claim 8, characterized in that: The second connecting member (3) is a second fixing steel plate.
10. The partition bar fixing structure according to claim 9, characterized in that: The angle between the second fixed steel plate and the second dividing strip segment (12) is an acute angle.