Multi-pipeline fixing structure on refueling ship
By designing a multi-pipe fixing structure including switching structures and fixing parts, the problem of the multi-pipe fixing structure on the gasoline tanker needs to be arranged and fixed according to different design and functional needs, and the flexible arrangement and efficient fixing of the pipeline are achieved.
Patent Information
- Application Number
- CN202421339458.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-12
- Publication Date
- 2025-03-18
- Estimated Expiration
- 2034-06-12
AI Technical Summary
The multi-pipe fixing structure on the gasoline tank needs to be arranged and fixed according to different design and functional needs, resulting in the need to prepare two different bracket styles, which is troublesome to operate.
A multi-pipe fixing structure including a switching structure and a fixing member is designed. The driving member in the switching structure drives the lifting block to rise or fall, and the cooperation between the hinge rod and the rotating plate is achieved to realize the horizontal or vertical arrangement of the pipeline, and the pipeline is fixed through multiple sets of fixing members.
The fixed structure of switching the pipeline layout method as needed is realized, which simplifies the operation process, reduces the hassle of preparing different bracket styles, and improves the fixing efficiency.
Smart Images

Figure CN222634002U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a fixing structure, in particular to a multi-pipeline fixing structure on a refueling ship. Background Art
[0002] The multiline on a bunker vessel generally refers to the piping system used to transport fuel during the bunkering process.
[0003] The pipelines are usually arranged according to the design and functional requirements of the refueling ship. They usually need to be arranged side by side horizontally or vertically. When arranging these pipelines, they need to be fixed by brackets.
[0004] Due to the different designs and functional requirements of refueling ships, different bracket styles are required when laying pipelines, which requires personnel to prepare two bracket styles, which is very troublesome. Utility Model Content
[0005] The main purpose of the utility model is to provide a multi-pipeline fixing structure on a refueling ship which can be switched according to needs.
[0006] In order to achieve the above-mentioned purpose, the utility model provides a multi-pipeline fixing structure on a refueling ship, including a switching structure and a fixing member;
[0007] The switching structure comprises a fixed block, a driving member, a lifting block and a switching member, the fixed block has an opening, the lifting block is movably arranged in the opening, the driving member is used to drive the lifting block to rise or fall, the switching member has two groups, the two groups of switching members are respectively arranged on both sides of the fixed block, the two groups of switching members each comprise a rotating plate and a hinge rod, the inner end of the rotating plate is rotatably connected to the upper end of the fixed block, the upper end of the hinge rod is hingedly connected to the lower end of the rotating plate, and the lower end of the hinge rod is hingedly connected to the lower side of the lifting block;
[0008] The fixing parts are arranged at the upper end of the rotating plate, and there are multiple groups of the fixing parts. Two groups of fixing parts are arranged on each rotating plate, and one group of the fixing parts is arranged at the upper end of the fixing block. The fixing parts are used to fix the pipeline.
[0009] The above-mentioned beneficial effect is that the lifting block is driven to rise by the driving member, and the lower end of the lifting block drives the lower end of the hinged rod to move up, and the upper end of the hinged rod drives the outer end of the rotating plate to move up, so that the rotating plate is in a horizontal position. At this time, multiple groups of fixing members respectively fix the pipelines to complete the horizontal parallel arrangement of the pipelines. The driving member drives the lifting block to descend, and the lifting block rotates from horizontal to vertical through the action of the hinged rod. When the rotating plate is in a vertical position, each rotating plate will have two groups of fixing members, and the pipelines are fixed by the two groups of fixing members respectively to complete the vertical side by side arrangement of the pipelines. In addition, when the rotating plate is in a vertical position, the fixing members at the upper end of the fixing block can also fix the pipelines and use them according to needs. The fixing members at the upper end of the fixing block are mainly used to cooperate with the horizontal side by side pipelines. In this way, the corresponding usage style can be switched according to the arrangement of the pipelines.
[0010] A preferred solution is that the driving member includes a screw, a turbine and a worm, the screw is arranged in an opening, the lower end of the screw is arranged in a notch at the lower end of the fixed block, the turbine is arranged at the lower end of the screw, the worm is meshed and connected with the turbine, the two ends of the worm are respectively connected to the two sides of the notch, and a turntable is arranged at one end of the worm.
[0011] A preferred solution is that the fixing member includes an upper arc plate, a lower arc plate, a screw rod, an upper nut and a lower nut, both sides of the upper arc plate and the lower arc plate are sleeved on the screw rod, the upper nut is arranged at the upper end of the screw rod, and the lower nut is arranged at the lower end of the screw rod.
[0012] A preferred solution is that a mounting plate is provided at the lower end of the fixing block, and a mounting hole is provided on the mounting plate.
[0013] A preferred solution is that arc-shaped sponge pads are provided at the inner ends of the upper arc-shaped plate and the lower arc-shaped plate. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] The utility model is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0015] Figure 1 This is a structural schematic diagram of a multi-pipeline fixing structure on a refueling ship of the utility model;
[0016] Figure 2 It is a structural schematic diagram of a plane view of a multi-pipeline fixed structure on a refueling ship of the utility model;
[0017] Figure 3 It is a structural schematic diagram of a side sectional view of a multi-pipeline fixing structure on a refueling ship of the utility model;
[0018] Figure 4 yes Figure 2 Schematic diagram of the enlarged structure of area A in the middle. DETAILED DESCRIPTION
[0019] The following is a clear and complete description of the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings in the embodiments of the present invention. In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention can also be implemented in other ways different from those described herein, and those skilled in the art can make similar generalizations without violating the connotation of the present invention, so the present invention is not limited by the specific embodiments disclosed below.
[0020] like Figures 1 to 4 As shown, the utility model provides a multi-pipeline fixing structure on a refueling ship, including a switching structure 10 and a fixing member 20;
[0021] The switching structure 10 includes a fixed block 11, a driving member 110, a lifting block 12 and a switching member 30. The fixed block 11 has an opening 13. The lifting block 12 is movably arranged in the opening 13. The driving member 110 is used to drive the lifting block 12 to rise or fall. The switching member 30 has two groups. The two groups of switching members 30 are respectively arranged on both sides of the fixed block 11. The two groups of switching members 30 include a rotating plate 31 and a hinge rod 32. The inner end of the rotating plate 31 is rotatably connected to the upper end of the fixed block 11. The upper end of the hinge rod 32 is hingedly connected to the lower end of the rotating plate 31. The lower end of the hinge rod 32 is hingedly connected to the lower side of the lifting block 12.
[0022] The fixing member 20 is arranged at the upper end of the rotating plate 31. There are multiple groups of the fixing members 20. Two groups of fixing members 20 are arranged on each rotating plate 31, and one group of the fixing members 20 is arranged at the upper end of the fixing block 11. The fixing members 20 are used to fix the pipeline.
[0023] During the operation, the driving member 110 drives the lifting block 12 to rise, the lower end of the lifting block 12 drives the lower end of the hinge rod 32 to move upward, and the upper end of the hinge rod 32 drives the outer end of the rotating plate 31 to move upward, so that the rotating plate 31 is in a horizontal position. At this time, multiple sets of fixing members 20 fix the pipelines respectively, and the pipelines are arranged side by side horizontally. The driving member 110 drives the lifting block 12 to descend, and the lifting block 12 is acted on by the hinge rod 32, so that the rotating plate 31 rotates from horizontal to vertical. When the rotating plate When 31 is in a vertical position, each rotating plate 31 will have two sets of fixing parts 20, and the pipelines are fixed by the two sets of fixing parts 20 respectively, so as to complete the vertical side-by-side arrangement of the pipelines. In addition, when the rotating plate 31 is in a vertical position, the fixing parts 20 on the upper end of the fixing block 11 can also fix the pipelines, which can be used as needed. The fixing parts 20 on the upper end of the fixing block 11 are mainly used for cooperating with the horizontal side-by-side pipelines. In this way, the corresponding usage style can be switched according to the arrangement of the pipelines.
[0024] Preferably, the driving member 110 includes a screw rod 111, a turbine 112 and a worm 113, the screw rod 111 is arranged in the opening 13, the lower end of the screw rod 111 is arranged in the notch 19 at the lower end of the fixed block 11, the turbine 112 is arranged at the lower end of the screw rod 112, the worm 113 is meshed and connected with the turbine 112, the two ends of the worm 113 are respectively connected to the two sides of the notch 19, and a turntable 114 is provided at one end of the worm 113.
[0025] A person rotates the turntable 114, the worm 113 rotates, driving the turbine 112 to rotate, and the turbine 112 drives the screw rod 111 to rotate, so that the lifting block 12 can be raised or lowered.
[0026] Preferably, the fixing member 20 includes an upper arc plate 21, a lower arc plate 22, a screw rod 23, an upper nut 24 and a lower nut 25, both sides of the upper arc plate 21 and the lower arc plate 22 are sleeved on the screw rod 23, the upper nut 24 is arranged at the upper end of the screw rod 23, and the lower nut 25 is arranged at the lower end of the screw rod 23.
[0027] When the pipeline is fixed, the pipeline passes through between the two arc plates, and then the lower nut 25 locks the lower arc plate 22, and then the upper nut 24 is tightened to fix the pipeline between the two arc plates.
[0028] Preferably, a mounting plate 102 is provided at the lower end of the fixing block 11 , and a mounting hole 103 is provided on the mounting plate 102 .
[0029] The arrangement of the mounting holes 103 on the mounting plate 102 facilitates the installation of the structure on a refueling ship.
[0030] Preferably, the inner ends of the upper arc plate 21 and the lower arc plate 22 are both provided with arc-shaped sponge pads.
[0031] Since it is used on ships, in order to avoid damage to the pipeline surface when the pipeline vibrates slightly between the two curved plates, the pipeline is protected by the setting of curved sponge pads, which can also achieve the purpose of shock absorption.
[0032] Obviously, the described embodiments are only some embodiments of the utility model, not all embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
Claims
1. A multi-pipeline fixing structure on a refueling ship, characterized in that: include; A switching structure, the switching structure comprises a fixed block, a driving member, a lifting block and a switching member, the fixed block has an opening, the lifting block is movably arranged in the opening, the driving member is used to drive the lifting block to rise or fall, the switching member has two groups, the two groups of switching members are respectively arranged on both sides of the fixed block, the two groups of switching members each comprise a rotating plate and a hinge rod, the inner end of the rotating plate is rotatably connected to the upper end of the fixed block, the upper end of the hinge rod is hingedly connected to the lower end of the rotating plate, and the lower end of the hinge rod is hingedly connected to the lower side of the lifting block; The fixing part is arranged at the upper end of the rotating plate. The fixing part has multiple groups. Two groups of fixing parts are arranged on each rotating plate, and one group of fixing parts is arranged at the upper end of the fixing block. The fixing part is used to fix the pipeline.
2. The multi-pipeline fixing structure on a refueling ship according to claim 1, characterized in that: The driving member includes a screw, a turbine and a worm. The screw is arranged in an opening. The lower end of the screw is arranged in a notch at the lower end of a fixed block. The turbine is arranged at the lower end of the screw. The worm is meshed and connected with the turbine. The two ends of the worm are respectively connected to the two sides of the notch. A turntable is arranged at one end of the worm.
3. The multi-pipeline fixing structure on a refueling ship according to claim 1, characterized in that: The fixing member includes an upper arc plate, a lower arc plate, a screw rod, an upper nut and a lower nut. Both sides of the upper arc plate and the lower arc plate are sleeved on the screw rod. The upper nut is arranged at the upper end of the screw rod, and the lower nut is arranged at the lower end of the screw rod.
4. The multi-pipeline fixing structure on a refueling ship according to claim 1, characterized in that: A mounting plate is disposed at the lower end of the fixing block, and a mounting hole is disposed on the mounting plate.
5. The multi-pipeline fixing structure on a refueling ship according to claim 3, characterized in that: The inner ends of the upper arc plate and the lower arc plate are both provided with arc-shaped sponge pads.