High-load-bearing suspended ceiling system

By designing a high-load-bearing ceiling system, the main keel, secondary keel and connecting mechanism are used to form a high-load-bearing frame, the problem of insufficient load-bearing capacity of the existing ceiling system is solved, and effective lifting and fixing of heavy cable trays is achieved, and the advantages of high load-bearing and detachable are achieved.

CN222667285UActive Publication Date: 2025-03-25FOSHAN PEARL BUILDING MATERIALS IND
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421416935.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-19
Publication Date
2025-03-25
Estimated Expiration
2034-06-19

AI Technical Summary

Technical Problem

The existing ceiling suspended ceiling system has limited load-bearing capacity and cannot effectively lift and fix cable trays with large weights.

Method used

A high-load-bearing ceiling suspended ceiling system is designed, including a frame body, a storage mechanism and a lifting mechanism. The frame body consists of a main keel, a secondary keel and a connecting mechanism. Through these connecting mechanisms, a high-load-bearing frame body can be formed, which can lift and fix the cable tray.

Benefits of technology

It achieves high load-bearing performance and can effectively carry cable trays equipped with cables and other pipelines. It has a structure that is removable, easy to disassemble and assemble, and has strong applicability, especially suitable for computer data centers and other places.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222667285U_ABST
    Figure CN222667285U_ABST
Patent Text Reader

Abstract

The utility model discloses a high-load-bearing suspended ceiling system, which belongs to the technical field of suspended ceilings and comprises a frame main body, a storage mechanism and a hoisting mechanism, the storage mechanism is mounted on the frame main body, and the frame main body is hoisted on a ceiling through the hoisting mechanism; the frame main body comprises a main keel, an auxiliary keel and a first connecting mechanism, and the main keel and the auxiliary keel are perpendicular and are connected through the first connecting mechanism; the lower end of the hoisting mechanism is connected with the first connecting mechanism, and the upper end is connected with the ceiling; and the storage mechanism is mounted on the main keel. According to the suspended ceiling system, the main keels and the auxiliary keels are connected through the first connecting mechanisms, the main body frame with the high bearing performance is obtained, then the main body frame can be connected with the hoisting mechanism and the storage mechanism at the same time, articles such as cables can be placed in the storage mechanism, and the suspended ceiling structure and the cable bridge structure are combined through the suspended ceiling system. The cable tray has the advantages of being high in bearing performance, capable of effectively bearing the cable tray, good in stability and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of ceilings, in particular to a high-load-bearing ceiling system. Background Art

[0002] At present, cable trays are mainly used to lay computer cables, communication cables, thermocouple cables and other control cables of highly sensitive systems. Cable trays are generally divided into: trough-type trays, tray-type trays, ladder-type trays and grid-type trays. During the installation and use of the tray, the tray needs to be fixed and supported.

[0003] As shown in the Chinese utility model patent with announcement number CN212518249U, it provides a fixing device for a cable grid bridge, which relates to the technical field of cable bridge fixing devices and solves the problem of cumbersome process of fixing cable bridges. It includes a crossbeam and a fixing rod vertically arranged at both ends of the crossbeam, one end of the fixing rod is fixedly connected to the crossbeam, and the other end is fixedly connected to the ceiling, the crossbeam is vertically arranged with the long rod, the crossbeam is a hollow structure, and a side wall of the crossbeam close to the ceiling is provided with a plurality of notches for the long rods on the grid bridge, the notches are connected to the inner cavity of the crossbeam, and the notches are arranged through the width direction of the crossbeam, the width of the notches is greater than the diameter of the long rod, a cross plate is movably installed inside the crossbeam, and a plurality of fasteners for buckling the long rods are fixedly arranged on the cross plate corresponding to the notches, and a driving member for driving the fasteners to buckle the long rods after the cross plate moves is also installed in the crossbeam. The present application can facilitate the fixing of the grid bridge and improve work efficiency.

[0004] As shown in the above patent, the cable tray in the prior art is generally fixed directly on the ceiling. The reason is that the existing ceiling system has limited load-bearing capacity and cannot hoist heavy facilities such as cable trays. Therefore, it is necessary to propose a high-load-bearing ceiling system that can install cable trays. Utility Model Content

[0005] The purpose of the utility model is to provide a high load-bearing ceiling system, which can at least solve one of the above problems.

[0006] According to one aspect of the utility model, a high-load-bearing ceiling system is provided, including a frame body, a storage mechanism and a hanging mechanism, wherein the storage mechanism is installed on the frame body, and the frame body is hung on the ceiling by the hanging mechanism;

[0007] The frame body includes a main keel, a secondary keel and a first connecting mechanism, wherein the main keel is perpendicular to the secondary keel and connected via the first connecting mechanism;

[0008] The lower end of the hanging mechanism is connected to the first connecting mechanism, and the upper end is connected to the ceiling;

[0009] The storage mechanism is installed on the main keel.

[0010] Therefore, the utility model provides a ceiling system with a brand-new structure. The main keel and the secondary keel of the system are connected by a first connecting mechanism to obtain a main frame with high load-bearing performance. Then the lifting mechanism and the storage mechanism can be connected at the same time. Cables and other items can be placed in the storage mechanism. The ceiling system of the utility model combines the ceiling structure and the cable tray structure, and has many advantages such as high load-bearing performance, ability to effectively carry the cable tray, and good stability.

[0011] In some embodiments, the upper and lower ends of the main keel are respectively provided with a first threaded connection groove and a second threaded connection groove, the upper and lower ends of the auxiliary keel are respectively provided with a third threaded connection groove and a fourth threaded connection groove, the first connection mechanism cooperates with the first threaded connection groove and the third threaded connection groove, and the storage mechanism is detachably connected to the second threaded connection groove. Thus, the special structure of the main keel and the auxiliary keel can realize the detachable installation of the components connected thereto, which is convenient for disassembly and assembly, and the installation position can be arbitrarily selected, and has strong applicability.

[0012] In some embodiments, the first connection mechanism includes a first connection member and a first fastener, the first connection member is installed on the upper end surface of the main keel and the secondary keel through the first fastener, and the lower end of the first fastener is threadedly connected to the first threaded connection groove or the third threaded connection groove. Therefore, the first connection mechanism is detachable and easy to disassemble and assemble.

[0013] In some embodiments, the first connecting member is provided with a first connecting hole matched with the hanging mechanism, thereby facilitating connection with the hanging mechanism.

[0014] In some embodiments, the frame body also includes a frame, a second connecting mechanism and a third connecting mechanism. The frame is perpendicular to the main keel or the secondary keel and is connected through the second connecting mechanism. The frame includes a longitudinal frame and a transverse frame. The longitudinal frame and the transverse frame are connected through the third connecting mechanism.

[0015] In some embodiments, a fifth threaded connection groove is provided at the upper end of the frame, the second connection mechanism includes a second connection piece and a second fastener, the second connection piece is installed on the frame and the upper end surface of the main keel or the frame and the upper end surface of the secondary keel through the second fastener, and the lower end of the second fastener is threadedly connected to the fifth threaded connection groove. In this way, the frame can be detachable and easy to disassemble and assemble.

[0016] In some embodiments, the third connecting mechanism includes a third connecting member and a third fastener, the third connecting member is installed on the upper end surfaces of the longitudinal frame and the transverse frame through the third fastener, and the lower end of the third fastener is threadedly connected to the fifth threaded connection groove.

[0017] In some embodiments, the storage mechanism includes a cable tray and a connection assembly, the connection assembly is connected to the main keel, and the cable tray is installed on the connection assembly;

[0018] There are multiple connecting components, and the multiple connecting components are sequentially spaced along the length extension direction of the main keel;

[0019] The connecting assembly includes a bearing member, a connecting rod, a locking member and a gasket. The bearing member extends along the length direction of the secondary keel and is respectively connected to the connecting rod at both ends. The upper end of the connecting rod is threadedly connected to the first threaded connecting groove. The locking member is sleeved on the connecting rod and threadably matched with the connecting rod. The gasket is sleeved on the connecting rod and is located between the locking member and the main keel.

[0020] In some embodiments, the high load-bearing ceiling system also includes a ceiling material, which is installed in the space formed between the main keel and the secondary keel or the space formed between the main keel, the secondary keel and the frame, and the bottom of the main keel is formed with a first folded edge that matches the ceiling material, the bottom of the secondary keel is formed with a second folded edge that matches the ceiling material, and the bottom of the frame is formed with a third folded edge that matches the ceiling material.

[0021] In some embodiments, the frame body further includes a fourth connecting mechanism, there are multiple main keels, and two adjacent main keels are connected by the fourth connecting mechanism;

[0022] The fourth connecting mechanism includes a fourth connecting member, a fifth connecting member, a fourth fastener and a fifth fastener. The fourth connecting member is installed on the upper end surfaces of two adjacent main keels through the fourth fastener. The fifth connecting member is installed on the lower end surfaces of two adjacent main keels through the fifth fastener. The lower end of the fourth fastener is threadedly connected to the first threaded connecting groove, and the upper end of the fifth fastener is threadedly connected to the second threaded connecting groove.

[0023] Beneficial effects of the utility model:

[0024] The utility model provides a ceiling system with a brand-new structure, in which the main keel and the auxiliary keel are connected by a first connecting mechanism to obtain a main frame with high load-bearing performance, and then a lifting mechanism and a storage mechanism can be connected at the same time, and items such as cables can be placed in the storage mechanism.

[0025] The main keel, the secondary keel and the frame are connected by a first connecting mechanism, a second connecting mechanism, a third connecting mechanism and a fourth connecting mechanism to form a frame body with high load-bearing performance, which can effectively carry the cable tray equipped with cables and other pipelines.

[0026] The upper ends of the main keel, the secondary keel and the frame are provided with threaded connection grooves, so that the first connection mechanism, the second connection mechanism, the third connection mechanism and the fourth connection mechanism can be disassembled, thereby realizing the detachability of the frame body, which is convenient for disassembly and assembly, and is easy to combine according to actual needs, with strong flexibility.

[0027] The ceiling system of the utility model combines the ceiling structure with the cable bridge structure, and has many advantages such as convenient disassembly and assembly, strong applicability, high flexibility, high load-bearing performance, good stability, etc. The ceiling system of the utility model is particularly suitable for places such as computer data centers. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a schematic diagram of the three-dimensional structure of a high load-bearing ceiling system according to one embodiment of the utility model.

[0029] Figure 2 for Figure 1 An enlarged structural diagram of point A of the high load-bearing ceiling system is shown.

[0030] Figure 3 for Figure 1 An enlarged structural diagram of point B of the high load-bearing ceiling system is shown.

[0031] Figure 4 for Figure 1 An enlarged structural diagram of location C of the high load-bearing ceiling system is shown.

[0032] Figure 5 for Figure 1 An enlarged structural diagram of point D of the high load-bearing ceiling system is shown.

[0033] Figure 6 for Figure 1 The three-dimensional structural diagram of a high load-bearing ceiling system in one direction after omitting part of the structure is shown.

[0034] Figure 7 for Figure 1 The cross-sectional structure diagram of the main keel of the high load-bearing ceiling system is shown.

[0035] Figure 8 for Figure 1 A schematic diagram of the cross-sectional structure of the frame of the high load-bearing ceiling system is shown.

[0036] Fig. 9 for Figure 1 The three-dimensional structural diagram of the connection components and the main keel connection of the high load-bearing ceiling system is shown.

[0037] Figures 1 to 9Reference numerals in the figure: 1-frame body; 2-placement mechanism; 3-lifting mechanism; 11-main keel; 12-secondary keel; 13-frame; 14-first connecting mechanism; 15-second connecting mechanism; 16-third connecting mechanism; 17-fourth connecting mechanism; 18-fifth connecting mechanism; 21-cable tray; 22-connection assembly; 111-first threaded connection groove; 112-second threaded connection groove; 113-first folding edge; 121-third threaded connection groove; 122-fourth threaded connection groove; 123-second folding edge; 131-longitudinal frame; 132-transverse frame; 133-fifth threaded connection groove; 134-third folded edge; 141-first connecting member; 142-first fastener; 151-second connecting member; 152-second fastener; 161-third connecting member; 162-third fastener; 171-fourth connecting member; 172-fourth fastener; 173-fifth connecting member; 174-fifth fastener; 221-bearing member; 222-connecting rod; 223-locking member; 224-gasket; 141a-first connecting hole. DETAILED DESCRIPTION

[0038] The utility model is further described in detail below in conjunction with the accompanying drawings.

[0039] Figures 1 to 9 A high load-bearing ceiling system according to an embodiment of the utility model is schematically shown.

[0040] like Figures 1 to 9 As shown, the high load-bearing ceiling system includes a frame body 1, a placement mechanism 2 and a hanging mechanism 3, the placement mechanism 2 is installed on the frame body 1, and the frame body 1 is hung on the ceiling through the hanging mechanism 3;

[0041] The frame body 1 includes a main keel 11, a secondary keel 12 and a first connecting mechanism 14. The main keel 11 is perpendicular to the secondary keel 12 and is connected by the first connecting mechanism 14.

[0042] The lower end of the hanging mechanism 3 is connected to the first connecting mechanism 14, and the upper end is connected to the ceiling;

[0043] The storage mechanism 2 is installed on the main keel 11 .

[0044] Preferably, the upper and lower ends of the main keel 11 are respectively provided with a first threaded connection groove 111 and a second threaded connection groove 112, the upper and lower ends of the auxiliary keel 12 are respectively provided with a third threaded connection groove 121 and a fourth threaded connection groove 122, the first connection mechanism 14 cooperates with the first threaded connection groove 111 and the third threaded connection groove 121, and the storage mechanism 2 is detachably connected to the second threaded connection groove 112. Therefore, the special structure of the main keel 11 and the auxiliary keel 12 can realize the detachable installation of the components connected thereto, which is convenient for disassembly and assembly, and the installation position can be arbitrarily selected, and has strong applicability.

[0045] Preferably, the first connection mechanism 14 includes a first connection member 141 and a first fastener 142. The first connection member 141 is installed on the upper end surface of the main keel 11 and the secondary keel 12 through the first fastener 142. The lower end of the first fastener 142 is threadedly connected to the first threaded connection groove 111 or the third threaded connection groove 121. Therefore, the first connection mechanism 14 is detachable and easy to disassemble and assemble.

[0046] Preferably, the first connecting member 141 is provided with a first connecting hole 141 a matched with the hanging mechanism 3 , thereby facilitating the connection with the hanging mechanism 3 .

[0047] Preferably, the hanging mechanism 3 may be a turnbuckle bolt.

[0048] Preferably, the frame body 1 also includes a frame 13, a second connecting mechanism 15 and a third connecting mechanism 16. The frame 13 is perpendicular to the main keel 11 or the secondary keel 12 and is connected through the second connecting mechanism 15. The frame 13 includes a longitudinal frame 131 and a transverse frame 132. The longitudinal frame 131 and the transverse frame 132 are connected through the third connecting mechanism 16.

[0049] Preferably, a fifth threaded connection groove 133 is provided at the upper end of the frame 13, and the second connection mechanism 15 includes a second connection member 151 and a second fastener 152. The second connection member 151 is installed on the upper end surface of the frame 13 and the main keel 11 or the upper end surface of the frame 13 and the secondary keel 12 through the second fastener 152, and the lower end of the second fastener 152 is threadedly connected to the fifth threaded connection groove 133. In this way, the frame 13 can be detachable, which is convenient for disassembly and assembly.

[0050] Preferably, the third connecting mechanism 16 includes a third connecting member 161 and a third fastener 162. The third connecting member 161 is installed on the upper end surfaces of the longitudinal frame 131 and the transverse frame 132 through the third fastener 162. The lower end of the third fastener 162 is threadedly connected to the fifth threaded connecting groove 133.

[0051] Preferably, the storage mechanism 2 includes a cable tray 21 and a connecting component 22, the connecting component 22 is connected to the main keel 11, and the cable tray 21 is installed on the connecting component 22;

[0052] There are multiple connecting components 22, and the multiple connecting components 22 are sequentially spaced along the length extension direction of the main keel 11;

[0053] The connecting assembly 22 includes a bearing member 221, a connecting rod 222, a locking member 223 and a gasket 224. The bearing member 221 extends along the length direction of the secondary keel 12 and is respectively connected to the connecting rod 222 at both ends. The upper end of the connecting rod 222 is threadedly connected to the first threaded connecting groove 111. The locking member 223 is sleeved on the connecting rod 222 and threadedly matched with the connecting rod 222. The gasket 224 is sleeved on the connecting rod 222 and is located between the locking member 223 and the main keel 11.

[0054] Preferably, the high load-bearing ceiling system also includes a ceiling material, which is installed in the space formed between the main keel 11 and the secondary keel 12 or the space formed between the main keel 11, the secondary keel 12 and the frame 13. The bottom of the main keel 11 is formed with a first folded edge 113 that matches the ceiling material, the bottom of the secondary keel 12 is formed with a second folded edge 123 that matches the ceiling material, and the bottom of the frame 13 is formed with a third folded edge 134 that matches the ceiling material.

[0055] Preferably, the frame body 1 further includes a fourth connection mechanism 17, there are multiple main keels 11, and two adjacent main keels 11 are connected by the fourth connection mechanism 17;

[0056] The fourth connecting mechanism 17 includes a fourth connecting member 171, a fifth connecting member 173, a fourth fastener 172 and a fifth fastener 174. The fourth connecting member 171 is installed on the upper end surfaces of two adjacent main keels 11 through the fourth fastener 172, and the fifth connecting member 173 is installed on the lower end surfaces of two adjacent main keels 11 through the fifth fastener 174. The lower end of the fourth fastener 172 is threadedly connected to the first threaded connecting groove 111, and the upper end of the fifth fastener 174 is threadedly connected to the second threaded connecting groove 112.

[0057] Preferably, the upper end of the second connecting member 151 can be provided with a second connecting hole that cooperates with the lifting mechanism 3, the upper end of the third connecting member 161 can be provided with a third connecting hole that cooperates with the lifting mechanism 3, and the upper end of the fourth connecting member 171 can be provided with a fourth connecting hole that cooperates with the lifting mechanism 3. The lifting mechanism 3 is preferably connected to the first connecting member 141 arranged on the main keel 11, and can also be selectively connected to the second connecting member 151, the third connecting member 161, and the fourth connecting member 171.

[0058] Preferably, the ceiling system of this embodiment may also include a lighting fixture that is detachably installed under the main keel 11 or the secondary keel 12. A threaded connector that threadably cooperates with the second threaded connection groove 112 may be provided on the top of the lighting fixture to achieve a detachable connection. The driving power supply and the like may also be detachably installed in the first threaded connection groove 111 to achieve a hidden installation.

[0059] The load-bearing performance of the ceiling system of the present invention can be tested by a deformation test method. After testing, the deformation of the ceiling system of the present invention when bearing heavy objects is extremely small, which meets the use requirements of high load-bearing occasions.

[0060] The utility model provides a ceiling system with a brand-new structure, in which a main keel 11 and a secondary keel 12 are connected by a first connecting mechanism 14 to obtain a main frame with high load-bearing performance, and then a lifting mechanism 3 and a storage mechanism 2 can be connected at the same time, and items such as cables can be placed in the storage mechanism 2.

[0061] The main keel 11, the secondary keel 12 and the frame 13 are connected by a first connecting mechanism 14, a second connecting mechanism 15, a third connecting mechanism 16 and a fourth connecting mechanism 17 to form a frame body 1 with high load-bearing performance, which can effectively carry the cable tray 21 equipped with cables and other pipelines.

[0062] The upper ends of the main keel 11, the secondary keel 12 and the frame 13 are provided with threaded connection grooves, so that the first connection mechanism 14, the second connection mechanism 15, the third connection mechanism 16 and the fourth connection mechanism 17 are detachable, thereby realizing the detachability of the frame body 1, which is convenient for disassembly and assembly, and is easy to combine according to actual needs, with strong flexibility.

[0063] The ceiling system of the utility model combines the ceiling structure with the cable bridge 21 structure, and has many advantages such as convenient disassembly and assembly, strong applicability, high flexibility, high load-bearing performance, good stability, etc.

[0064] The above are only some embodiments of the present invention. For those skilled in the art, several modifications and improvements can be made without departing from the inventive concept of the present invention, which all belong to the protection scope of the present invention.

Claims

1. A high load-bearing ceiling system, characterized in that: It comprises a frame body (1), a storage mechanism (2) and a hanging mechanism (3), wherein the storage mechanism (2) is installed on the frame body (1), and the frame body (1) is hung on the ceiling via the hanging mechanism (3); The frame body (1) comprises a main keel (11), a secondary keel (12) and a first connecting mechanism (14); the main keel (11) is perpendicular to the secondary keel (12) and is connected via the first connecting mechanism (14); The lower end of the hanging mechanism (3) is connected to the first connecting mechanism (14), and the upper end is connected to the ceiling; The storage mechanism (2) is installed on the main keel (11).

2. The high load-bearing ceiling system according to claim 1, characterized in that: The upper and lower ends of the main keel (11) are respectively provided with a first threaded connection groove (111) and a second threaded connection groove (112); the upper and lower ends of the secondary keel (12) are respectively provided with a third threaded connection groove (121) and a fourth threaded connection groove (122); the first connection mechanism (14) cooperates with the first threaded connection groove (111) and the third threaded connection groove (121); and the storage mechanism (2) is detachably connected to the second threaded connection groove (112).

3. The high load-bearing ceiling system according to claim 2, characterized in that: The first connecting mechanism (14) comprises a first connecting member (141) and a first fastening member (142); the first connecting member (141) is mounted on the upper end surfaces of the main keel (11) and the secondary keel (12) via the first fastening member (142); and the lower end of the first fastening member (142) is threadedly connected to the first threaded connection groove (111) or the third threaded connection groove (121).

4. The high load-bearing ceiling system according to claim 3, characterized in that: The first connecting member (141) is provided with a first connecting hole (141a) that matches the lifting mechanism (3).

5. The high load-bearing ceiling system according to claim 1, characterized in that: The frame body (1) further comprises a frame (13), a second connecting mechanism (15) and a third connecting mechanism (16); the frame (13) is perpendicular to the main keel (11) or the secondary keel (12) and is connected via the second connecting mechanism (15); the frame (13) comprises a longitudinal frame (131) and a transverse frame (132); the longitudinal frame (131) and the transverse frame (132) are connected via the third connecting mechanism (16).

6. The high load-bearing ceiling system according to claim 5, characterized in that: A fifth threaded connection groove (133) is provided at the upper end of the frame (13); the second connection mechanism (15) comprises a second connection piece (151) and a second fastener (152); the second connection piece (151) is installed on the upper end surface of the frame (13) and the main keel (11) or the upper end surface of the frame (13) and the secondary keel (12) through the second fastener (152); the lower end of the second fastener (152) is threadedly connected to the fifth threaded connection groove (133).

7. The high load-bearing ceiling system according to claim 6, characterized in that: The third connection mechanism (16) comprises a third connection member (161) and a third fastener (162); the third connection member (161) is mounted on the upper end surfaces of the longitudinal frame (131) and the transverse frame (132) via the third fastener (162); and the lower end of the third fastener (162) is threadedly connected to the fifth threaded connection groove (133).

8. The high load-bearing ceiling system according to any one of claims 2 to 4, characterized in that: The storage mechanism (2) comprises a cable tray (21) and a connecting component (22), wherein the connecting component (22) is connected to the main keel (11), and the cable tray (21) is installed on the connecting component (22); There are a plurality of connection components (22), and the plurality of connection components (22) are sequentially spaced apart along the length extension direction of the main keel (11); The connecting assembly (22) comprises a bearing member (221), a connecting rod (222), a locking member (223) and a gasket (224); the bearing member (221) extends along the length direction of the secondary keel (12) and is respectively connected to the connecting rod (222) at both ends; the upper end of the connecting rod (222) is threadedly connected to the first threaded connecting groove (111); the locking member (223) is sleeved on the connecting rod (222) and threadedly matched with the connecting rod (222); the gasket (224) is sleeved on the connecting rod (222) and is located between the locking member (223) and the main keel (11).

9. The high load-bearing ceiling system according to any one of claims 5 to 7, characterized in that: The invention also comprises a ceiling material, wherein the ceiling material is installed in the space formed between the main keel (11) and the auxiliary keel (12) or in the space formed between the main keel (11), the auxiliary keel (12) and the frame (13); the bottom of the main keel (11) is formed with a first folded edge (113) matching with the ceiling material; the bottom of the auxiliary keel (12) is formed with a second folded edge (123) matching with the ceiling material; the bottom of the frame (13) is formed with a third folded edge (134) matching with the ceiling material.

10. The high load-bearing ceiling system according to any one of claims 2 to 4, characterized in that: The frame body (1) further comprises a fourth connection mechanism (17); there are a plurality of main keels (11), and two adjacent main keels (11) are connected via the fourth connection mechanism (17); The fourth connecting mechanism (17) comprises a fourth connecting member (171), a fifth connecting member (173), a fourth fastener (172) and a fifth fastener (174); the fourth connecting member (171) is installed on the upper end surfaces of two adjacent main keels (11) through the fourth fastener (172); the fifth connecting member (173) is installed on the lower end surfaces of two adjacent main keels (11) through the fifth fastener (174); the lower end of the fourth fastener (172) is threadedly connected to the first threaded connection groove (111); and the upper end of the fifth fastener (174) is threadedly connected to the second threaded connection groove (112).

Citation Information

Patent Citations

  • Fixing device for cable grid bridge