Scaffold protection device for high-altitude construction
By setting fixing rods and ferrules on the outer wall of the connecting frame of the high-altitude construction scaffolding, and setting support and clamping devices on the bottom and top, the problem of the lack of material fixing devices in the existing technology of high-altitude construction scaffolding is solved, the stability of installation and material barrel fixing is improved, and better safety guarantees are provided.
Patent Information
- Application Number
- CN202420741844.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-11
- Publication Date
- 2025-03-25
- Estimated Expiration
- 2034-04-11
AI Technical Summary
The existing high-altitude construction scaffolding lacks material fixing devices, which causes the material barrels used by construction workers to fall easily, pose safety hazards and cannot meet the needs of use.
A high-altitude construction scaffolding protection device is designed. By setting a fixed rod and a ferrule on the outer wall of the connecting frame, and the ferrule and a scaffold are installed in the scaffolding when the scaffolding is built, two ferrulees are set to improve installation stability. At the same time, a support device is provided at the bottom of the connecting frame and a clamping device is provided at the top to support and clamp the barrel to improve its fixing stability.
By improving the installation stability of scaffolding and the fixing stability of the material barrel, more comprehensive and effective safety guarantees are provided, safety risks during construction are reduced, and life safety of construction personnel is guaranteed.
Smart Images

Figure CN222667559U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of building construction, and more specifically, to a protective device for a high-altitude construction scaffold. Background Art
[0002] With the rapid development of urban construction, the number of high-rise building construction projects is increasing, and the safety issues of high-altitude construction are becoming more and more prominent. In traditional high-altitude construction, scaffolding, as an important working platform, carries construction workers and building materials, and its safety is of vital importance. However, the existing scaffolding still has some shortcomings in terms of safety protection, especially in preventing construction workers and materials from falling. The scaffolding lacks material fixing devices, and the material barrels used by the staff are prone to falling, which poses certain safety hazards and cannot meet the use requirements. Utility Model Content
[0003] 1. Technical issues to be solved
[0004] In view of the problem that the existing scaffolding in the prior art lacks material fixing devices, the material barrels used by the staff are prone to falling, there are certain safety hazards, and cannot meet the use requirements, the purpose of the utility model is to provide a high-altitude construction scaffolding protection device, which can realize the setting of fixing rods and rings on the outer wall of the connecting frame. When the scaffolding is built, the rings are installed by socketing with the scaffolding, and two rings are set to improve the overall installation stability. A supporting device is set at the bottom of the connecting frame to facilitate the support and placement of the material barrel, thereby improving the placement stability of the material barrel. A clamping device is set to facilitate further clamping and fixing of the placed material barrel, thereby improving the fixing stability of the material barrel, providing more comprehensive and effective safety protection for high-altitude construction, reducing safety risks in the construction process, and ensuring the life safety of construction personnel.
[0005] 2. Technical solution
[0006] To solve the above problems, the utility model adopts the following technical solutions.
[0007] A protective device for a high-altitude construction scaffold comprises a connecting frame, an outer wall of the connecting frame is fixedly connected to a fixing rod, an end of the fixing rod is fixedly connected to a ferrule, the number of the ferrules is two, the bottom end of the connecting frame is fixedly connected to a supporting device, the top end of the connecting frame is fixedly connected to a clamping device, the supporting device supports a barrel, and the clamping device clamps and fixes the barrel.
[0008] Preferably, the ferrule is sleeved and installed with a scaffolding steel pipe, and a rubber pad is provided on the inner wall of the ferrule.
[0009] Preferably, the supporting device comprises a supporting frame and a filter screen, the supporting frame is fixedly connected to the end of the connecting frame, and the filter screen is arranged at the bottom of the inner wall of the supporting frame.
[0010] Preferably, the clamping device includes a fixed block, a guide rod, a mounting plate, a mounting block, a clamping frame, a threaded rod, a rotating disk, a movable frame, a support frame and a connecting block, the fixed block is fixedly connected to the end portion of the connecting frame, the two sides of the fixed block are fixedly connected to the guide rod, the end of the guide rod is fixedly connected to the mounting plate, the surface of the mounting plate is fixedly connected to the mounting block, the mounting block is rotatably connected to the clamping frame, the gap between the fixed block and the mounting plate is rotatably connected to the threaded rod, the surface of the threaded rod is fixedly connected to the rotating disk, the threaded rod is threadedly connected to the movable frame, the movable frame is slidably connected to the guide rod, both ends of the movable frame are rotatably connected to the support frame, the end of the support frame away from the movable frame is rotatably connected to the connecting block, and the connecting block is fixedly connected to the outer wall of the clamping frame.
[0011] Preferably, the arc inner wall of the clamping frame is provided with wear-resistant particles.
[0012] Preferably, the connecting frame and the supporting device are both made of stainless steel.
[0013] 3. Beneficial effects
[0014] Compared with the prior art, the advantages of the present invention are:
[0015] A fixing rod and a ring are arranged on the outer wall of the connecting frame. When the scaffold is erected, the ring is installed by socketing with the scaffold. Two rings are arranged to improve the overall installation stability. A supporting device is arranged at the bottom of the connecting frame to facilitate the support and placement of the barrel, thereby improving the placement stability of the barrel.
[0016] By setting up a clamping device, it is convenient to further clamp and fix the placed material barrel, thereby improving the fixing stability of the material barrel, providing more comprehensive and effective safety protection for high-altitude construction, reducing safety risks during the construction process, and ensuring the life safety of construction workers. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the overall external structure of the utility model;
[0018] Figure 2 It is a schematic diagram of the overall internal structure of the utility model;
[0019] Figure 3 This is a schematic diagram of the structure of the clamping device of the utility model;
[0020] Figure 4 This is a schematic diagram of the structure of the support device of the utility model.
[0021] Description of the numbers in the figure:
[0022] 1. Connecting frame; 2. Fixing rod; 3. Ring; 4. Support device; 41. Support frame; 42. Filter screen; 5. Clamping device; 51. Fixing block; 52. Guide rod; 53. Mounting plate; 54. Mounting block; 55. Clamping frame; 56. Threaded rod; 57. Rotating disk; 58. Moving frame; 59. Support frame; 510. Connecting block. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of them. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0024] Embodiment 1:
[0025] See also Figure 1-4 The utility model provides a technical solution: a protective device for a scaffold for high-altitude construction, comprising a connecting frame 1, a fixing rod 2 is fixedly connected to the outer wall of the connecting frame 1, a ferrule 3 is fixedly connected to the end of the fixing rod 2, and the number of ferrules 3 is two, a supporting device 4 is fixedly connected to the bottom end of the connecting frame 1, and a clamping device 5 is fixedly connected to the top end of the connecting frame 1, the supporting device 4 supports the barrel, and the clamping device 5 clamps and fixes the barrel. The outer wall of the connecting frame 1 is provided with a fixing rod 2 and a ferrule 3, when the scaffold is erected, the ferrule 3 is sleeved and installed with the scaffold, and two ferrules 3 are provided to improve the overall installation stability, the supporting device 4 is provided at the bottom of the connecting frame 1, which is convenient for supporting and placing the barrel, and improving the stability of the barrel placement, and the clamping device 5 is provided, which is convenient for further clamping and fixing the placed barrel, and improving the stability of the barrel fixation, providing more comprehensive and effective safety protection for high-altitude construction, reducing safety risks during construction, and ensuring the life safety of construction personnel.
[0026] Among them, the ferrule 3 is sleeved and installed with the scaffold steel pipe, and a rubber pad is arranged on the inner wall of the ferrule 3. When the scaffold is built, the ferrule 3 is sleeved and installed with the scaffold to form a material placement place, which is convenient for the staff to place the materials.
[0027] The support device 4 includes a support frame 41 and a filter screen 42. The support frame 41 is fixedly connected to the end of the connecting frame 1, and a filter screen 42 is provided at the bottom of the inner wall of the support frame 41. The support device 4 is provided, the support frame 41 is convenient for supporting and placing the material barrel, and the filter screen 42 is provided to facilitate interception and filtration of debris.
[0028] Among them, the clamping device 5 includes a fixed block 51, a guide rod 52, a mounting plate 53, a mounting block 54, a clamping frame 55, a threaded rod 56, a rotating disk 57, a moving frame 58, a support frame 59 and a connecting block 510. The fixed block 51 is fixedly connected to the end of the connecting frame 1, the two sides of the fixed block 51 are fixedly connected with the guide rod 52, the end of the guide rod 52 is fixedly connected with the mounting plate 53, the surface of the mounting plate 53 is fixedly connected with the mounting block 54, the mounting block 54 is rotatably connected with the clamping frame 55, the gap between the fixed block 51 and the mounting plate 53 is rotatably connected with the threaded rod 56, the surface of the threaded rod 56 is fixedly connected with the rotating disk 57, the threaded rod 56 is threadedly connected with the moving frame 58, the moving frame 58 is slidably connected with the guide rod 52, the two ends of the moving frame 58 are rotatably connected with the support frame 59, the end of the support frame 59 away from the moving frame 58 is rotatably connected with the connecting block 510, and the connecting block 510 is fixedly connected to the outer wall of the clamping frame 55. A clamping device 5 is provided to further clamp and fix the placed material barrel. The rotating disk 57 is rotated to drive the threaded rod 56 to rotate, drive the moving frame 58 to move, drive the supporting frame 59 to move, support the connecting block 510, and drive the clamping frame 55 to move, thereby clamping and fixing the material barrel and improving the overall placement stability.
[0029] The arc inner wall of the clamping frame 55 is provided with wear-resistant particles, which increase friction and improve the overall placement stability.
[0030] The connecting frame 1 and the supporting device 4 are both made of stainless steel to improve the overall strength.
[0031] The above is only a preferred specific implementation method of the utility model, but the protection scope of the utility model is not limited to it. Any technician familiar with the technical field within the technical scope disclosed by the utility model and any equivalent replacement or change based on the technical solution and improved concept of the utility model shall be included in the protection scope of the utility model.
Claims
1. A protective device for a high-altitude construction scaffold, comprising a connecting frame (1), characterized in that: The outer wall of the connecting frame (1) is fixedly connected to a fixing rod (2), the end of the fixing rod (2) is fixedly connected to a ferrule (3), the number of the ferrules (3) is two, the bottom end of the connecting frame (1) is fixedly connected to a supporting device (4), the top end of the connecting frame (1) is fixedly connected to a clamping device (5), the supporting device (4) supports the barrel, and the clamping device (5) clamps and fixes the barrel.
2. A high-altitude construction scaffolding protection device according to claim 1, characterized in that: The ferrule (3) is sleeved and installed with a scaffolding steel pipe, and a rubber pad is provided on the inner wall of the ferrule (3).
3. A high-altitude construction scaffolding protection device according to claim 1, characterized in that: The support device (4) comprises a support frame (41) and a filter screen (42); the support frame (41) is fixedly connected to the end of the connecting frame (1); and the filter screen (42) is provided at the bottom of the inner wall of the support frame (41).
4. A high-altitude construction scaffolding protection device according to claim 1, characterized in that: The clamping device (5) comprises a fixed block (51), a guide rod (52), a mounting plate (53), a mounting block (54), a clamping frame (55), a threaded rod (56), a rotating disk (57), a moving frame (58), a supporting frame (59) and a connecting block (510), wherein the fixed block (51) is fixedly connected to an end of the connecting frame (1), the guide rod (52) is fixedly connected to both sides of the fixed block (51), the end of the guide rod (52) is fixedly connected to the mounting plate (53), the surface of the mounting plate (53) is fixedly connected to the mounting block (54), and the mounting block (54) A clamping frame (55) is rotatably connected, a threaded rod (56) is rotatably connected between the fixed block (51) and the mounting plate (53), a rotating disk (57) is fixedly connected to the surface of the threaded rod (56), a moving frame (58) is threadedly connected to the threaded rod (56), the moving frame (58) is slidably connected to the guide rod (52), both ends of the moving frame (58) are rotatably connected to support frames (59), one end of the support frame (59) away from the moving frame (58) is rotatably connected to a connecting block (510), and the connecting block (510) is fixedly connected to the outer wall of the clamping frame (55).
5. A high-altitude construction scaffolding protection device according to claim 4, characterized in that: The arc inner wall of the clamping frame (55) is provided with wear-resistant particles.
6. A high-altitude construction scaffolding protection device according to claim 1, characterized in that: The connecting frame (1) and the supporting device (4) are both made of stainless steel.