Brine preparation tank for producing guar gum

By designing a guar brine preparation tank containing a preparation tank body, preparation assembly and delivery assembly, the use of weight sensors and electric valves to achieve quantitative delivery and real-time monitoring, the problem that existing devices cannot control the amount of guar gum is solved, and the quality and practicality of the product are significantly improved.

CN222677771UActive Publication Date: 2025-03-28NANTONG XINYUAN BIOTECHNOLOGY CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421185258.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-28
Publication Date
2025-03-28
Estimated Expiration
2034-05-28

AI Technical Summary

Technical Problem

The existing brine preparation device cannot conveniently control the amount of guar gum, resulting in a difference in the solubility of the mixture from the pre-conceived solution, affecting the quality of guar gum brine.

Method used

A guar brine preparation tank including preparation tank body, preparation assembly and delivery assembly was designed. Through the cooperation of weight sensors and electric valves, quantitative delivery and real-time monitoring are achieved to ensure the accurate delivery of salt and guar gum.

Benefits of technology

The solubility error of the guar brine mixed solution is effectively controlled, the quality of the final product is ensured, and the practicality of the guar brine preparation tank is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222677771U_ABST
    Figure CN222677771U_ABST
Patent Text Reader

Abstract

The utility model relates to a salt water preparation tank for producing guar gum, which belongs to the technical field of guar gum production and comprises a preparation tank body, a preparation component for stirring mixed solution is mounted on the outer side of the preparation tank body, and a feeding component for quantitative feeding is mounted at the top of the preparation tank body. The feeding assembly comprises eight supporting rods fixed to the top of the preparation tank body, supporting plates are fixedly connected between the top ends of the four corresponding supporting rods, and weight sensors which are evenly distributed are fixedly installed at the tops of the supporting plates; and a feeding box is fixedly connected between the tops of the multiple weight sensors located on the top of the same supporting plate, a feeding pipe is fixedly connected to the bottom of the feeding box, and a second electric valve is fixedly installed on the outer side of the feeding pipe. According to the preparation tank for producing guar gum salt water, the quantitative feeding effect can be achieved, and the solubility error of a prepared guar gum salt water mixed solution is effectively controlled.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of guar gum production, in particular to a brine preparation tank for producing guar gum. Background Art

[0002] Guar gum is a water-soluble high molecular polymer. It is a highly purified natural polysaccharide extracted from guar beans. It is a natural thickener and is widely used in food, petroleum, medicine and other fields. With the improvement of science and technology, guar gum used as a food additive is no longer limited to thickening effects. People have found that adding appropriate salt water during the production process can greatly improve the taste and mouthfeel of guar gum as a food additive, and can also increase the viscosity of guar gum, so that less guar gum can be used to achieve the desired effect.

[0003] According to the brine preparation device disclosed in Chinese Patent Publication No. CN218485725U, the patent introduces gas into the tank to make the salt float, which accelerates the dissolution rate of the salt, so that the preparation process can be carried out efficiently. However, the patent still has certain shortcomings in actual use. When preparing the brine, it is necessary to match the amount of guar gum added. In the process of preparing the brine using the patent, it is not convenient to quantitatively add the salt content and the amount of guar gum added, resulting in a certain difference between the actual mixed product and the pre-conceived solution solubility, which will affect the actual quality of the final guar gum brine. In this regard, the present application provides a guar gum brine preparation tank for producing guar gum to solve the above problems. Utility Model Content

[0004] 1. Technical issues to be resolved

[0005] In view of the shortcomings of the prior art, the utility model provides a guar gum brine preparation tank, which has the advantages of being able to achieve quantitative dosage, so that the solubility error of the prepared guar gum brine mixed solution is effectively controlled, and solves the problem that the existing brine preparation device cannot conveniently control the dosage of guar gum.

[0006] (II) Technical solution

[0007] In order to achieve the above-mentioned effect of being able to achieve quantitative delivery and effectively control the solubility error of the prepared guar gum brine mixed solution, the utility model provides the following technical solutions: a guar gum brine preparation tank, comprising a preparation tank body, a preparation component for stirring the mixed solution is installed on the outside of the preparation tank body, and a delivery component for quantitative delivery is installed on the top of the preparation tank body;

[0008] The delivery assembly includes eight support rods fixed to the top of the preparation tank body, a support plate is fixedly connected between the tops of the corresponding four support rods, a uniformly distributed weight sensor is fixedly installed on the top of the support plate, a delivery box is fixedly connected between the tops of several weight sensors located on the top of the same support plate, a delivery tube is fixedly connected to the bottom of the delivery box, and a second electric valve is fixedly installed on the outside of the delivery tube;

[0009] The preparation component includes a driving mechanism fixedly installed on the top of the preparation tank body, the inner top wall of the preparation tank body is rotatably connected to a mixing rod through a bearing, a plurality of stirring members are fixedly installed on the outside of the mixing rod, a water inlet pipe is penetrated and fixedly connected on the right side of the preparation tank body, a flow meter is fixedly installed on the outside of the water inlet pipe, a solubility tester is penetrated and fixedly installed on the right side of the preparation tank body, an air pump is fixedly installed on the top of the preparation tank body, an air supply pipe is fixedly installed on the output end of the air pump, a discharge pipe is fixedly connected to the bottom of the preparation tank body, and a first electric valve is fixedly installed on the outside of the discharge pipe.

[0010] Furthermore, the output shaft of the driving mechanism passes through the top of the preparation tank and is fixedly connected to the top of the mixing rod. The stirring element includes a plurality of connecting rods fixed to the outside of the mixing rod. The end of the connecting rod away from the mixing rod is fixedly connected to two diverging rods.

[0011] Furthermore, the bottom end of the gas delivery pipe passes through the top of the preparation tank body and extends to the interior of the preparation tank body, and evenly distributed exhaust holes are opened on the outside of the gas delivery pipe.

[0012] Furthermore, a feed pipe is fixed on the top of the delivery box, and a movable hole is opened on the top of the support plate for the corresponding delivery pipe to pass through and move.

[0013] Furthermore, the top of the preparation tank body is provided with two through holes for two delivery pipes to pass through and move respectively, and the second electric valve is located at the bottom end of the corresponding delivery pipe.

[0014] Furthermore, the delivery tube is conical, and the diameter of the bottom end of the delivery tube is smaller than the diameter of the top end.

[0015] (III) Beneficial effects

[0016] Compared with the prior art, the utility model provides a guar gum brine preparation tank, which has the following beneficial effects:

[0017] The guar gum brine preparation tank can achieve the effect of quantitative delivery through the coordinated use of the preparation tank body, the preparation components and the delivery components, so that the solubility error of the prepared guar gum brine mixed solution can be effectively controlled, and the salt and guar gum can be monitored in real time during the delivery process, so that the error of the delivery amount can be reduced as much as possible, so that the guar gum brine solution finally prepared can meet the pre-requirements, thereby effectively improving the practicality of the guar gum brine preparation tank. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the structure of the utility model;

[0019] Figure 2 It is a partial enlarged schematic diagram of the A part in the structure of the utility model;

[0020] Figure 3 It is a three-dimensional schematic diagram of the connection structure of the delivery pipe in the structure of the utility model.

[0021] In the figure: 1 preparation tank, 200 preparation component, 201 driving mechanism, 202 mixing rod, 203 stirring element, 204 water inlet pipe, 205 flow meter, 206 solubility tester, 207 air pump, 208 air pipe, 209 discharge pipe, 210 first electric valve, 300 delivery component, 301 support rod, 302 support plate, 303 weight sensor, 304 delivery box, 305 delivery pipe, 306 second electric valve. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] See also Figure 1-3The utility model provides a technical solution: a preparation tank for producing guar gum brine, comprising a preparation tank body 1, a preparation component 200 for stirring a mixed solution is installed on the outer side of the preparation tank body 1, and a delivery component 300 for quantitative delivery is installed on the top of the preparation tank body 1; through the coordinated use of the preparation tank body 1, the preparation component 200 and the delivery component 300, the effect of quantitative delivery can be achieved, so that the solubility error of the prepared guar gum brine mixed solution can be effectively controlled, and the salt and guar gum can be monitored in real time during the delivery process, so that the error of the delivery amount can be reduced as much as possible, so that the finally prepared guar gum brine solution can meet the pre-requirements, thereby effectively improving the practicality of the guar gum brine preparation tank.

[0024] In this embodiment, the delivery component 300 is a structure for quantitatively delivering materials.

[0025] like Figure 1 , Figure 2 and Figure 3 As shown, the delivery assembly 300 includes eight support rods 301 fixed to the top of the preparation tank body 1, and support plates 302 are fixedly connected between the tops of the corresponding four support rods 301, and evenly distributed weight sensors 303 are fixedly installed on the top of the support plates 302. A delivery box 304 is fixedly connected between the tops of several weight sensors 303 located on the top of the same support plate 302, and a delivery tube 305 is fixedly connected to the bottom of the delivery box 304, and a second electric valve 306 is fixedly installed on the outer side of the delivery tube 305.

[0026] It should be noted that a feed pipe is fixed on the top of the delivery box 304, so that materials can be placed inside the delivery box 304. A movable hole is provided on the top of the support plate 302 for the corresponding delivery pipe 305 to pass through and move. Two through holes are provided on the top of the preparation tank body 1 for the two delivery pipes 305 to pass through and move respectively. The bottom end of the delivery pipe 305 extends to the interior of the preparation tank body 1. The second electric valve 306 is located at the bottom end of the corresponding delivery pipe 305, so that when the weight of the delivery box 304 changes, the delivery pipe 305 will not come into contact with other structures, so that the weight of the delivery box 304 can be monitored by the weight sensor 303.

[0027] In addition, the delivery tube 305 is conical, and the diameter of the bottom end of the delivery tube 305 is smaller than the diameter of the top end, so that the material inside can be smoothly transported under the restriction of the cone when flowing downward, thereby improving the actual accuracy of the delivery amount.

[0028] In this embodiment, the preparation component 200 is a structure for stirring the mixed solution to achieve a preparation effect.

[0029] like Figure 1As shown, the preparation component 200 includes a driving mechanism 201 fixedly mounted on the top of the preparation tank body 1, the inner top wall of the preparation tank body 1 is rotatably connected to a mixing rod 202 through a bearing, a plurality of stirring members 203 are fixedly mounted on the outer side of the mixing rod 202, a water inlet pipe 204 is penetrated and fixedly connected to the right side of the preparation tank body 1, a flow meter 205 is fixedly mounted on the outer side of the water inlet pipe 204, a solubility tester 206 is penetrated and fixedly mounted on the right side of the preparation tank body 1, an air pump 207 is fixedly mounted on the top of the preparation tank body 1, an air supply pipe 208 is fixedly mounted on the output end of the air pump 207, a discharge pipe 209 is fixedly connected to the bottom of the preparation tank body 1, and a first electric valve 210 is fixedly mounted on the outer side of the discharge pipe 209.

[0030] It should be noted that the output shaft of the driving mechanism 201 passes through the top of the preparation tank body 1 and is fixedly connected to the top of the mixing rod 202, so that the driving mechanism 201 can drive the mixing rod 202 to rotate. The driving mechanism 201 can be a servo motor, and the stirring element 203 includes a plurality of connecting rods fixed to the outside of the mixing rod 202. The end of the connecting rod away from the mixing rod 202 is fixedly connected to two diverging rods, so that the connecting rod can cooperate with the corresponding two diverging rods to play a good contact stirring role on the mixed solution.

[0031] In addition, the bottom end of the air pipe 208 passes through the top of the preparation tank body 1 and extends to the interior of the preparation tank body 1. The outer side of the air pipe 208 is provided with evenly distributed exhaust holes, so that the airflow output by the air pump 207 can be input into the interior of the preparation tank body 1 through the air pipe 208 and the exhaust holes. A filtering mechanism for dust blocking and filtering is fixedly installed at the input end of the air pump 207. The filtering mechanism can be a dust blocking mesh plate, a dust filter box, or other structures that can be used to filter dust. The solubility tester 206 can be a monitoring sensor for the pH value of the test solution.

[0032] The working principle of the above embodiment is:

[0033] When preparing guar gum brine, salt and guar gum materials are placed in two delivery boxes 304 respectively. The total weight of the two delivery boxes 304 can be monitored in real time under the action of the weight sensor 303. The preparation water is transported to the inside of the preparation tank 1 through the water inlet pipe 204. The value of the water inflow can be monitored under the action of the flow meter 205. After the required water inflow is reached, the water inflow is closed and the second electric valve 306 is started, so that the salt and guar gum materials in the delivery box 304 can be transported to the inside of the preparation tank 1 through the corresponding delivery pipe 204. 305 is transported to the interior of the preparation tank 1, the driving mechanism 201 is started, and the mixing rod 202 is driven to rotate, so that the stirring element 203 can stir the mixed solution, and the air pump 207 is started to input gas into the mixed solution through the air pipe 208, so as to speed up the stirring and mixing efficiency. At the same time, the weight of the two delivery boxes 304 can be monitored under the action of the weight sensor 303. When the delivery amount reaches the preset value, the second electric valve 306 can be closed in time, so as to reduce the solubility error of the guar gum brine solution as much as possible.

[0034] Compared with the prior art, the guar gum brine preparation tank can achieve the effect of quantitative delivery through the coordinated use of the preparation tank body 1, the preparation component 200 and the delivery component 300, so that the solubility error of the prepared guar gum brine mixed solution can be effectively controlled, and the salt and guar gum can be monitored in real time during the delivery process, so that the error of the delivery amount can be reduced as much as possible, so that the guar gum brine solution finally prepared can meet the pre-requirements, thereby effectively improving the practicality of the guar gum brine preparation tank and solving the problem that the existing brine preparation device cannot conveniently control the delivery amount of guar gum.

[0035] The electrical components appearing in the article are all electrically connected to the main controller and the power supply. The provision of power supply is common knowledge in the field. The main controller can be a conventional known device for control such as a computer, which can be realized through simple programming by technicians in the field. They are all existing public power connection technologies and will not be described in detail in the article.

[0036] It should be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or device including the element.

[0037] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that many changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention.

Claims

1. A guar gum brine preparation tank, comprising a preparation tank body (1), characterized in that: A preparation component (200) for stirring the mixed solution is installed on the outside of the preparation tank (1), and a delivery component (300) for quantitative delivery is installed on the top of the preparation tank (1); The delivery assembly (300) comprises eight support rods (301) fixed to the top of the preparation tank (1), a support plate (302) is fixedly connected between the tops of the four corresponding support rods (301), a uniformly distributed weight sensor (303) is fixedly installed on the top of the support plate (302), a delivery box (304) is fixedly connected between the tops of a plurality of weight sensors (303) located on the top of the same support plate (302), a delivery tube (305) is fixedly connected to the bottom of the delivery box (304), and a second electric valve (306) is fixedly installed on the outer side of the delivery tube (305); The preparation assembly (200) comprises a driving mechanism (201) fixedly mounted on the top of a preparation tank body (1); a mixing rod (202) is rotatably connected to the inner top wall of the preparation tank body (1) via a bearing; a plurality of stirring members (203) are fixedly mounted on the outer side of the mixing rod (202); a water inlet pipe (204) is passed through and fixedly connected to the right side of the preparation tank body (1); a flow meter (205) is fixedly mounted on the outer side of the water inlet pipe (204); a solubility tester (206) is passed through and fixedly mounted on the right side of the preparation tank body (1); an air pump (207) is fixedly mounted on the top of the preparation tank body (1); an air delivery pipe (208) is fixedly mounted on the output end of the air pump (207); a discharge pipe (209) is fixedly connected to the bottom of the preparation tank body (1); a first electric valve (210) is fixedly mounted on the outer side of the discharge pipe (209).

2. The guar gum brine preparation tank according to claim 1, characterized in that: The output shaft of the driving mechanism (201) passes through the top of the preparation tank (1) and is fixedly connected to the top of the mixing rod (202); the stirring element (203) comprises a plurality of connecting rods fixed to the outside of the mixing rod (202); one end of the connecting rod away from the mixing rod (202) is fixedly connected to two diverging rods.

3. The guar gum brine preparation tank according to claim 1, characterized in that: The bottom end of the gas delivery pipe (208) passes through the top of the preparation tank (1) and extends to the interior of the preparation tank (1), and the outer side of the gas delivery pipe (208) is provided with evenly distributed exhaust holes.

4. The guar gum brine preparation tank according to claim 1, characterized in that: A feeding pipe is fixed on the top of the delivery box (304), and a movable hole for the corresponding delivery pipe (305) to penetrate and move is opened on the top of the support plate (302).

5. The guar gum brine preparation tank according to claim 1, characterized in that: The top of the preparation tank (1) is provided with two through holes for two delivery pipes (305) to pass through and move respectively, and the second electric valve (306) is located at the bottom end of the corresponding delivery pipe (305).

6. The brine preparation tank for producing guar gum according to claim 1, characterized in that: The delivery tube (305) is conical, and the diameter of the bottom end of the delivery tube (305) is smaller than the diameter of the top end.

Citation Information

Patent Citations

  • Saline water preparation device

    CN218485725U