Trestle steel pipe pile transporting trolley and transporting device

By designing a transportation trolley that adapts to the outer curve surface of steel pipe piles, the problem of transportation difficulties of long steel pipe piles is solved, efficient front-field construction is achieved, construction period is saved, and it is characterized by low cost and high safety.

CN222698388UActive Publication Date: 2025-04-01ZHEJIANG COMM CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421190281.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-28
Publication Date
2025-04-01
Estimated Expiration
2034-05-28

AI Technical Summary

Technical Problem

In the existing trest construction methods, the steel pipe pile design length is relatively long, resulting in slow construction speed of direct welding in the front field, affecting construction efficiency.

Method used

A trestle steel pipe pile transportation trolley is designed, including the frame body and tires. The frame body is a rectangular frame, and the upper end surface of the front and rear frames is equipped with a concave arc surface to adapt to the outer arc surface of the steel pipe piles and realize the stable transportation of steel pipe piles.

Benefits of technology

It can effectively transport steel pipe piles with a length of more than 50 meters, improve the construction speed of the front field, save construction period, and has simple production process, low cost and high safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222698388U_ABST
    Figure CN222698388U_ABST
Patent Text Reader

Abstract

The utility model relates to a trestle steel pipe pile transport trolley and transport device.The trestle steel pipe pile transport trolley comprises a trolley frame body and tires arranged on the two sides of the bottom of the trolley frame body, the trolley frame body is a rectangular frame and comprises a front frame body, a rear frame body, a left frame body and a right frame body, the upper end face of the front frame body and the upper end face of the rear frame body are provided with concave arc faces matched with the outer arc faces of the steel pipe piles. The steel pipe pile transport vehicle has the advantages that the steel pipe pile with the length larger than 50 meters can be transported, the front field construction speed can be increased, the construction period can be shortened, the steel pipe pile transport vehicle is simple and convenient in manufacturing process, low in production cost, high in strength, convenient to transport and the like, meanwhile, the concave arc face is attached to the arc face of the steel pipe pile, the left side and the right side are high, and the middle is concave to form limiting. The steel pipe pile cannot roll to the left and right sides, and the safety is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of trestle construction, in particular to a trolley and a transport device for trestle steel pipe piles. Background Art

[0002] With the rapid development of my country's economy, transportation modes such as railways and urban rail transit have developed rapidly. Currently, most bridges across rivers, seas and lakes are built with steel trestles as construction and transportation channels. However, the design length of trestles' steel pipe piles is generally long, some exceeding 50 meters. The existing construction method usually directly welds steel pipes in the front field, but this method has a slow construction speed and delays the construction time in the front field. Therefore, processing steel pipes in the back field and then transporting them to the front field for direct connection can improve construction efficiency, but if the steel pipe piles processed in the back field are transported to the front field for construction, it is a major technical problem in trestles construction. Summary of the invention

[0003] In order to solve the above problems, the purpose of the utility model is to provide a steel pipe pile that can be transported with a length of more than 50 meters, which is convenient for workers to transport the steel pipe piles processed in the back field to the front field for direct insertion. A single steel pipe pile can save at least 5 hours of welding time for steel pipe piles in the front field, greatly improving the construction speed of the front field, saving construction period, and the manufacturing process is simple and convenient, and the manufacturing cost is low.

[0004] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a trolley for transporting steel pipe piles for a pier, comprising a frame body and tires arranged on both sides of the bottom of the frame body, the frame body being a rectangular frame, comprising a front frame body, a rear frame body, a left frame body and a right frame body, wherein the upper end surfaces of the front frame body and the rear frame body are provided with concave arc surfaces that are adapted to the outer arc surfaces of the steel pipe piles.

[0005] The utility model can achieve the following beneficial effects: it can transport steel pipe piles with a length of more than 50 meters, improve the speed of front-site construction, save construction period, and has a simple and convenient manufacturing process, low production cost, high strength, and convenient transportation. At the same time, the concave arc surface fits the arc surface of the steel pipe pile, the left and right sides are high, and the middle is concave to form a limit, so that the steel pipe pile will not roll to the left or right, and the safety is high.

[0006] Preferably, the front frame, the rear frame, the left frame and the right frame are respectively formed by welding two channel steels up and down, and the end faces of the upper channel steels of the front frame and the rear frame are cut into concave arc surfaces that adapt to the outer arc surface of the steel pipe pile.

[0007] The two channel steels are welded up and down, the frame has high strength, the process is simple and convenient, and the manufacturing cost is low; the end faces of the upper channel steels of the front frame and the rear frame are cut into concave arc surfaces that adapt to the outer arc surfaces of the steel pipe piles to achieve left and right limiting of the steel pipe piles without sliding, and the manufacturing process is simple and the cost is low.

[0008] Preferably, the end faces of the upper channel steels of the front frame and the rear frame are respectively cut with two left and right concave arc surfaces that are adapted to the outer arc surfaces of the steel pipe piles.

[0009] The two arc surfaces can realize the simultaneous transportation of two steel pipe piles, thus increasing the transportation efficiency.

[0010] Preferably, bearings are installed at the lower channel steels of the left frame and the right frame, and the tires are installed at the bearings.

[0011] Convenient transportation, simple installation and low production cost.

[0012] Preferably, a longitudinal beam parallel to the left and right frames is provided between the left frame and the right frame, and a transverse beam parallel to the front and rear frames is provided between the front frame and the rear frame.

[0013] The frame has high strength, simple manufacturing process and low production cost.

[0014] Specifically, a handle that can be pulled or connected to a forklift is provided at the front frame or the rear frame away from the frame.

[0015] The handle can be directly dragged after transportation or connected to a forklift to drag and transfer to another location.

[0016] The utility model also provides a trestle steel pipe pile transportation device, comprising the trestle steel pipe pile transportation trolley and a forklift, wherein a connecting piece is arranged at the front end of the steel pipe pile, and the connecting piece is directly or indirectly connected to the forklift.

[0017] The forklift is connected to the connecting piece, pulling the front end of the steel pipe pile forward, and the rear end of the steel pipe pile is placed in the arc surface of the trestle steel pipe pile transport trolley. Due to its heavy weight, the steel pipe pile generates friction with the trestle steel pipe pile transport trolley, and moves forward together with the trolley.

[0018] Preferably, a stop device is provided at the rear end of the steel pipe pile, and when the steel pipe pile is in the transportation state, the stop device abuts against the rear end surface of the rear frame.

[0019] The stopping device can better enable the steel pipe piles to drag the trestle steel pipe pile transport trolley forward.

[0020] Preferably, the connecting piece is a lifting lug, the front end of the steel pipe pile is welded to the lifting lug, and the lifting lug is connected to the forklift by a steel wire rope.

[0021] The wire rope has high strength and is easy to connect.

[0022] Preferably, the stop device is a steel plate welded to the rear end of the steel pipe pile.

[0023] Steel plates are easy to weld, low in cost, and convenient to obtain. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 This is a structural schematic diagram of a trolley for transporting steel pipe piles for a trestle bridge according to the utility model;

[0025] Figure 2 This is a schematic diagram of the structure of a top view of a trolley for transporting steel pipe piles for a trestle bridge according to the utility model;

[0026] Figure 3 This is a structural schematic diagram of a left view (top view direction) of a trolley for transporting steel pipe piles for a trestle according to the utility model;

[0027] Figure 4 This is a structural schematic diagram of a front view (top view direction) of a trolley for transporting steel pipe piles for a trestle bridge according to the utility model;

[0028] Figure 5 The utility model is a structural schematic diagram of a trestle steel pipe pile transportation device.

[0029] Explanation of the numbers in the above drawings: 1. Pier steel pipe pile transport trolley, 3. Tire, 4. Front frame, 5. Rear frame, 6. Left frame, 7. Right frame, 8. Arc surface, 9. Channel steel, 10. Longitudinal beam, 11. Cross beam, 12. Forklift, 13. Lifting lug, 14. Stop device, 15. Wire rope, 16. Handle, 17. Steel pipe pile, 18. Bearing. DETAILED DESCRIPTION

[0030] In the description of the present utility model, it is necessary to understand that the terms "longitudinal", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, features defined as "first" and "second" may explicitly or implicitly include one or more of such features. In the description of the present utility model, unless otherwise specified, "multiple" means two or more.

[0031] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0032] Example

[0033] The following is combined with Figure 1-5 , the preferred embodiments of the utility model are further described in detail.

[0034] like Figure 1-4 A trolley 1 for transporting steel pipe piles for a pier is shown, comprising a frame body and tires 3 arranged on both sides of the bottom of the frame body. The frame body is a rectangular frame, comprising a front frame body 4, a rear frame body 5, a left frame body 6, and a right frame body 7, wherein the upper end surfaces of the front frame body 4 and the rear frame body 5 are provided with a concave arc surface 8 that adapts to the outer arc surface of the steel pipe pile.

[0035] The front frame 4, the rear frame 5, the left frame 6, and the right frame 7 are directional indicators relative to the forward direction in the use state. Figure 3 Left side view shown, Figure 4 The main view shown is relative Figure 2 As indicated by the direction in the top view, the trolley 1 for transporting the steel pipe piles 17 of the trestle bridge can transport the steel pipe piles 17 with a length exceeding 50 meters, thereby increasing the speed of the front-end construction and saving the construction period. The manufacturing process is simple and convenient, the production cost is low, and the trolley 1 has the effects of high strength and convenient transportation. At the same time, the concave arc surface 8 fits the arc surface of the steel pipe pile 17, with the left and right sides being high and the middle being concave, forming a limit, so that the steel pipe pile 17 will not roll to the left or right, and has a high degree of safety.

[0036] Specifically, the front frame 4, the rear frame 5, the left frame 6, and the right frame 7 are respectively formed by welding two channel steels 9 up and down. The end faces of the upper channel steels 9 of the front frame 4 and the rear frame 5 are cut into concave arc surfaces 8 that are adapted to the outer arc surfaces of the steel pipe piles 17.

[0037] The two channel steels 9 are welded up and down, the frame has high strength, the process is simple and convenient, and the manufacturing cost is low; the end faces of the upper channel steels 9 of the front frame 4 and the rear frame 5 are cut into concave arc surfaces 8 that adapt to the outer arc surfaces of the steel pipe piles 17 to achieve left and right positioning of the steel pipe piles 17 without sliding, and the manufacturing process is simple and the cost is low.

[0038] Specifically, the end faces of the upper channel steel 9 of the front frame 4 and the rear frame 5 are respectively cut with two left and right concave arc surfaces 8 that are adapted to the outer arc surfaces of the steel pipe piles 17 .

[0039] The two arc surfaces 8 can realize the simultaneous transportation of two steel pipe piles 17, thereby increasing the transportation efficiency.

[0040] Specifically, the bearing 18 is installed at the lower channel steel 9 of the left frame 6 and the right frame 7 , and the tire 3 is installed at the bearing 18 .

[0041] Convenient transportation, simple installation and low production cost.

[0042] Specifically, a longitudinal beam 10 parallel to the left and right frames 7 is provided between the left frame 6 and the right frame 7 , and a transverse beam 11 parallel to the front and rear frames 5 is provided between the front frame 4 and the rear frame 5 .

[0043] The frame has high strength, simple manufacturing process and low production cost.

[0044] Specifically, a handle 16 that can be pulled or connected to the forklift 12 is provided at the front frame 4 or the rear frame 5 away from the frame.

[0045] The handle 16 can be directly dragged after transportation or connected to the forklift 12 to be dragged to another location.

[0046] like Figure 5 The transport device for the steel pipe pile 17 of the trestle shown in the figure comprises the above Figure 1-4 The trestle steel pipe pile 17 shown in the figure transports the trolley 1 and the forklift 12 . A connecting piece is arranged at the front end of the steel pipe pile 17 , and the connecting piece is directly or indirectly connected to the forklift 12 .

[0047] The forklift 12 is connected to the connecting piece, pulling the front end of the steel pipe pile 17 forward, and the rear end of the steel pipe pile 17 is placed in the arc surface 8 of the trestle steel pipe pile 17 transport trolley 1. Due to its heavy weight, the steel pipe pile 17 generates friction with the trestle steel pipe pile 17 transport trolley 1, and moves forward together with the trolley.

[0048] Specifically, a stopper 14 is disposed at the rear end of the steel pipe pile 17 . When the steel pipe pile 17 is in the transportation state, the stopper 14 abuts against the rear end surface of the rear frame 5 .

[0049] The stopping device can better enable the steel pipe pile 17 to drag the trestle steel pipe pile 17 transport trolley 1 forward.

[0050] Specifically, the connecting piece is a lifting lug 13 , the front end of the steel pipe pile 17 is welded to the lifting lug 13 , and the lifting lug 13 is connected to the forklift 12 via a steel wire rope 15 .

[0051] The steel wire rope 15 has high strength and is easy to connect.

[0052] Specifically, the stopper 14 is a steel plate welded to the rear end of the steel pipe pile 17 .

[0053] Steel plates are easy to weld, low in cost, and convenient to obtain.

[0054] Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are illustrative and cannot be understood as limitations on the present invention. Ordinary technicians in the field can change, modify, replace and modify the above embodiments within the scope of the present invention without departing from the principles and purpose of the present invention.

Claims

1. A trolley for transporting steel pipe piles for a trestle, characterized in that: It includes a frame body and tires arranged on both sides of the bottom of the frame body. The frame body is a rectangular frame, including a front frame body, a rear frame body, a left frame body, and a right frame body. The upper end faces of the front frame body and the rear frame body are provided with concave arc surfaces that are adapted to the outer arc surfaces of steel pipe piles. The front frame body, the rear frame body, the left frame body, and the right frame body are respectively formed by welding two channel steels up and down, and the end faces of the upper channel steels of the front frame body and the rear frame body are cut into concave arc surfaces that are adapted to the outer arc surfaces of steel pipe piles.

2. A trolley for transporting trestle steel pipe piles according to claim 1, characterized in that: The end faces of the upper channel steels of the front frame and the rear frame are respectively cut with two left and right concave arc surfaces that are adapted to the outer arc surfaces of the steel pipe piles.

3. A trolley for transporting trestle steel pipe piles according to claim 2, characterized in that: Bearings are installed at the lower channel steels of the left frame and the right frame, and the tires are installed at the bearings.

4. The trolley for transporting steel pipe piles for a trestle according to claim 1, characterized in that: A longitudinal beam parallel to the left and right frames is arranged between the left frame and the right frame, and a transverse beam parallel to the front and rear frames is arranged between the front frame and the rear frame.

5. The trolley for transporting trestle steel pipe piles according to claim 1 is characterized in that: A handle which can be pulled or connected to a forklift is provided at the front frame or the rear frame in a direction away from the vehicle frame.

6. A trestle steel pipe pile transportation device, characterized in that: It comprises the trestle steel pipe pile transport trolley and forklift as described in any one of claims 1 to 5, wherein a connecting piece is arranged at the front end of the steel pipe pile, and the connecting piece is directly or indirectly connected to the forklift.

7. A trestle steel pipe pile transportation device according to claim 6, characterized in that: A stop device is arranged at the rear end of the steel pipe pile. When the steel pipe pile is in the transportation state, the stop device abuts against the rear end surface of the rear frame.

8. The trestle steel pipe pile transportation device according to claim 6, characterized in that: The connecting piece is a lifting lug, the front end of the steel pipe pile is welded to the lifting lug, and the lifting lug is connected to the forklift by a steel wire rope.

9. A trestle steel pipe pile transportation device according to claim 7, characterized in that: The stopper device is a steel plate welded on the rear end of the steel pipe pile.