A boiler water circulation pump pipeline flushing system
By designing a boiler and furnace water circulation pump pipeline flushing system, and using high-pressure water pump and spray head to flush the outer wall of the pipeline, the problem of dust and debris hindering the heat exchange and cooling of the pipeline is solved, and the normal operation and efficient cooling of the pipeline are achieved.
Patent Information
- Application Number
- CN202421388121.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-18
- Publication Date
- 2025-04-04
- Estimated Expiration
- 2034-06-18
AI Technical Summary
After the boiler and furnace water circulation pump pipeline is used for a long time, a large amount of dust and debris will stick to the outer wall, hindering the heat exchange and cooling effect of the pipeline.
A boiler furnace water circulation pump pipe flushing system is designed, and the outer wall of the pipe is flushed by passing the pipe through the first semicircular plate and the second semicircular plate, and using a high-pressure water pump and a spray head, the nozzle sprays water to flush the outer wall of the pipe.
It effectively avoids dust and debris to reduce the heat exchange and cooling effect of the pipeline, and ensures the normal operation of the pipeline.
Smart Images

Figure CN222710389U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pipeline flushing, in particular to a boiler water circulation pump pipeline flushing system. Background Art
[0002] A boiler is an energy conversion device. The energy input to the boiler includes chemical energy and electrical energy in the fuel. The boiler outputs steam, high-temperature water or organic heat carrier with a certain amount of thermal energy. The hot water or steam generated in the boiler can directly provide the required thermal energy for industrial production and people's lives, or can be converted into mechanical energy through a steam power device, or mechanical energy can be converted into electrical energy through a generator. After the annual overhaul of the boiler unit, before the boiler is filled with water and before the boiler water circulation pump is started, the boiler water circulation pump needs to be filled with water.
[0003] For example, the prior art publication number CN217990343U is a boiler water circulation pump cooling pipe flushing device. The utility model facilitates the installation and disassembly of the boiler water circulation pump cooling pipe for flushing through the setting of the connecting mechanism.
[0004] However, the above-mentioned prior art still has the following problems when used: after flushing the inside of the boiler water circulating pump pipeline, due to the long-term use of the boiler water circulating pump pipeline, a large amount of dust and debris will adhere to the outer wall thereof, and the dust and debris will hinder the heat exchange and cooling effect of the pipeline. Based on this, the utility model provides a boiler water circulating pump pipeline flushing system which is convenient for flushing the outer wall of the pipeline. Utility Model Content
[0005] In order to overcome the above-mentioned defects of the prior art, the utility model provides a boiler water circulation pump pipe flushing system, which passes the pipe through a first semicircular plate and a second semicircular plate, pulls the pipe to move at the same time, and uses a high-pressure water pump and a nozzle to spray water to flush the outer wall of the pipe, thereby preventing dust and debris from reducing the heat exchange and cooling effect of the pipe, so as to solve the problems arising from the above-mentioned background technology.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a boiler water circulation pump pipeline flushing system, comprising a vehicle plate, a flushing assembly is provided on the top of the vehicle plate, the flushing assembly comprises a first semicircular plate and a second semicircular plate hinged up and down, the first semicircular plate and the second semicircular plate are both provided with water cavities, the front and rear sides of the first semicircular plate and the second semicircular plate are fixed with a plurality of nozzles, the plurality of nozzles are all connected to the inside of the water cavity, the top of the vehicle plate is provided with an adjustment assembly for adjusting the height of the first semicircular plate and the second semicircular plate, the adjustment assembly comprises an electric push rod, the top of the piston rod of the electric push rod is fixed with a mounting plate supporting the second semicircular plate, and the top of the vehicle plate is fixed with an infusion assembly connected to the two water cavities.
[0007] In a preferred embodiment, a slot is provided at the top of the mounting plate, and the bottom end of the second semicircular plate is inserted into the slot, so as to facilitate removing the second semicircular plate from the mounting plate and cleaning the first semicircular plate and the second semicircular plate.
[0008] In a preferred embodiment, spring pins are fixedly inserted into the second semicircular plate and the front and rear sides of the mounting plate, and slots are provided on the first semicircular plate and the front and rear sides of the second semicircular plate. Multiple spring pins are respectively engaged with the multiple slots, which makes it convenient for staff to disassemble the first semicircular plate and the second semicircular plate for cleaning.
[0009] In a preferred embodiment, the infusion assembly includes a high-pressure water pump, which is fixed on the rear side of the top of the vehicle plate. The liquid outlet of the high-pressure water pump is connected to the inside of the two water chambers through a liquid outlet pipe, and the liquid inlet of the high-pressure water pump is connected to the water tank through an inlet pipe. The high-pressure water pump is used to automatically deliver water without manual operation, which saves time and effort to use.
[0010] In a preferred embodiment, the water tank is fixed to the top of the vehicle plate, and the water tank is arranged in front of the electric push rod. A cover plate is hinged on the top of the water tank. Opening the cover plate makes it convenient for staff to add water to the water tank.
[0011] In a preferred embodiment, a handrail is fixedly provided on the top of the vehicle plate, and the handrail is arranged behind the high-pressure water pump. A limiting ring for supporting the liquid outlet pipe is fixedly provided on the handrail for supporting the liquid outlet pipe.
[0012] In a preferred embodiment, handles are fixedly provided on the first semicircular plate and the second semicircular plate, so that the staff can hold the first semicircular plate and the second semicircular plate to flush the pipeline.
[0013] Technical effects and advantages of the utility model:
[0014] 1. The utility model passes the pipeline through the first semicircular plate and the second semicircular plate, pulls the pipeline to move at the same time, and uses a high-pressure water pump and a nozzle to spray water to flush the outer wall of the pipeline, thereby preventing dust and debris from reducing the heat exchange and cooling effect of the pipeline.
[0015] 2. The first semicircular plate and the second semicircular plate, and the second semicircular plate and the mounting plate are fixed together by using spring pins, so that it is convenient for the staff to disassemble the first semicircular plate and the second semicircular plate, clean the first semicircular plate and the second semicircular plate, and use the electric push rod to conveniently adjust the height of the first semicircular plate and the second semicircular plate. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0017] Figure 2 It is a side view of the overall structure of the utility model;
[0018] Figure 3 This is a structural diagram of the second semicircular plate and the mounting plate of the utility model;
[0019] Figure 4 This is a structural diagram of the first semicircular plate and the second semicircular plate of the utility model;
[0020] Figure 5 This is a cross-sectional view of the second semicircular plate of the present invention.
[0021] The accompanying drawings are marked as follows: 1. vehicle plate; 2. flushing assembly; 3. adjustment assembly; 4. infusion assembly; 5. slot; 6. spring latch; 7. card slot; 8. cover plate; 9. armrest; 10. limit ring; 11. handle;
[0022] 201, first semicircular plate; 202, second semicircular plate; 203, water chamber; 204, nozzle;
[0023] 301, electric push rod; 302, mounting plate;
[0024] 401. High-pressure water pump; 402. Liquid outlet pipe; 403. Liquid inlet pipe; 404. Water tank. DETAILED DESCRIPTION
[0025] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0026] Refer to the instruction manual Figure 1-5 The utility model provides a boiler water circulation pump pipeline flushing system, including a vehicle plate 1, a flushing assembly 2 is provided at the top of the vehicle plate 1, the flushing assembly 2 includes a first semicircular plate 201 and a second semicircular plate 202 hinged up and down, a water cavity 203 is provided in the first semicircular plate 201 and the second semicircular plate 202, a plurality of nozzles 204 are fixedly penetrated through the front and rear sides of the first semicircular plate 201 and the second semicircular plate 202, and the plurality of nozzles 204 are connected with the inside of the water cavity 203, an adjusting assembly 3 for adjusting the height of the first semicircular plate 201 and the second semicircular plate 202 is provided at the top of the vehicle plate 1, and the adjusting assembly 3 includes an electric push rod 301, and a mounting plate 302 supporting the second semicircular plate 202 is fixedly provided at the top of the piston rod of the electric push rod 301;
[0027] The top of the vehicle board 1 is fixedly provided with an infusion assembly 4 connected to the two water chambers 203. Specifically, the infusion assembly 4 includes a high-pressure water pump 401. The high-pressure water pump 401 is fixed to the rear side of the top of the vehicle board 1. The liquid outlet of the high-pressure water pump 401 is connected to the inside of the two water chambers 203 through a liquid outlet pipe 402. The liquid inlet of the high-pressure water pump 401 is connected to a water tank 404 through a liquid inlet pipe 403. The high-pressure water pump 401 is used to automatically transport water without manual operation, which is more time-saving and labor-saving to use.
[0028] In addition, the water tank 404 is fixed to the top of the vehicle plate 1, and the water tank 404 is arranged in front of the electric push rod 301. A cover plate 8 is hinged on the top of the water tank 404. Opening the cover plate 8 makes it convenient for the staff to add water to the water tank 404. A handrail 9 is fixed to the top of the vehicle plate 1. The handrail 9 is arranged behind the high-pressure water pump 401. A limiting ring 10 for supporting the liquid outlet pipe 402 is fixed on the handrail 9 to support the liquid outlet pipe 402.
[0029] When in use, the staff first removes the boiler water circulation pump pipe, and passes one end of the pipe through the first semicircular plate 201 and the second semicircular plate 202, and uses the high-pressure water pump 401 to transport water into the two water chambers 203. The water is sprayed onto the outer wall of the pipe through multiple nozzles 204 to wash away the dust and debris adhering to the surface of the outer wall of the pipe, and at the same time pulls the pipe to continue moving, thereby completing the flushing of the outer wall of the pipe and preventing dust and debris from reducing the heat exchange and cooling effect of the pipe.
[0030] Refer to the instruction manual Figure 1-5 , a slot 5 is provided at the top of the mounting plate 302, and the bottom end of the second semicircular plate 202 is inserted into the slot 5, so that the second semicircular plate 202 can be removed from the mounting plate 302 to clean the first semicircular plate 201 and the second semicircular plate 202. Spring latches 6 are fixedly penetrated on the second semicircular plate 202 and the front and rear sides of the mounting plate 302. Slots 7 are provided on the first semicircular plate 201 and the front and rear sides of the second semicircular plate 202. Multiple spring latches 6 are respectively engaged with multiple slots 7, so that the staff can disassemble the first semicircular plate 201 and the second semicircular plate 202 for cleaning;
[0031] In addition, handles 11 are fixedly provided on the first semicircular plate 201 and the second semicircular plate 202, so that the staff can hold the first semicircular plate 201 and the second semicircular plate 202 to flush the pipeline.
[0032] The first semicircular plate 201 and the second semicircular plate 202, as well as the second semicircular plate 202 and the mounting plate 302 are fixed together by adopting the spring latch 6, so that the staff can disassemble the first semicircular plate 201 and the second semicircular plate 202 conveniently, clean the first semicircular plate 201 and the second semicircular plate 202, and use the electric push rod 301 to conveniently adjust the height of the first semicircular plate 201 and the second semicircular plate 202.
[0033] Finally: The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present utility model should be included in the protection scope of the present utility model.
Claims
1. A boiler water circulation pump pipeline flushing system, comprising a vehicle plate (1), characterized in that: A flushing assembly (2) is provided at the top of the vehicle plate (1), and the flushing assembly (2) comprises a first semicircular plate (201) and a second semicircular plate (202) which are hinged up and down, a water cavity (203) is provided in the first semicircular plate (201) and the second semicircular plate (202), and a plurality of spray heads (204) are fixedly penetrated on both the front and rear sides of the first semicircular plate (201) and the second semicircular plate (202), and the plurality of spray heads (204) are all connected to the inside of the water cavity (203); The top of the vehicle plate (1) is provided with an adjustment component (3) for adjusting the height of the first semicircular plate (201) and the second semicircular plate (202); the adjustment component (3) comprises an electric push rod (301); a mounting plate (302) for supporting the second semicircular plate (202) is fixedly provided at the top of the piston rod of the electric push rod (301); and an infusion component (4) connected to the two water chambers (203) is fixedly provided at the top of the vehicle plate (1).
2. A boiler water circulation pump pipeline flushing system according to claim 1, characterized in that: The top end of the mounting plate (302) is provided with a slot (5), and the bottom end of the second semicircular plate (202) is inserted into the slot (5).
3. A boiler water circulation pump pipeline flushing system according to claim 1, characterized in that: Spring latches (6) are fixedly inserted through the front and rear sides of the second semicircular plate (202) and the mounting plate (302), and slots (7) are provided on the first semicircular plate (201) and the front and rear sides of the second semicircular plate (202), and the plurality of spring latches (6) are respectively engaged with the plurality of slots (7).
4. A boiler water circulation pump pipeline flushing system according to claim 1, characterized in that: The infusion assembly (4) comprises a high-pressure water pump (401), which is fixed to the rear side of the top end of the vehicle plate (1); the liquid outlet of the high-pressure water pump (401) is connected to the inside of the two water chambers (203) via a liquid outlet pipe (402); and the liquid inlet of the high-pressure water pump (401) is connected to a water tank (404) via a liquid inlet pipe (403).
5. A boiler water circulation pump pipeline flushing system according to claim 4, characterized in that: The water tank (404) is fixed on the top of the vehicle plate (1), and the water tank (404) is arranged in front of the electric push rod (301), and a cover plate (8) is hinged on the top of the water tank (404).
6. A boiler water circulation pump pipeline flushing system according to claim 1, characterized in that: A handrail (9) is fixedly provided on the top of the vehicle plate (1), and the handrail (9) is arranged behind the high-pressure water pump (401). A limiting ring (10) for supporting the liquid outlet pipe (402) is fixedly provided on the handrail (9).
7. A boiler water circulation pump pipeline flushing system according to claim 1, characterized in that: The first semicircular plate (201) and the second semicircular plate (202) are both fixedly provided with handles (11) for facilitating the taking of the first semicircular plate (201) and the second semicircular plate (202).
Citation Information
Patent Citations
Flushing device for cooling pipeline of boiler water circulating pump
CN217990343U