Energy-saving building material installation clamping device

By designing an energy-saving building materials installation clamping device with adjustable limiting plate spacing, the problem that existing devices cannot adapt to energy-saving building materials of different thicknesses is solved, and the firmness of clamping of building materials of different thicknesses is achieved and the firmness of clamping is further improved through auxiliary fixing components.

CN222726580UActive Publication Date: 2025-04-08SHANDONG LUGONG DECORATION DESIGN ENGINEERING CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421558621.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-03
Publication Date
2025-04-08
Estimated Expiration
2034-07-03

AI Technical Summary

Technical Problem

The existing energy-saving building materials installation clamping devices cannot adapt to energy-saving building materials of different thicknesses, resulting in a decrease in its practicality and cannot meet various needs.

Method used

A clamping device including a first placement plate and a second placement plate is designed. Through the combination of a screw and a twist, the spacing between the limiting plates is adjusted to adapt to energy-saving building materials of different thicknesses, and the clamping firmness is further improved by auxiliary fixing components.

Benefits of technology

The firm clamping of energy-saving building materials of different thicknesses is achieved, the practicality of the device is improved, and the clamping firmness is further enhanced through auxiliary fixing components.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222726580U_ABST
    Figure CN222726580U_ABST
Patent Text Reader

Abstract

The utility model discloses an energy-saving building material installation clamping device, which belongs to the technical field of energy-saving building materials, and includes a first placement plate and a second placement plate for energy-saving building material installation clamping, wherein a first limiting plate is installed on the side of the top of the first placement plate, and a screw is installed on the inner wall of the first placement plate, and the outer wall of the screw passes through one side of the second placement plate. The energy-saving building material installation clamping device benefits from the design of the first placement plate, the second placement plate and the twist. The twist drives the second placement plate to move outward through the screw. After the energy-saving building material is placed on the top of the two placement plates, one side of the energy-saving building material contacts the first limiting plate, and then the twist is rotated in the opposite direction until the second limiting plate contacts the other side of the energy-saving building material. In this way, the distance between the two limiting plates can be adjusted, so that the clamping device can clamp energy-saving building materials of different thicknesses, thereby improving the practicality of the clamping device and enabling it to meet a variety of needs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of energy-saving building materials, in particular to an energy-saving building material installation clamping device. Background Art

[0002] Energy-saving building materials are materials used to reduce the energy consumption of buildings, mainly including: plastic-steel energy-saving windows with hollow coated glass, which can prevent ultraviolet rays, isolate outdoor noise, and maintain indoor heat in winter; exterior wall insulation system materials, which are used to reduce building energy consumption and eliminate the heat island effect; interior wall tile veneer environmentally friendly materials, which are used to avoid pollution and reduce indoor cooling and heating energy loss. Energy-saving building materials usually need to be fixed and installed when they are put into use.

[0003] A Chinese patent document (application publication number CN217943146U) discloses an energy-saving building material installation and clamping device, which includes a mounting plate, an outer wall on one side of the mounting plate is provided with an adjustment groove, a first clamping plate is slidably connected to the inner wall of the adjustment groove, a first clamping groove is provided on the bottom outer wall of the first clamping plate, a second clamping plate is fixedly connected to the outer wall on one side of the mounting plate, a second clamping groove is provided on the top outer wall of the second clamping plate, and the first clamping plate and the second clamping plate are symmetrical to each other.

[0004] It can be seen that although the patent document cited above can adjust the distance between the first clamping plate and the second clamping plate by setting a fixed plate, a screw rod, a handwheel, a threaded block, a fixed rod and an adjusting groove, so that the first clamping groove and the second clamping groove can cooperate to clamp energy-saving building materials of different specifications firmly, the thickness of energy-saving building materials of different specifications is also different, and the groove width of the first clamping groove and the second clamping groove is fixed and cannot be adjusted, so that it can only clamp energy-saving building materials of fixed thickness, thereby reducing its practicality and failing to meet various needs. Utility Model Content

[0005] The purpose of the utility model is to provide an energy-saving building material installation clamping device to solve the problems raised in the background technology.

[0006] To achieve the above-mentioned objectives, the utility model provides the following technical solutions: an energy-saving building material installation and clamping device, comprising a first placement plate and a second placement plate for energy-saving building material installation and clamping, a first limiting plate is installed on the side of the top end of the first placement plate, the inner side wall of the first placement plate is equipped with a screw rod, the outer wall of the screw rod passes through one side of the second placement plate, a twist is installed on one end of the screw rod, installation components are provided on both sides of the bottom end of the first placement plate, a second limiting plate is installed on the side of the top end of the second placement plate away from the first placement plate, a fixing block is installed on one side of the second limiting plate, and an auxiliary fixing component for auxiliary installation and clamping of energy-saving building materials is provided at the bottom of the fixing block.

[0007] As a preferred embodiment, the auxiliary fixing assembly includes a connecting rod, an outer wall of which is sleeved with a spring, a connecting block is installed at one end of the connecting rod, and a clamping block is installed at the other end of the connecting rod.

[0008] As a preferred embodiment, the mounting assembly includes a mounting block, and the inner side wall of the mounting block is provided with two mounting screws.

[0009] As a preferred embodiment, positioning columns are installed on both sides of the first placement plate, and the outer walls of the two positioning columns are provided with connecting plates, and the opposite sides of the two connecting plates are fixedly connected to the two sides of the second placement plate respectively.

[0010] As a preferred embodiment, one end of the spring is fixedly connected to one side of the connecting block, and the other end of the spring is fixedly connected to one side of the second limiting plate.

[0011] As a preferred embodiment, an elastic block is installed on the top of the connecting block, and the outer wall of the elastic block is snap-connected with the top of the fixing block.

[0012] As a preferred embodiment, fixing grooves are provided through opposite sides of the two connecting plates, and the inner sides of the two fixing grooves are slidably connected to the outer walls of the two positioning columns respectively.

[0013] As a preferred embodiment, sliding bars are installed on both sides of the inner wall of the second placement plate, and the outer walls of the two sliding bars are respectively slidably connected to the two sides of the inner wall of the first placement plate.

[0014] Compared with the prior art, the technical effects and advantages of the utility model are as follows:

[0015] The energy-saving building material installation clamping device benefits from the design of the first placement plate, the second placement plate and the twist. The twist is turned to drive the second placement plate to move outward through the screw rod. After the energy-saving building material is placed on the top of the two placement plates, one side of the energy-saving building material contacts the first limit plate. Then, the twist is turned in the opposite direction until the second limit plate contacts the other side of the energy-saving building material. In this way, the distance between the two limit plates can be adjusted, so that the clamping device can clamp energy-saving building materials of different thicknesses, thereby improving the practicality of the clamping device and enabling it to meet various needs.

[0016] Through the design of providing a connecting block, an elastic block and a clamping block, after the energy-saving building materials are clamped and fixed, the elastic block is pressed downward, and the connecting block is driven to move inward under the elastic action of the spring, thereby driving the clamping block to move inward until the elastic block engages with the fixed block again. At this time, the clamping block contacts one side of the energy-saving building material, which can assist in clamping and fixing the energy-saving building materials, thereby further improving the firmness of the clamping. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0018] Figure 1 It is a schematic diagram of the structure of the utility model;

[0019] Figure 2 This is a schematic diagram of the connection structure of the first placement plate of the utility model;

[0020] Figure 3 This is a schematic diagram of the connection structure of the second placement plate of the utility model;

[0021] Figure 4 It is a schematic diagram of the structure of the auxiliary fixing component of the utility model.

[0022] Description of reference numerals:

[0023] In the figure: 1, first placement plate; 2, second placement plate; 3, first limit plate; 4, screw rod; 5, twist; 6, second limit plate; 7, slide bar; 8, positioning column; 9, connecting plate; 10, fixing block; 11, auxiliary fixing assembly; 12, installation assembly;

[0024] 901, fixing slot;

[0025] 1101, connecting rod; 1102, spring; 1103, connecting block; 1104, clamping block; 1105, elastic block;

[0026] 1201. Mounting block; 1202. Mounting screw. DETAILED DESCRIPTION

[0027] In the following description, a large number of specific details are given to provide a more thorough understanding of the utility model. However, it is obvious to those skilled in the art that the utility model can be implemented without one or more of these details. In other examples, in order to avoid confusion with the utility model, some technical features known in the art are not described.

[0028] Unless otherwise defined, the directions of up, down, left, right, front, back, inside and outside involved in this document are based on the directions of up, down, left, right, front, back, inside and outside in the figures shown in the utility model, and are explained here together.

[0029] The connection method can be bonding, welding, bolt connection, etc., depending on actual needs.

[0030] This embodiment provides Figures 1 to 4 The first placement plate 1 and the second placement plate 2 for energy-saving building material installation and clamping are shown. The first placement plate 1 and the second placement plate 2 are arranged crosswise. A first limiting plate 3 is installed on the side of the top of the first placement plate 1. The inner side wall of the first placement plate 1 is equipped with a screw rod 4. The first placement plate 1 and the screw rod 4 are connected by bearings. The outer wall of the screw rod 4 passes through one side of the second placement plate 2. The outer wall of the screw rod 4 is connected with the internal thread of the second placement plate 2. A twist 5 is installed at one end of the screw rod 4. The outer wall of the twist 5 is provided with an anti-slip thread to increase the friction between the human hand and the twist 5. It is convenient to rotate the knob 5. Installation components 12 are provided on both sides of the bottom end of the first placement plate 1. A second limiting plate 6 is installed on the side of the top of the second placement plate 2 away from the first placement plate 1. A fixing block 10 is installed on one side of the second limiting plate 6. An auxiliary fixing component 11 for auxiliary installation and clamping of energy-saving building materials is provided at the bottom of the fixing block 10. Rotating the knob 5 drives the screw rod 4 to rotate, thereby adjusting the distance between the second placement plate 2 and the first placement plate 1. At the same time, with the cooperation of the first limiting plate 3 and the second limiting plate 6, energy-saving building materials of different thicknesses can be clamped and fixed.

[0031] The auxiliary fixing assembly 11 provided in this embodiment includes a connecting rod 1101, the outer wall of the connecting rod 1101 passes through one side of the second limiting plate 6, the outer wall of the connecting rod 1101 is sleeved with a spring 1102, a connecting block 1103 is installed at one end of the connecting rod 1101, and a clamping block 1104 is installed at the other end of the connecting rod 1101, and a rubber pad is provided on the side of the clamping block 1104 opposite to the first limiting plate 3, and at the same time, a storage groove adapted to the clamping block 1104 is opened on the other side of the second limiting plate 6, and its depth is greater than the thickness of the clamping block 1104.

[0032] The mounting assembly 12 provided in this embodiment includes a mounting block 1201 , and two mounting screws 1202 are provided on the inner side wall of the mounting block 1201 . The mounting assembly 12 is used to facilitate the mounting and fixing of the clamping device, thereby improving the overall stability.

[0033] The present embodiment provides that both sides of the first placement plate 1 are installed with positioning columns 8, the outer walls of the two positioning columns 8 are provided with connecting plates 9, the opposite sides of the two connecting plates 9 are respectively fixedly connected to the two sides of the second placement plate 2, and the opposite sides of the two connecting plates 9 are penetrated by fixing grooves 901, the inner sides of the two fixing grooves 901 are respectively slidably connected to the outer walls of the two positioning columns 8, and when the positioning columns 8 are in contact with the two ends of the fixing grooves 901, the first placement plate 1 is in contact with the second placement plate 2.

[0034] In this embodiment, one end of the spring 1102 is fixedly connected to one side of the connecting block 1103, and the other end of the spring 1102 is fixedly connected to one side of the second limiting plate 6. An elastic block 1105 is installed on the top of the connecting block 1103. The outer wall of the elastic block 1105 is snap-connected with the top of the fixed block 10. Two clamping holes are provided on the top of the fixed block 10. The elastic block 1105 is snap-connected with the fixed block 10 through the clamping holes. When the elastic block 1105 is snap-connected with the outermost clamping hole, the clamping block 1104 is located in the receiving groove on one side of the second limiting plate 6. When the elastic block 1105 is snap-connected with the other clamping hole, one side of the clamping block 1104 and one side of the second limiting plate 6 are located on the same horizontal plane, and the spring 1102 is in a stretched state.

[0035] In this embodiment, slide bars 7 are installed on both sides of the inner wall of the second placement plate 2, and the outer walls of the two slide bars 7 are respectively slidably connected to the two sides of the inner wall of the first placement plate 1. Slide grooves are opened on both sides of the inner wall of the first placement plate 1, and the slide bars 7 are slidably connected to the slide grooves.

[0036] How it works

[0037] First, the first placement plate 1 is installed and fixed through the two installation components 12, and then the knob 5 is rotated. The knob 5 drives the second placement plate 2 to move outward through the screw rod 4. The second placement plate 2 moves outward and drives the connecting plate 9 to move outward until the positioning columns 8 on both sides of the first placement plate 1 move to one end of the fixing groove 901. Then, the energy-saving building material is placed on the top of the first placement plate 1 and the second placement plate 2, and one side of it contacts with the first limiting plate 3, and then the knob 5 is rotated in the opposite direction until the second limiting plate 6 at the top of the second placement plate 2 contacts with the other side of the energy-saving building material. In this way, By adjusting the distance between the two limit plates, the clamping device can clamp energy-saving building materials of different thicknesses, thereby improving the practicability of the clamping device and enabling it to meet various needs. Secondly, the elastic block 1105 is pressed downward, and the connecting block 1103 is driven to move inward under the elastic action of the spring 1102. The connecting block 1103 drives the clamping block 1104 to move inward through the connecting rod 1101 until the elastic block 1105 is engaged with another clamping hole. At this time, the clamping block 1104 is in contact with the energy-saving building material, which can assist in clamping and fixing the energy-saving building material, thereby further improving its clamping firmness.

[0038] It should be noted that, in this article, relational terms such as one and two are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions. The sentence "includes an element defined by ... does not exclude the existence of other identical elements in the process, method, article or device including the element".

[0039] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An energy-saving building material installation clamping device, characterized in that: The invention comprises a first placement plate (1) and a second placement plate (2) for installing and clamping energy-saving building materials, wherein a first limiting plate (3) is installed on the side of the top end of the first placement plate (1), a screw rod (4) is installed on the inner side wall of the first placement plate (1), the outer wall of the screw rod (4) passes through one side of the second placement plate (2), a twisting knob (5) is installed on one end of the screw rod (4), installation components (12) are provided on both sides of the bottom end of the first placement plate (1), a second limiting plate (6) is installed on the side of the top end of the second placement plate (2) away from the first placement plate (1), a fixing block (10) is installed on one side of the second limiting plate (6), and an auxiliary fixing component (11) for auxiliary installation and clamping of energy-saving building materials is provided at the bottom of the fixing block (10).

2. The energy-saving building material installation and clamping device according to claim 1 is characterized in that: The auxiliary fixing assembly (11) comprises a connecting rod (1101), the outer wall of the connecting rod (1101) is sleeved with a spring (1102), one end of the connecting rod (1101) is mounted with a connecting block (1103), and the other end of the connecting rod (1101) is mounted with a clamping block (1104).

3. The energy-saving building material installation and clamping device according to claim 1 is characterized in that: The mounting assembly (12) comprises a mounting block (1201), and the inner side wall of the mounting block (1201) is provided with two mounting screws (1202).

4. The energy-saving building material installation and clamping device according to claim 1 is characterized in that: Positioning columns (8) are installed on both sides of the first placement plate (1), and the outer walls of the two positioning columns (8) are provided with connecting plates (9), and the opposite sides of the two connecting plates (9) are fixedly connected to the two sides of the second placement plate (2) respectively.

5. The energy-saving building material installation and clamping device according to claim 2 is characterized in that: One end of the spring (1102) is fixedly connected to one side of the connecting block (1103), and the other end of the spring (1102) is fixedly connected to one side of the second limiting plate (6).

6. The energy-saving building material installation and clamping device according to claim 5 is characterized in that: An elastic block (1105) is installed at the top end of the connecting block (1103), and the outer wall of the elastic block (1105) is snap-connected with the top end of the fixing block (10).

7. The energy-saving building material installation and clamping device according to claim 4 is characterized in that: A fixing groove (901) is provided through opposite sides of the two connecting plates (9), and the inner sides of the two fixing grooves (901) are respectively slidably connected to the outer walls of the two positioning columns (8).

8. The energy-saving building material installation and clamping device according to claim 1 is characterized in that: Slide bars (7) are installed on both sides of the inner wall of the second placement plate (2), and the outer walls of the two slide bars (7) are respectively slidably connected to the two sides of the inner wall of the first placement plate (1).

Citation Information

Patent Citations

  • Mounting and clamping device for energy-saving building materials

    CN217943146U