Install elevator hoisting structure

By opening the middle opening at the top of the elevator shaft and setting up the top lifting welded parts, the problem of dangerous lifting operations in the prior art is solved, a safer lifting and installation process is achieved, and the sealing waterproofness is ensured.

CN222729274UActive Publication Date: 2025-04-08HENGDA FUJI ELEVATOR
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420790300.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-17
Publication Date
2025-04-08
Estimated Expiration
2034-04-17

AI Technical Summary

Technical Problem

The existing elevator lifting method is more dangerous because the rope cannot be removed at the closed end of the top section, which makes the lifting operation more dangerous.

Method used

A middle opening is opened at the top of the elevator shaft, and a top lifting welded piece is installed on the edge of the opening. The lifting tool is connected to the welded piece by bolts, and the lifting rope is connected to the crane hook. After the lifting is completed, the lifting tool and connecting bolts are removed, and the sealing cover plate is installed to ensure sealing and waterproof.

Benefits of technology

In this way, the dangerous operation of workers removing the crane hook from the outside is avoided, the safety of lifting and installation operations is improved, and the sealing and waterproofing of the top shaft is ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222729274U_ABST
    Figure CN222729274U_ABST
Patent Text Reader

Abstract

The utility model discloses an elevator hoisting structure, comprising a top hoistway (1), a middle opening (2) being provided on the top surface of the top hoistway (1), a top hoisting welding piece (3) being provided on the edge of the middle opening (2), a bolt hole (4) being provided on the top hoisting welding piece (3); and a hoisting tool (5), the hoisting tool (5) being connected to the bolt hole (4) via a bolt; and a hoisting rope (6) being provided on the hoisting tool (5), and the hoisting rope (6) being connected to a crane hook (7). The utility model has the characteristic of effectively improving safety.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a hoisting installation for adding a top structure of an elevator shaft, in particular to an elevator hoisting installation structure. Background Art

[0002] In recent years, the installation of elevators has been strongly supported by the government and is highly anticipated by owners of old residential communities, and projects have been implemented in various cities. At present, the traditional installation method of steel structure shafts for installing elevators mostly adopts building block-style hoisting, which is transported to the site in several sections for assembly. This method has a disadvantage, that is, the middle section has a rope installation hole, which is more convenient for hoisting, but the top section is a closed end, and the rope cannot be removed from the inside of the shaft, so a rope plate can only be welded on the top beam, exposed outside the shaft. After the hoisting is completed, the workers remove the crane hook from the outside, and the whole operation is relatively dangerous. Therefore, the existing technology has the problem of relatively dangerous hoisting operations. Utility Model Content

[0003] The purpose of the utility model is to provide an elevator hoisting structure. The utility model has the characteristic of effectively improving safety.

[0004] The technical solution of the utility model is to add an elevator hoisting structure, including a top hoistway, a middle opening is provided on the top surface of the top hoistway, a top hoisting welding piece is provided on the edge of the middle opening, and a bolt hole is provided on the top hoisting welding piece; it also includes a hoisting tool, which is connected to the bolt hole via bolts; the hoisting tool is provided with a hoisting rope, which is connected to the crane hook.

[0005] In the aforementioned elevator hoisting structure, the hoisting tooling includes two L-shaped angle steels distributed in parallel, a rectangular reinforcement tube is provided at one end between the two L-shaped angle steels, and mounting holes and U-shaped hoisting hooks are provided on the horizontal surface of the L-shaped angle steel; an independent rectangular tube is also provided at the other end of each L-shaped angle steel, and a reinforcement rod is provided between the independent rectangular tube and the L-shaped angle steel.

[0006] In the aforementioned elevator hoisting structure, a reinforcement member is also provided between the two L-shaped angle steels.

[0007] In the aforementioned elevator hoisting structure, after the hoisting is completed and the hoisting tooling is removed, the middle opening is covered with a detachable sealing cover plate.

[0008] In the aforementioned elevator hoisting structure, a drainage outlet is also provided at the end corner of the top of the top hoistway.

[0009] Compared with the prior art, the utility model opens a middle opening at the top of the top shaft, and the lifting tool is detachably connected to the top lifting welding piece located at the outer edge of the middle opening through bolts. During lifting, it is fixed to the lifting tool through a lifting rope for lifting. After the lifting is completed, the personnel remove the lifting rope from the middle opening of the top shaft, and then remove the connecting bolts between the lifting tool and the top shaft, and then install the sealing cover plate to complete the lifting and installation of the top shaft. There is no need for workers to remove the crane hook from the outside, thereby effectively improving the safety of the lifting and installation operations; and through the setting of the sealing cover plate, the sealing and waterproof properties can also be guaranteed. In summary, the utility model has the characteristics of effectively improving safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 It is a schematic diagram of the utility model when it is hoisted;

[0011] Figure 2 It is the structural view of the lifting tooling;

[0012] Figure 3 This is the structural view when installing the removable sealing cover after the lifting is completed;

[0013] Figure 4 This is a structural view after the detachable sealing cover is installed;

[0014] Figure 5 It is a structural view during transportation;

[0015] Figure 6 yes Figure 5 A-direction view.

[0016] The marks in the attached drawings are: 1-top shaft, 2-middle opening, 3-top lifting welding part, 4-bolt hole, 5-lifting tooling, 6-lifting rope, 7-crane hook, 8-detachable sealing cover, 9-drainage outlet, 501-L-shaped angle steel, 502-rectangular reinforcement tube, 503-U-shaped lifting hook, 504-independent rectangular tube, 505-reinforcement rod, 506-reinforcement member. DETAILED DESCRIPTION

[0017] The present invention is further described below in conjunction with the accompanying drawings and embodiments, but they are not intended to limit the present invention.

[0018] Embodiment. Install an elevator hoisting structure, which is as follows Figure 1-6 As shown, it includes a top shaft 1, a middle opening 2 is provided on the top surface of the top shaft 1, a top lifting welding part 3 is provided at the edge of the middle opening 2, and a bolt hole 4 is provided on the top lifting welding part 3; it also includes a lifting tool 5, which is connected to the bolt hole 4 through bolts; the lifting tool 5 is provided with a lifting rope 6, and the lifting rope 6 is connected to a crane hook 7.

[0019] like Figure 2 As shown, the lifting fixture 5 comprises two parallel L-shaped angle steels 501, one end between the two L-shaped angle steels 501 is provided with a rectangular reinforcement tube 502, and the horizontal surface of the L-shaped angle steel 501 is provided with a mounting hole and a U-shaped lifting hook 503; the other end of each L-shaped angle steel 501 is also provided with an independent rectangular tube 504, and a reinforcement rod 505 is provided between the independent rectangular tube 504 and the L-shaped angle steel 501. The lifting fixture adopts the above structure, which is simple and firm.

[0020] A reinforcement member 506 is further provided between the two L-shaped angle steels 501 .

[0021] like Figure 3 and 4 As shown, after the lifting is completed and the lifting tooling is removed, the middle opening 2 is covered with a detachable sealing cover plate 8.

[0022] like Figure 4 As shown, a drainage port 9 is also provided at the end corner of the top of the top shaft 1 .

[0023] The lifting fixture structure can be installed in place in the production workshop (connected to the bolt holes of the top lifting weldment by bolts). By setting up rectangular tubes, it can be used as a load-bearing support during transportation ( Figure 5 and 6 It can be directly hoisted on site.

[0024] When hoisting, Figure 1 As shown in the figure, the lifting tool is connected with the top lifting welding parts by bolts, and the four U-shaped lifting hooks of the lifting tool are connected with the lifting rope, and the other end of the lifting rope is connected with the crane hook. After the lifting is completed ( Figure 2 and 3 As shown in the figure, the personnel first remove the lifting rope from the middle opening of the top shaft, then remove the bolts between the lifting tooling and the top shaft, and then install the sealing cover.

[0025] For top waterproofing, this solution makes a drainage hole on the top cover plate of the top well ( Figure 3 As shown), and a waterproof coating is applied on the surface of the top cover of the shaft.

Claims

1. Install an elevator hoisting structure, which is characterized by: The invention comprises a top shaft (1), wherein the top surface of the top shaft (1) is provided with a middle opening (2), the edge of the middle opening (2) is provided with a top hoisting welding piece (3), and the top hoisting welding piece (3) is provided with a bolt hole (4); and further comprises a hoisting tool (5), wherein the hoisting tool (5) is connected to the bolt hole (4) via a bolt; and the hoisting tool (5) is provided with a hoisting rope (6), and the hoisting rope (6) is connected to a crane hook (7).

2. The elevator hoisting structure according to claim 1 is characterized in that: The lifting tool (5) comprises two L-shaped angle steels (501) arranged in parallel, a rectangular reinforcing tube (502) being arranged at one end between the two L-shaped angle steels (501), a mounting hole (507) and a U-shaped lifting hook (503) being arranged on the horizontal surface of the L-shaped angle steel (501); an independent rectangular tube (504) being arranged at the other end of each L-shaped angle steel (501), a reinforcing rod (505) being arranged between the independent rectangular tube (504) and the L-shaped angle steel (501).

3. The elevator hoisting structure according to claim 2 is characterized in that: A reinforcing member (506) is also provided between the two L-shaped angle steels (501).

4. The elevator hoisting structure according to claim 1, characterized in that: After the lifting is completed and the lifting tooling is removed, the middle opening (2) is covered with a detachable sealing cover plate (8).

5. The elevator hoisting structure according to claim 1, characterized in that: A drainage outlet (9) is also provided at the end corner of the top of the top shaft (1).