An improved top iron structure for railway turnout
By designing an improved top iron structure, using the combined design of tooth blocks, bolts, magnets, telescopic rods and oil pipes, the problem of difficulty in maintaining standard gaps in the top iron structure is solved, and the adaptability and lubricity of top iron is achieved, and the workload and energy consumption are reduced.
Patent Information
- Application Number
- CN202421545340.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-02
- Publication Date
- 2025-04-11
- Estimated Expiration
- 2034-07-02
AI Technical Summary
The existing top iron structure is difficult to maintain a standard gap with the pointed rail or core rail, resulting in poor railway switch conversion.
An improved top iron structure is designed. By changing the shape of top iron one and top iron two, and providing tooth blocks and bolts on their outer walls, combined with the design of magnets, telescopic rods and oil pipes, the adaptability and lubricity of top iron are achieved.
Without changing the stress process and reducing the firmness, stability and safety of the coupling parts, the improved top iron structure can adapt to on-site demand and seasonal changes, reduce on-site workload, reduce the stress level of rail parts, and improve the lubrication state between the top iron and the wheel through the lubrication mechanism, reducing wear and energy consumption.
Smart Images

Figure CN222744697U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of improved top irons, in particular to an improved top iron structure used on railway turnouts. Background Art
[0002] The turnout top iron is an important connecting part of the turnout equipment. Because the turnout point rail and heart rail need to be frequently switched, but fasteners cannot be installed on both sides, a transverse top iron is required to resist the outward flipping of the point rail and heart rail caused by the lateral force of the train. Although the structure is simple, a well-installed and standard-sized top iron plays an important role in the smooth operation of trains and reducing turnout switching failures.
[0003] A certain gap should be maintained between the top iron end and the point rail or heart rail. However, this gap standard is very difficult to maintain on site, which may lead to adverse conditions in railway turnout conversion in the long run.
[0004] In order to solve the above problems, we proposed an improved top iron structure for railway turnouts. Utility Model Content
[0005] The utility model aims to solve the problems in the background technology and proposes an improved top iron structure for railway turnouts.
[0006] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: an improved top iron structure for railway turnouts, comprising track one and track two, the track two being located on the right side of the track one, the outer side wall of the track one being fixedly connected with the top iron two, the outer side wall of the track two being fixedly connected with the top iron one, the outer side wall of the top iron two being fixedly connected with a plurality of tooth blocks two, the outer side wall of the top iron one being fixedly connected with a plurality of tooth blocks one, the top iron one being provided with two openings, the top iron two being provided with two threaded holes, the top iron two being respectively connected with the two threaded holes by two bolts, and the two bolts extending to the openings and being threadedly connected with the track two.
[0007] In the above-mentioned improved top iron structure for railway turnouts, the outer side wall of the track one is adsorbed with multiple magnets, the outer side walls of the multiple magnets are fixedly connected with a fixed cylinder, a fixed plate is provided on the outer side of the track one, the outer side wall of the fixed plate is fixedly connected with multiple telescopic rods, the multiple telescopic rods are respectively slidably connected with the inner side wall of the fixed cylinder, the outer side wall of the fixed plate is provided with a sliding groove, the outer side wall of the fixed plate is fixedly connected with a rotating rod, the outer side wall of the rotating rod is rotatably sleeved with an oil pipe, and the end of the oil pipe is slidably connected with the inner side wall of the sliding groove.
[0008] In the above-mentioned improved top iron structure for railway turnout, a plurality of the tooth blocks 2 are evenly arranged on the outer side wall of the top iron 2, and a plurality of the tooth blocks 1 are evenly arranged on the outer side wall of the top iron 1.
[0009] In the above-mentioned improved top iron structure for railway turnout, a plurality of the magnets are uniformly adsorbed on the outer side wall of track one, and a plurality of the telescopic rods are uniformly arranged at the four corners of the fixed plate.
[0010] In the above-mentioned improved top iron structure for railway turnout, the length of top iron one is greater than the length of top iron two, multiple tooth blocks one are in contact with the outer side wall of top iron two, and multiple tooth blocks two are in contact with the outer side wall of top iron one.
[0011] In the above-mentioned improved top iron structure for railway turnout, the length of the oil pipe is equal to the length of the fixing plate.
[0012] Compared with the existing technology, the advantages of the improved top iron structure for railway turnout are:
[0013] The utility model changes the shapes of the top iron one and the top iron two, thereby completing the process of force bearing without changing and without reducing the firmness, stability and safety of the connecting parts, making slight changes to the top iron one and the top iron two, so as to adapt to the needs of the site and the season, reduce the workload of the site, and alleviate the stress degree of the rail parts. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 This is a bottom view of an improved top iron structure for railway turnouts proposed by the utility model;
[0015] Figure 2 A top view of an improved top iron structure for railway turnouts proposed by the utility model;
[0016] Figure 3 The utility model is a partial front view of an improved top iron structure for railway turnouts.
[0017] In the figure: 1 track 1, 2 track 2, 3 tooth block 1, 4 bolts, 5 top iron 1, 6 tooth block 2, 7 telescopic rod, 8 fixing plate, 9 top iron 2, 10 fixing cylinder, 11 magnet, 12 oil pipe, 13 rotating rod, 14 sliding groove. DETAILED DESCRIPTION
[0018] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0019] Reference Figure 1-Figure 3, an improved top iron structure for railway turnout, comprising track 1 and track 2, track 2 is located on the right side of track 1, the outer wall of track 1 is fixedly connected with top iron 2 9, the outer wall of track 2 is fixedly connected with top iron 1 5, the outer wall of top iron 2 9 is fixedly connected with multiple tooth blocks 2 6, the outer wall of top iron 5 is fixedly connected with multiple tooth blocks 3, top iron 5 is provided with two openings, top iron 2 9 is provided with two threaded holes, top iron 2 9 is respectively connected with the two threaded holes by two bolts 4, the two bolts 4 extend to the openings and are threadedly connected with track 2, multiple tooth blocks 2 6 are evenly arranged on the outer wall of top iron 2 9, multiple tooth blocks 3 are evenly arranged on the outer wall of top iron 5, the length of top iron 5 is greater than the length of top iron 2 9, multiple tooth blocks 3 are in contact with the outer wall of top iron 2 9, multiple Tooth block 2 6 is in contact with the outer wall of top iron 1 5. Compared with general top irons, top iron 1 5 is installed on track 2 2 by bolt 4. The basic principle is to ensure that the strength of the rail is not reduced, so the original rail threaded hole cannot be enlarged or the threaded hole cannot be increased. The end of bolt 4 is designed to form an anti-loosening structure with top iron 1 5 and top iron 2 9 to keep the fitting surface of top iron 1 5 and top iron 2 9 with the basic rail unchanged and prevent stress concentration caused by uneven fitting surface. The more complex the structure, the more likely it is to have unexpected situations. Therefore, the complexity of top iron 1 5 and top iron 2 9 is minimized. Without changing the force process and reducing the firmness, stability and safety of the connecting parts, small changes are made to top iron 1 5 and top iron 2 9 to adapt them to on-site needs and seasonal needs, reduce on-site workload, and reduce the stress level of the rail parts.
[0020] The outer wall of the track 1 is adsorbed with a plurality of magnets 11, and the outer walls of the plurality of magnets 11 are fixedly connected with a fixed cylinder 10. A fixed plate 8 is provided on the outer side of the track 1, and a plurality of telescopic rods 7 are fixedly connected to the outer wall of the fixed plate 8. The plurality of telescopic rods 7 are respectively slidably connected with the inner wall of the fixed cylinder 10. A sliding groove 14 is provided on the outer wall of the fixed plate 8, and a rotating rod 13 is fixedly connected to the outer wall of the fixed plate 8. An oil pipe 12 is rotatably sleeved on the outer wall of the rotating rod 13, and the end of the oil pipe 12 is slidably connected with the inner wall of the sliding groove 14. The plurality of magnets 11 are uniformly adsorbed on the outer wall of the track 1, and the plurality of telescopic rods 7 are uniformly arranged at the four corners of the fixed plate 8. The length of the oil pipe 12 is the same as that of the fixed plate 8. The lengths of the fixed plates 8 are equal. After the top iron 5 and the top iron 2 9 have been used for a period of time, the personnel can use the fixed plate 8 to make the multiple magnets 11 adsorb on the track 1 or the track 2 2, and then adjust the position of the fixed plate 8 by pulling the telescopic rod 7, and then move the end of the oil pipe 12 upward along the sliding groove 14, and then inject lubricating oil through the oil pipe 12. The lubricating oil flows to the top iron 5 or the top iron 2 9 by gravity, so as to facilitate the lubrication operation of the top iron 5 and the top iron 2 9, so as to maintain a good lubrication state between the top iron and the wheel, reduce wear and energy consumption, and thus quickly and conveniently perform lubrication operations on places where it is difficult to apply lubricating oil, thereby improving practicality.
[0021] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. An improved top iron structure for a railway turnout, comprising a track 1 (1) and a track 2 (2), characterized in that: The track 2 (2) is located on the right side of the track 1 (1); the outer wall of the track 1 (1) is fixedly connected to a top iron 2 (9); the outer wall of the track 2 (2) is fixedly connected to a top iron 1 (5); the outer wall of the top iron 2 (9) is fixedly connected to a plurality of tooth blocks 2 (6); the outer wall of the top iron 1 (5) is fixedly connected to a plurality of tooth blocks 1 (3); the top iron 1 (5) is provided with two openings; the top iron 2 (9) is provided with two threaded holes; the top iron 2 (9) is respectively connected to the two threaded holes by two bolts (4); the two bolts (4) extend to the openings and are threadedly connected to the track 2 (2).
2. The improved top iron structure for railway turnout according to claim 1, characterized in that: The outer wall of the track 1 (1) is adsorbed with a plurality of magnets (11), and the outer walls of the plurality of magnets (11) are fixedly connected to a fixed cylinder (10). A fixed plate (8) is provided on the outer side of the track 1 (1), and the outer wall of the fixed plate (8) is fixedly connected to a plurality of telescopic rods (7), and the plurality of telescopic rods (7) are respectively slidably connected to the inner wall of the fixed cylinder (10). The outer wall of the fixed plate (8) is provided with a sliding groove (14), and the outer wall of the fixed plate (8) is fixedly connected to a rotating rod (13), and the outer wall of the rotating rod (13) is rotatably sleeved with an oil pipe (12), and the end of the oil pipe (12) is slidably connected to the inner wall of the sliding groove (14).
3. The improved top iron structure for railway turnout according to claim 1, characterized in that: A plurality of the tooth blocks 2 (6) are evenly arranged on the outer side wall of the top iron 2 (9), and a plurality of the tooth blocks 1 (3) are evenly arranged on the outer side wall of the top iron 1 (5).
4. The improved top iron structure for railway turnout according to claim 2, characterized in that: The plurality of magnets (11) are uniformly adsorbed on the outer side wall of the track (1), and the plurality of telescopic rods (7) are uniformly arranged at the four corners of the fixed plate (8).
5. The improved top iron structure for railway turnout according to claim 1, characterized in that: The length of the top iron one (5) is greater than the length of the top iron two (9), a plurality of the tooth blocks one (3) are in contact with the outer side wall of the top iron two (9), and a plurality of the tooth blocks two (6) are in contact with the outer side wall of the top iron one (5).
6. The improved top iron structure for railway turnout according to claim 2, characterized in that: The length of the oil pipe (12) is equal to the length of the fixing plate (8).