Large-span prestressed cantilever casting intelligent hanging basket
By designing a large span prestressed cantilever casting smart hanging basket, using a hydraulic synchronous walking system and an automatic spraying system, the problems of easy overturning and insufficient maintenance of traditional hanging baskets are solved, the construction safety and efficiency are improved, and the maintenance of all positions of the box beam is ensured.
Patent Information
- Application Number
- CN202421538865.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-01
- Publication Date
- 2025-04-11
- Estimated Expiration
- 2034-07-01
AI Technical Summary
In the construction of large span prestressed cantilever casting, there are problems such as easy overturning, high labor intensity, and difficulty in walking on the hanging basket and formwork. In addition, the concrete of the cantilever casting is insufficient, especially the box beam flange plate and bottom plate are difficult to effectively maintain.
A large span prestressed cantilever casting smart hanging basket was designed, and a hydraulic synchronous walking system was installed on the top plate of the box girder, and equipped with an automatic spraying system and a stress monitoring system. The automatic spraying system includes top, side and bottom spray components, which can fully spray water to maintain all positions of the box beam; the stress monitoring system monitors the status and construction safety of the hanging basket through inclination sensors, walking distance sensors and displacement sensors.
It improves the safety and efficiency of bridge construction, ensures the maintenance of all positions of box beams, reduces the arbitraryness and labor intensity of manual maintenance, and improves the quality and reliability of cantilever casting construction.
Smart Images

Figure CN222744827U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge construction, in particular to a large-span prestressed cantilever casting intelligent hanging basket. Background Art
[0002] At present, the hanging basket construction is mainly used in the cantilever pouring construction of large-span prestressed concrete. The hanging basket construction refers to the use of the hanging basket method to cast the cantilever bridge with a larger span in situ. It does not require the erection of brackets and does not use large cranes. The hanging basket is often used in the construction of large-span and ultra-wide bridges. Compared with other methods, it has the advantages of light structure, simple and convenient assembly, and no pressure. The design principles of the hanging basket: light weight, simple structure, strong and stable, easy to move forward and assemble and disassemble, strong reusability, small deformation after being stressed, etc., and there is sufficient space under the hanging basket, which can provide a larger construction working surface, which is conducive to the construction operation of the steel formwork.
[0003] The traditional hanging basket is easy to overturn, has high labor intensity, and is difficult to move the hanging basket and formwork. In the cantilevered concrete casting of the hanging basket, the main method is to cover the top surface of the segment concrete with water storage materials for artificial watering and curing, the inner cavity of the box beam is artificially watered, and the outer surface of the web is sprinkled or sprayed with curing liquid. However, the flange plate and the bottom surface of the bottom plate of the box beam are basically impossible to be maintained, and the parts that are manually maintained also have the disadvantages of large randomness and poor sustainability, which leads to inadequate curing of the cantilevered box beam segment concrete. Utility Model Content
[0004] The purpose of the utility model is to provide a large-span prestressed cantilever casting intelligent hanging basket to solve the above-mentioned deficiencies in the prior art.
[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0006] A large-span prestressed cantilever casting intelligent hanging basket, comprising a hanging basket body, the hanging basket body is installed on the box beam top plate of the box beam through a hydraulic synchronous walking system, an upper crossbeam is arranged at the front end of the hanging basket body, a lower crossbeam is fixed to the upper beam body through a first suspension rod, a side beam area is arranged between the upper crossbeam and the lower crossbeam, the side beam area is connected to the upper crossbeam and the lower crossbeam, a stress monitoring mechanism is arranged on the hanging basket body, and monitoring mechanisms are arranged on the upper crossbeam, the lower crossbeam and the side beam area;
[0007] It also includes an automatic sprinkler system, which includes a water supply mechanism and a sprinkler mechanism. The water supply mechanism is installed on the hanging basket body. The sprinkler mechanism includes a top sprinkler assembly, a side sprinkler assembly and a bottom sprinkler assembly connected to the water supply mechanism. The top sprinkler assembly is arranged on the hanging basket body, the side sprinkler assembly is arranged on the side beam area, and the bottom sprinkler assembly is arranged on the lower cross beam.
[0008] The above-mentioned large-span prestressed cantilever casting intelligent hanging basket, the stress monitoring system includes an inclination sensor, a travel distance sensor and a displacement sensor.
[0009] The above-mentioned large-span prestressed cantilever casting intelligent hanging basket, the side beam area includes a horizontal beam and a vertical beam that are fixedly connected, the horizontal beam is connected to the upper beam through a second hanger, and the lower end of the vertical beam is connected to the lower beam.
[0010] The above-mentioned large-span prestressed cantilever casting intelligent hanging basket has a plurality of support beams arranged on the horizontal crossbeam, and the plurality of support beams are arranged in different directions, and the support beams are connected with side beams corresponding to the box beam flange plates.
[0011] The above-mentioned large-span prestressed cantilever casting intelligent hanging basket, the monitoring mechanism includes high-definition cameras arranged on the upper beam, the lower beam and the horizontal beam.
[0012] The above-mentioned large-span prestressed cantilever casting intelligent hanging basket, the water supply mechanism includes a water tank, a high-pressure water pump and a water receiving pipe, the high-pressure water pump is connected to the water tank, the water receiving pipe has a first water receiving pipe port and a second water receiving pipe port, the first water receiving pipe port is connected to the high-pressure water pump, and the second water receiving pipe port is connected to the top spray assembly, the side spray assembly and the bottom spray assembly.
[0013] The above-mentioned large-span prestressed cantilever casting intelligent hanging basket, the top spray assembly, the side spray assembly and the bottom spray assembly all include a spray maintenance pipe and a plurality of nozzles arranged on the spray maintenance pipe.
[0014] In the above technical scheme, the utility model provides a large-span prestressed cantilever casting intelligent hanging basket, including a hanging basket body and an automatic sprinkler system, an upper crossbeam is arranged at the front end of the hanging basket body, and a lower crossbeam is fixed to the upper beam body through a first hanger, and a side beam area is arranged between the upper crossbeam and the lower crossbeam, and the side beam area is connected to the upper crossbeam and the lower crossbeam, a stress monitoring mechanism is arranged on the hanging basket body, and a monitoring mechanism is arranged on the upper crossbeam, the lower crossbeam and the side beam area, and the safety of bridge construction can be improved by the stress monitoring mechanism and the monitoring mechanism, and the automatic sprinkler system includes a water supply mechanism and a sprinkler mechanism, and the sprinkler mechanism includes a top sprinkler assembly, a side sprinkler assembly and a bottom sprinkler assembly connected to the water supply mechanism, so that water spraying maintenance can be performed on the box girder top plate, the box girder flange plate, the box girder web plate and the box girder bottom plate, so that each position of the box girder is sprayed with water for maintenance, thereby improving the maintenance efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present utility model. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.
[0016] Figure 1 A side view of a large-span prestressed cantilever casting smart hanging basket provided by an embodiment of the utility model;
[0017] Figure 2 One of the front views of the large-span prestressed cantilever casting intelligent hanging basket provided in the embodiment of the utility model;
[0018] Figure 3 The second front view of the large-span prestressed cantilever casting intelligent hanging basket provided by the embodiment of the utility model;
[0019] Figure 4 A schematic structural diagram of a movable spray assembly provided in an embodiment of the utility model.
[0020] Description of reference numerals:
[0021] 1. Box girder; 11. Box girder bottom plate; 12. Box girder top plate; 13. Box girder flange plate; 14. Box girder web plate; 15. Box girder inner cavity; 2. Basket body; 21. Upper crossbeam; 22. Lower crossbeam; 23. Side beam area; 230. Horizontal crossbeam; 231. Vertical beam; 232. Side beam body; 233. Support beam; 24. Stress monitoring mechanism; 240. Displacement sensor; 241. Travel distance sensor; 25. Monitoring mechanism; 3. Automatic sprinkler system; 31. Water supply mechanism; 32. Top sprinkler assembly; 33. Side sprinkler assembly; 34. Bottom sprinkler assembly; 35. Sprinkler; 4. Movable sprinkler assembly; 40. Vertical rod; 41. Horizontal rod; 42. Round piece; 43. Water spraying part. DETAILED DESCRIPTION
[0022] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be further described in detail below in conjunction with the accompanying drawings.
[0023] like Figure 1-4As shown, the utility model provides a large-span prestressed cantilever casting intelligent hanging basket, including a hanging basket body 2 and an automatic spraying system 3. The hanging basket body 2 is installed on the box beam top plate 12 of the box beam 1 through a hydraulic synchronous walking system. The front end of the hanging basket body 2 is provided with an upper cross beam 21, and the upper beam body is fixed with a lower cross beam 22 through a first suspension rod. A side beam area 23 is provided between the upper cross beam 21 and the lower cross beam 22, and the side beam area 23 is connected to the upper cross beam 21 and the lower cross beam 22. A stress monitoring system is provided on the hanging basket body 2. Mechanism 24, the upper crossbeam 21, the lower crossbeam 22 and the side beam area 23 are all provided with a monitoring mechanism 25, the automatic sprinkler system 3 includes a water supply mechanism 31 and a sprinkler mechanism, the water supply mechanism 31 is installed on the hanging basket body 2, the sprinkler mechanism includes a top sprinkler assembly 32, a side sprinkler assembly 33 and a bottom sprinkler assembly 34 connected to the water supply mechanism 31, the top sprinkler assembly 32 is arranged on the hanging basket body 2, the side sprinkler assembly 33 is arranged on the side beam area 23, and the bottom sprinkler assembly 34 is arranged on the lower beam area.
[0024] Specifically, the box girder 1 includes a box girder top plate 12, a box girder flange plate 13, a box girder web plate 14 and a box girder bottom plate 11, and the box girder top plate 12, the box girder flange plate 13, the box girder web plate 14 and the box girder bottom plate 11 surround the box girder inner cavity 15, and the hanging basket body 2 is rhombus-shaped, and the rear end of the hanging basket body 2 is fixed on the upper side of the box girder 1 by an anchor beam, and the front end of the hanging basket body 2 extends outward from the end of the box girder 1. The lower part of the hanging basket body 2 is slidably matched with the box girder top plate 12 through a track, such as a hydraulic synchronous walking system is set between the lower part of the hanging basket body 2 and the box girder top plate 12, a hydraulic oil pump is installed on the hanging basket track at the lower part of the hanging basket body 2, and a synchronous walking sensor is installed to ensure the synchronization of the hanging basket walking, so as to facilitate the subsequent displacement of the hanging basket. All of the above belong to existing mechanisms, and those skilled in the art should be able to understand.
[0025] In this embodiment, an upper crossbeam 21 is provided at the front end of the hanging basket body 2. When there are two, three or more diamond-shaped hanging basket bodies 2, the upper crossbeam 21 is connected to each hanging basket body 2, the upper crossbeam 21 is located directly above the box girder top plate 12, the lower crossbeam 22 is arranged parallel to the upper crossbeam 21, the lower crossbeam 22 is fixedly connected to the upper crossbeam 21 through a plurality of first suspension rods, the lower crossbeam 22 is located below the box girder bottom plate 11, a side beam area 23 is provided between the upper crossbeam 21 and the lower crossbeam 22, the side beam area 23 is connected to the upper crossbeam 21 and the lower crossbeam 22, the side beam area 23 corresponds to the box girder flange plate 13 and the box girder web 14, a stress monitoring mechanism 24 is provided on the hanging basket body 2, the stress monitoring system includes an inclination sensor, a walking distance sensor 241 and a displacement sensor 240, and the inclination sensor is used for the hanging basket body 2 is used to measure the inclination angle of the hanging basket 2 to ensure the safety of the hanging basket body 2 during walking. The walking distance sensor 241 and the displacement sensor 240 are used to measure the walking distance of the hanging basket body 2 so that the hanging basket body 2 can walk a suitable distance each time. The stress monitoring system can also include wind speed and direction sensors, weight sensors, stress sensors, etc., so as to measure the environmental wind speed and direction of the hanging basket, the inclination angle, the amount of concrete in the hanging basket (to ensure symmetrical pouring of concrete), the walking distance, the stress state of the hot spot area and the displacement data of the key area. The sensor is connected to the cloud platform through a wireless signal to upload data in real time. A monitoring mechanism 25 is provided on the upper beam 21, the lower beam 22 and the side beam area 23. The monitoring mechanism 25 includes a high-definition camera to monitor every detail change in the construction area and provide all-round monitoring for the construction operation.
[0026] In this embodiment, the automatic sprinkler system 3 includes a water supply mechanism 31 and a sprinkler mechanism. The water supply mechanism 31 is installed on the hanging basket body 2. The water supply mechanism 31 can store water and can transport water required for sprinkler mechanism. The sprinkler mechanism includes a top sprinkler assembly 32, a side sprinkler assembly 33 and a bottom sprinkler assembly 34 connected to the water supply mechanism 31. The top sprinkler assembly 32 is arranged on the hanging basket body 2. The top sprinkler assembly 32 can be used to spray water on the box girder top plate 12 for maintenance. The side sprinkler assembly 33 is arranged on the side beam area 23. The side sprinkler assembly 33 can be used to spray water on the box girder flange plate 13 and the box girder web plate 14 for maintenance. The bottom sprinkler assembly 34 is arranged on the lower cross beam 22. The bottom sprinkler assembly 34 can be used to spray water on the box girder bottom plate 11 for maintenance, thereby realizing all-round water spray maintenance of the box girder 1.
[0027] The utility model provides a large-span prestressed cantilever casting intelligent hanging basket, including a hanging basket body 2 and an automatic spraying system 3. The front end of the hanging basket body 2 is provided with an upper crossbeam 21, the upper beam body is fixed with a lower crossbeam 22 through a first suspension rod, a side beam area 23 is provided between the upper crossbeam 21 and the lower crossbeam 22, the side beam area 23 is connected to the upper crossbeam 21 and the lower crossbeam 22, a stress monitoring mechanism 24 is provided on the hanging basket body 2, and the upper crossbeam 21, the lower crossbeam 22 and the side beam area 23 are all provided with monitoring Mechanism 25, the safety of bridge construction can be improved through the stress monitoring mechanism 24 and the monitoring mechanism 25, the automatic sprinkler system 3 includes a water supply mechanism 31 and a sprinkler mechanism, the sprinkler mechanism includes a top sprinkler assembly 32, a side sprinkler assembly 33 and a bottom sprinkler assembly 34 connected to the water supply mechanism 31, so that water spraying maintenance can be performed on the box girder top plate 12, the box girder flange plate 13, the box girder web plate 14 and the box girder bottom plate 11, so that each position of the box girder 1 is sprayed with water for maintenance, thereby improving the maintenance efficiency.
[0028] In this embodiment, the measurement area includes a horizontal beam 230 and a vertical beam 231 that are fixedly connected. The horizontal beam 230 is connected to the upper beam 21 through a second hanger, and the lower end of the vertical beam 231 is connected to the lower beam 22. A plurality of support beams 233 are arranged on the horizontal beam 230, and the plurality of support beams 233 are arranged in different directions. The support beams 233 are connected with a side beam body 232 corresponding to the box beam flange plate 13. A portion of the side beam body 232 is arranged corresponding to the box beam flange plate 13, and a portion of the side beam body 232 is arranged corresponding to the upper portion of the box beam web plate 14.
[0029] In this embodiment, the monitoring mechanism 25 includes a high-definition camera arranged on the upper beam 21, the lower beam 22 and the horizontal beam 230. The high-definition camera can be a gun-type outdoor camera or a spherical outdoor camera in the prior art. The high-definition camera has a waterproof effect, and the construction area can be monitored through the high-definition camera.
[0030] In this embodiment, the water supply mechanism 31 includes a water tank, a high-pressure water pump and a water receiving pipe. The high-pressure water pump is connected to the water tank. The water receiving pipe has a first water receiving pipe port and a second water receiving pipe port. The first water receiving pipe port is connected to the high-pressure water pump, and the second water receiving pipe port is connected to the top spray assembly 32, the side spray assembly 33 and the bottom spray assembly 34. The top spray assembly 32, the side spray assembly 33 and the bottom spray assembly 34 all include a spray maintenance pipe and a plurality of nozzles 35 arranged on the spray maintenance pipe. A top spray beam is arranged on the hanging basket body 2. The spray beam is located below the upper cross beam 21 and directly above the box beam top plate 12. The spray maintenance pipe of the top spray assembly 32 is installed on the top spray beam, the spray maintenance pipe of the side spray assembly 33 is installed along the side beam body 232 and the vertical beam 231, and the spray maintenance pipe of the bottom spray assembly 34 is installed along the side beam body 232 and the lower beam body. In this way, the top spray assembly 32, the side spray assembly 33 and the bottom spray assembly 34 can be used to spray water for maintenance on the box beam top plate 12, the box beam flange plate 13, the box beam web plate 14 and the box beam bottom plate 11.
[0031] In this embodiment, a movable spray assembly 4 is also included. The movable spray assembly 4 includes a vertical rod 40 and a horizontal rod 41 arranged on the top of the vertical rod 40. The horizontal rod 41 is a rod body with adjustable length. A mounting seat is arranged on the lower cross beam 22. The vertical rod 40 is detachably mounted on the mounting seat. A connected water delivery channel is arranged inside the vertical rod 40 and the horizontal rod 41. A circular piece 42 is arranged at one end of the horizontal rod 41 away from the vertical rod 40. The circular piece 42 is circumferentially provided with a plurality of water spraying parts 43. A water spray chamber is provided inside the circular member 42, the water spray chamber is connected with the conveying channel, and each water spray part 43 is connected with the water spray chamber, and water can be sprayed into the inner cavity 15 of the box beam through the movable spray assembly 4. In this way, when it is necessary to spray water into the inner cavity 15 of the box beam, the vertical rod 40 is installed on the mounting seat, and the high-pressure water pump works to convey water to the water conveying channels of the vertical rod 40 and the horizontal rod 41, and finally conveyed to the water conveying chamber and sprayed out from each water spray part 43, so as to spray water into the inner cavity 15 of the box beam.
[0032] The above only describes some exemplary embodiments of the present invention by way of illustration. It is undoubted that those skilled in the art can modify the described embodiments in various ways without departing from the spirit and scope of the present invention. Therefore, the above drawings and descriptions are illustrative in nature and should not be construed as limiting the scope of protection of the claims of the present invention.
Claims
1. A large-span prestressed cantilever casting intelligent hanging basket, comprising a hanging basket body, wherein the hanging basket body is installed on the top plate of the box beam through a hydraulic synchronous walking system, characterized in that: An upper crossbeam is provided at the front end of the hanging basket body, a lower crossbeam is fixed to the upper beam body through a first suspension rod, a side beam area is provided between the upper crossbeam and the lower crossbeam, the side beam area is connected to both the upper crossbeam and the lower crossbeam, a stress monitoring mechanism is provided on the hanging basket body, and monitoring mechanisms are provided on the upper crossbeam, the lower crossbeam and the side beam area; It also includes an automatic sprinkler system, which includes a water supply mechanism and a sprinkler mechanism. The water supply mechanism is installed on the hanging basket body. The sprinkler mechanism includes a top sprinkler assembly, a side sprinkler assembly and a bottom sprinkler assembly connected to the water supply mechanism. The top sprinkler assembly is arranged on the hanging basket body, the side sprinkler assembly is arranged on the side beam area, and the bottom sprinkler assembly is arranged on the lower cross beam.
2. The large-span prestressed cantilever casting intelligent hanging basket according to claim 1 is characterized in that: The stress monitoring system includes an inclination sensor, a travel distance sensor and a displacement sensor.
3. The large-span prestressed cantilever casting intelligent hanging basket according to claim 1 is characterized in that: The side beam area includes a horizontal beam and a vertical beam that are fixedly connected. The horizontal beam is connected to the upper beam through a second suspension rod, and the lower end of the vertical beam is connected to the lower beam.
4. The large-span prestressed cantilever casting intelligent hanging basket according to claim 3 is characterized in that: A plurality of support beams are arranged on the horizontal cross beam, and the plurality of support beams are arranged in different directions. The support beams are connected with side beam bodies corresponding to the flange plates of the box beam.
5. The large-span prestressed cantilever casting intelligent hanging basket according to claim 4 is characterized in that: The monitoring mechanism comprises high-definition cameras arranged on the upper crossbeam, the lower crossbeam and the horizontal crossbeam.
6. The large-span prestressed cantilever casting intelligent hanging basket according to claim 4 is characterized in that: The water supply mechanism includes a water tank, a high-pressure water pump and a water receiving pipe, the high-pressure water pump is connected to the water tank, the water receiving pipe has a first water receiving pipe opening and a second water receiving pipe opening, the first water receiving pipe opening is connected to the high-pressure water pump, and the second water receiving pipe opening is connected to the top spray assembly, the side spray assembly and the bottom spray assembly.
7. The large-span prestressed cantilever casting intelligent hanging basket according to claim 6 is characterized in that: The top spray assembly, the side spray assembly and the bottom spray assembly all include a spray maintenance pipe and a plurality of spray heads arranged on the spray maintenance pipe.