Guide frame for row pile construction

By designing a guide frame for steel pipe pile construction, the problems of axis deviation and inclination in steel pipe pile construction are solved, and the stable guidance and adaptability adjustment of steel pipe piles are achieved.

CN222745033UActive Publication Date: 2025-04-11CHINA HARBOUR ENGINEERING +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421522203.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-01
Publication Date
2025-04-11
Estimated Expiration
2034-07-01

AI Technical Summary

Technical Problem

During the construction of steel pipe piles, axial deviation and inclination are prone to occur when directly penetrated into the ground through the equipment.

Method used

A guide frame for pile row construction is designed, including a base frame, top frame, column, fixed beam, positioning frame and guide wheel. These components form a stable frame, and the upper and lower guide to the steel pipe piles through the positioning frame and guide wheel.

Benefits of technology

It effectively avoids the problems of axis deviation and inclination during the construction process of steel pipe piles, and adapts to steel pipe piles of different diameters and spacings through an adjustable design.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222745033U_ABST
    Figure CN222745033U_ABST
Patent Text Reader

Abstract

The utility model discloses a guide frame for row pile construction. The guide frame comprises a bottom frame, a top frame, stand columns and a positioning frame. According to the guide frame for row pile construction, a top frame corresponding to a bottom frame is arranged above the bottom frame, stand columns are symmetrically and fixedly connected between the top frame and the bottom frame at equal intervals, first inclined pull parts are jointly and fixedly connected between the stand columns located at the corners of the bottom frame and fixed cross beams, and second inclined pull parts are fixedly connected between the stand columns on the same side in a staggered mode; multiple groups of positioning frames are symmetrically arranged in the bottom frame and the top frame, guide wheels are symmetrically mounted on the circumferences of the positioning frames, the top frame and the bottom frame are formed through edge beams and end beams, are connected into a whole through stand columns, are reinforced through first cable-stayed parts and second cable-stayed parts, and are fixed through fixing cross beams, so that a stable frame is formed; and through cooperation of positioning of the positioning frame and guiding of the guiding wheels, guiding is conducted on steel pipe pile row pile construction, up-down double guiding is achieved, and the problems of axis deviation and inclination are effectively avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of civil construction, in particular to a guide frame for pile row construction. Background Art

[0002] A pile row is a foundation pit support structure composed of a certain type of pile arranged in a queue. The most commonly used pile types are reinforced concrete bored piles and bored piles, in addition to I-beam piles, H-beam piles and steel pipe piles.

[0003] Regarding the construction of steel pipe piles, since the steel pipe piles themselves are relatively long, axis deviation and tilt are prone to occur when the steel pipe piles are directly driven into the ground by equipment. Therefore, a guide frame for pile row construction is proposed to facilitate the pile row construction of steel pipe piles. Utility Model Content

[0004] The utility model aims to provide a guide frame for pile row construction, so as to solve the problem of axis deviation and inclination when steel pipe piles are driven into the ground directly by equipment proposed in the above background technology.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] A guide frame for pile row construction comprises a base frame, a top frame corresponding to the base frame is arranged above the base frame, columns are symmetrically fixedly connected between the top frame and the base frame at equal distances, fixed beams are symmetrically fixedly connected at both ends of the bottom surface of the base frame, the base frame and the top frame both comprise symmetrically arranged side beams and symmetrically arranged end beams, the end beams are welded and fixedly connected at both ends of the side beams, a first inclined brace is commonly fixedly connected between the columns located at the corners of the base frame and the fixed beams, a second inclined brace is staggered and fixedly connected between the columns on the same side, a plurality of groups of positioning frames are symmetrically arranged in the base frame and the top frame, the positioning frames in the base frame correspond to the positioning frames in the top frame, and guide wheels are symmetrically installed on the positioning frames.

[0007] As a further solution of the utility model: the columns, fixed cross beams and side beams are all welded from two I-beams, and the end beams, the first diagonal stays and the second diagonal stays are all I-beams.

[0008] As a further solution of the utility model: one side of the positioning frame is inserted into the inner edge of the base frame and the top frame and moves along the edge, the inner side of the base frame and the top frame is composed of the inner I-beam of the side beam to form a sliding groove for the positioning frame to be inserted and slide, the inner edges of the base frame and the top frame are symmetrically provided with adjustment holes at equal distances, and the sides of the positioning frame are symmetrically provided with fixing holes.

[0009] As a further solution of the utility model: the fixing hole corresponds to and fits with the adjusting hole, a fixing bolt passes through both the fixing hole and the adjusting hole, and the fixing bolt passes through the fixing hole and the adjusting hole and is threadedly connected with a nut.

[0010] As a further solution of the utility model: each group of the positioning frames is composed of two positioning frames, and the two corners of the top surface of the positioning frame are fixedly connected with a guide sleeve, and a guide rod compatible with it is slidably connected in the guide sleeve, and the end of the guide rod is fixedly connected with an articulated seat, and the articulated seats corresponding to the two corners of the positioning frame are fixedly connected to the positive end surface of the corresponding guide rod, the articulated seats are centered and corresponding, and the guide wheel is rotatably installed in the articulated seat.

[0011] As a further solution of the utility model: the top surface of the guide sleeve is threadedly connected with a locking bolt, the locking bolt passes through the guide sleeve and is inserted into the guide rod, the guide sleeve is provided with a threaded hole for the locking bolt to be threadedly connected, and the guide rod is provided with positioning holes for the locking bolt to pass through at equal distances.

[0012] As a further solution of the utility model: a table top is fixedly connected to the top frame, a ladder is connected to one side of the table top, the ladder is fixedly connected to the corresponding column through a fixing rod, guardrails are fixedly connected to the table top and the ladder, and a triangular plate is evenly fixedly connected between the bottom surface of the table top and the top frame, and the triangular plate has a reinforcing support effect on the table top.

[0013] Compared with the prior art, the beneficial effects of the utility model are:

[0014] 1. The utility model forms a top frame and a bottom frame through side beams and end beams, which are connected into a whole through columns, reinforced by first and second inclined pulls, and fixed by fixed cross beams, so as to form a stable frame, cooperate with the positioning of the positioning frame and the guidance of the guide wheel, so as to guide the construction of steel pipe piles, and the double upper and lower guidance can effectively avoid the problems of axis deviation and inclination.

[0015] 2. The utility model controls the extension distance of the guide rod and the position of the hinge seat by adjusting the locking bolt and the positioning hole, so that the size of the area surrounded by the guide wheel can be changed, thereby adapting to the guidance of steel pipe piles of different diameters. At the same time, the spacing of the positioning frame can be controlled by selecting the fixing bolt and the adjustment hole, thereby adapting to the guidance of steel pipe piles of different spacings.

[0016] 3. The utility model provides a ladder to facilitate workers to climb onto the platform so as to operate the positioning frame on the platform, while the guardrail plays a role of safety protection. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 The present invention is a structural schematic diagram of a guide frame for pile construction.

[0018] Figure 2 It is an upward stereoscopic view of a guide frame used for pile construction.

[0019] Figure 3 This is a diagram showing the positioning frame in a guide frame used in pile construction.

[0020] In the figure: 1. bottom frame; 2. top frame; 3. second inclined-stayed frame; 4. upright column; 5. fixed crossbeam; 6. side beam; 7. end beam; 8. first inclined-stayed frame; 9. triangle plate; 10. positioning frame; 11. guide wheel; 12. adjustment hole; 13. fixing hole; 14. fixing bolt; 15. guide sleeve; 16. guide rod; 17. hinge seat; 18. locking bolt; 19. positioning hole; 20. table top; 21. ladder; 22. guardrail. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0022] See also Figures 1 to 3 In the embodiment of the utility model, a guide frame for pile construction includes a base frame 1, a corresponding top frame 2 is arranged above the base frame 1, columns 4 are symmetrically fixedly connected between the top frame 2 and the base frame 1 at equal distances, fixed beams 5 are symmetrically fixedly connected at both ends of the bottom surface of the base frame 1, the base frame 1 and the top frame 2 both include symmetrically arranged side beams 6 and symmetrically arranged end beams 7, the end beams 7 are welded and fixedly connected to the two ends of the side beams 6, a first inclined stay 8 is fixedly connected between the columns 4 located at the corners of the base frame 1 and the fixed beams 5, a second inclined stay 3 is staggered and fixedly connected between the columns 4 on the same side, a plurality of positioning frames 10 are symmetrically arranged in the base frame 1 and the top frame 2, the positioning frames 10 in the base frame 1 correspond to the positioning frames 10 in the top frame 2, and guide wheels 11 are symmetrically installed on the positioning frames 10.

[0023] The top frame 2 and the bottom frame 1 are formed by the side beams 6 and the end beams 7, which are connected into a whole by the columns 4, reinforced by the first inclined brace 8 and the second inclined brace 3, and fixed by the fixed cross beam 5, so as to form a stable frame. The positioning of the positioning frame 10 and the guidance of the guide wheel 11 can guide the construction of the steel pipe pile row, and the double upper and lower guidance can effectively avoid the problems of axis deviation and tilt.

[0024] The upright column 4, the fixed cross beam 5, and the side beam 6 are all formed by welding two I-beams, and the end beam 7, the first inclined brace 8, and the second inclined brace 3 are all I-beams.

[0025] One side of the positioning frame 10 is inserted into the inner edge of the base frame 1 and the top frame 2 and moves along the edge. The inner side of the base frame 1 and the top frame 2 is composed of the inner I-beam of the side beam 6 to form a slide groove for the positioning frame 10 to be inserted and slide. Adjustment holes 12 are symmetrically opened on the inner edges of the base frame 1 and the top frame 2 at equal distances, and fixing holes 13 are symmetrically opened on the sides of the positioning frame 10.

[0026] The fixing hole 13 corresponds to and matches the adjusting hole 12 , and a fixing bolt 14 penetrates both the fixing hole 13 and the adjusting hole 12 . The fixing bolt 14 penetrates the fixing hole 13 and the adjusting hole 12 and is threadedly connected with a nut.

[0027] Each group of the positioning frames 10 is composed of two positioning frames 10, and the two corners of the top surface of the positioning frame 10 are fixedly connected with a guide sleeve 15, and a guide rod 16 adapted thereto is slidably connected inside the guide sleeve 15. The end of the guide rod 16 is fixedly connected with an articulated seat 17, and the articulated seats 17 corresponding to the two corners of the positioning frame 10 are fixedly connected to the positive end surface of the corresponding guide rod 16, and the articulated seats 17 are all centered and corresponding, and the guide wheel 11 is rotatably installed in the articulated seat 17.

[0028] The positioning frames 10 are grouped in pairs, with a gap in between, so as to avoid interference with the connecting parts during pile row construction and affect pile driving.

[0029] The top surface of the guide sleeve 15 is threadedly connected with a locking bolt 18, and the locking bolt 18 passes through the guide sleeve 15 and is inserted into the guide rod 16. The guide sleeve 15 is provided with a threaded hole for the locking bolt 18 to be threadedly connected, and the guide rod 16 is provided with positioning holes 19 for the locking bolt 18 to pass through at equal distances.

[0030] By adjusting the locking bolt 18 in coordination with the positioning hole 19, the extension distance of the guide rod 16 is controlled, thereby controlling the position of the hinge seat 17, so that the size of the area surrounded by the guide wheel 11 is changed, thereby adapting to the guidance of steel pipe piles of different diameters. At the same time, the spacing of the positioning frame 10 can be controlled by selecting the fixing bolt 14 and the adjustment hole 12, thereby adapting to the guidance of steel pipe piles of different spacings.

[0031] A table top 20 is fixedly connected to the top frame 2, a ladder 21 is connected to one side of the table top 20, the ladder 21 is fixedly connected to the corresponding column 4 through a fixing rod, guardrails 22 are fixedly connected to both the table top 20 and the ladder 21, and a triangular plate 9 is evenly fixedly connected between the bottom surface of the table top 20 and the top frame 2, the triangular plate 9 serves to strengthen the support effect of the table top 20.

[0032] The ladder 21 is provided to facilitate workers to climb onto the platform 20 , so as to operate the positioning frame 10 on the platform 20 , while the guardrail 22 plays a role of safety protection.

[0033] Before installing the guide frame, anchor anti-slip piles need to be set at the four corners of the guide frame. The anchor anti-slip piles are φ400mm steel pipe piles, 7m long. First, calculate the distance between the positioning anchor anti-slip piles and the axis of the pipe sheet pile wall on the drawing. After measuring and releasing the axis of the steel pipe pile on site, use a steel tape measure to measure the position of the positioning anchor anti-slip piles. Positioning anchor anti-slip piles need to be driven in each construction section. The anchor anti-slip piles are driven in by a crawler crane hoisting vibrating hammer. After the anchor anti-slip piles are driven in to a certain distance above the ground, the guide frame can be installed.

[0034] After the anchor anti-slip piles are driven, the assembled guide frame is lifted by a crawler crane and placed in the calculated position. After the guide frame is adjusted to a horizontal level by a hydraulic jack, the anchor anti-slip piles are welded to the base steel plate of the guide frame.

[0035] The working principle of the utility model is:

[0036] When in use, the user can climb onto the platform 20 via the ladder 21 to operate. During operation, the positioning frames 10 on the bottom frame 1 and the top frame 2 can be operated simultaneously, and the positioning frame 10 can be slid in the slide groove formed by the I-beam. The appropriate adjustment hole 12 is selected, and the nut is screwed on by the fixing bolt 14 passing through the fixing hole 13 and the adjustment hole 12 to adjust the spacing of the positioning frame 10, thereby controlling the central moment of the steel pipe pile. At the same time, the locking bolt 18 can be loosened so that the guide rod 16 can slide in the guide sleeve 15, thereby controlling the movement of the articulated seat 17. By selecting different positioning holes 19 and fixing them with the locking bolt 18, the size of the area enclosed by the guide wheel 11 can be controlled, so as to facilitate the guidance of steel pipe piles of different diameters.

[0037] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.

Claims

1. A guide frame for pile construction, comprising a base frame (1), characterized in that: A corresponding top frame (2) is arranged above the bottom frame (1), columns (4) are symmetrically fixedly connected between the top frame (2) and the bottom frame (1) at equal distances, fixed beams (5) are symmetrically fixedly connected at both ends of the bottom surface of the bottom frame (1), the bottom frame (1) and the top frame (2) both include symmetrically arranged side beams (6) and symmetrically arranged end beams (7), the end beams (7) are welded and fixedly connected to both ends of the side beams (6), a first inclined brace (8) is commonly fixedly connected between the columns (4) located at the corners of the bottom frame (1) and the fixed beams (5), a second inclined brace (3) is staggered and fixedly connected between the columns (4) on the same side, a plurality of groups of positioning frames (10) are symmetrically arranged in the bottom frame (1) and the top frame (2), the positioning frames (10) in the bottom frame (1) correspond to the positioning frames (10) in the top frame (2), and guide wheels (11) are symmetrically installed on the positioning frames (10).

2. A guide frame for pile construction according to claim 1, characterized in that: The upright column (4), the fixed cross beam (5) and the side beam (6) are all formed by welding two I-beams, and the end beam (7), the first inclined brace (8) and the second inclined brace (3) are all I-beams.

3. A guide frame for pile construction according to claim 1, characterized in that: One side of the positioning frame (10) is inserted into the inner edges of the bottom frame (1) and the top frame (2) and moves along the edges; the inner edges of the bottom frame (1) and the top frame (2) are symmetrically provided with adjustment holes (12) at equal distances; and the sides of the positioning frame (10) are symmetrically provided with fixing holes (13).

4. A guide frame for pile construction according to claim 3, characterized in that: The fixing hole (13) corresponds to and matches the adjusting hole (12); a fixing bolt (14) penetrates both the fixing hole (13) and the adjusting hole (12); and the fixing bolt (14) penetrates the fixing hole (13) and the adjusting hole (12) and is then threadedly connected with a nut.

5. The guide frame for pile construction according to claim 1, characterized in that: Each group of the positioning frames (10) is composed of two positioning frames (10), the top two corners of the positioning frames (10) are fixedly connected with guide sleeves (15), the guide sleeves (15) are slidably connected with guide rods (16) adapted thereto, the ends of the guide rods (16) are fixedly connected with hinge seats (17), the hinge seats (17) corresponding to the two corners of the positioning frames (10) are fixedly connected to the positive end faces of the corresponding guide rods (16), the hinge seats (17) are all centered and corresponding, and the guide wheels (11) are rotatably installed in the hinge seats (17).

6. A guide frame for pile construction according to claim 5, characterized in that: The top surface of the guide sleeve (15) is threadedly connected with a locking bolt (18), which passes through the guide sleeve (15) and is inserted into the guide rod (16). Positioning holes (19) for the locking bolt (18) to pass through are formed at equal distances on the guide rod (16).

7. The guide frame for pile construction according to claim 1, characterized in that: A platform (20) is fixedly connected to the top frame (2), a ladder (21) is connected to one side of the platform (20), the ladder (21) is fixedly connected to the corresponding column (4) via a fixing rod, a guardrail (22) is fixedly connected to both the platform (20) and the ladder (21), and a triangular plate (9) is evenly fixedly connected between the bottom surface of the platform (20) and the top frame (2).