Fabricated beam-column joint adopting dry and wet combined connection
By adopting a wet and dry method in the beam and column nodes of prefabricated buildings, combined with the use of built-in positioning support table and high-toughness early-strength concrete, the problem of insufficient node integrity and seismic resistance in the existing technology is solved, and higher bearing capacity and construction efficiency are achieved.
Patent Information
- Application Number
- CN202421550704.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-02
- Publication Date
- 2025-04-11
- Estimated Expiration
- 2034-07-02
AI Technical Summary
In existing prefabricated buildings, the node integrity and seismic resistance of dry connections are poor, while the nodes of wet connections are complex in construction and have a long cycle, making it difficult to achieve prefabricated beam and column nodes with convenient construction and good connection performance.
The prefabricated beam and column nodes are connected by dry and wet methods. By setting up a built-in positioning support platform on the prefabricated columns and overlapping with the prefabricated notched beams in the core area, a dry and wet connection points are formed. Combined with the use of high-toughness and early strength concrete, the integrity and seismic resistance of the nodes are improved.
It improves the bearing capacity and integrity of the nodes, enhances seismic resistance, and simplifies the construction process, reduces on-site workload, and improves construction efficiency.
Smart Images

Figure CN222745282U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of assembled buildings, in particular to an assembled beam-column node connected by a dry-wet method. Background Art
[0002] Prefabricated buildings are a type of construction that uses prefabricated components and is assembled on site. Compared with the original cast-in-place construction, the workload is greatly reduced, which is beneficial for saving resources, improving labor productivity and quality and safety levels.
[0003] Prefabricated beam-column joints are generally composed of prefabricated columns, prefabricated beams and post-cast concrete, and the connection methods are usually divided into dry connection and wet connection. Dry connection basically does not require pouring concrete, which reduces the workload and shortens the construction period, but the integrity and seismic performance of the joint are poor; wet connection nodes have good integrity, but the on-site workload is large, the difficulty is high, and the construction period is long. In summary, how to provide a prefabricated beam-column joint that is easy to construct and has good connection performance is an urgent problem to be solved in the field of prefabricated buildings. Utility Model Content
[0004] The purpose of the utility model is to overcome the deficiencies of the prior art and to provide an assembled beam-column node connected by a combination of dry and wet methods, wherein a built-in positioning support platform for the outwardly extending column is provided at the bottom of the core area, thereby improving the node bearing capacity and facilitating construction.
[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0006] A prefabricated beam-column node connected by a dry-wet method, comprising a prefabricated notched beam, a prefabricated column, a prefabricated built-in positioning support platform, a first connection point, column longitudinal reinforcement, beam longitudinal reinforcement, and a second connection point;
[0007] The notch of the prefabricated notched beam is on the lower side and the protrusion is on the upper side. The prefabricated built-in positioning support platform is arranged on the prefabricated column. The prefabricated built-in positioning support platform extends to the outside in the core area of the assembled beam-column node and overlaps with the prefabricated notched beam;
[0008] The longitudinal reinforcement of the bottom beam of the prefabricated notched beam extends outward from the beam cross section and is welded to the bottom steel plate of the prefabricated built-in positioning support platform to form a first connection point;
[0009] The upper longitudinal reinforcements of the two ends of the prefabricated notched beam are connected in the core area of the assembled beam-column node through an adjustable mechanical sleeve to form a second connection point;
[0010] Pouring high-toughness early-strength concrete in the core area of the assembled beam-column node and the extended section area of the prefabricated built-in positioning support platform;
[0011] The first connection point is a dry connection, and the second connection point is a wet connection.
[0012] Preferably, the end of the beam longitudinal reinforcement is provided with an external thread for connecting to the adjustable mechanical sleeve.
[0013] Preferably, the prefabricated built-in positioning support platform is welded by two horizontal steel plates and two vertical steel plates, and the horizontal steel plates are provided with reserved holes for positioning and passing the column longitudinal reinforcement.
[0014] Preferably, the bottom surface of the extended section of the prefabricated notched beam overlaps the upper surface of the prefabricated built-in positioning support platform.
[0015] Preferably, the length of the upper overhanging section of the prefabricated notched beam is the same as the length of the overhanging column of the prefabricated built-in positioning support platform.
[0016] Beneficial effects: The built-in positioning support platform of the utility model is in contact with the prefabricated beam and welded to the bottom longitudinal reinforcement. The longitudinal reinforcement of the beam is connected in the core area by an adjustable mechanical sleeve. Compared with the traditional connection method, this composite connection method not only improves the node bearing capacity, but also facilitates construction, reduces on-site workload, and improves construction efficiency; and the post-cast high-toughness early-strength concrete enhances the integrity and seismic resistance of the node compared to only using dry connection. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 A schematic diagram of the structure of the assembled node provided by the utility model;
[0018] Figure 2 A schematic diagram of the structure of the core area of the assembled node provided by the utility model;
[0019] Figure 3 This is a structural schematic diagram of the built-in positioning support platform of the assembled node provided by the utility model;
[0020] Reference numerals:
[0021] 1. Prefabricated notched beam; 2. Prefabricated column; 3. Prefabricated built-in positioning support platform; 4. First connection point; 5. Column longitudinal reinforcement; 6. Beam longitudinal reinforcement; 7. Second connection point; 8. Horizontal steel plate; 9. Vertical steel plate; 10. Reserved hole. DETAILED DESCRIPTION
[0022] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be further described in detail below in conjunction with the accompanying drawings.
[0023] Please refer to Figure 1-3 As shown, a prefabricated beam-column node connected by a combination of dry and wet methods comprises a prefabricated notched beam 1, a prefabricated column 2, a prefabricated built-in positioning support platform 3, a first connection point 4, a column longitudinal reinforcement 5, a beam longitudinal reinforcement 6, and a second connection point 7;
[0024] The notch of the prefabricated notched beam 1 is on the lower side and the protrusion is on the upper side. The prefabricated built-in positioning support platform 3 is arranged on the prefabricated column 2. The prefabricated built-in positioning support platform 3 extends to the outside in the core area of the assembled beam-column node and overlaps with the prefabricated notched beam 1;
[0025] The longitudinal reinforcement 6 at the bottom of the prefabricated notched beam 1 extends outward from the beam cross section and is welded to the bottom steel plate of the prefabricated built-in positioning support platform 3 to form a first connection point 4;
[0026] The upper beam longitudinal reinforcements 6 at both ends of the prefabricated notched beam 1 are connected by an adjustable mechanical sleeve in the core area of the assembled beam-column node to form a second connection point 7; the ends of the beam longitudinal reinforcements 6 are provided with external threads for connection with the adjustable mechanical sleeve.
[0027] The prefabricated built-in positioning support platform 3 is welded by two horizontal steel plates 8 and two vertical steel plates 9. The horizontal steel plates 8 are provided with reserved holes 10 for positioning and passing the column longitudinal reinforcement 5. The bottom surface of the extended section of the prefabricated notched beam 1 overlaps the upper surface of the prefabricated built-in positioning support platform 3. The length of the upper extended section of the prefabricated notched beam 1 is the same as the length of the extended column of the prefabricated built-in positioning support platform 3.
[0028] Formwork is provided in the core area of the assembled beam-column node and the extended section area of the prefabricated built-in positioning support platform 3, and high-toughness early-strength concrete with cementitious materials and silicate cement is poured later, so that the node reaches sufficient strength to become a whole after 48 hours of curing. This not only improves the node bearing capacity, enhances the integrity and seismic performance of the node, but also facilitates construction, reduces on-site workload, and improves construction efficiency.
[0029] The first connection point 4 is a dry connection, and the second connection point 7 is a wet connection.
[0030] The above only describes some exemplary embodiments of the present invention by way of illustration. It is undoubted that those skilled in the art can modify the described embodiments in various ways without departing from the spirit and scope of the present invention. Therefore, the above drawings and descriptions are illustrative in nature and should not be construed as limiting the scope of protection of the claims of the present invention.
Claims
1. A prefabricated beam-column joint connected by a dry and wet method, characterized in that: It includes a prefabricated notched beam, a prefabricated column, a prefabricated built-in positioning support platform, a first connection point, a column longitudinal reinforcement, a beam longitudinal reinforcement and a second connection point; The notch of the prefabricated notched beam is on the lower side and the protrusion is on the upper side. The prefabricated built-in positioning support platform is arranged on the prefabricated column. The prefabricated built-in positioning support platform extends to the outside in the core area of the assembled beam-column node and overlaps with the prefabricated notched beam; The longitudinal reinforcement of the bottom beam of the prefabricated notched beam extends outward from the beam cross section and is welded to the bottom steel plate of the prefabricated built-in positioning support platform to form a first connection point; The upper longitudinal beam reinforcements at both ends of the prefabricated notched beam are connected in the core area of the assembled beam-column node through an adjustable mechanical sleeve to form a second connection point; Pouring high-toughness early-strength concrete in the core area of the assembled beam-column node and the extended section area of the prefabricated built-in positioning support platform; The first connection point is a dry connection, and the second connection point is a wet connection.
2. The assembled beam-column node of claim 1, characterized in that: The end of the beam longitudinal reinforcement is provided with an external thread for connecting with the adjustable mechanical sleeve.
3. The assembled beam-column node of claim 2, characterized in that: The prefabricated built-in positioning support platform is formed by welding two horizontal steel plates and two vertical steel plates. The horizontal steel plates are provided with reserved holes for positioning and passing the column longitudinal reinforcement.
4. The assembled beam-column node of claim 3, characterized in that: The bottom surface of the extended section of the prefabricated notched beam is overlapped with the upper surface of the prefabricated built-in positioning support platform.
5. The assembled beam-column node of claim 4, characterized in that: The length of the upper outward extension section of the prefabricated notched beam is the same as the length of the outward extension column of the prefabricated built-in positioning support platform.