Building hanging basket device with wind vibration resisting function
By designing a building hanging basket device including suspension bracket, ground anchor, cable wind rope, hanging rope, hanging basket, draw rope, cable sliding sleeve and fixed knot assembly, the existing building hanging basket has poor stability in strong winds, and the effect of effectively reducing the swing range of the hanging basket and ensuring the safety of the operator is achieved.
Patent Information
- Application Number
- CN202421331623.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-12
- Publication Date
- 2025-04-11
- Estimated Expiration
- 2034-06-12
AI Technical Summary
The existing building hanging baskets have poor stability in strong winds and pose safety risks.
A building hanging basket device including a suspension bracket, ground anchor, cable wind rope, suspended rope, hanging basket, draw rope, cable sliding sleeve and fixing knot assembly is designed. It is fixed to the building through the upper and middle part of the cable wind rope, and the lower end is fixed to the ground. The hanging basket is fixed to the cable wind rope through the draw rope and cable sliding sleeve to ensure the stability of the hanging basket.
It effectively reduces the swing amplitude of the hanging basket, ensures the safety of the operator, and improves the wind-resistant function of the hanging basket.
Smart Images

Figure CN222745604U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of hanging baskets, in particular to a building hanging basket device with wind-vibration resistance function. Background Art
[0002] With the increasing maturity of hanging basket construction technology and the standardization of on-site safety management, more and more hanging baskets are being used in projects such as building curtain walls, old house repairs and exterior wall cleaning. Compared with traditional scaffolding, hanging baskets not only have the advantages of quick erection, simple operation, convenient use, safety and reliability, but also can effectively shorten the construction period, reduce the labor intensity of workers, significantly improve labor efficiency, and reduce construction costs. However, since the left and right sides of the hanging basket are set on the ropes on the suspension bracket, the hanging basket cannot establish a reliable connection with the main building, resulting in poor stability of the hanging basket. At the same time, its use is limited in areas with frequent strong winds, especially in the case of sudden gusts, the safety of the operator cannot be guaranteed, and there are great safety hazards. Utility Model Content
[0003] The utility model aims to overcome the deficiencies of the prior art and provide a building hanging basket device with wind-vibration resistance function.
[0004] The purpose of this utility model is achieved through the following technical solutions:
[0005] A building hanging basket device with anti-wind vibration function, comprising a suspension bracket, a ground anchor, a cable wind rope, a suspension rope, a hanging basket, a pull rope, a cable sleeve and a fixed knot assembly, wherein the suspension bracket is fixedly arranged on the top of the building, and the cantilever on the suspension bracket extends to the outside of the building, the upper end of the cable wind rope is fixed to the cantilever, and the lower end of the cable wind rope is fixed to the ground through the ground anchor, the hanging basket is arranged on the cantilever through the suspension rope, the hanging basket is fixedly connected to one end of the pull rope, and the other end of the pull rope is fixedly arranged on the cable sleeve, the cable sleeve is arranged on the cable wind rope, and the middle part of the cable wind rope is fixed to the building through the fixed knot assembly.
[0006] Furthermore, two hanging ropes are arranged on the hanging bracket, and two ends of the hanging basket are respectively arranged on the two hanging ropes.
[0007] Furthermore, two sets of mutually parallel wind ropes are arranged between the suspension bracket and the ground, and the two ends of the hanging basket are respectively arranged on the wind ropes through the pull ropes and the cable sliding sleeves.
[0008] Furthermore, the fixed tie assembly includes a floor tie ring, a fixed lock buckle and a fixed lock rope, the floor tie ring is fixedly connected to the fixed lock buckle through the fixed lock rope, the fixed lock buckle is detachably connected to the cable wind rope, and the floor tie ring is fixedly set on the building.
[0009] Furthermore, the floor tie ring is fixedly arranged on the floor of the building.
[0010] Furthermore, the guy rope and the suspension rope are both arranged vertically.
[0011] Furthermore, the cable sleeve includes a long sleeve, a short sleeve, a hinge shaft, a cam, a manual lever, an adjusting lever, an axial rod and an adjusting ring, one end of the long sleeve is connected to one end of the short sleeve through the hinge shaft, one end of the adjusting lever is connected to the adjusting ring, the other end of the adjusting lever passes through the short sleeve and the long sleeve in sequence and is fixedly connected to the axial rod, the axial rod is rotatably arranged on the middle part of the cam, the manual lever is fixedly connected to the outer wall of the cam, the long sleeve and the short sleeve are both provided with sliding grooves cooperating with the cable wind rope, and the pull rope is fixedly connected to the long sleeve.
[0012] Furthermore, the adjusting rod is fixedly connected to the middle portion of the axial rod, and the cam is provided with a rotation groove that cooperates with the adjusting rod.
[0013] Furthermore, the adjusting ring is a nut, and the adjusting ring and the adjusting rod are threadedly matched.
[0014] Furthermore, a mounting hole for fixing the pull rope is provided on the end of the long sliding sleeve.
[0015] The beneficial effects of the utility model are:
[0016] 1) In this technology, the upper end and the middle part of the cable wind rope are fixed on the building, and the lower end is fixed on the ground. The hanging basket is fixed on the cable wind rope through the pull rope and the cable slide. This can ensure the stability of the hanging basket. Even if there is a strong wind, the swing amplitude of the hanging basket can be effectively reduced, so that the safety of the user can be effectively guaranteed.
[0017] 2) In the present technology, the cable sliding sleeve can not only slide on the cable wind rope, but also be fixed together with the cable wind rope and can be removed from the cable wind rope, which is easy to operate and has a simple structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 This is a schematic diagram of the side view connection structure of the building hanging basket device;
[0019] Figure 2 This is a schematic diagram of the main view connection structure of the building hanging basket device;
[0020] Figure 3 This is a schematic diagram of the main view connection structure of the cable sleeve;
[0021] Figure 4 It is a schematic diagram of the side view connection structure of the cable sliding sleeve;
[0022] In the figure, 1-suspension bracket, 2-ground anchor, 3-wind rope, 4-hanging rope, 5-hanging basket, 6-pull rope, 7-cable slide, 8-floor tie ring, 9-fixed lock buckle, 10-fixed lock rope, 11-floor, 12-long slide, 13-short slide, 14-hinge shaft, 15-cam, 16-manual lever, 17-adjusting lever, 18-axial rod, 19-adjusting ring, 20-slide groove, 21-rotation groove, 22-installing hole. DETAILED DESCRIPTION
[0023] The following will be combined with the embodiments to clearly and completely describe the technical solution of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the utility model.
[0024] See also Figure 1-Figure 4 , the utility model provides a technical solution:
[0025] A building hanging basket device with wind-resistant vibration function comprises a suspension bracket 1, a ground anchor 2, a cable wind rope 3, a suspension rope 4, a hanging basket 5, a pull rope 6, a cable sleeve 7 and a fixed tie assembly, wherein the suspension bracket 1 is fixedly arranged on the top of the building, and the cantilever on the suspension bracket 1 extends to the outside of the building, the upper end of the cable wind rope 3 is fixed on the cantilever, and the lower end of the cable wind rope 3 is fixed to the ground through the ground anchor 2, the hanging basket 5 is arranged on the cantilever through the suspension rope 4, the hanging basket 5 is fixedly connected to one end of the pull rope 6, and the other end of the pull rope 6 is fixedly arranged on the cable sleeve 7, the cable sleeve 7 is arranged on the cable wind rope 3, and the middle part of the cable wind rope 3 is fixed to the building through the fixed tie assembly. The cable wind rope 3 and the suspension rope 4 are both arranged vertically. Among them, the suspension bracket 1 is a bracket in the prior art and is used to fix the cable wind rope 3 and the suspension rope 4 in the prior art through a cantilever. The suspension rope 4 is used to hang the hanging basket 5 in the prior art. The lower end of the cable wind rope 3 is fixed to the ground through the ground anchor 2 in the prior art. The hanging basket 5 is connected to the cable wind rope 3 through a pull rope 6 and a cable slide 7, which can effectively reduce the swing amplitude of the hanging basket 5. The cable wind rope 3 is fixed to the building through a fixed tie assembly, which limits the deformation of the cable wind rope 3, thereby further limiting the swing amplitude of the hanging basket 5, so that the safety of the user can be effectively guaranteed.
[0026] In some embodiments, two suspension ropes 4 are provided on the suspension bracket 1, and the two ends of the hanging basket 5 are respectively provided on the two suspension ropes 4. Two sets of parallel wind ropes 3 are provided between the suspension bracket 1 and the ground, and the two ends of the hanging basket 5 are respectively provided on the wind ropes 3 through the pull ropes 6 and the cable sleeves 7. Among them, the hanging basket 5 is generally provided on two suspension ropes 4. As the length of the hanging basket 5 increases, the number of suspension ropes 4 can be provided with three, four or more. The wind ropes 3 play a stabilizing role on the hanging basket 5, and generally two wind ropes are provided.
[0027] In some embodiments, the fixed tie assembly includes a floor tie ring 8, a fixed lock buckle 9 and a fixed lock rope 10. The floor tie ring 8 is fixedly connected to the fixed lock buckle 9 through the fixed lock rope 10. The fixed lock buckle 9 is detachably connected to the cable wind rope 3. The floor tie ring 8 is fixedly set on the building. The floor tie ring 8 is fixedly set on the floor 11 of the building. Among them, the floor tie ring 8, the fixed lock buckle 9 and the fixed lock rope 10 are all existing technologies. The floor tie ring 8 is fixed on the wall or floor of the building. The fixed lock rope 10 is used to connect the floor tie ring 8 and the fixed lock buckle 9. The fixed lock buckle 9 adopts a detachable safety buckle. When in use, the fixed lock buckle 9 can be connected to the cable wind rope 3 or removed. Generally, it is connected to the cable wind rope 3. When the cable sliding sleeve 7 needs to pass the position of the fixed lock buckle 9, the fixed lock buckle 9 needs to be removed from the cable wind rope 3. After the cable sliding sleeve 7 passes, the fixed lock buckle 9 is fixed to the cable wind rope 3.
[0028] In some embodiments, the cable sleeve 7 includes a long sleeve 12, a short sleeve 13, a hinge shaft 14, a cam 15, a manual lever 16, an adjustment lever 17, a shaft rod 18 and an adjustment ring 19. One end of the long sleeve 12 is connected to one end of the short sleeve 13 through the hinge shaft 14. One end of the adjustment lever 17 is connected to the adjustment ring 19. The other end of the adjustment lever 17 passes through the short sleeve 13 and the long sleeve 12 in sequence and is fixedly connected to the shaft rod 18. The shaft rod 18 is rotatably arranged on the middle part of the cam 15. The manual lever 16 is fixedly connected to the outer wall of the cam 15. The long sleeve 12 and the short sleeve 13 are both provided with a sliding groove 20 that matches the cable wind rope 3. The pull rope 6 is fixedly connected to the long sleeve 12. The adjustment lever 17 is fixedly connected to the middle part of the shaft rod 18. The cam 15 is provided with a rotation groove 21 that matches the adjustment lever 17. The adjustment ring 19 is a nut, and the adjustment ring 19 and the adjustment rod 17 are threadedly matched. The end of the long sliding sleeve 12 is provided with a mounting hole 22 for fixing the pull rope 6. The long sliding sleeve 12 and the short sliding sleeve 13 are connected together by a hinge shaft 14, and the long sliding sleeve 12 and the short sliding sleeve 13 can rotate around the hinge shaft 14. The cable wind rope 3 is clamped between the sliding grooves 20 of the long sliding sleeve 12 and the short sliding sleeve 13. The other ends of the long sliding sleeve 12 and the short sliding sleeve 13 are connected by an adjustment rod 17. The manual rod 16 drives the cam 15 to rotate. When the cam 15 rotates, the long sliding sleeve 12 and the short sliding sleeve 13 are brought closer or separated. When the long sliding sleeve 12 and the short sliding sleeve 13 are separated, the cable wind rope 3 is loosened, and the cable sliding sleeve 7 can slide on the cable wind rope 3. When the long sliding sleeve 12 and the short sliding sleeve 13 are close to each other, they are fixed on the cable wind rope 3. The rotation of the cam 15 is manually operated by the manual rod 16. In order to make the force on the cam 15 uniform, a rotation groove 21 is provided on the cam 15, and the rotation groove 21 cooperates with the adjustment rod 17. The rotation angle of the cam 15 is between 180 and 210 degrees. The adjustment rod 17 is fixedly connected with the shaft rod 18 to form a T-shaped structure. The adjustment ring 19 and the adjustment rod 17 are threadedly matched, so that the distance between the long sliding sleeve 12 and the short sliding sleeve 13 can be adjusted. In this way, it can be applied to the cable wind ropes 3 of different diameters, so that the cable sliding sleeve 7 has a wider range of use. At the same time, when there is wear between the long sliding sleeve 12 and the cam 15, it is also convenient to adjust the distance between the long sliding sleeve 12 and the short sliding sleeve 13.
[0029] In the description of the present invention, it should be understood that the terms "one end", "top", "middle", "the other end", "upper", "one side", "inside", "front", "center", "both ends" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0030] In the present utility model, unless otherwise clearly stipulated and limited, the terms such as "installation", "setting", "connection", "fixation", "hinge" and the like should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements. Unless otherwise clearly defined, ordinary technicians in this field can understand the specific meanings of the above terms in the utility model according to the specific circumstances.
[0031] The above is only a preferred embodiment of the utility model. It should be understood that the utility model is not limited to the form disclosed herein, and should not be regarded as excluding other embodiments, but can be used in various other combinations, modifications and environments, and can be modified within the scope of the concept described herein through the above teachings or the technology or knowledge of the relevant field. The changes and modifications made by those skilled in the art do not deviate from the spirit and scope of the utility model, and should be within the scope of protection of the claims attached to the utility model.
Claims
1. A building hanging basket device with wind-resistant vibration function, characterized in that: The invention comprises a suspension bracket (1), a ground anchor (2), a wind rope (3), a suspension rope (4), a hanging basket (5), a pull rope (6), a cable sleeve (7) and a fixed tie assembly, wherein the suspension bracket (1) is fixedly arranged on the top of a building, and the cantilever on the suspension bracket (1) extends to the outside of the building, the upper end of the wind rope (3) is fixed on the cantilever, and the lower end of the wind rope (3) is fixed to the ground through the ground anchor (2), the hanging basket (5) is arranged on the cantilever through the suspension rope (4), the hanging basket (5) is fixedly connected to one end of the pull rope (6), the other end of the pull rope (6) is fixedly arranged on the cable sleeve (7), the cable sleeve (7) is arranged on the wind rope (3), and the middle part of the wind rope (3) is fixed to the building through the fixed tie assembly.
2. The building hanging basket device with wind-vibration resistance function according to claim 1, characterized in that: The suspension bracket (1) is provided with two suspension ropes (4), and the two ends of the suspension basket (5) are respectively provided on the two suspension ropes (4).
3. A building hanging basket device with wind-vibration resistance function according to claim 1 or 2, characterized in that: Two sets of mutually parallel wind ropes (3) are arranged between the suspension bracket (1) and the ground, and the two ends of the hanging basket (5) are respectively arranged on the wind ropes (3) through the pull ropes (6) and the cable sliding sleeves (7).
4. A building hanging basket device with wind-vibration resistance function according to claim 1 or 2, characterized in that: The fixed tie assembly comprises a floor tie ring (8), a fixed lock buckle (9) and a fixed lock rope (10); the floor tie ring (8) is fixedly connected to the fixed lock buckle (9) via the fixed lock rope (10); the fixed lock buckle (9) is detachably connected to the cable wind rope (3); and the floor tie ring (8) is fixedly arranged on the building.
5. The building hanging basket device with wind-vibration resistance function according to claim 4 is characterized in that: The floor tie ring (8) is fixedly arranged on the floor (11) of the building.
6. A building hanging basket device with wind-vibration resistance function according to claim 1 or 2, characterized in that: The guy rope (3) and the suspension rope (4) are both arranged vertically.
7. A building hanging basket device with wind-vibration resistance function according to claim 1 or 2, characterized in that: The cable sleeve (7) comprises a long sleeve (12), a short sleeve (13), a hinge shaft (14), a cam (15), a manual lever (16), an adjusting lever (17), a shaft rod (18) and an adjusting ring (19), one end of the long sleeve (12) is connected to one end of the short sleeve (13) via the hinge shaft (14), one end of the adjusting lever (17) is connected to the adjusting ring (19), and the other end of the adjusting lever (17) is connected to the adjusting ring (19) in sequence. After passing through the short sliding sleeve (13) and the long sliding sleeve (12), it is fixedly connected to the axial rod (18), the axial rod (18) is rotatably arranged on the middle part of the cam (15), the manual rod (16) is fixedly connected to the outer wall of the cam (15), the long sliding sleeve (12) and the short sliding sleeve (13) are both provided with a sliding groove (20) cooperating with the cable wind rope (3), and the pull rope (6) is fixedly connected to the long sliding sleeve (12).
8. The building hanging basket device with wind-vibration resistance function according to claim 7 is characterized in that: The adjusting rod (17) is fixedly connected to the middle part of the axial rod (18), and the cam (15) is provided with a rotation groove (21) that matches the adjusting rod (17).
9. The building hanging basket device with wind-vibration resistance function according to claim 7, characterized in that: The adjusting ring (19) is a nut, and the adjusting ring (19) and the adjusting rod (17) are threadedly matched.
10. The building hanging basket device with wind-vibration resistance function according to claim 7, characterized in that: A mounting hole (22) for fixing the pull rope (6) is provided at the end of the long sliding sleeve (12).