Material receiving table for leveling
By designing a leveling feeding table, including the overall structure, material bearing assembly and transfer assembly, the problems of long transfer time, high risk and high labor intensity after leveling equipment are completed, and efficient and safe transfer and storage of sheet materials are achieved.
Patent Information
- Application Number
- CN202421422968.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-21
- Publication Date
- 2025-04-15
- Estimated Expiration
- 2034-06-21
AI Technical Summary
After the leveling equipment is completed, the transfer time will be long, the degree of danger will be high, and the labor intensity of personnel will be high.
Design a leveling feeding table, including an integral frame, a feed bearing assembly and a transport assembly. The overall structure is welded by multiple horizontal channel steel and vertical channel steel. The material bearing assembly is composed of multiple steel plates to prevent the sheet from falling and damage. The transport assembly includes wooden piers, sheet hooks and forklifts, which are used to efficiently transfer sheets.
The temporary storage of finished parts of leveling equipment is realized, which reduces the consumption time of the completed parts, reduces the danger during the transfer process, improves the operation efficiency of leveling equipment, reduces the labor intensity of staff, and improves safety.
Smart Images

Figure CN222757412U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of leveling tooling, and in particular relates to a material receiving platform for leveling. Background Art
[0002] When the leveling equipment is running during the production process, the multi-roller platform reciprocates, and its discharge position is also the multi-roller platform. After the product is leveled, it is necessary to stop the equipment first, and then use a crane to lift the product to the turnover vehicle. The production efficiency is low, the labor intensity and operation difficulty are high. At the same time, the height of the multi-roller platform is high, and the degree of danger during the lifting and transportation of plates is high. Utility Model Content
[0003] 1. Technical issues to be resolved
[0004] The utility model provides a material receiving platform for leveling, so as to solve the technical problems of long transportation time, high danger degree and high labor intensity of personnel after the leveling equipment is completed.
[0005] (II) Technical solution
[0006] In order to solve the above technical problems, the utility model proposes a leveling receiving platform, which includes an overall frame, a material receiving component and a transfer component; wherein,
[0007] The overall frame plays a load-bearing role and is welded by multiple transverse channel steels and multiple vertical channel steels; among them, the first upper transverse channel steel includes two left and right ones, a first vertical channel steel is welded to the rear end of each first upper transverse channel steel, a reinforcing channel steel is welded between the two left and right first upper transverse channel steels, and a connecting plate for connecting the leveling equipment is installed at the front end of each first upper transverse channel steel; the second upper transverse channel steel includes two left and right ones, a second vertical channel steel is welded to the rear end of each second upper transverse channel steel, a reinforcing channel steel is welded between the two left and right second upper transverse channel steels, and a first lower transverse channel steel is welded between the first vertical channel steel and the second vertical channel steel on the same side; the third upper transverse channel steel includes two left and right ones, a fourth vertical channel steel is welded to the rear end of each third upper transverse channel steel, and a connecting plate for connecting the second vertical channel steel and the fourth vertical channel steel on the same side is welded There is a second lower transverse channel steel, a third vertical channel steel is welded between the third upper transverse channel steel and the second lower transverse channel steel, and a reinforcing channel steel is welded between the left and right third upper transverse channel steels; the fourth upper transverse channel steel includes two left and right ones, a fifth vertical channel steel is welded to the front end of each fourth upper transverse channel steel, a sixth vertical channel steel is welded to the rear end of each fourth upper transverse channel steel, and a third lower transverse channel steel is welded between the fourth vertical channel steel and the fifth vertical channel steel on the same side; the first upper transverse channel steel, the second upper transverse channel steel, the third upper transverse channel steel and the fourth upper transverse channel steel have the same inclination angle, the height of each upper transverse channel steel decreases gradually along the straight line, and an opening of suitable width is reserved between adjacent upper transverse channel steels as the installation gear of the wooden pier, and it is convenient to directly use a forklift to transport the finished products after production is completed;
[0008] The material bearing assembly is used to prevent the sheet material from falling and being damaged, and is composed of a plurality of steel plates; wherein the left and right ends of the first steel plate, the second steel plate, the third steel plate and the fourth steel plate are respectively welded to the left and right ends of the first upper horizontal channel steel, the second upper horizontal channel steel, the third upper horizontal channel steel and the fourth upper horizontal channel steel, and the fifth steel plate is obliquely welded between the fourth upper horizontal channel steel and the sixth vertical channel steel; the planes of the first steel plate, the second steel plate and the third steel plate are not in the same straight line, and there is a height difference;
[0009] The transfer components include wooden blocks, sheet material hooks and forklifts; the wooden blocks are used to be placed at corresponding installation positions according to the size of the sheets to achieve stacking of the sheets; the sheet material hooks and forklifts are used to lift or transfer the sheets respectively.
[0010] Furthermore, a first reinforcing rib is welded between the first upper transverse channel steel and the first vertical channel steel.
[0011] Furthermore, a second reinforcing rib is welded between the second upper transverse channel steel and the second vertical channel steel.
[0012] Furthermore, a channel steel bottom plate is welded to the bottom of each of the first vertical channel steel, the second vertical channel steel, the fourth vertical channel steel, the fifth vertical channel steel and the sixth vertical channel steel.
[0013] (III) Beneficial effects
[0014] The utility model proposes a material receiving platform for leveling, including an overall frame, a material receiving component and a transfer component. The overall frame plays a load-bearing role and is welded by multiple horizontal channel steels and multiple vertical channel steels. The material receiving component is used to prevent the sheet material from falling and being damaged, and is composed of multiple steel plates. The transfer component includes a wooden pier, a sheet material hook and a forklift. The material receiving platform for leveling of the utility model is used for temporary storage of finished parts of the leveling equipment, reducing the time consumed in the transfer of finished parts, reducing the danger during the transfer process, and can improve the operating efficiency of the leveling equipment, reduce the labor intensity of the staff, and at the same time provide a certain guarantee for safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a front view of the material receiving platform for leveling of the utility model;
[0016] Figure 2 This is a top view of the material receiving platform for leveling of the utility model;
[0017] Figure 3 For the utility model Figure 1 It is a material receiving platform for leveling of the utility model;
[0018] Figure 4 The utility model is a schematic diagram of the method of using the material receiving table for leveling.
[0019] Among them: 1-first upper horizontal channel steel, 2-second upper horizontal channel steel, 3-third upper horizontal channel steel, 4-fourth upper horizontal channel steel, 5-first vertical channel steel, 6-second vertical channel steel, 7-third vertical channel steel, 8-fourth vertical channel steel, 9-fifth vertical channel steel, 10-sixth vertical channel steel, 11-first lower horizontal channel steel, 12-second lower horizontal channel steel, 13-third lower horizontal channel steel, 14-reinforced channel steel, 15-first reinforcement rib, 16-second reinforcement rib, 17-channel steel bottom plate, 18-first steel plate, 19 second steel plate, 20-third steel plate, 21-fourth steel plate, 22-fifth steel plate, 23-connecting plate, 24-wooden pier, 25-sheet material hook, 26-forklift, 27-large material, 28-small material, 29-leveling machine tool. DETAILED DESCRIPTION
[0020] In order to make the purpose, content and advantages of the utility model clearer, the specific implementation methods of the utility model are further described in detail below in conjunction with the drawings and embodiments.
[0021] This embodiment provides a leveling receiving platform, the structure of which is as follows: Figures 1 to 3 As shown, it mainly includes an overall frame, a material-bearing component and a transfer component.
[0022] The overall frame mainly plays a load-bearing role and is welded by multiple horizontal channel steels and multiple vertical channel steels. Among them, the first upper transverse channel steel 1 includes two on the left and right sides, a first vertical channel steel 5 is welded to the rear end of each first upper transverse channel steel 1, a first reinforcing rib 15 is welded between the first upper transverse channel steel 1 and the first vertical channel steel 5, a reinforcing channel steel 14 is welded between the two first upper transverse channel steels 1 on the left and right sides, and a connecting plate 23 for connecting the leveling device 29 is installed at the front end of each first upper transverse channel steel 1; the second upper transverse channel steel 2 includes two on the left and right sides, a second vertical channel steel 6 is welded to the rear end of each second upper transverse channel steel 2, a second reinforcing rib 16 is welded between the second upper transverse channel steel 2 and the second vertical channel steel 6, a reinforcing channel steel 14 is welded between the two second upper transverse channel steels 2 on the left and right sides, a first lower transverse channel steel 11 is welded between the first vertical channel steel 5 and the second vertical channel steel 6 on the same side; the third upper transverse channel steel 3 includes two on the left and right sides, a fourth vertical channel steel 8 is welded to the rear end of each third upper transverse channel steel 3, a second lower transverse channel steel 12 is welded between the second vertical channel steel 6 and the fourth vertical channel steel 8 on the same side, A third vertical channel steel 7 is welded between the upper transverse channel steel 3 and the second lower transverse channel steel 12, and a reinforcing channel steel 14 is welded between the left and right third upper transverse channel steels 3; the fourth upper transverse channel steel 4 includes two left and right ones, a fifth vertical channel steel 9 is welded to the front end of each fourth upper transverse channel steel 4, a sixth vertical channel steel 10 is welded to the rear end of each fourth upper transverse channel steel 4, and a third lower transverse channel steel 13 is welded between the fourth vertical channel steel 8 and the fifth vertical channel steel 9 on the same side; a channel steel bottom plate 17 is welded to the bottom of each first vertical channel steel 5, second vertical channel steel 6, fourth vertical channel steel 8, fifth vertical channel steel 9 and sixth vertical channel steel 10; the first upper transverse channel steel 1, the second upper transverse channel steel 2, the third upper transverse channel steel 3 and the fourth upper transverse channel steel 4 have the same inclination angle, the height of each upper transverse channel steel decreases gradually along the straight line, and an opening of suitable width is reserved between adjacent upper transverse channel steels 4 as the installation gear of the wooden pier 24, and it is convenient to directly use a forklift to transport the completed products after production is completed.
[0023] The material bearing assembly is used to prevent the sheet material from falling and being damaged, and is composed of multiple steel plates. Among them, the left and right ends of the first steel plate 18, the second steel plate 19, the third steel plate 20 and the fourth steel plate 21 are respectively welded to the left and right ends of the first upper horizontal channel steel 1, the second upper horizontal channel steel 2, the third upper horizontal channel steel 3 and the fourth upper horizontal channel steel 4, and the fifth steel plate 22 is welded obliquely between the fourth upper horizontal channel steel 4 and the sixth vertical channel steel 10. The planes of the first steel plate 18, the second steel plate 19 and the third steel plate 20 are not in the same straight line, and there is a height difference, which can effectively prevent the sheet material from being stuck in the gap of the overall frame due to natural sagging.
[0024] The transfer assembly includes a wooden pier 24, a sheet material hook 25 and a forklift 26. The wooden pier 24 is used to be placed in the corresponding installation position according to the size of the sheet material to achieve the stacking of the sheet material. The sheet material hook 25 and the forklift 26 are used to lift or transfer the sheet material respectively. The wooden pier 24 can effectively adjust the length of the material receiving platform, and prevent the product from falling while achieving the neat and orderly stacking of small pieces. The dedicated sheet material hook 25 can cooperate with the gap between the material receiving platform and the product to achieve efficient transfer of the product.
[0025] When using the leveling receiving table of the utility model, if Figure 4 As shown, the material receiving platform is transferred to the discharge port of the leveling device 29, and after adjusting the position, the leveling device 29 and the overall structure of the material receiving platform are connected and fixed by bolts through the connecting plate 23. First, three gears are selected according to the product size to place or not place the wooden pier 24. When the product is a small piece of material 28, the wooden pier 24 is placed in the gear closest to the leveling device 29. After the sheet material is leveled, it automatically falls to the material receiving platform with the movement of the multi-roller platform. After it is accumulated to a certain extent, it is manually transported or transferred to the transfer vehicle using a magnetic lifting device. When the product size is large, after the material receiving platform is accumulated to a certain extent, it is selected to use a forklift 26 to directly transfer it or to use a sheet material hook 25 to lift it to the transfer vehicle depending on the difficulty of operation. For example, when the product is a large piece of material 27 with a large size, you can choose to use a forklift 26 to directly transfer it through the space reserved in the overall frame, or you can use a sheet material hook 25 for lifting. Due to the reserved drop in the upper surface design of the material receiving platform, the sheet material hook 25 can be directly inserted into the gap between the sheet material and the material receiving platform.
[0026] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the protection scope of the present invention.
Claims
1. A material receiving platform for leveling, characterized in that: The leveling receiving platform includes an overall frame, a material receiving assembly and a transfer assembly; wherein, The overall frame plays a load-bearing role and is welded by multiple transverse channel steels and multiple vertical channel steels; among them, the first upper transverse channel steel includes two left and right ones, a first vertical channel steel is welded to the rear end of each first upper transverse channel steel, a reinforcing channel steel is welded between the two left and right first upper transverse channel steels, and a connecting plate for connecting the leveling equipment is installed at the front end of each first upper transverse channel steel; the second upper transverse channel steel includes two left and right ones, a second vertical channel steel is welded to the rear end of each second upper transverse channel steel, a reinforcing channel steel is welded between the two left and right second upper transverse channel steels, and a first lower transverse channel steel is welded between the first vertical channel steel and the second vertical channel steel on the same side; the third upper transverse channel steel includes two left and right ones, a fourth vertical channel steel is welded to the rear end of each third upper transverse channel steel, and a connecting plate for connecting the second vertical channel steel and the fourth vertical channel steel on the same side is welded There is a second lower transverse channel steel, a third vertical channel steel is welded between the third upper transverse channel steel and the second lower transverse channel steel, and a reinforcing channel steel is welded between the left and right third upper transverse channel steels; the fourth upper transverse channel steel includes two left and right ones, a fifth vertical channel steel is welded to the front end of each fourth upper transverse channel steel, a sixth vertical channel steel is welded to the rear end of each fourth upper transverse channel steel, and a third lower transverse channel steel is welded between the fourth vertical channel steel and the fifth vertical channel steel on the same side; the first upper transverse channel steel, the second upper transverse channel steel, the third upper transverse channel steel and the fourth upper transverse channel steel have the same inclination angle, the height of each upper transverse channel steel decreases gradually along the straight line, and an opening of suitable width is reserved between adjacent upper transverse channel steels as the installation gear of the wooden pier, and it is convenient to directly use a forklift to transport the finished products after production is completed; The material bearing assembly is used to prevent the sheet material from falling and being damaged, and is composed of a plurality of steel plates; wherein the left and right ends of the first steel plate, the second steel plate, the third steel plate and the fourth steel plate are respectively welded to the left and right ends of the first upper horizontal channel steel, the second upper horizontal channel steel, the third upper horizontal channel steel and the fourth upper horizontal channel steel, and the fifth steel plate is obliquely welded between the fourth upper horizontal channel steel and the sixth vertical channel steel; the planes of the first steel plate, the second steel plate and the third steel plate are not in the same straight line, and there is a height difference; The transfer components include wooden blocks, sheet material hooks and forklifts; the wooden blocks are used to be placed in corresponding installation positions according to the size of the sheets to achieve stacking of the sheets; the sheet material hooks and forklifts are used to lift or transfer the sheets respectively.
2. The leveling receiving platform according to claim 1, characterized in that: A first reinforcing rib is welded between the first upper transverse channel steel and the first vertical channel steel.
3. The leveling receiving platform according to claim 1, characterized in that: A second reinforcing rib is welded between the second upper transverse channel steel and the second vertical channel steel.
4. The leveling receiving platform according to claim 1, characterized in that: A channel steel bottom plate is welded to the bottom of each of the first vertical channel steel, the second vertical channel steel, the fourth vertical channel steel, the fifth vertical channel steel and the sixth vertical channel steel.