Bridge deck concrete construction platform

By designing an automatically moving bridge deck concrete construction platform, the bridge deck concrete quality problem caused by staff walking when the concrete has not finally set, and the construction efficiency and quality improvement have been achieved.

CN222758730UActive Publication Date: 2025-04-15CHINA RAILWAY 11TH BUREAU GRP CORP LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421382359.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-18
Publication Date
2025-04-15
Estimated Expiration
2034-06-18

AI Technical Summary

Technical Problem

In the prior art, since the concrete does not reach final setting, the staff need to walk on the top surface of the poured concrete, the quality of the bridge deck concrete is affected, and the flatness and appearance quality are greatly affected.

Method used

A concrete construction platform for bridge decks is designed, including walking tracks, walking devices, support beam brackets, construction platforms, connecting plates and scrapers. The driving device drives the walking wheel to drive the overall device to walk on the ground, avoiding manual drag, and realizing the automatic movement of the construction platform.

Benefits of technology

It reduces manpower investment, saves construction costs, improves construction efficiency, avoids concrete surface imprints, and improves bridge deck flatness and appearance quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222758730U_ABST
    Figure CN222758730U_ABST
Patent Text Reader

Abstract

The embodiment of the utility model relates to the technical field of bridge operation, in particular to a bridge deck concrete construction platform which is installed on the top faces of anti-collision guardrails on the two sides of a bridge and comprises two walking rails, a walking device, a supporting main beam support, a construction platform body, a connecting plate and a scraping plate. Two walking rails are arranged on the base, two walking devices are arranged above the two walking rails respectively, a supporting main beam support is arranged between the two walking devices, a construction platform is arranged below the supporting main beam support, a connecting plate is arranged below the construction platform, and a plurality of scraping plates are arranged at the lower end of the connecting plate. The driving device drives the walking wheels to drive the whole bridge deck concrete construction platform device to walk on the ground, an extra manual dragging device is not needed for construction, and manpower input is reduced. The construction platform is adopted for operation, workers do not need to walk on the poured concrete top face, and therefore the flatness and the appearance quality of a bridge floor are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The embodiment of the utility model relates to the technical field of bridge operation, and in particular to a bridge deck concrete construction platform. Background Art

[0002] At present, bridge deck concrete paving is a key process in bridge operations. Controlling the three degrees of bridge deck concrete paving, thickness, strength, and flatness, is the key to the operation. When pouring concrete on the bridge deck, the concrete surface needs to be slurried, leveled, smoothed, and cured, so as to make the concrete densely combined and eliminate the honeycombed surface of the concrete, so as to improve its strength and ensure the quality of concrete components.

[0003] There are mature construction techniques and methods for bridge deck concrete paving. However, after the concrete for bridge deck paving is poured, the common vibration and finishing construction of bridge deck concrete is basically carried out manually using machinery in steps. Because the concrete has not reached final setting, the workers need to walk on the top surface of the poured concrete, which will leave marks on the concrete surface, thus having a great impact on the flatness and appearance quality of the bridge deck. The above-mentioned processes are all carried out in steps, which requires a lot of manpower and material resources, and the construction process is relatively long, which also has a great impact on the progress of the project. Utility Model Content

[0004] The main purpose of the utility model is to provide a bridge deck concrete construction platform to solve the problem in the prior art that the quality of the bridge deck concrete is greatly affected because the workers need to walk on the top surface of the poured concrete when the concrete has not reached final setting.

[0005] In order to achieve the above-mentioned purpose, according to one aspect of the utility model, a bridge deck concrete construction platform is provided, which is installed on the top surface of anti-collision guardrails on both sides of the bridge, including walking tracks, walking devices, supporting main beam brackets, construction platforms, connecting plates, and scrapers. Two walking tracks are respectively provided on the top of the two anti-collision guardrails on both sides of the bridge, two walking devices are respectively provided above the two walking tracks, a supporting main beam bracket is provided between the two walking devices, a construction platform is provided below the supporting main beam bracket, a connecting plate is provided below the construction platform, and a plurality of scrapers are provided at the lower end of the connecting plate.

[0006] Furthermore, the traveling device includes a vehicle body, traveling wheels, and a driving device. A traveling wheel is provided above the traveling track, a vehicle body is provided above the traveling wheel, the vehicle body and the traveling wheel are connected via a rotating shaft, and a driving device is provided on the vehicle body.

[0007] Furthermore, the travel wheel is composed of a driving wheel and a driven wheel, the driving device is connected to the driving wheel through a belt, and a driven wheel is provided on one side of the driving wheel.

[0008] Furthermore, the supporting main beam bracket includes a supporting main beam upper crossbeam, a supporting main beam column, a supporting main beam diagonal brace, and a supporting main beam lower crossbeam. The two ends of the supporting main beam upper crossbeam are respectively placed on the body of the two walking devices. A supporting main beam lower crossbeam is provided below the supporting main beam upper crossbeam, and a number of supporting main beam columns and a number of supporting main beam diagonal braces are provided between the supporting main beam upper crossbeam and the supporting main beam lower crossbeam.

[0009] Furthermore, the construction platform includes a construction platform frame and a working platform. The construction platform frame is provided below the lower cross beam of the supporting main beam, and the working platform is provided on the construction platform frame.

[0010] Compared with the prior art, the utility model has the following beneficial effects:

[0011] 1. The driving device drives the walking wheels to drive the entire bridge deck concrete construction platform to move on the ground. No additional manual dragging device is required for construction, which reduces manpower investment and saves construction costs.

[0012] 2. Integrating multiple different devices required for bridge deck concrete construction into one complete device realizes the integration of different functions, allowing multiple processes to be constructed simultaneously, saving construction time and improving construction efficiency.

[0013] 3. By using a construction platform, workers do not need to walk on the top surface of the poured concrete, thereby improving the flatness and appearance quality of the bridge deck.

[0014] 4. The scraper angle can be adjusted according to the slope of the beam surface, and can be applied to most beam surface slopes. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The drawings constituting part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention. In the drawings:

[0016] Figure 1 A front view of a bridge deck concrete construction platform according to the utility model is shown;

[0017] Figure 2 Shows Figure 1 A top view of the concrete construction platform for the bridge deck in Figure 1;

[0018] Figure 3 Shows Figure 1 Partial structural diagram of the bridge deck concrete construction platform.

[0019] Among them, the above-mentioned drawings include the following figure marks: walking track 1, walking device 2, supporting main beam bracket 3, construction platform 4, connecting plate 5, scraper 6, car body 7, walking wheel 8, driving device 9, driving wheel 10, driven wheel 11, belt 12, supporting main beam upper beam 13, supporting main beam column 14, supporting main beam diagonal brace 15, supporting main beam lower beam 16, construction platform frame 17, and working platform 18. DETAILED DESCRIPTION

[0020] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present utility model will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0021] like Figures 1 to 3 As shown, the embodiment of the utility model provides a bridge deck concrete construction platform, which is installed on the top surface of the anti-collision guardrails on both sides of the bridge, including a walking track 1, a walking device 2, a supporting main beam bracket 3, a construction platform 4, a connecting plate 5, and a scraper 6;

[0022] Two walking tracks 1 are respectively arranged on the top of the two anti-collision guardrails on both sides of the bridge. The walking tracks 1 serve as supporting tracks for the walking device 2, so that the working platform can move normally in a complex construction environment.

[0023] Two walking devices 2 are respectively arranged above the two walking tracks 1, and a supporting main beam bracket 3 is arranged between the two walking devices 2. The supporting main beam bracket 3 includes a supporting main beam upper cross beam 13, a supporting main beam column 14, a supporting main beam diagonal brace 15, and a supporting main beam lower cross beam 16. The two ends of the supporting main beam upper cross beam 13 are respectively placed on the vehicle bodies 7 of the two walking devices 2, and a supporting main beam lower cross beam 16 is arranged below the supporting main beam upper cross beam 13. A plurality of supporting main beam columns 14 and a plurality of supporting main beam diagonal braces 15 are arranged between the supporting main beam upper cross beam 13 and the supporting main beam lower cross beam 16. The supporting main beam bracket 3 serves as a load support for the construction platform 4, ensuring the structural stability of the construction platform 4 in a large-span operation environment.

[0024] The walking device 2 includes a body 7, a walking wheel 8, and a driving device 9. The walking wheel 8 is provided above the walking track 1, and the body 7 is provided above the walking wheel 8. The body 7 and the walking wheel 8 are connected by a rotating shaft, and the driving device 9 is provided on the body 7. The walking wheel 8 is composed of a driving wheel 10 and a driven wheel 11. The driving device 9 is connected to the driving wheel 10 by a belt 12, and a driven wheel 11 is provided on one side of the driving wheel 10. The driving wheel 10 of the walking wheel 8 driven by the driving device 9 drives the entire device of the bridge deck concrete construction platform to walk on the ground, and no additional manual dragging device is required for construction, which reduces manpower input and saves construction costs.

[0025] A construction platform 4 is provided below the supporting main beam bracket 3, a connecting plate 5 is provided below the construction platform 4, and a plurality of scrapers 6 are provided at the lower end of the connecting plate 5. The construction platform 4 includes a construction platform frame 17 and a working platform 18. A construction platform frame 17 is provided below the lower cross beam 16 of the supporting main beam, and a working platform 18 is provided on the construction platform frame 17. The construction platform frame 17 is connected to the lower cross beam 16 of the supporting main beam by welding or bolt connection. The construction platform frames 17 are respectively arranged on both sides of the supporting main beam bracket 3, and a working platform 18 is laid on the construction platform frame 17. The working platform 18 is used for workers to work on it, so that the workers do not need to walk on the top surface of the poured concrete, thereby improving the flatness and appearance quality of the bridge deck.

[0026] The angle of the scraper 6 can be adjusted according to the slope of the beam surface, and can be applied to most of the slopes of the beam surface. The scraper 6 is used to spread the bridge deck concrete. The overall construction platform and its scraper 6 can be driven by the walking device 2 to spread the bridge deck concrete.

[0027] The bridge deck concrete construction platform integrates multiple different devices required for bridge deck concrete construction into one complete device, realizing the integration of different functions, allowing multiple processes to be constructed simultaneously, saving construction time and improving construction efficiency.

[0028] The above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. For those skilled in the art, the utility model may have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A bridge deck concrete construction platform, installed on the top surface of the anti-collision guardrail on both sides of the bridge, characterized in that: It includes walking tracks, walking devices, supporting main beam brackets, construction platforms, connecting plates and scrapers. Two walking tracks are respectively arranged on the tops of the two anti-collision guardrails on both sides of the bridge, two walking devices are respectively arranged above the two walking tracks, a supporting main beam bracket is arranged between the two walking devices, a construction platform is arranged below the supporting main beam bracket, a connecting plate is arranged below the construction platform, and a plurality of scrapers are arranged at the lower ends of the connecting plates.

2. The bridge deck concrete construction platform according to claim 1, characterized in that: The traveling device comprises a vehicle body, traveling wheels and a driving device. The traveling wheels are arranged above the traveling track, the vehicle body is arranged above the traveling wheels, the vehicle body and the traveling wheels are connected via a rotating shaft, and the driving device is arranged on the vehicle body.

3. The bridge deck concrete construction platform as claimed in claim 2, characterized in that: The traveling wheel is composed of a driving wheel and a driven wheel. The driving device is connected to the driving wheel through a belt, and a driven wheel is arranged on one side of the driving wheel.

4. The bridge deck concrete construction platform according to claim 1, characterized in that: The supporting main beam bracket includes an upper crossbeam of the supporting main beam, a supporting main beam column, a supporting main beam diagonal brace, and a supporting main beam lower crossbeam. The two ends of the upper crossbeam of the supporting main beam are respectively placed on the body of the two walking devices. A lower crossbeam of the supporting main beam is arranged below the upper crossbeam of the supporting main beam. A plurality of supporting main beam columns and a plurality of supporting main beam diagonal braces are arranged between the upper crossbeam of the supporting main beam and the lower crossbeam of the supporting main beam.

5. The bridge deck concrete construction platform as claimed in claim 4, characterized in that: The construction platform comprises a construction platform frame and a working platform. The construction platform frame is provided below the lower cross beam of the supporting main beam, and the working platform is provided on the construction platform frame.