Large pile foundation bearing simulation detection device
By setting an auxiliary component with an angle of 90 degrees and a hydraulic oil slide structure in the pile foundation bearing simulation and detection device, the problem of difficulty in adjusting the pile foundation position to be measured is solved, the accurate judgment of the pile foundation position and the uniformity of the load bearing force are achieved, and the detection effect is improved.
Patent Information
- Application Number
- CN202421598678.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-08
- Publication Date
- 2025-04-15
- Estimated Expiration
- 2034-07-08
AI Technical Summary
In the existing pile foundation bearing capacity detection device, the pile foundation to be tested is blocked by the pressure plate, which is inconvenient to adjust to the center of the pressure plate, resulting in uneven force during the load bearing process.
A large pile foundation bearing simulation and detection device is designed. By setting two auxiliary components with an angle of 90 degrees on the surface of the pressure plate, using screws, connecting plates, push plates, adjustment rods and other components to measure the spacing between the pile foundation surface and the inner wall of the pile foundation groove, determine whether the pile foundation is located in the center of the groove, and quickly adjust the pile foundation position through structures such as hydraulic oil and slides.
Through the arrangement of auxiliary components, the position of the pile foundation to be tested can be accurately judged, ensuring that it is located in the center of the pile foundation groove, so that the stress during the bearing process is more uniform and the detection effect is improved.
Smart Images

Figure CN222758969U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a large pile foundation bearing simulation detection device. Background Art
[0002] With the development of modern architecture, the demand for pile foundations is increasing, and pile foundations need to be tested for bearing capacity. The most commonly used pile foundation bearing capacity test is static testing technology, and the static testing technology of pile foundations mainly uses the pile loading method and the anchor pile method, and the most commonly used is the pile loading method.
[0003] After searching, a Chinese patent discloses a pile foundation bearing capacity detection device (publication number CN215926090U). This patented technology pressurizes the pile foundation by adding a balancing liquid into the bearing box instead of concrete blocks. The balancing liquid can be quickly removed after the construction is completed, which saves a lot of workload of loading concrete blocks. However, the pile foundation to be tested in this structure is blocked by the pressure plate, and it is inconvenient to adjust the pile foundation to be tested to the center of the pressure plate. Therefore, technical personnel in this field provide a large-scale pile foundation bearing simulation detection device to solve the problems raised in the above background technology. Utility Model Content
[0004] The purpose of the utility model is to provide a large pile foundation bearing simulation detection device in order to solve the above problems, thereby improving the problem that the pile foundation to be tested is blocked by the pressure plate and it is inconvenient to adjust the pile foundation to be tested to the center of the pressure plate.
[0005] The utility model achieves the above-mentioned purpose through the following technical scheme: a large-scale pile foundation bearing simulation detection device, comprising: a bearing platform, a liquid storage tank is arranged on the top of the bearing platform, a pressure plate is arranged on the bottom of the bearing platform, a jack is arranged between the top of the pressure plate and the bearing platform, and a pile foundation groove is opened on the bottom of the pressure plate; two auxiliary components, both of which are arranged on the surface of the pressure plate, and the angle between the two auxiliary components is ninety degrees; wherein, the auxiliary component comprises a mounting seat fixedly connected to the top of the pressure plate, a screw is rotatably connected to the surface of the mounting seat, a connecting plate is threadedly connected to the surface of the screw, and the lower end of the connecting plate passes through the pressure plate and is fixedly connected to a mounting plate located inside the pile foundation groove.
[0006] Preferably, an integrally formed protrusion is fixedly connected to the surface of the mounting plate, a temporary storage cavity is opened inside the mounting plate, a push plate is slidably connected inside the temporary storage cavity, an adjusting rod is fixedly connected to the surface of the push plate, and the other end of the adjusting rod passes through the protrusion and is fixedly connected to a trigger plate.
[0007] Preferably, a spring is fixedly connected to one side of the push plate away from the adjusting rod, and the other end of the spring is fixedly connected to the inner wall of the temporary storage cavity.
[0008] Preferably, an adjusting chamber is formed between the push plate away from the adjusting rod and the interior of the temporary storage chamber, and the interior of the adjusting chamber is filled with hydraulic oil.
[0009] Preferably, a slideway is provided inside the mounting plate, a counterweight rod is slidably connected to the inner wall of the slideway, the upper end of the counterweight rod passes through the mounting plate, and a slide groove is provided on the surface of the pressure plate, the upper end of the counterweight rod extends to the inside of the slide groove, and a connecting channel connected to the adjusting chamber is provided on the inner bottom wall of the slideway.
[0010] Preferably, two groups of indicator lines are arranged on the surface of the pressure plate, and the two groups of indicator lines are evenly distributed along the opening directions of the two groups of slideways.
[0011] The beneficial effect of the utility model is that by setting up the auxiliary component, the distance between the surface of the pile foundation to be measured and the inner wall of the pile foundation groove can be measured by the auxiliary component when the pile foundation to be measured is placed inside the pile foundation groove. By setting up two auxiliary components with an angle of ninety degrees, it is possible to judge whether the pile foundation to be measured is located at the center of the pile foundation groove according to the measured distance, so as to adjust the position of the device so that the pile foundation to be measured is located at the center of the pile foundation groove, which can make the force in the subsequent load-bearing process more uniform. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a schematic diagram of the structure of the utility model;
[0013] Figure 2 This is a schematic diagram of the connection between the auxiliary component and the pressure plate of the utility model;
[0014] Figure 3 It is a structural schematic diagram of the auxiliary components of the utility model;
[0015] Figure 4 for Figure 3 A magnified view of middle;
[0016] Figure 5 This is a schematic diagram of the distribution of indicator lines of the utility model.
[0017] In the figure: 1, support platform; 101, liquid storage tank; 2, pressure plate; 201, jack; 3, auxiliary component; 301, mounting seat; 302, connecting plate; 303, screw; 304, temporary storage chamber; 305, push plate; 306, adjustment rod; 307, trigger plate; 308, connecting channel; 309, slideway; 310, counterweight rod; 311, spring; 312, mounting plate; 313, indicator line. DETAILED DESCRIPTION
[0018] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0019] When implementing: Figure 1-5 As shown, a large-scale pile foundation bearing simulation detection device comprises: a bearing platform 1, a liquid storage tank 101 is arranged on the top of the bearing platform 1, a pressure plate 2 is arranged on the bottom of the bearing platform 1, a jack 201 is arranged between the top of the pressure plate 2 and the bearing platform 1, and a pile foundation groove is opened on the bottom of the pressure plate 2; two auxiliary components 3, both of which are arranged on the surface of the pressure plate 2, and the angle between the two auxiliary components 3 is ninety degrees; wherein, the auxiliary component 3 comprises a mounting seat 301 fixedly connected to the top of the pressure plate 2, a screw rod 303 is rotatably connected to the surface of the mounting seat 301, a connecting plate 302 is threadedly connected to the surface of the screw rod 303, and the lower end of the connecting plate 302 passes through the pressure plate 2 and is fixedly connected to a mounting plate 312 located inside the pile foundation groove.
[0020] By injecting water into the liquid storage tank 101 , the weight of the liquid storage tank 101 can be increased, so that the pile foundation can be subjected to load-bearing simulation testing through the jack 201 and the pressure plate 2 .
[0021] like Figure 2 , Figure 3 , Figure 4 and Figure 5 As shown, the surface of the mounting plate 312 is fixedly connected with an integrally formed protrusion, the interior of the mounting plate 312 is provided with a temporary storage cavity 304, the interior of the temporary storage cavity 304 is slidably connected with a push plate 305, the surface of the push plate 305 is fixedly connected with an adjustment rod 306, the other end of the adjustment rod 306 passes through the protrusion and is fixedly connected with a trigger plate 307, the side of the push plate 305 away from the adjustment rod 306 is fixedly connected with a spring 311, the other end of the spring 311 is fixedly connected with the inner wall of the temporary storage cavity 304;
[0022] When placing the pile foundation inside the pile foundation groove, aligning it with the inner center of the pile foundation groove can make the force in the subsequent load-bearing process more uniform;
[0023] By rotating the screw rod 303, the connecting plate 302 can be driven to move, and the trigger plate 307 can be driven to contact the surface of the pile foundation to be tested. After the trigger plate 307 contacts the surface of the pile foundation, the screw rod 303 continues to rotate. Since the surface of the pile foundation blocks the trigger plate 307, the adjusting rod 306 can be driven to insert into the temporary storage cavity 304 and compress the spring 311.
[0024] like Figure 2 , Figure 3 , Figure 4 and Figure 5 As shown, an adjusting chamber is formed between the push plate 305 away from the adjusting rod 306 and the interior of the temporary storage chamber 304, the interior of the adjusting chamber is filled with hydraulic oil, a slideway 309 is provided inside the mounting plate 312, a counterweight rod 310 is slidably connected to the inner wall of the slideway 309, the upper end of the counterweight rod 310 passes through the mounting plate 312, and a slide groove is provided on the surface of the pressure plate 2, the upper end of the counterweight rod 310 extends to the interior of the slide groove, and a connecting channel 308 connected to the adjusting chamber is provided on the inner bottom wall of the slideway 309, and two groups of indicator lines 313 are arranged on the surface of the pressure plate 2, and the two groups of indicator lines 313 are evenly distributed along the opening directions of the two groups of slideways 309 respectively;
[0025] When the adjusting rod 306 is inserted into the temporary storage chamber 304, it can drive the push plate 305 to squeeze the hydraulic oil stored in the adjusting chamber. The squeezed hydraulic oil can be injected into the interior of the slideway 309 through the connecting channel 308, thereby pushing the counterweight rod 310 to pass through the slideway, that is, the surface trigger plate 307 is in full contact with the surface of the pile foundation to be tested, and the distance between the pile foundation surface and the inner wall of the pile foundation groove can be quickly obtained in conjunction with the indicator line 313. By measuring the distance between the pile foundation surface and the inner wall of the pile foundation groove by two auxiliary components 3 with an angle of ninety degrees, it can be determined whether the pile foundation is located at the center of the pile foundation groove, so as to improve the effect of subsequent load-bearing simulation detection after adjustment.
[0026] When the utility model is in use, after the pile foundation is placed inside the pile foundation groove, the connecting plate 302 can be driven to move by rotating the screw rod 303, which can drive the trigger plate 307 to contact the surface of the pile foundation to be measured. After the trigger plate 307 contacts the surface of the pile foundation, the screw 303 continues to rotate. Since the surface of the pile foundation blocks the trigger plate 307, the adjusting rod 306 can be driven to insert into the temporary storage cavity 304 and compress the spring 311. During the process of the adjusting rod 306 being inserted into the temporary storage cavity 304, the push plate 305 can be driven to squeeze and store the spring 311 inside the adjusting cavity. The hydraulic oil squeezed can be injected into the interior of the slideway 309 through the connecting channel 308, thereby pushing the counterweight rod 310 to pass through the slideway, that is, the surface trigger plate 307 is in full contact with the surface of the pile foundation to be tested, and the distance between the pile foundation surface and the inner wall of the pile foundation groove can be quickly obtained in conjunction with the indicator line 313. By measuring the distance between the pile foundation surface and the inner wall of the pile foundation groove by two auxiliary components 3 with an included angle of ninety degrees, it can be determined whether the pile foundation is located at the center of the pile foundation groove, so as to facilitate adjustment and improve the effect of subsequent load simulation detection.
[0027] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A large pile foundation bearing simulation detection device, characterized in that: include: A bearing platform (1), wherein a liquid storage tank (101) is arranged on the top of the bearing platform (1), a pressing plate (2) is arranged on the bottom of the bearing platform (1), a jack (201) is arranged between the top of the pressing plate (2) and the bearing platform (1), and a pile foundation groove is opened on the bottom of the pressing plate (2); Two auxiliary components (3), both of which are arranged on the surface of the pressing plate (2), and the angle between the two auxiliary components (3) is ninety degrees; The auxiliary component (3) comprises a mounting seat (301) fixedly connected to the top of the pressure plate (2); a screw rod (303) is rotatably connected to the surface of the mounting seat (301); a connecting plate (302) is threadedly connected to the surface of the screw rod (303); the lower end of the connecting plate (302) passes through the pressure plate (2) and is fixedly connected to a mounting plate (312) located inside the pile foundation groove.
2. A large pile foundation bearing simulation detection device according to claim 1, characterized in that: An integrally formed protrusion is fixedly connected to the surface of the mounting plate (312), a temporary storage cavity (304) is provided inside the mounting plate (312), a push plate (305) is slidably connected inside the temporary storage cavity (304), an adjusting rod (306) is fixedly connected to the surface of the push plate (305), and the other end of the adjusting rod (306) passes through the protrusion and is fixedly connected to a trigger plate (307).
3. A large pile foundation bearing simulation detection device according to claim 2, characterized in that: A spring (311) is fixedly connected to one side of the push plate (305) away from the adjustment rod (306), and the other end of the spring (311) is fixedly connected to the inner wall of the temporary storage chamber (304).
4. A large pile foundation bearing simulation detection device according to claim 3, characterized in that: An adjustment chamber is formed between the push plate (305) away from the adjustment rod (306) and the interior of the temporary storage chamber (304), and the interior of the adjustment chamber is filled with hydraulic oil.
5. A large pile foundation bearing simulation detection device according to claim 4, characterized in that: A slideway (309) is provided inside the mounting plate (312), and a counterweight rod (310) is slidably connected to the inner wall of the slideway (309). The upper end of the counterweight rod (310) passes through the mounting plate (312), and a slide groove is provided on the surface of the pressure plate (2). The upper end of the counterweight rod (310) extends to the inside of the slide groove, and a connecting channel (308) connected to the adjustment chamber is provided on the inner bottom wall of the slideway (309).
6. A large pile foundation bearing simulation detection device according to claim 5, characterized in that: The surface of the pressing plate (2) is provided with two groups of indicator lines (313), and the two groups of indicator lines (313) are evenly distributed along the opening directions of the two groups of slideways (309).