Guardrail stand column mounting tool

By providing a guardrail post installation tool that can position and install two guardrail posts simultaneously, the problems of low installation efficiency and poor positioning accuracy in the prior art are solved, and efficient and accurate guardrail post installation is achieved, reducing labor and engineering costs.

CN222759547UActive Publication Date: 2025-04-15CHENGDE HIGH-GRADE HIGHWAY CONSTR MANAGEMENT GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421519080.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-28
Publication Date
2025-04-15
Estimated Expiration
2034-06-28

AI Technical Summary

Technical Problem

When installing cable guardrails in the prior art, the efficiency is low, the positioning accuracy is poor, and it consumes a lot of manpower, making it difficult to ensure smooth line shape and coordinated appearance of the guardrail.

Method used

It provides a guardrail post installation tool, including two fixed grooves that are adapted to the guardrail post, which can position and install two guardrail posts at the same time, improving the installation efficiency and accuracy control level.

Benefits of technology

Through this tool, two guardrail columns can be installed simultaneously, which improves installation efficiency and precision control level, reduces manpower, and saves project construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222759547U_ABST
    Figure CN222759547U_ABST
Patent Text Reader

Abstract

The utility model discloses a guardrail stand column installation tool which comprises two fixing grooves matched with guardrail stand columns, each fixing groove is used for containing one guardrail stand column, the extending directions of the two fixing grooves are parallel to each other, the two fixing grooves are spaced by a preset distance, and when the guardrail stand columns are installed, the guardrail stand columns are fixed through the fixing grooves. The extending direction of the two fixing grooves is perpendicular to the ground. The guardrail stand column installation tool can position two guardrail stand columns at the same time, the installation efficiency and the precision control level are improved, manpower can be reduced, and the engineering construction cost is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of road construction, and in particular to a guardrail post installation tool. Background Art

[0002] Cable guardrails are often installed in the middle isolation zone of the landscape avenue and on both sides of the avenue. The cable guardrail is transparent and beautiful, can be coordinated with the landscape along the road, and is more ornamental. The cable guardrail includes steel columns and steel wire ropes connecting the steel columns. When installing the cable guardrail, it is necessary to first connect multiple steel columns to the ground, and then install the steel wire rope, which connects multiple steel columns. When installing the steel columns, it is necessary to pour a concrete foundation under the steel columns to fix the steel columns to the ground. Two cable guardrails need to be installed at the central isolation zone of the landscape avenue. In order to maintain the beauty, the two guardrail columns need to be set side by side with the same spacing. The existing construction method usually installs one row of steel columns before installing another row of steel columns, or divides the construction workers into two groups to install at the same time. This has low work efficiency and consumes more manpower, and it is difficult to ensure the smoothness of the guardrail line and the coordination of the appearance. Utility Model Content

[0003] The guardrail post installation tool provided in the present application can install two guardrail posts at the same time, thereby improving the installation efficiency and precision control level, and can reduce manpower and save construction costs.

[0004] The present application provides a guardrail post installation tool, comprising two fixing grooves adapted to the guardrail post, each of the fixing grooves being used to accommodate a guardrail post, the extension directions of the two fixing grooves being parallel to each other, and the two fixing grooves being spaced apart by a preset distance, and when the guardrail post is installed, the extension directions of the two fixing grooves are perpendicular to the ground.

[0005] The guardrail post installation tool can position two guardrail posts at the same time, improving installation efficiency and precision control, reducing manpower and saving construction costs.

[0006] In one embodiment, the guardrail post installation tool includes a support frame and two brackets, wherein the two brackets are installed on the sides of the support frame, each of the brackets has a fixing groove, and the post is connected to the bracket via a connecting piece.

[0007] In one embodiment, the two brackets include a first bracket and a second bracket, and the two fixing grooves include a first fixing groove and a second fixing groove, wherein the first bracket includes the first angle steel and the second angle steel, and the first angle steel and the second angle steel are arranged relative to each other to form the first fixing groove; and the second bracket includes a third angle steel and a fourth angle steel, and the third angle steel and the fourth angle steel are arranged relative to each other to form the second fixing groove.

[0008] In one embodiment, the support frame includes a top beam, a first bottom beam, a second bottom beam, a diagonal bracing beam and a transverse bracing beam. The top beam, the first bottom beam and the second bottom beam are arranged parallel to each other, and the positive projections of the top beam and the first bottom beam overlap in a direction perpendicular to the ground. The diagonal bracing beam is connected between the bracket and the second bottom beam, and the transverse bracing beam is connected between the first bottom beam and the second bottom beam.

[0009] In one embodiment, the two brackets are connected to the top beam and the first bottom beam.

[0010] In one embodiment, the guardrail post installation tool also includes a fixing beam, which is detachably connected to the support frame, the fixing beam is located at the notch of the fixing slot, and the fixing beam is perpendicular to the extension direction of the fixing slot, and the fixing beam is used to limit the movement of the guardrail post.

[0011] In one embodiment, the support frame further includes a fixed beam support seat, which is fixedly connected to the first bottom beam and is located between the first bracket and the second bracket.

[0012] In one embodiment, the fixed beam support seat includes a base, a stopper and a fifth angle steel, the base is fixedly mounted on the first bottom beam, the stopper and the fifth angle steel are mounted on the side of the base away from the ground, the fifth angle steel is parallel to the first bottom beam, the fifth angle steel includes a first side plate, and the first side plate is perpendicular to the base. An accommodating space is formed between the first side plate and the stopper, and the fixed beam is detachably mounted in the accommodating space.

[0013] In one embodiment, the length of the first bottom beam is greater than the length of the top beam, and the length of the second bottom beam is greater than the length of the top beam.

[0014] In one embodiment, the guardrail post installation tool is mounted on curbstones on opposite sides of a central isolation strip, and the lengths of the first bottom beam and the second bottom beam are both greater than the spacing between the curbstones on opposite sides of the central isolation strip. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 A schematic diagram of the structure of a guardrail post installation tool provided in one embodiment of the present application;

[0016] Figure 2 A layout diagram of guardrail posts in a central isolation zone provided for an embodiment of the present application;

[0017] Figure 3A schematic structural diagram of a guardrail post installation tool provided in another embodiment of the present application;

[0018] Figure 4 A side view of a guardrail post installation tool provided for one embodiment of the present application;

[0019] Figure 5 A top view of the assembly of a guardrail post installation tool and a guardrail post provided in one embodiment of the present application.

[0020] Reference numerals:

[0021] 1-fixing groove; 0-guardrail column; A-ground; 100-central isolation zone; 101-kerbstone; 102-center line of central isolation zone; M-first direction; N-second direction; 00-support frame; 01-bracket; 011-first bracket; 012-second bracket; 11-first fixing groove; 001-first column; 12-second fixing groove; 002-second column; 111-first angle steel; 112-second angle steel; 121-third angle steel; 122-fourth angle steel; 10-fixing bolt; 2-top beam; 3-first bottom beam; 4-second bottom beam; 5-diagonal bracing beam; 6-horizontal bracing beam; 7-fixed beam support seat; 8-fixed beam; 71-base; 72-block; 73-fifth angle steel; 730-first side plate. DETAILED DESCRIPTION

[0022] In order to solve the problems of low installation efficiency and poor positioning accuracy of cable guardrails, the present application provides a guardrail post installation tool. In order to make the purpose, technical solution and advantages of the present application clearer, the present application is further described in detail below with reference to the accompanying drawings.

[0023] Figure 1 A schematic diagram of the structure of a guardrail post installation tool provided in one embodiment of the present application. Figure 1 As shown, an embodiment of the present application provides a guardrail post installation tool, comprising two fixing grooves 1 adapted to the guardrail post 0, each fixing groove 1 being used to accommodate a guardrail post 0, so that the guardrail post 0 is fixed to the guardrail post installation tool. The extension directions of the two fixing grooves 1 are parallel to each other, and the two fixing grooves 1 are spaced apart by a preset distance. When installing the guardrail post 0, the extension directions of the two fixing grooves 1 are perpendicular to the ground A.

[0024] Figure 2 A layout diagram of guardrail posts in a central isolation zone provided for an embodiment of the present application, such as Figure 2As shown, during construction, firstly, measurement and laying out are carried out, and the surveying personnel mark the positioning lines of the installation position of the guardrail column 0 on the upper surface of the curbstones 101 on both sides of the central isolation zone 100. The total width of the central isolation zone 100 is 1700mm, and the distance between the two positioning lines is 4000mm along the extension direction of the central isolation zone 100, which is hereinafter referred to as the first direction M. The direction perpendicular to the extension direction of the central isolation zone 100 is hereinafter referred to as the second direction N. Then, a drilling rig is used to drill holes between the curbstones 101 on both sides of the isolation zone, and the two holes are symmetrically arranged along the center line 102 of the central isolation zone. The drilling depth is 1200mm from the top of the curbstone 101 to the bottom of the hole. After the drilling is completed, the guardrail column installation tool is set on the curbstone 101 according to the position of the positioning line. Make the extension direction of the fixing groove 1 perpendicular to the ground A, and each fixing groove 1 corresponds to a hole. Each guardrail post 0 is placed in a fixing groove 1, and the guardrail post installation tool can position and install two guardrail posts 0 at the same time, thereby improving the installation efficiency and precision control level, reducing manpower, and saving construction costs.

[0025] Figure 3 A schematic diagram of the structure of a guardrail post installation tool provided in another embodiment of the present application is shown in FIG. Figure 3 As shown, in one embodiment, the guardrail post installation tool comprises a support frame 00 and two brackets 01, the two brackets 01 are installed on the side of the support frame 00, and each bracket 01 has a fixing groove 1. The bracket 01 is located on the side of the support frame 00, which is convenient for hanging the guardrail post 0 on the bracket 01, making the operation more labor-saving.

[0026] Figure 4 A side view of a guardrail post installation tool provided in one embodiment of the present application, Figure 5 A top view of the guardrail post installation tool and the guardrail post assembled in accordance with an embodiment of the present application. Figure 3 to Figure 5In a specific embodiment, the two brackets 01 include a first bracket 011 and a second bracket 012, and the two fixing grooves 1 include a first fixing groove 11 and a second fixing groove 12. The first bracket 011 includes a first angle steel 111 and a second angle steel 112, and the first angle steel 111 and the second angle steel 112 are arranged opposite to each other to form a first fixing groove 11. Angle steel is a commonly used structural member in the prior art, which is composed of two vertically arranged strips, and one long side of the two strips is connected together to form a structural member with a 90° angle. The first angle steel 111 and the second angle steel 112 are arranged opposite to each other, and a certain gap can be left between them to meet the lateral width of the guardrail column 0. The first angle steel 111 and the second angle steel 112 form a first fixing groove 11 with a rectangular cross section. The bottom width of the fixing groove 1 is roughly the same as the width of the guardrail column 0, and is slightly larger than the width of the column 0, so that the column 0 can be effectively fixed and avoid being unable to be placed in the fixing groove. During installation, the guardrail post 0 is embedded in the first fixing groove 11 to achieve positioning, and the guardrail post 0 can be called the first post 001. Similarly, the second bracket 012 includes a third angle steel 121 and a fourth angle steel 122, which are arranged opposite to each other to form a second fixing groove 12. The second fixing groove 12 achieves the positioning of the second post 002.

[0027] The above-mentioned column is connected to the bracket 01 through a connecting piece. In one embodiment, the connecting piece can be a fixing bolt 10. Specifically, the above-mentioned guardrail column 0 includes two opposite first side surfaces and a second side surface. The two opposite side surfaces are respectively provided with a plurality of through holes at equal intervals along a direction perpendicular to the ground. These through holes are used to install the connecting piece for fixing the cable. The through holes on the first side surface correspond to the through holes on the second side surface in a one-to-one relationship. When the guardrail column 0 is installed on the guardrail column installation tool, the above-mentioned first side surface and the second side surface are arranged along the second direction N. Then insert the fixing bolt 10 into any two corresponding through holes, such as Figure 1 , and then the fixing bolt 10 is clamped on the top of the first bracket 011, or clamped on the top of the second bracket 012, so that the guardrail post 0 is suspended on the bracket 01. Under the action of gravity, the guardrail post 0 and the bracket 01 are relatively stationary, and the fixing groove 1 is achieved.

[0028] It is worth noting that using the above-mentioned fixing bolt 10 as a connecting piece to hang the column 0 on the bracket 01 is a way to fix the column 0. In other embodiments, other forms of connecting pieces can also be used to fix the column 0 to the bracket 01. For example, the connecting piece can be a magnet. The column 0 is a steel column with magnetic conductivity. A magnet is set in the fixing groove 1 of the bracket 01, or a magnet is set on the steel column. The column 0 is fixed on the bracket 01 through the adsorption force of the magnet.

[0029] In a specific embodiment, the size of the guardrail column 0 is 50mm×100mm×2200mm, and the net distance between the two columns is 664mm along the second direction N. The guardrail column 0 is a standard part. According to the construction requirements, the fixing bolt 10 is inserted into the third through hole of the guardrail column 0 from the top to the bottom, and then the fixing bolt 10 is hung on the top of the bracket 01. At this time, the installation height of the guardrail column 0 is consistent with the design drawing, that is, the top of the guardrail column 0 is 1000mm higher than the top surface of the curb 101.

[0030] The structure of the support frame 00 is described below.

[0031] In one embodiment, the support frame 00 includes a top beam 2, a first bottom beam 3, a second bottom beam 4, a diagonal bracing beam 5 and a transverse bracing beam 6. The top beam 2, the first bottom beam 3 and the second bottom beam 4 are arranged parallel to each other, and the orthographic projections of the top beam 2 and the first bottom beam 3 overlap in a direction perpendicular to the ground, and two brackets 01 are respectively connected to the top beam 2 and the first bottom beam 3. The diagonal bracing beam 5 is connected between the top beam 2 and the second bottom beam 4, or the diagonal bracing beam 5 is connected between the bracket 01 and the second bottom beam 4. The transverse bracing beam 6 is connected between the first bottom beam 3 and the second bottom beam 4. The diagonal bracing beam 5 and the transverse bracing beam 6 have an acute angle. Along the second direction N, the support frame 00 and the bracket 01 form a triangular frame, which has a stable structure and improves the reliability of the guardrail post installation tool.

[0032] Of course, the support frame 00 can also be a frame of other shapes, such as a rectangular frame, a trapezoidal frame, etc. The support frame 00 of other forms can achieve the function of fixing the bracket 01, and this application does not make specific restrictions.

[0033] In one embodiment, the length of the first bottom beam 3 and the second bottom beam 4 along the second direction N is greater than the spacing between the curbstones 101 on both sides of the central isolation zone 100, so that the guardrail column installation tool can be erected above the curbstones 101 on both sides.

[0034] In one embodiment, the length of the first bottom beam 3 may be greater than the length of the top beam 2 , and the length of the second bottom beam 4 may be greater than the length of the top beam 2 .

[0035] After the guardrail post installation tool is set up, the construction personnel use a level ruler to perform a leveling operation. Specifically, the level ruler is placed on the top beam 2 to adjust the flatness of the guardrail post installation tool, and then the level ruler is placed in the bracket 01 to adjust the verticality of the guardrail post installation tool until the guardrail post installation tool is leveled.

[0036] In one embodiment, the support frame 00 further includes a fixed beam support seat 7, which is fixedly connected to the first bottom beam 3, and the fixed beam support seat 7 is located between the first bracket 011 and the second bracket 012 along the second direction N.

[0037] In one embodiment, the guardrail post installation tool further includes a fixed beam 8, which is detachably connected to the fixed beam support seat 7, and is located at the notch of the fixing slot 1. The fixed beam 8 extends in the second direction N, and the fixed beam 8 is perpendicular to the extension direction of the fixing slot 1. The fixed beam 8 is used to limit the movement of the guardrail post 0 along the first direction M. After the first column 001 and the second column 002 are respectively installed in the first fixing slot 11 and the second fixing slot 12, the fixed beam 8 is installed on the fixed beam support seat 7, so that the fixed beam 8 is located on the side of the first column 001 and the second column 002, so that the movement of the first column 001 and the second column 002 along the first direction M is restricted, and the first column 001 and the second column 002 are reduced from falling off the guardrail post installation tool.

[0038] In a specific embodiment, the fixed beam support seat 7 includes a base 71, a stopper 72 and a fifth angle steel 73. The base 71 is fixedly mounted on the first bottom beam 3. The stopper 72 and the fifth angle steel 73 are mounted on the side of the base 71 away from the ground. The fifth angle steel 73 is parallel to the first bottom beam 3. The fifth angle steel 73 includes a first side plate 730, and the first side plate 730 is perpendicular to the base 71. An accommodating space is formed between the first side plate 730 and the stopper 72, and the fixed beam 8 is detachably mounted in the accommodating space.

[0039] After fixing the two guardrail posts 0, the construction workers poured the foundation concrete in the hole and vibrated it to make it dense. After the foundation concrete solidified, the fixed beam 8 was removed, and then the guardrail post installation tool was removed. The installation of the guardrail post 0 was completed.

[0040] In the description of the present invention, it should be noted that the directions or positional relationships indicated by the terms "up", "down", "left", "right", etc. are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention.

[0041] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.

Claims

1. A guardrail post installation tool, characterized in that: The guardrail post installation tool includes two fixing grooves adapted to the guardrail posts, each of the fixing grooves is used to accommodate a guardrail post, the extension directions of the two fixing grooves are parallel to each other, and the two fixing grooves are spaced apart by a preset distance. When the guardrail post is installed, the extension direction of the two fixing grooves is perpendicular to the ground.

2. The guardrail post installation tool according to claim 1, characterized in that: The guardrail post installation tool comprises a support frame and two brackets, wherein the two brackets are installed on the sides of the support frame, each bracket has a fixing groove, and the post is connected to the bracket via a connecting piece.

3. The guardrail post installation tool according to claim 2, characterized in that: The two brackets include a first bracket and a second bracket, and the two fixing grooves include a first fixing groove and a second fixing groove, wherein: The first bracket includes a first angle steel and a second angle steel, wherein the first angle steel and the second angle steel are arranged opposite to each other to form the first fixing groove; The second bracket includes a third angle steel and a fourth angle steel, and the third angle steel and the fourth angle steel are arranged opposite to each other to form the second fixing groove.

4. The guardrail post installation tool according to claim 2, characterized in that: The support frame includes a top beam, a first bottom beam, a second bottom beam, a diagonal bracing beam and a transverse bracing beam. The top beam, the first bottom beam and the second bottom beam are arranged parallel to each other, and the orthographic projections of the top beam and the first bottom beam overlap in a direction perpendicular to the ground. The diagonal bracing beam is connected between the bracket and the second bottom beam, and the transverse bracing beam is connected between the first bottom beam and the second bottom beam. The diagonal bracing beam and the transverse bracing beam have an acute angle.

5. The guardrail post installation tool according to claim 4, characterized in that: The two brackets are connected to the top beam and the first bottom beam.

6. The guardrail post installation tool according to claim 4, characterized in that: The guardrail post installation tool also includes a fixed beam, which is detachably connected to the support frame, the fixed beam is located at the notch of the fixing slot, and the fixed beam is perpendicular to the extension direction of the fixing slot. The fixed beam is used to limit the movement of the guardrail post along a first direction, and the first direction is perpendicular to the extension direction of the bracket and perpendicular to the first bottom beam.

7. The guardrail post installation tool according to claim 6, characterized in that: The two brackets include a first bracket and a second bracket. The support frame also includes a fixed beam support seat. The fixed beam support seat is fixedly connected to the first bottom beam and is located between the first bracket and the second bracket.

8. The guardrail post installation tool according to claim 7, characterized in that: The fixed beam support seat includes a base, a stopper and a fifth angle steel. The base is fixedly installed on the first bottom beam. The stopper and the fifth angle steel are installed on the side of the base away from the ground. The fifth angle steel is parallel to the first bottom beam. The fifth angle steel includes a first side plate. The first side plate is perpendicular to the base. An accommodating space is formed between the first side plate and the stopper. The fixed beam is detachably installed in the accommodating space.

9. The guardrail post installation tool according to claim 4, characterized in that: The length of the first bottom beam is greater than that of the top beam, and the length of the second bottom beam is greater than that of the top beam.

10. The guardrail post installation tool according to claim 9, characterized in that: The guardrail column installation tool is set up on the curbstones on opposite sides of the central isolation zone, and the lengths of the first bottom beam and the second bottom beam are both greater than the distance between the curbstones on opposite sides of the central isolation zone.