Deformation joint of unequal-height floors of basement

By using deformation joint sealing components and waterproof components at basement deformation joints, the leakage problem caused by deterioration of waterproof materials in traditional methods is solved, and better waterproofing effect and durability of deformation joints are achieved.

CN222771530UActive Publication Date: 2025-04-18CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421486776.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-27
Publication Date
2025-04-18
Estimated Expiration
2034-06-27

AI Technical Summary

Technical Problem

The deformed joints in traditional basements are prone to deterioration of the material, resulting in a decrease in waterproofing effect and cannot effectively resist leakage.

Method used

Deformed joint sealing components and waterproof components are used, including polyurethane sealant, polystyrene slats, SBS asphalt waterproof coils, rubber asphalt waterproof coatings, shale protective bricks and fine stone concrete protective layers, to enhance the sealing and waterproof performance of the deformed joints.

Benefits of technology

It effectively improves the waterproof effect and durability of the deformation joints, avoids leakage problems, and can resist uneven settlement of buildings or expansion and contraction caused by changes in temperature and humidity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222771530U_ABST
    Figure CN222771530U_ABST
Patent Text Reader

Abstract

A basement concrete structure comprises a basement structure high-side section and a basement structure low-side section, and the basement structure high-side section comprises a high-side section floor, a high-side section upper wall body, a high-side section lower wall body and a high-side section bridging piece; the basement structure low-side section comprises a low-side section floor, a low-side section upper wall body and a low-side section lower wall body; a second gap is formed between the bottom of the bridging piece of the high-side section and the top of the upper wall of the low-side section in the vertical direction, and a deformation joint sealing assembly is arranged in the second gap; a waterproof assembly is arranged between the basement structure high-side section and the basement structure low-side section. According to the utility model, expansion and shrinkage deformation caused by factors such as uneven settlement or temperature and humidity of a building can be effectively resisted, the sealing performance of the basement exterior wall can be ensured, and the leakage condition is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a deformation joint of unequal-height floors of a basement. Background Art

[0002] Expansion joints are gaps between buildings, which require that the entire building be disconnected from the foundation to the main structure and then to the roof. By setting up effective expansion joints, it is possible to resist uneven settlement of the building or expansion and contraction caused by factors such as temperature and humidity.

[0003] Expansion joints also need to be set up in the basement, but in actual construction projects, basement leakage is often encountered. After research, it is found that basement leakage is mostly concentrated in the expansion joints, so waterproof construction is required when constructing the expansion joints.

[0004] When setting expansion joints in basements, it is common to encounter situations where the floor elevations on both sides of the expansion joints are different. In this case, the method of setting the expansion joints needs to be carefully considered. The traditional method of simply using waterproof materials to make a waterproof layer at the expansion joints is prone to a decrease in waterproof effect due to material deterioration. How to solve the leakage problem at the expansion joints of traditional basements and improve the waterproof effect and durability of the expansion joints is a technical problem that needs to be solved urgently. Summary of the invention

[0005] The utility model aims to solve the deficiencies of the prior art and provides a deformation joint for unequal-height floors of a basement.

[0006] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a deformation joint of unequal-height floor of a basement, wherein the concrete structure of the basement includes a high-side segment of the basement structure and a low-side segment of the basement structure, wherein the high-side segment of the basement structure includes a high-side segment floor slab, a high-side segment upper wall, a high-side segment lower wall, and a high-side segment cantilever plate; the low-side segment of the basement structure includes a low-side segment floor slab, a low-side segment upper wall, and a low-side segment lower wall;

[0007] The upper wall of the high side segment is located at the upper part of the high side segment floor, the lower wall of the high side segment is located at the lower part of the high side segment floor, the high side segment cantilever plate and the high side segment floor are located at both sides of the upper wall of the high side segment and the lower wall of the high side segment respectively; the upper wall of the low side segment is located at the upper part of the low side segment floor, and the lower wall of the low side segment is located at the lower part of the low side segment floor; the high side segment cantilever plate is located above the upper wall of the low side segment;

[0008] There is a first gap in the horizontal direction between the upper wall of the high side segment and the lower wall of the high side segment and the upper wall of the low side segment and the lower wall of the low side segment, and there is a second gap in the vertical direction between the bottom of the high side segment cantilever plate and the top of the upper wall of the low side segment, and a deformation joint sealing component is arranged in the second gap;

[0009] A waterproofing assembly is arranged between the high side section of the basement structure and the low side section of the basement structure. The waterproofing assembly includes a waterproofing membrane assembly, a shale protection brick, and a fine stone concrete protective layer. The waterproofing membrane assembly covers the outer side of the upper wall of the high side section, the outer side of the cantilever of the high side section, the second gap, the outer side of the upper wall of the low side section, and the upper part of the low side section floor. Shale protection bricks are arranged in the vertical direction of the waterproofing membrane assembly, and a fine stone concrete protective layer is laid in the horizontal direction of the waterproofing membrane assembly.

[0010] In particular, the deformation joint sealing component includes polyurethane sealant and polystyrene strips, multiple layers of polystyrene strips are stacked up and down and arranged in the second gap, and the polyurethane sealant is applied on the outside of the polystyrene strips to seal the second gap.

[0011] In particular, the waterproofing membrane components include SBS asphalt waterproofing membrane, rubber asphalt waterproofing membrane, SBS asphalt chemical root penetration resistant waterproofing membrane, and membrane reinforcement layer.

[0012] In particular, the SBS asphalt waterproof membrane covers the outer end of the high-side segment cantilever, the second gap and the outer side of the upper wall of the low-side segment.

[0013] In particular, the rubber asphalt waterproof coating covers the outer side of the upper wall of the high side segment, the upper part of the high side segment cantilever, the outer side of the SBS asphalt waterproof membrane and the upper part of the low side segment floor.

[0014] Specifically, the SBS asphalt chemical root-penetration resistant waterproofing membrane covers the outer side of the rubber asphalt waterproofing membrane.

[0015] In particular, the roll material reinforcement layer covers the junction of the upper wall of the high side segment and the high side segment cantilever plate, and the junction of the upper wall of the low side segment and the low side segment floor slab, and the roll material reinforcement layer is located between the SBS asphalt chemical root-resistant puncture waterproof roll material and the rubber asphalt waterproof coating.

[0016] In particular, earth is backfilled on the upper part of the low-side segmented floor, the outer side of the low-side segmented upper wall, the outer side of the high-side segmented cantilever slab, and the outer side of the high-side segmented upper wall.

[0017] The beneficial effects of the utility model are as follows: the utility model can play the role of the expansion joint itself and effectively resist uneven settlement of the building or expansion and contraction deformation caused by factors such as temperature and humidity by arranging the expansion joint sealing component and the waterproof component, and can also ensure the sealing of the outer wall of the basement to avoid leakage; and the waterproof membrane component is arranged in multiple layers, and the waterproof effect is better. The arrangement of shale protection bricks and fine stone concrete protective layers can protect the waterproof membrane component and prevent the waterproof membrane from being deteriorated by external factors, thereby causing a decrease in the waterproof effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1It is a structural schematic diagram of the utility model;

[0019] Figure 2 for Figure 1 The enlarged schematic diagram at A in the middle;

[0020] In the figure:

[0021] 1- high side segment of basement structure; 101- high side segment floor; 102- high side segment upper wall; 103- high side segment lower wall; 104- high side segment cantilever plate;

[0022] 2-low side segment of basement structure; 201-low side segment floor slab; 202-low side segment upper wall; 203-low side segment lower wall;

[0023] 3-deformation joint sealing component; 301-polyurethane sealant; 302-polystyrene strips;

[0024] 4- waterproof components; 401- SBS asphalt waterproofing membrane; 402- rubber asphalt waterproofing membrane; 403- SBS asphalt chemical root puncture resistant waterproofing membrane; 404- membrane reinforcement layer; 405- shale protection brick; 406- fine stone concrete protection layer;

[0025] The following is a detailed description of the embodiments of the present invention with reference to the accompanying drawings. DETAILED DESCRIPTION

[0026] The utility model is further described below in conjunction with the accompanying drawings and embodiments:

[0027] like Figure 1 , Figure 2 As shown, a deformation joint of unequal-height floors in a basement, wherein the concrete structure of the basement comprises a high-side segment 1 of the basement structure and a low-side segment 2 of the basement structure, wherein the high-side segment 1 of the basement structure comprises a high-side segment floor 101, an upper wall 102 of the high-side segment, a lower wall 103 of the high-side segment, and a high-side segment cantilever 104; the low-side segment 2 of the basement structure comprises a low-side segment floor 201, an upper wall 202 of the low-side segment, and a lower wall 203 of the low-side segment; the upper wall 102 of the high-side segment is located above the high-side segment floor 101, and the lower wall 103 of the high-side segment is located above the high-side segment floor 101. At the lower part of the segmented floor 101, the high side segmented cantilever 104 and the high side segmented floor 101 are respectively located on both sides of the high side segmented upper wall 102 and the high side segmented lower wall 103; the low side segmented upper wall 202 is located at the upper part of the low side segmented floor 201, and the low side segmented lower wall 203 is located at the lower part of the low side segmented floor 201; the high side segmented cantilever 104 is located above the low side segmented upper wall 202, and the upper part of the low side segmented floor 201, the outer side of the low side segmented upper wall 202, the outer side of the high side segmented cantilever 104, and the outer side of the high side segmented upper wall 102 are backfilled with earth.

[0028] There is a first gap in the horizontal direction between the upper wall 102 and the lower wall 103 of the high side section and the upper wall 202 and the lower wall 203 of the low side section, and there is a second gap in the vertical direction between the bottom of the high side section cantilever 104 and the top of the upper wall 202 of the low side section, and a deformation joint sealing component 3 is arranged in the second gap; the deformation joint sealing component 3 includes polyurethane sealant 301 and polystyrene strips 302, and multiple layers of polystyrene strips 302 are stacked up and down and arranged in the second gap, and the polyurethane sealant 301 is applied to the outside of the polystyrene strips 302 to seal the second gap.

[0029] A waterproofing assembly 4 is arranged between the high side segment 1 of the basement structure and the low side segment 2 of the basement structure. The waterproofing assembly 4 includes a waterproofing coiled material assembly, a shale protection brick 405, and a fine stone concrete protection layer 406. The waterproofing coiled material assembly covers the outer side of the upper wall 102 of the high side segment, the outer side of the cantilever plate 104 of the high side segment, the second gap, the outer side of the upper wall 202 of the low side segment, and the upper part of the low side segment floor 201. Shale protection bricks 405 are arranged in the vertical direction of the waterproofing coiled material assembly, and a fine stone concrete protection layer 406 is laid in the horizontal direction of the waterproofing coiled material assembly. The shale protection bricks 405 and the fine stone concrete protection layer 406 can protect the waterproofing coiled material assembly.

[0030] The waterproofing membrane assembly includes an SBS asphalt waterproofing membrane 401, a rubber asphalt waterproofing membrane 402, an SBS asphalt chemical root penetration resistant waterproofing membrane 403, and a membrane reinforcement layer 404; the SBS asphalt waterproofing membrane 401 can be a 4.0 mm thick SBS modified asphalt waterproofing membrane, the rubber asphalt waterproofing membrane 402 can be a 2.0 mm thick non-curing rubber asphalt waterproofing membrane, the SBS asphalt chemical root penetration resistant waterproofing membrane 403 can be a 4.0 mm thick SBS modified asphalt chemical root penetration resistant waterproofing membrane, the membrane reinforcement layer 404 is a 1.5 mm thick double-sided self-adhesive tireless membrane reinforcement layer, and the shale protection brick 405 is 100 mm thick.

[0031] The SBS asphalt waterproofing membrane 401 covers the outer end of the high side segmented cantilever 104, the second gap and the outer side of the low side segmented upper wall 202; the rubber asphalt waterproofing membrane 402 covers the outer side of the high side segmented upper wall 102, the upper part of the high side segmented cantilever 104, the outer side of the SBS asphalt waterproofing membrane 401 and the upper part of the low side segmented floor 201; the SBS asphalt chemical root-piercing waterproofing membrane 403 covers the outer side of the rubber asphalt waterproofing membrane 402; the membrane reinforcement layer 404 covers the junction of the high side segmented upper wall 102 and the high side segmented cantilever 104, the junction of the low side segmented upper wall 202 and the low side segmented floor 201, and the membrane reinforcement layer 404 is located between the SBS asphalt chemical root-piercing waterproofing membrane 403 and the rubber asphalt waterproofing membrane 402. The waterproofing membrane assembly is provided with multiple layers, and the waterproofing effect is better.

[0032] After the expansion joint construction is completed, backfill construction can be carried out on the upper part of the low-side segmented floor 201, the outer side of the low-side segmented upper wall 202, the outer side of the high-side segmented cantilever 104, and the outer side of the high-side segmented upper wall 102; the expansion joint can not only play the role of the expansion joint itself, effectively resisting uneven settlement of the building or expansion and contraction deformation caused by factors such as temperature and humidity, but also ensure the sealing of the basement outer wall to avoid leakage.

[0033] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0034] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present utility model, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0035] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0036] The utility model is described above by way of example in conjunction with the accompanying drawings. It is obvious that the specific implementation of the utility model is not limited to the above-mentioned method. As long as various improvements are made using the method concept and technical solution of the utility model, or are directly applied to other occasions without improvement, they are all within the protection scope of the utility model.

Claims

1. A basement unequal height floor deformation joint, the basement concrete structure comprises a basement structure high side segment (1) and a basement structure low side segment (2), characterized in that: The high side segment (1) of the basement structure includes a high side segment floor slab (101), a high side segment upper wall (102), a high side segment lower wall (103), and a high side segment cantilever (104); the low side segment (2) of the basement structure includes a low side segment floor slab (201), a low side segment upper wall (202), and a low side segment lower wall (203); The high side segment upper wall (102) is located on the upper part of the high side segment floor (101), the high side segment lower wall (103) is located on the lower part of the high side segment floor (101), and the high side segment cantilever plate (104) and the high side segment floor (101) are respectively located on both sides of the high side segment upper wall (102) and the high side segment lower wall (103); the low side segment upper wall (202) is located on the upper part of the low side segment floor (201), and the low side segment lower wall (203) is located on the lower part of the low side segment floor (201); the high side segment cantilever plate (104) is located above the low side segment upper wall (202); A first gap exists in the horizontal direction between the high side segment upper wall (102) and the high side segment lower wall (103) and the low side segment upper wall (202) and the low side segment lower wall (203), and a second gap exists in the vertical direction between the bottom of the high side segment cantilever plate (104) and the top of the low side segment upper wall (202), and a deformation joint sealing component (3) is arranged in the second gap; A waterproofing assembly (4) is arranged between the high side segment (1) of the basement structure and the low side segment (2) of the basement structure. The waterproofing assembly (4) comprises a waterproofing coiled material assembly, shale protection bricks (405), and a fine stone concrete protection layer (406). The waterproofing coiled material assembly covers the outer side of the upper wall (102) of the high side segment, the outer side of the cantilever plate (104) of the high side segment, the second gap, the outer side of the upper wall (202) of the low side segment, and the upper part of the low side segment floor slab (201). Shale protection bricks (405) are arranged in the vertical direction of the waterproofing coiled material assembly, and a fine stone concrete protection layer (406) is laid in the horizontal direction of the waterproofing coiled material assembly.

2. The basement unequal height floor deformation joint according to claim 1 is characterized in that: The deformation joint sealing component (3) comprises polyurethane sealant (301) and polystyrene strips (302). Multiple layers of polystyrene strips (302) are stacked up and down and arranged in the second gap. The polyurethane sealant (301) is applied to the outside of the polystyrene strips (302) to seal the second gap.

3. The basement unequal height floor deformation joint according to claim 1 is characterized in that: The waterproof roll material assembly comprises an SBS asphalt waterproof roll material (401), a rubber asphalt waterproof coating (402), an SBS asphalt chemical root-penetration-resistant waterproof roll material (403), and a roll material reinforcement layer (404).

4. The basement unequal height floor deformation joint according to claim 3 is characterized in that: The SBS asphalt waterproofing membrane (401) covers the outer end of the high-side segmented cantilever plate (104), the second gap and the outer side of the low-side segmented upper wall (202).

5. The basement unequal height floor deformation joint according to claim 4 is characterized in that: The rubber asphalt waterproof coating (402) covers the outer side of the upper wall (102) of the high side segment, the upper part of the high side segment cantilever plate (104), the outer side of the SBS asphalt waterproofing membrane (401) and the upper part of the low side segment floor (201).

6. The basement unequal height floor deformation joint according to claim 5, characterized in that: The SBS asphalt chemical root-penetration-resistant waterproofing membrane (403) covers the outer side of the rubber asphalt waterproofing coating (402).

7. The basement unequal height floor deformation joint according to claim 6, characterized in that: The roll material reinforcement layer (404) covers the junction between the upper wall (102) of the high side segment and the cantilever plate (104) of the high side segment, and the junction between the upper wall (202) of the low side segment and the floor slab (201) of the low side segment, and the roll material reinforcement layer (404) is located between the SBS asphalt chemical root-penetration-resistant waterproof roll material (403) and the rubber asphalt waterproof coating (402).

8. The basement unequal height floor deformation joint according to claim 1 is characterized in that: The upper part of the low side segmented floor slab (201), the outer side of the low side segmented upper wall (202), the outer side of the high side segmented cantilever slab (104), and the outer side of the high side segmented upper wall (102) are backfilled with earth.