Temporary construction frame for house building
By designing a combination of multi-layer construction frame body, liftable lifting table and connecting frame, the safety hazards of existing construction frames when conveying workpieces are solved, and a more efficient and safe construction process is achieved.
Patent Information
- Application Number
- CN202421577502.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-04
- Publication Date
- 2025-04-18
- Estimated Expiration
- 2034-07-04
AI Technical Summary
When the existing construction frame is conveying workpieces, the materials connected to the end of the wire rope can only move to a position flush with the highest floor, and there is no protection on the side of the main body of the construction frame, which poses a safety hazard.
A temporary construction frame for building a house is designed, including a base, construction frame body, lifting table and connecting frame. The construction frame body is equipped with multiple layers according to the construction height. The lifting table side wall is equipped with lifting boxes. The connecting frame is equipped with telescopic blocks and bells. The side plates are used for protection. T-shaped guide grooves and sliders are used for limit guidance of the hanging box.
Through the protective design of the side panel, the risk of personnel falling from the side is avoided; the combination of telescopic blocks and ringing reminds the personnel on this floor that the materials have been delivered, improving safety and working efficiency; the design of the T-shaped guide groove and slider avoids the shaking of the hanging box during lifting and lowering, and improving the stability of operation.
Smart Images

Figure CN222771834U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction frames, in particular to a temporary building construction frame. Background Art
[0002] The construction frame used in building construction is also called scaffolding. It is a working platform set up to ensure the smooth progress of each construction process. According to the location of the scaffolding, it can be divided into external scaffolding and internal scaffolding; according to the different materials, it can be divided into wooden scaffolding, bamboo scaffolding, and steel pipe scaffolding.
[0003] The utility model patent with announcement number: CN 217975283 U discloses a building construction frame, including a base plate, a construction frame body is installed on the upper end of the base plate, a lifting assembly is arranged on one side of the construction frame body, the lifting assembly includes two groups of fixed columns fixedly connected to the base plate, one side of the two groups of fixed columns is commonly fixedly connected to a slide rail, the front end of the slide rail is provided with an adjustment assembly, the adjustment assembly includes a slider, the front end of the slider is fixedly connected to a connecting plate, the front end of the connecting plate is fixedly connected to a connecting rod, the front end of the connecting rod is fixedly connected to a rotating plate, and a steel wire rope is arranged on the inner side of the rotating plate.
[0004] However, there are still certain shortcomings in the above technical solution: when the above technical solution is in use, when transporting workpieces to the highest floor, the material connected to the end of the wire rope can only be moved to a position flush with the highest floor, and there is no protection on the sides of the construction frame body. When personnel take materials, they need to squat and take materials from the side, which makes the process of taking materials after lifting dangerous. Utility Model Content
[0005] The utility model aims to provide a temporary construction frame for building construction to solve the problems raised in the above-mentioned background technology.
[0006] To achieve the above purpose, the utility model provides the following technical solutions: a temporary construction frame for building construction, comprising a base,
[0007] A construction frame body is installed on one side of the top of the base, a lifting platform is installed on the other side of the base, a connecting frame is connected between the construction frame body and the lifting platform, and a lifting box that can be raised and lowered is installed on the side wall of the lifting platform;
[0008] The construction frame body is provided with multiple layers according to the construction height. The construction frame body includes vertical bars, four of which are distributed in a rectangular shape, and a horizontal working platform is installed between the vertical bars. An inclined ladder is also installed between the vertical bars, and side panels are installed between the vertical bars on the same side.
[0009] The connecting frame includes a telescopic block. The connecting frame is designed in a "C" shape, and the telescopic block is installed on the inner wall of the connecting frame through a spring. A bell is installed inside the telescopic block.
[0010] By adopting the above technical solution, during use, after personnel climb to a high place through the inclined ladder, the side plates provide protective effects on both sides. When the hanging box lifts the materials or workpieces, it passes through the slotted opening in the connecting frame and compresses the position of the telescopic block, causing the bell inside the telescopic block to shake and make a sound, thereby reminding the staff on this floor that a hanging box is passing by, facilitating the staff to still know that the hanging box has arrived even after being blocked by the side plates.
[0011] As a further solution of the present invention: The lifting platform includes a connecting plate. Connecting plates are installed at the top and bottom of the lifting platform. After multiple lifting platforms are docked, they are fixed by the cooperation of the screw holes and bolts on the connecting plates. Mounting seats one are provided at the top of both sides of the lifting platform, and through slots are贯穿ly opened on the lifting platform. A longitudinal T-shaped guiding groove is opened on the side wall of the lifting platform close to the connecting frame.
[0012] By adopting the above technical solution, when installing the lifting platform, the height of the overall lifting platform is increased by docking multiple connecting plates and fixing them with bolts. The design of the mounting seat one facilitates the installation of the mounting seat two. The design of the through slot facilitates the passing of the winding rope. The design of the T-shaped guiding groove facilitates the guiding of the hanging box.
[0013] As a further solution of the present invention: Steering mechanisms are installed on both side walls of the top lifting platform. The steering mechanism includes a mounting seat two. The mounting seat two is aligned with the mounting seat one, and a rotating wheel is rotatably installed inside the mounting seat two.
[0014] By adopting the above technical solution, during use, the movement direction of the winding rope is adjusted through the rotating wheel, thereby facilitating the lifting and lowering of the hanging box.
[0015] As a further solution of the present invention: A winding disc is installed on the top of the base, and a motor is installed on the back of the winding disc. A winding rope is wound around the winding disc, and the end of the winding rope is connected to the hanging box after passing around the steering mechanism.
[0016] By adopting the above technical solution, the motor on the back of the winding disc drives the rotation of the winding disc, thereby realizing the winding or unwinding of the winding rope.
[0017] As a further solution of the present invention: The hanging box includes a slider. A slider is opened on the side wall of the hanging box close to the lifting platform, and the slider is slidably installed in the T-shaped guiding groove.
[0018] By adopting the above technical solution, when in use, the design of the slider in the T-shaped guide groove has a guiding and limiting effect on the lifting of the hanging box, thereby avoiding shaking when the hanging box is lifted or lowered.
[0019] Compared with the prior art, the utility model has the following beneficial effects: the temporary construction frame for building a house is
[0020] Side plates and connecting frames are provided. The side plates on both sides are used to protect the overall sides of the construction frame body to prevent personnel from falling from both sides. A connecting frame is connected between the construction frame body and the lifting platform. At the same time, the telescopic block in the connecting frame contracts when the hanging box is driven to rise, so that the bell in the telescopic block shakes and produces a bell sound, reminding personnel on this floor that materials have been delivered.
[0021] In addition, the temporary construction frame for building construction is also provided with a T-shaped guide groove and a slider. The slider is slidably installed in the T-shaped guide groove. When the hanging box is raised or lowered, it has the effect of limiting and guiding the hanging box to avoid shaking when the hanging box is raised. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 This is a schematic diagram of the front view structure of the utility model;
[0023] Figure 2 This is a schematic diagram of the three-dimensional structure of the lifting platform and the connecting frame of the utility model;
[0024] Figure 3 It is a schematic diagram of the three-dimensional structure of the hanging box of the utility model.
[0025] In the figure: 1. base; 2. construction frame body; 201. vertical rod; 202. working platform; 203. inclined ladder; 204. side plate; 3. lifting platform; 301. connecting plate; 302. mounting seat 1; 303. through groove; 304. T-shaped guide groove; 4. connecting frame; 401. telescopic block; 5. winding disk; 6. steering mechanism; 601. mounting seat 2; 602. rotating wheel; 7. winding rope; 8. hanging box; 801. slider. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0027] See also Figure 1-3 The utility model provides a technical solution: a temporary construction frame for building construction, comprising a base 1,
[0028] On one side of the top of the base 1, a construction frame body 2 is installed. On the other side of the base 1, a lifting platform 3 is installed. A connecting frame 4 is connected between the construction frame body 2 and the lifting platform 3. An elevating hanging box 8 is installed on the side wall of the lifting platform 3;
[0029] The construction frame body 2 is provided with multiple layers according to the construction height. The construction frame body 2 includes vertical rods 201. Four vertical rods 201 are distributed in a rectangular shape, and a horizontal working platform 202 is installed between the vertical rods 201. An inclined ladder 203 is also installed between the vertical rods 201. Side plates 204 are installed between the vertical rods 201 on the same side;
[0030] The connecting frame 4 includes a telescopic block 401. The connecting frame 4 is designed in a "C" shape, and a telescopic block 401 is installed on the inner wall of the connecting frame 4 through a spring. A bell is installed inside the telescopic block 401;
[0031] Specifically, strengthening diagonal rods are installed on the construction frame body 2 to improve the strength of the overall construction frame body 2. The telescopic block 401 is designed in a triangular shape to facilitate the compression of the telescopic block 401.
[0032] Please refer to Figure 2 , further, the lifting platform 3 includes a connecting plate 301. Connecting plates 301 are installed at the top and bottom of the lifting platform 3. After multiple lifting platforms 3 are butted, they are fixed by the cooperation of the screw holes and bolts on the connecting plate 301. Mounting seats one 302 are provided at the tops on both sides of the lifting platform 3, and a through groove 303 is penetrated through the lifting platform 3. A longitudinal T-shaped guide groove 304 is opened on the side wall of the lifting platform 3 close to the connecting frame 4.
[0033] Please refer to Figure 1 , further, steering mechanisms 6 are installed on both side walls of the top lifting platform 3. The steering mechanism 6 includes a mounting seat two 601. The mounting seat two 601 is aligned with the mounting seat one 302, and a rotating wheel 602 is rotatably installed inside the mounting seat two 601.
[0034] Please refer to Figure 1 , further, a winding disc 5 is installed on the top of the base 1, and a motor is installed on the back of the winding disc 5. A winding rope 7 is wound around the winding disc 5, and the end of the winding rope 7 bypasses the steering mechanism 6 and is connected to the hanging box 8;
[0035] Specifically, after the winding rope 7 passes through the rotating wheel 602, it passes through the through groove 303 and contacts the rotating wheel 602 on the other side, and then is fixedly connected to the top of the hanging box 8 downward.
[0036] Please refer to Figure 3 , further, the hanging box 8 includes a slider 801. A slider 801 is opened on the side wall of the hanging box 8 close to the lifting platform 3, and the slider 801 is slidably installed in the T-shaped guide groove 304;
[0037] Specifically, the thickness of the hanging box 8 matches the space in the connecting frame 4 .
[0038] Working principle: When using the temporary construction scaffolding for building a house, the side panels 204 on both sides are used to protect the overall sides of the construction scaffolding body 2 to prevent people from falling from both sides, and a connecting frame 4 is connected between the construction scaffolding body 2 and the lifting platform 3. At the same time, the telescopic block 401 in the connecting frame 4 contracts when the hanging box 8 is driven to rise, so that the bell in the telescopic block 401 shakes and produces a ringing sound, prompting the personnel on this floor that the materials have been delivered. The slider 801 is slidably installed in the T-shaped guide groove 304. When the hanging box 8 is raised or lowered, it has a limiting and guiding effect on the hanging box 8 to prevent the hanging box 8 from shaking when it is raised. The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.
[0039] The directions or positional relationships indicated by terms such as "center", "longitudinal", "lateral", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" are based on the directions or positional relationships shown in the accompanying drawings. They are merely simplified descriptions for the convenience of describing the present invention, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, they cannot be understood as limitations on the protection content of the present invention.
[0040] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.
Claims
1. A temporary construction scaffold for building construction, comprising a base (1), characterized in that: On one side of the top of the base (1), a construction scaffold body (2) is installed. On the other side of the base (1), a lifting platform (3) is installed. A connecting frame (4) is connected between the construction scaffold body (2) and the lifting platform (3). A liftable hanging box (8) is installed on the side wall of the lifting platform (3); The construction scaffold body (2) is provided with multiple layers according to the construction height. The construction scaffold body (2) includes vertical rods (201). Four vertical rods (201) are distributed in a rectangular shape, and a horizontal working platform (202) is installed between the vertical rods (201). An inclined ladder (203) is also installed between the vertical rods (201). Side plates (204) are installed between the vertical rods (201) on the same side; The connecting frame (4) includes a telescopic block (401). The connecting frame (4) is designed in a "C" shape, and a telescopic block (401) is installed on the inner wall of the connecting frame (4) through a spring. A bell is installed inside the telescopic block (401).
2. A temporary construction scaffold for building construction according to claim 1, characterized in that: The lifting platform (3) includes a connecting plate (301). Connecting plates (301) are installed at the top and bottom of the lifting platform (3). After multiple lifting platforms (3) are butted, they are fixed through the cooperation of the screw holes and bolts on the connecting plate (301). Mounting seats one (302) are provided at the tops on both sides of the lifting platform (3), and a through groove (303) is penetrated through the lifting platform (3). A longitudinal T-shaped guiding groove (304) is opened on the side wall of the lifting platform (3) close to the connecting frame (4).
3. A temporary construction scaffold for building construction according to claim 2, characterized in that: Steering mechanisms (6) are installed on both side walls of the top lifting platform (3). The steering mechanisms (6) include mounting seats two (601). The mounting seats two (601) are aligned with the mounting seats one (302). A rotating wheel (602) is rotatably installed inside the mounting seats two (601).
4. A temporary construction scaffold for building construction according to claim 3, characterized in that: A winding disc (5) is installed on the top of the base (1), and a motor is installed on the back of the winding disc (5). A winding rope (7) is wound around the winding disc (5), and the end of the winding rope (7) is connected to the hanging box (8) after passing around the steering mechanism (6).
5. A temporary construction scaffold for building construction according to claim 4, characterized in that: The hanging box (8) includes a slider (801). A slider (801) is opened on the side wall of the hanging box (8) close to the lifting platform (3), and the slider (801) is slidably installed in the T-shaped guiding groove (304).
Citation Information
Patent Citations
House building scaffold
CN217975283U