Prefabricated bridge pier column lifting device

By designing a prefabricated bridge pier column lifting device including a rotating ring, the problem of prefabricated pier columns being easily damaged during lifting in the prior art is solved, and a safer and more stable lifting process is achieved.

CN222781247UActive Publication Date: 2025-04-22华翔德建建设集团有限公司
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421734347.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2025-04-22
Estimated Expiration
2034-07-22

AI Technical Summary

Technical Problem

When lifting the existing prefabricated pier column lifting and flipping devices and device groups, the prefabricated pier columns are changed from a flat position to a vertical position, so that the stress between the nylon sleeve and the steel rod is concentrated, which easily causes damage to the prefabricated pier columns.

Method used

A prefabricated bridge pier column lifting device is designed, including prefabricated pier columns, steel rods and lifting components. The lifting assembly includes a mounting frame, a rotating ring, a limiting plate, a support rod, a nylon sleeve, a suspended rope and a fixing frame. Through the design of the rotating ring, the nylon sleeve slides on the rotating ring to avoid accidents following the flip of the prefabricated pier column.

Benefits of technology

It effectively avoids stress concentration between the nylon sleeve and the steel rod, reduces the risk of damage of prefabricated pier columns during the lifting process, and ensures the safety and stability of the lifting process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222781247U_ABST
    Figure CN222781247U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of bridge engineering, in particular to a prefabricated bridge pier column lifting device which comprises a prefabricated pier column, a steel bar and a lifting assembly, and the lifting assembly comprises a mounting frame, a rotating ring, a limiting plate, a supporting rod, a nylon sleeve, a lifting rope and a fixing frame. The nylon sleeve on the lifting rope is wound on the rotating ring in the mounting frame, the lifting equipment is started to drive the fixing frame to be lifted, so that the nylon sleeve on the lifting rope is lifted along with the fixing frame, the steel bar is driven to move along with the nylon sleeve, the end, close to the steel bar, of the prefabricated pier column can be lifted, and at the moment, the output end of the lifting equipment is slowly lifted; and one end, close to the steel bar, of the prefabricated pier column is lifted along with the lifting mechanism until the prefabricated pier column is completely lifted, so that the problems that when an existing prefabricated pier column lifting and overturning device and device set are lifted, the prefabricated pier column is converted into a vertical position from a flat position, stress between the nylon sleeve and the steel bar is concentrated, and the prefabricated pier column is prone to being damaged are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridge engineering, in particular to a prefabricated bridge pier hoisting device. Background Art

[0002] With the promotion of prefabricated bridge technology, the assembly technology of prefabricated piers in prefabricated bridge construction has been popularized. During the construction of prefabricated bridges, a large number of prefabricated pier columns need to be lifted and turned over to a flat state for transportation.

[0003] At present, the prior art (CN210944502U) discloses a prefabricated pier column lifting and flipping device and device group, including a shoulder pole beam, two steel bars, limit bolts, and two groups of hanging parts; the steel bar is fixed to the upper part of the prefabricated pier column, and the two ends extend out of the two sides of the prefabricated pier column; the two groups of hanging parts are located on both sides of the prefabricated pier column to hang the steel bar on the shoulder pole beam; each group of hanging parts includes a shackle, a sling, and three nylon sleeves, the shackle is installed on the shoulder pole beam, the shackle includes a bent ring and a pin shaft, a nylon sleeve is installed on the pin shaft of the shackle, and a nylon sleeve is installed on the same side ends of the two steel bars; the two ends of the sling are respectively connected to the two nylon sleeves on the lower side; the middle part of the sling is placed on the nylon sleeve on the upper side; the limit bolts for axially limiting the nylon sleeve are installed on the steel bar.

[0004] However, when the above method is used to lift the prefabricated pier column, the nylon sleeve is hung on the steel rod, so that the lifting equipment lifts the nylon sleeve and then lifts the prefabricated pier column. During the lifting, the prefabricated pier column is turned from a horizontal position to a vertical position, which causes stress concentration between the nylon sleeve and the steel rod, which can easily cause damage to the prefabricated pier column. Utility Model Content

[0005] The utility model aims to provide a prefabricated bridge pier lifting device, aiming to solve the problem that in the existing prefabricated pier lifting and turning devices and device groups, when lifting, the prefabricated pier is turned from a lying position to a vertical position, which causes stress concentration between the nylon sleeve and the steel rod, and easily causes damage to the prefabricated pier.

[0006] To achieve the above-mentioned purpose, the utility model provides a prefabricated bridge pier column lifting device, comprising a prefabricated pier column, a steel rod and a lifting assembly, wherein the steel rod is fixedly connected to the prefabricated pier column and is located on one side of the prefabricated pier column, and the lifting assembly comprises a mounting frame, a rotating ring, a limiting plate, a supporting rod, a nylon sleeve, a lifting rope and a fixing frame;

[0007] The mounting frame is fixedly connected to the steel rod and is located on one side of the steel rod. The rotating ring is rotatably connected to the mounting frame and is located on one side of the mounting frame. The limiting plate is fixedly connected to the steel rod and is located on a side of the steel rod away from the prefabricated pier. The supporting rod is fixedly connected to the prefabricated pier, and is fixedly connected to the mounting frame, and is fixedly connected to the limiting plate and is located on both sides of the mounting frame. The nylon sleeve is slidably connected to the rotating ring and is located on one side of the rotating ring. The lifting rope is fixedly connected to the nylon sleeve and is located on the top of the nylon sleeve. The fixing frame is fixedly connected to the lifting rope and is located on one side of the lifting rope.

[0008] Wherein, the lifting assembly also includes an extension plate and an auxiliary frame, the extension plate is fixedly connected to the mounting frame and is located on one side of the mounting frame, and the auxiliary frame is fixedly connected to the fixed frame and is located on one side of the fixed frame.

[0009] Wherein, the lifting assembly also includes a base and a stabilizing frame, the base is fixedly connected to the prefabricated pier and is located at the bottom of the prefabricated pier, the stabilizing frame is fixedly connected to the base and the prefabricated pier, and is located on one side of the base.

[0010] Wherein, the lifting assembly also includes an auxiliary mechanism, and the auxiliary mechanism is arranged on one side of the prefabricated pier.

[0011] Wherein, the auxiliary mechanism includes a left-side clamp, a right-side clamp and a fixing bolt, the left-side clamp is slidably connected to the base and is located on one side of the base, the right-side clamp is slidably connected to the base and is located on the side of the base away from the left-side clamp, and the fixing bolt is threadedly connected to the left-side clamp and passes through the right-side clamp.

[0012] Wherein, the auxiliary mechanism also includes a protective layer, which is fixedly connected to the left clamp and is located on one side of the left clamp.

[0013] The utility model discloses a prefabricated bridge pier lifting device. When the prefabricated pier is manufactured and needs to be transported to the bridge construction site, the staff first uses the lifting equipment to move the fixing frame on the hook to the side of the prefabricated pier. At this time, the nylon sleeve on the lifting rope can be wound around the rotating ring in the mounting frame. At this time, the lifting equipment is started to drive the fixing frame to rise, so that the nylon sleeve on the lifting rope is raised accordingly, and then the steel rod is driven to move accordingly, so that the prefabricated pier can be lifted up at one end close to the steel rod. At this time, the lifting device is turned on and the fixing frame is turned up and the nylon sleeve on the lifting rope is turned up and the steel rod is turned up and the prefabricated pier is lifted up. The output end of the lifting device is slowly lifted, so that the end of the prefabricated pier column close to the steel rod is lifted along with it until the prefabricated pier column is completely lifted. When the prefabricated pier column flips when being lifted, the rotating ring can rotate on the mounting frame, so that the nylon sleeve slides on the rotating ring to avoid accidents caused by the flipping of the prefabricated pier column. This solves the problem that in the existing prefabricated pier column lifting and flipping devices and device groups, the prefabricated pier column is turned from a lying position to a vertical position during lifting, which causes stress concentration between the nylon sleeve and the steel rod, and easily causes damage to the prefabricated pier column. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art are briefly introduced below.

[0015] Figure 1 It is a schematic diagram of the overall structure of the first embodiment of the utility model.

[0016] Figure 2 It is an overall front view of the first embodiment of the utility model.

[0017] Figure 3 It is a schematic diagram of the overall structure of the second embodiment of the utility model.

[0018] Figure 4 It is an overall front view of the second embodiment of the utility model.

[0019] 101-prefabricated pier, 102-steel rod, 103-lifting assembly, 104-mounting frame, 105-rotating ring, 106-limiting plate, 107-support rod, 108-nylon sleeve, 109-lifting rope, 110-fixed frame, 111-extension plate, 112-auxiliary frame, 113-base, 114-stabilizing frame, 201-auxiliary mechanism, 202-left clamp, 203-right clamp, 204-fixing bolt, 205-protective layer. DETAILED DESCRIPTION

[0020] The first embodiment of the present application is:

[0021] See also Figure 1-2 , Figure 1 It is a schematic diagram of the overall structure of the first embodiment of the utility model. Figure 2 It is an overall front view of the first embodiment of the utility model.

[0022] The utility model discloses a prefabricated bridge pier lifting device, comprising a prefabricated pier 101, a steel rod 102 and a lifting assembly 103, wherein the lifting assembly 103 comprises a mounting frame 104, a rotating ring 105, a limiting plate 106, a supporting rod 107, a nylon sleeve 108, a lifting rope 109, a fixing frame 110, an extension plate 111, an auxiliary frame 112, a base 113 and a stabilizing frame 114; the above-mentioned scheme solves the problem that the existing prefabricated pier lifting and turning devices and device groups are used to lift the prefabricated pier 101, which causes the stress between the nylon sleeve 108 and the steel rod 102 to concentrate, and the prefabricated pier 101 is easily damaged.

[0023] According to this specific implementation, the steel rod 102 is installed on the prefabricated pier 101 to facilitate subsequent transportation.

[0024] The mounting frame 104 is fixedly connected to the steel rod 102 and is located on one side of the steel rod 102. The rotating ring 105 is rotatably connected to the mounting frame 104 and is located on one side of the mounting frame 104. The limiting plate 106 is fixedly connected to the steel rod 102 and is located on a side of the steel rod 102 away from the prefabricated pier 101. The supporting rod 107 is fixedly connected to the prefabricated pier 101 and is fixedly connected to the mounting frame 104 and is fixedly connected to the limiting plate 106 and is located on the mounting frame 104. On both sides of the pier 101, the nylon sleeve 108 is slidably connected to the rotating ring 105 and is located on one side of the rotating ring 105. The lifting rope 109 is fixedly connected to the nylon sleeve 108 and is located on the top of the nylon sleeve 108. The fixing frame 110 is fixedly connected to the lifting rope 109 and is located on one side of the lifting rope 109. When the prefabricated pier 101 is completed and needs to be transported to the bridge construction site, the staff first uses the lifting equipment to move the fixing frame 110 on the hook to the side of the prefabricated pier 101. At this time, The nylon sleeve 108 on the lifting rope 109 can be wound around the rotating ring 105 in the mounting frame 104. At this time, the lifting device is started to drive the fixing frame 110 to rise, so that the nylon sleeve 108 on the lifting rope 109 is raised accordingly, thereby driving the steel rod 102 to move accordingly, and the end of the prefabricated pier column 101 close to the steel rod 102 can be lifted. At this time, the output end of the lifting device is slowly lifted, so that the end of the prefabricated pier column 101 close to the steel rod 102 is lifted accordingly, until the prefabricated pier column 101 is lifted. The column 101 is completely lifted, and when the prefabricated pier column 101 is overturned during the lifting, the rotating ring 105 can rotate on the mounting frame 104, so that the nylon sleeve 108 slides on the rotating ring 105 to avoid accidents caused by the overturning of the prefabricated pier column 101, thereby solving the problem that the existing prefabricated pier column 101 lifting and overturning device and device group turns the prefabricated pier column 101 from a lying position to a vertical position during lifting, which causes stress concentration between the nylon sleeve 108 and the steel rod 102, and easily causes damage to the prefabricated pier column 101.

[0025] Secondly, the extension plate 111 is fixedly connected to the mounting frame 104 and is located on one side of the mounting frame 104, and the auxiliary frame 112 is fixedly connected to the fixing frame 110 and is located on one side of the fixing frame 110. The extension plate 111 can prevent the nylon rope from falling off the rotating ring 105, and the auxiliary frame 112 can improve the strength of the fixing frame 110 to prevent the fixing frame 110 from being damaged during use.

[0026] Again, the base 113 is fixedly connected to the prefabricated pier 101 and is located at the bottom of the prefabricated pier 101. The stabilizing frame 114 is fixedly connected to the base 113 and is fixedly connected to the prefabricated pier 101 and is located on one side of the base 113. The base 113 is arranged at the bottom of the prefabricated pier 101 to facilitate the staff to directly install the prefabricated pier 101 at the designated position of the bridge construction, and the stability of the base 113 and the prefabricated pier 101 is improved by the stabilizing frame 114.

[0027] The prefabricated bridge pier lifting device described in this embodiment has a base 113 arranged at the bottom of the prefabricated pier 101, so that the staff can directly install the prefabricated pier 101 at the designated position of the bridge construction, and the stability of the base 113 and the prefabricated pier 101 is improved by the stabilizing frame 114. When the prefabricated pier 101 is manufactured and needs to be transported to the bridge construction site, the staff first uses the lifting equipment to move the fixing frame 110 on the hook to the side of the prefabricated pier 101. At this time, the nylon sleeve 108 on the lifting rope 109 can be wrapped around the rotating ring 105 in the mounting frame 104. At this time, the lifting equipment is started to drive the fixing frame 110 to rise, so that the nylon sleeve 108 on the lifting rope 109 is raised accordingly, and then The steel rod 102 is driven to follow the movement, and the end of the prefabricated pier 101 close to the steel rod 102 can be lifted. At this time, the output end of the lifting equipment is slowly lifted, so that the end of the prefabricated pier 101 close to the steel rod 102 is lifted until the prefabricated pier 101 is completely lifted. When the prefabricated pier 101 is overturned during lifting, the rotating ring 105 can rotate on the mounting frame 104, so that the nylon sleeve 108 slides on the rotating ring 105 to avoid accidents caused by the overturning of the prefabricated pier 101, thereby solving the problem that the existing prefabricated pier 101 lifting and overturning device and device group turns the prefabricated pier 101 from a lying position to a vertical position during lifting, which causes stress concentration between the nylon sleeve 108 and the steel rod 102, and easily causes damage to the prefabricated pier 101.

[0028] The second embodiment of the present application is:

[0029] Based on the first embodiment, please refer to Figure 3-4 , Figure 3 It is a schematic diagram of the overall structure of the second embodiment of the utility model. Figure 4 It is an overall front view of the second embodiment of the utility model.

[0030] The lifting assembly 103 of the prefabricated bridge pier lifting device of this embodiment also includes an auxiliary mechanism 201, and the auxiliary mechanism 201 includes a left clamp 202, a right clamp 203, a fixing bolt 204 and a protective layer 205.

[0031] Among them, the left side clamp 202 is slidably connected to the base 113 and is located on one side of the base 113, the right side clamp 203 is slidably connected to the base 113 and is located on the side of the base 113 away from the left side clamp 202, the fixing bolt 204 is threadedly connected to the left side clamp 202 and passes through the right side clamp 203, and the positions of the left side clamp 202 and the right side clamp 203 are fixed by installing the left side clamp 202 and the right side clamp 203 on the bottom of the base 113 and right-turning the fixing bolt 204 to avoid damage caused by collision with the ground during transportation to the base 113.

[0032] Secondly, the protective layer 205 is fixedly connected to the left clamp 202 and is located on one side of the left clamp 202. The protective layer 205 can protect the base 113 to prevent the left clamp 202 and the right clamp 203 from damaging the base 113.

[0033] The prefabricated bridge pier lifting device described in this embodiment installs the left-side clamp 202 and the right-side clamp 203 at the bottom of the base 113, and fixes the positions of the left-side clamp 202 and the right-side clamp 203 by right-turning the fixing bolt 204 to avoid damage caused by collision with the ground during transportation to the base 113. The base 113 can be protected by the protective layer 205 to avoid damage to the base 113 by the left-side clamp 202 and the right-side clamp 203.

[0034] What is disclosed above is only one or more preferred embodiments of the present application, and cannot be used to limit the scope of rights of the present application. Ordinary technicians in this field can understand that all or part of the processes of implementing the above embodiments and equivalent changes made according to the claims of the present application are still within the scope covered by the present application.

Claims

1. A prefabricated bridge pier lifting device, comprising a prefabricated pier and a steel rod, wherein the steel rod is fixedly connected to the prefabricated pier and is located on one side of the prefabricated pier, characterized in that: Also included is a lifting assembly; The lifting assembly includes a mounting frame, a rotating ring, a limiting plate, a supporting rod, a nylon sleeve, a lifting rope and a fixing frame; The mounting frame is fixedly connected to the steel rod and is located on one side of the steel rod. The rotating ring is rotatably connected to the mounting frame and is located on one side of the mounting frame. The limiting plate is fixedly connected to the steel rod and is located on a side of the steel rod away from the prefabricated pier. The supporting rod is fixedly connected to the prefabricated pier, and is fixedly connected to the mounting frame, and is fixedly connected to the limiting plate and is located on both sides of the mounting frame. The nylon sleeve is slidably connected to the rotating ring and is located on one side of the rotating ring. The lifting rope is fixedly connected to the nylon sleeve and is located on the top of the nylon sleeve. The fixing frame is fixedly connected to the lifting rope and is located on one side of the lifting rope.

2. A prefabricated bridge pier lifting device as claimed in claim 1, characterized in that: The lifting assembly also includes an extension plate and an auxiliary frame, wherein the extension plate is fixedly connected to the mounting frame and is located on one side of the mounting frame, and the auxiliary frame is fixedly connected to the fixing frame and is located on one side of the fixing frame.

3. A prefabricated bridge pier lifting device as claimed in claim 2, characterized in that: The lifting assembly also includes a base and a stabilizing frame, wherein the base is fixedly connected to the prefabricated pier and is located at the bottom of the prefabricated pier, and the stabilizing frame is fixedly connected to the base and the prefabricated pier and is located on one side of the base.

4. A prefabricated bridge pier lifting device as claimed in claim 3, characterized in that: The lifting assembly also includes an auxiliary mechanism, which is arranged on one side of the prefabricated pier.

5. A prefabricated bridge pier lifting device as claimed in claim 4, characterized in that: The auxiliary mechanism includes a left-side clamp, a right-side clamp and a fixing bolt. The left-side clamp is slidably connected to the base and is located on one side of the base. The right-side clamp is slidably connected to the base and is located on a side of the base away from the left-side clamp. The fixing bolt is threadedly connected to the left-side clamp and passes through the right-side clamp.

6. A prefabricated bridge pier lifting device as claimed in claim 5, characterized in that: The auxiliary mechanism also includes a protective layer, which is fixedly connected to the left clamp and is located on one side of the left clamp.

Citation Information

Patent Citations

  • Prefabricated pier stud hoisting and overturning device and device set

    CN210944502U