Anti-collapse supporting frame for pipe ditch construction

By designing anti-collapse support frames for pipe trench construction, using cage support frame structure and quick splicing system, the problem of trench slope collapse is solved, and construction safety and efficiency are improved.

CN222796453UActive Publication Date: 2025-04-25CHINA RAILWAY FIRST GRP BUILDING & INSTALLATION ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421634043.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-11
Publication Date
2025-04-25
Estimated Expiration
2034-07-11

AI Technical Summary

Technical Problem

During pipeline construction, the trench slopes are prone to collapse, resulting in low construction efficiency and reduced safety.

Method used

A anti-collapse support frame for pipe trench construction is designed, and two sets of guard plates are used to form a cage support frame. It can quickly assemble and adjust through plug-in columns and connecting support columns to prevent the trench slope from collapse.

Benefits of technology

Effectively prevent the collapse of the trench slope, improve construction safety and efficiency, and allow vertical excavation of the side walls of the trench to reduce the excavation area.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222796453U_ABST
    Figure CN222796453U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of buried pipe construction, and particularly relates to a pipe ditch construction anti-collapse supporting frame which comprises guard plates, the guard plates are symmetrically arranged, inserting columns are integrally formed at the two ends of the surfaces of the sides, close to each other, of the two sets of guard plates, and connecting supporting columns are movably connected to the surfaces of the two sets of inserting columns in an inserted mode. Weight reduction grooves are formed in the surfaces of the protection plates in a penetrating mode, the weight reduction grooves are distributed at equal intervals, soil prevention nets are arranged in inner cavities of the weight reduction grooves, and the connecting supporting columns are composed of first splicing columns and second splicing columns; the cage type supporting frame is composed of the two sets of protection plates, the protection effect on the groove slope can be achieved, a constructor installs a pipeline in an inner cavity of the cage type supporting frame, the groove slope can be prevented from collapsing, the safety in the construction process can be improved, meanwhile, the side wall of a groove can be vertically excavated when the groove is excavated, the excavation area is reduced when the groove is excavated, and the construction efficiency is improved. And the construction efficiency of the pipeline is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pipe-burying construction, in particular to an anti-collapse supporting frame for pipe trench construction. Background Art

[0002] During the construction of municipal roads and buildings, rainwater pipes and sewage pipes need to be laid. When laying rainwater pipes and sewage pipes, trenches need to be opened at the laying location, and the rainwater pipes and sewage pipes need to be laid in the trenches. After laying, the trenches need to be backfilled with sand.

[0003] In the existing pipeline construction process, it is necessary to use machinery to excavate the trench. In order to avoid trench collapse during excavation and construction, it is necessary to slope the trench side walls during trench excavation. Slope excavation will increase the amount of earthwork excavated in the trench, affecting construction efficiency. At the same time, if the slope is not standardized or the soil layer is loose, collapse may still occur during excavation or construction, reducing the safety during construction. To solve the above problems, the present application proposes an anti-collapse support frame for trench construction. Utility Model Content

[0004] (I) Purpose of the utility model

[0005] In order to solve the technical problems existing in the background technology, the utility model proposes an anti-collapse support frame for trench construction. Two groups of guard plates form a cage-type support frame, which can protect the trench slope. Construction workers install the pipeline in the inner cavity of the cage-type support frame to prevent the trench slope from collapsing, which can improve the safety during construction. At the same time, the trench side wall can be excavated vertically during excavation, which reduces the excavation area during excavation and improves the construction efficiency of the pipeline, so as to solve the problems raised in the background technology.

[0006] (II) Technical solution

[0007] In order to solve the above technical problems, the utility model provides an anti-collapse support frame for trench construction, including guard plates, the guard plates are symmetrically arranged, and both ends of the surfaces of the two groups of guard plates close to each other are integrally formed with plug-in columns, and the surfaces of the two groups of plug-in columns are movably plugged with connecting support columns;

[0008] The surface of the guard plate is provided with weight-reducing grooves, which are evenly spaced.

[0009] The inner cavity of the weight-reducing tank is provided with a soil-proof net;

[0010] The connecting support column consists of a No. 1 splicing column and a No. 2 splicing column.

[0011] Preferably, plugging holes are provided on the surfaces of both ends of the No. 1 splicing column and the No. 2 splicing column, and both ends of the No. 1 splicing column and the No. 2 splicing column are plugged into the plugging columns through the plugging holes respectively.

[0012] Preferably, positioning holes are formed through the surfaces of the plug-in posts, and positioning pins are movably inserted into the inner cavities of the positioning holes.

[0013] Preferably, the bottom of the positioning pin is threadedly connected with a locking nut.

[0014] Preferably, corresponding holes are formed through the surface of one end of the No. 1 splicing column close to the plug-in column and both ends of the No. 2 splicing column, and the corresponding holes coincide with the positioning holes after the No. 1 splicing column and the No. 2 splicing column are plugged into the plug-in column.

[0015] Preferably, a threaded connector is integrally formed at one end of the No. 1 splicing column away from the plug-in hole, and a threaded connection hole is formed on the surface of one end of the No. 2 splicing column away from the plug-in hole, and the threaded connection hole is threadedly connected to the threaded connector.

[0016] Preferably, pull rings are movably connected to the tops of both ends of the guard plate.

[0017] The above technical solution of the utility model has the following beneficial technical effects:

[0018] 1. In the utility model, two groups of guard plates form a cage-type support frame, which can protect the trench slope. Construction workers install the pipeline in the inner cavity of the cage-type support frame to prevent the trench slope from collapsing, thereby improving the safety during construction. At the same time, the trench side wall can be excavated vertically during excavation, which reduces the excavation area and improves the construction efficiency of the pipeline.

[0019] 2. In the utility model, the connecting support column is composed of a No. 1 splicing column and a No. 2 splicing column. The No. 1 splicing column and the No. 2 splicing column are threadedly connected to each other through a threaded connection hole and a threaded connection head for splicing. Both ends of the No. 2 splicing column are respectively plugged into the plug-in column through the threaded connection hole and the plug-in hole, and are locked by a positioning pin. The width of the support frame can be adjusted to meet the pipeline construction requirements of grooves of different widths. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 This is a schematic diagram of the overall structure of an anti-collapse support frame for trench construction according to the utility model;

[0021] Figure 2 This is a schematic diagram of the cross-sectional structure of a guard plate of an anti-collapse support frame for trench construction according to the utility model;

[0022] Figure 3 This is a schematic diagram of the guard plate structure of an anti-collapse support frame for trench construction according to the utility model;

[0023] Figure 4 The utility model is a schematic diagram of the structure of connecting support columns of an anti-collapse support frame for trench construction.

[0024] Reference numerals:

[0025] 1. Guard plate; 2. Weight reduction groove; 3. Soil-proof net; 4. Connecting support column; 5. Pull ring; 6. Plug-in column; 7. Positioning hole; 8. Plug-in hole; 9. Positioning pin; 10. Locking nut; 11. No. 1 splicing column; 12. No. 2 splicing column; 13. Threaded connection hole; 14. Threaded connector. DETAILED DESCRIPTION

[0026] In order to make the purpose, technical solution and advantages of the utility model clearer, the utility model is further described in detail below in combination with specific implementation methods and with reference to the accompanying drawings. It should be understood that these descriptions are only exemplary and are not intended to limit the scope of the utility model. In addition, in the following description, the description of well-known structures and technologies is omitted to avoid unnecessary confusion of the concept of the utility model.

[0027] like Figure 1-4 As shown, the utility model proposes a trench construction anti-collapse support frame, including a guard plate 1, the guard plate 1 is symmetrically arranged, and two groups of guard plates 1 are integrally formed with plug-in columns 6 at both ends of the surface of one side close to each other, and the surfaces of the two groups of plug-in columns 6 are movably plugged with connecting support columns 4;

[0028] The surface of the guard plate 1 is provided with weight-reducing grooves 2, and the weight-reducing grooves 2 are distributed in an equidistant manner;

[0029] The inner cavity of the weight-reducing tank 2 is provided with a soil-proof net 3.

[0030] It should be noted that the two sets of guard plates 1 can be quickly assembled to form a cage-type support frame, which can protect the trench slope. Construction workers can install the pipeline in the inner cavity of the cage-type support frame to prevent the trench slope from collapsing, thereby improving safety during construction. At the same time, the trench side walls can be excavated vertically during excavation, reducing the excavation area during excavation and improving the construction efficiency of the pipeline. The weight of the guard plate 1 can be reduced by opening a weight-reducing groove 2 on the surface of the guard plate 1, and the soil-proof net 3 can block the soil.

[0031] In this embodiment, if Figure 1 and Figure 2As shown, plug-in holes 8 are provided on the surfaces of both ends of the No. 1 splicing column 11 and the No. 2 splicing column 12, and both ends of the No. 1 splicing column 11 and the No. 2 splicing column 12 are respectively plugged with the plug-in column 6 through the plug-in holes 8, and positioning holes 7 are penetrated on the surface of the plug-in column 6, and positioning pins 9 are movably inserted in the inner cavity of the positioning holes 7, and locking nuts 10 are threadedly connected to the bottom of the positioning pins 9. Corresponding holes are penetrated on one end of the No. 1 splicing column 11 close to the plug-in column 6 and on the surfaces of both ends of the No. 2 splicing column 12, and the corresponding holes of the No. 1 splicing column 11 and the No. 2 splicing column 12 coincide with the positioning holes 7 after being plugged with the plug-in column 6.

[0032] It should be noted that the two ends of the connecting support column 4 are respectively connected to the plug-in column 6 on the surface of the guard plate 1 through the plug-in hole 8. At this time, the positioning hole 7 coincides with the corresponding hole, and the positioning pin 9 is plugged into the positioning hole 7 and the corresponding hole. The bottom of the positioning pin 9 is threadedly connected with a locking nut 10. The two ends of the connecting support column 4 can be positioned by the positioning pin 9, so that the two sets of guard plates 1 can be quickly assembled.

[0033] In this embodiment, if Figure 4 As shown, the connecting support column 4 is composed of a No. 1 splicing column 11 and a No. 2 splicing column 12. The No. 1 splicing column 11 has an integrally formed threaded connector 14 at one end away from the plug-in hole 8, and the No. 2 splicing column 12 has a threaded connection hole 13 on its surface at one end away from the plug-in hole 8. The threaded connection hole 13 is threadedly connected to the threaded connector 14.

[0034] It should be noted that the threaded connection hole 13 and the threaded connection head 14 are threadedly connected to facilitate the quick splicing of the connecting support column 4. The two sets of guard plates 1 are connected through the No. 2 splicing column 12, and the width of the support frame can be adjusted to meet the pipeline construction requirements of grooves of different widths.

[0035] In this embodiment, if Figure 1 As shown, pull rings 5 ​​are movably connected to the tops of both ends of the guard plate 1.

[0036] It should be noted that the pull ring 5 is connected to the steel wire rope, and the support frame can be pulled forward in the groove through the steel wire rope.

[0037] The working principle and use process of the utility model are as follows: the two ends of the connecting support column 4 are respectively plugged into the plug-in column 6 on the surface of the guard plate 1 through the plug-in hole 8, at this time the positioning hole 7 coincides with the corresponding hole, the positioning pin 9 is plugged into the positioning hole 7 and the corresponding hole, and the bottom of the positioning pin 9 is threadedly connected with a locking nut 10, and the two ends of the connecting support column 4 can be positioned by the positioning pin 9, so that the two groups of guard plates 1 can be quickly assembled, and the two groups of guard plates 1 form a cage-type support frame, which can protect the groove slope. The construction personnel install the pipeline in the inner cavity of the cage-type support frame, which can prevent the groove slope from collapsing, improve the safety during construction, and at the same time, the groove is opened When digging, the side wall of the trench can be excavated vertically, the excavation area can be reduced during excavation, and the construction efficiency of the pipeline can be improved. It is connected to the wire rope through the pull ring 5, and the support frame can be pulled forward in the trench through the wire rope. The connecting support column 4 is composed of a No. 1 splicing column 11 and a No. 2 splicing column 12. The No. 1 splicing column 11 and the No. 2 splicing column 12 are spliced ​​by threaded connection holes 13 and threaded connectors 14. The two ends of the No. 2 splicing column 12 are respectively plugged into the plug-in column 6 through the threaded connection holes 13 and the plug-in holes 8, and are locked by the positioning pin 9. The width of the support frame can be adjusted to meet the pipeline construction requirements of trenches of different widths.

[0038] It should be understood that the above specific embodiments of the present invention are only used to illustrate or explain the principles of the present invention, and do not constitute a limitation on the present invention. Therefore, any modifications, equivalent substitutions, improvements, etc. made without departing from the spirit and scope of the present invention should be included in the protection scope of the present invention. In addition, the claims attached to the present invention are intended to cover all changes and modifications that fall within the scope and boundaries of the attached claims or the equivalent forms of such scope and boundaries.

Claims

1. A pipe trench construction anti-collapse support frame, comprising a guard plate (1), wherein the guard plate (1) is symmetrically arranged, and is characterized in that: Both ends of the surfaces of one side of the two groups of guard plates (1) close to each other are integrally formed with plug-in columns (6), and the surfaces of the two groups of plug-in columns (6) are movably plugged with connecting support columns (4); The surface of the guard plate (1) is provided with weight-reducing grooves (2) which are uniformly distributed. The inner cavity of the weight-reducing trough (2) is provided with a soil-proof net (3); The connecting support column (4) consists of a No. 1 splicing column (11) and a No. 2 splicing column (12).

2. The anti-collapse support frame for trench construction according to claim 1, characterized in that: Both ends of the first splicing column (11) and the second splicing column (12) are provided with plugging holes (8), and both ends of the first splicing column (11) and the second splicing column (12) are respectively plugged into the plugging column (6) through the plugging holes (8).

3. The anti-collapse support frame for trench construction according to claim 2, characterized in that: Positioning holes (7) are provided through the surfaces of the plug-in columns (6), and positioning pins (9) are movably inserted into the inner cavities of the positioning holes (7).

4. The anti-collapse support frame for trench construction according to claim 3 is characterized in that: The bottom of the positioning pin (9) is threadedly connected with a locking nut (10).

5. The anti-collapse support frame for trench construction according to claim 4, characterized in that: The end of the No. 1 splicing column (11) close to the plug-in column (6) and the surfaces of both ends of the No. 2 splicing column (12) are penetrated with corresponding holes, and after the No. 1 splicing column (11) and the No. 2 splicing column (12) are plugged into the plug-in column (6), the corresponding holes coincide with the positioning holes (7).

6. The anti-collapse support frame for trench construction according to claim 5, characterized in that: A threaded connection head (14) is integrally formed on one end of the No. 1 splicing column (11) away from the insertion hole (8), and a threaded connection hole (13) is formed on the surface of one end of the No. 2 splicing column (12) away from the insertion hole (8), and the threaded connection hole (13) is threadedly connected to the threaded connection head (14).

7. The anti-collapse support frame for trench construction according to claim 1, characterized in that: Pull rings (5) are movably connected to the tops of both ends of the guard plate (1).