Construction support for repairing historic building
By adopting an adjustable pull-knot structure in the construction bracket for ancient building restoration, the problem of possible damage to ancient buildings when erecting construction brackets is solved, and the simplicity of stable fixation and installation is achieved, which is suitable for the needs of ancient building restoration.
Patent Information
- Application Number
- CN202421637748.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-11
- Publication Date
- 2025-04-25
- Estimated Expiration
- 2034-07-11
AI Technical Summary
During the restoration of ancient buildings, the construction bracket needs to be tied with the ancient buildings to ensure stability, but this process may lead to the damage of the ancient buildings and repairs it during later demolition, which is time-consuming and labor-intensive.
A construction bracket for restoration of ancient buildings is designed, which adopts an adjustable pull-knot structure to fix the columns of ancient buildings. Through the cooperation of threaded pipes and threaded rods, stable fixation without damaging the ancient buildings is achieved.
The construction brackets are stable and fixed without the need to destroy ancient buildings. They are simple and quick to install and have strong applicability, avoiding the damage to ancient buildings during construction and the cumbersomeness of later repairs.
Smart Images

Figure CN222797140U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of ancient building restoration, in particular to a construction support for ancient building restoration. Background Art
[0002] As an important carrier of historical culture, ancient buildings are of great significance to historians in studying history. As a part of history, understanding ancient buildings can help visitors have a deeper understanding of history. However, ancient buildings have been around for a long time and some of their structures have been damaged to a certain extent, making them inconvenient for research and visits. Therefore, ancient buildings are in urgent need of repair and protection.
[0003] The process of ancient building restoration is accompanied by high-altitude operations, and generally it is necessary to set up construction scaffolds to facilitate the construction of construction workers. During the process of setting up the construction scaffolds, they need to be tied to the ancient buildings to ensure the stability of the construction scaffolds. The ancient buildings may need to be destroyed during the tying process. When the construction scaffolds are removed later, they need to be repaired, which is time-consuming and labor-intensive. Therefore, we designed a construction scaffold for ancient building restoration. The scaffolding steel pipes on the construction scaffolds are fixed on the columns of the ancient buildings with an adjustable tying structure. There is no need to damage the ancient buildings. The installation is simple and quick, and it has strong applicability. Utility Model Content
[0004] The utility model aims to provide a construction support for the restoration of ancient buildings. The scaffolding steel pipes on the construction support are fixed on the columns of the ancient buildings with an adjustable tie structure. The ancient buildings do not need to be destroyed, the installation is simple and quick, and the applicability is strong. The utility model solves the problem that the restoration of ancient buildings is accompanied by climbing operations, and generally a construction support needs to be set up to facilitate the construction of construction personnel. During the construction of the construction support, it is necessary to tie with the ancient buildings to ensure the stability of the construction support. During the tying process, the ancient buildings may need to be destroyed. When the construction support is removed later, it needs to be repaired, which is relatively time-consuming and laborious.
[0005] The utility model provides a technical solution to the above-mentioned technical problems as follows: a construction support for repairing ancient buildings, comprising: a construction support body erected on the outer side of the ancient building, the ancient building being provided with a plurality of building columns, the construction support body being provided with a plurality of scaffolding steel pipes extending to the inner side of the building columns, an adjustable tie assembly being provided between the building columns and the scaffolding steel pipes, the adjustable tie assembly comprising a mounting plate mounted on the surface of the building columns, two symmetrical bearing seats being welded to one side of the mounting plate, an inner cavity of the bearing seat being rotatably connected with an L-shaped rod, an end of the L-shaped rod being rotatably connected with a threaded pipe, an inner cavity of the threaded pipe being threadedly connected with a threaded rod, one end of the threaded rod extending to the outer side of the threaded pipe and being provided with a clamp sleeve mounted on the surface of the scaffolding steel pipe.
[0006] The utility model is a construction support for repairing ancient buildings as described above, further: the clamp sleeve includes a semicircular sleeve 1 welded to the end of the threaded rod, the semicircular sleeve 1 is arranged on the surface of the scaffolding steel pipe, the semicircular sleeve 1 is arranged on the side away from the threaded rod, and the semicircular sleeve 1 and the semicircular sleeve 2 are fixedly installed on the surface of the scaffolding steel pipe by four gasket bolts.
[0007] The utility model is a construction support for repairing ancient buildings as described above, further comprising: one side of the mounting plate is provided with two U-shaped rods sleeved on the surface of the building columns, both ends of the U-shaped rods penetrate to one side of the mounting plate and are threadedly connected with gasket nuts on the surface.
[0008] The utility model provides a construction support for ancient building restoration as described above, further comprising: a mounting plate is provided on one side close to the building column.
[0009] The utility model provides a construction support for ancient building restoration as described above, further comprising: a protective pad is sleeved on the surface of the building column, and the protective pad is located on the inner side of the U-shaped rod.
[0010] The utility model provides a construction support for ancient building restoration as described above, further comprising: a cross section of the threaded tube being hexagonal.
[0011] The utility model is a construction support for ancient building restoration as described above, further comprising: a climbing frame net is installed on the outer side of the construction support body, and a cantilever net located below the ceiling of the ancient building is installed above the construction support body.
[0012] The beneficial effects of the utility model are:
[0013] 1. The utility model covers the surface of the building column with a protective pad according to the height of the scaffolding steel pipe, then installs the mounting plate on the surface of the building column, then operates the threaded pipe to rotate, so that the threaded rod is extended until the clamp sleeve is installed on the surface of the scaffolding steel pipe, and then twists the threaded pipe in the opposite direction to make the threaded rod move toward the inner cavity of the threaded pipe to perform tensioning and binding, without damaging the ancient building, so that the scaffolding steel pipe on the construction support is fixed on the column of the ancient building with an adjustable binding structure, without destroying the ancient building, and the installation is simple and fast, and the applicability is strong. It solves the problem that the construction support is usually required to be set up during the restoration of the ancient building accompanied by the climbing operation to facilitate the construction of the construction personnel. During the construction support setting process, it is necessary to bind with the ancient building to ensure the stability of the construction support. During the binding process, the ancient building may need to be damaged. When the construction support is removed later, it needs to be repaired, which is relatively time-consuming and labor-intensive.
[0014] 2. The setting of the utility model can make the mounting plate fit more closely to the surface of the building column. Compared with the contact between the plane and the building column, the surface of the building column will not be worn, thereby improving the stability of the mounting plate after being fixed on the building column.
[0015] 3. The utility model can buffer the mounting plate and the U-shaped rod sleeved on the surface of the building column by setting the protective pad, thereby avoiding damage to the surface of the building column due to direct contact and protecting the building column.
[0016] 4. The utility model uses a climbing frame net and a cantilever net in coordination, and the coordination of the climbing frame net and the cantilever net can protect against falling objects from high altitudes, thereby effectively reducing the potential safety hazards caused by falling objects from high altitudes. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The above and / or other advantages of the present invention will become clearer and easier to understand through the detailed description made in conjunction with the following drawings, which are only schematic and do not limit the present invention, wherein:
[0018] Figure 1 This is a schematic diagram of the structure of an embodiment of the utility model;
[0019] Figure 2 A three-dimensional schematic diagram of a building column and an adjustable tie assembly according to an embodiment;
[0020] Figure 3 The present invention is a three-dimensional schematic diagram of an adjustable tie-fastening assembly according to an embodiment of the present invention.
[0021] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0022] 1. Building column, 2. Construction support body, 3. Scaffolding steel pipe, 4. Adjustable tie assembly, 41. Mounting plate, 42. Bearing seat, 43. L-shaped rod, 44. Threaded pipe, 45. Threaded rod, 46. Clamp sleeve, 461. Semicircular sleeve one, 462. Semicircular sleeve two, 463. Gasket bolt, 47. U-shaped rod, 48. Gasket nut, 5. Protective pad, 6. Climbing frame net, 7. Cantilever net. DETAILED DESCRIPTION
[0023] Hereinafter, an embodiment of a construction support for ancient building restoration according to the present invention will be described with reference to the accompanying drawings.
[0024] The embodiments described herein are specific embodiments of the present invention, which are used to illustrate the concept of the present invention, are explanatory and exemplary, and should not be interpreted as limiting the embodiments of the present invention and the scope of the present invention. In addition to the embodiments described herein, those skilled in the art can also adopt other obvious technical solutions based on the claims and the contents disclosed in the specification of this application, including technical solutions that adopt any obvious replacement and modification of the embodiments described herein.
[0025] The drawings of this specification are schematic diagrams, which assist in explaining the concept of the utility model and schematically show the shapes of various parts and their mutual relationships. Please note that in order to clearly show the structure of various components of the embodiments of the utility model, the drawings are not drawn according to the same scale. The same reference numerals are used to represent the same parts.
[0026] Figure 1-3The utility model shows a construction support for ancient building restoration in one embodiment, which comprises: a construction support body 2 erected on the outside of the ancient building, a plurality of building columns 1 are arranged on the ancient building, a plurality of scaffolding steel pipes 3 extending to the inner side of the building columns 1 are arranged on the construction support body 2, a climbing frame net 6 is installed on the outside of the construction support body 2, and a cantilever net 7 located below the ceiling of the ancient building is installed above the construction support body 2. Through the coordinated use of the climbing frame net 6 and the cantilever net 7, the coordination of the climbing frame net 6 and the cantilever net 7 can protect against falling objects from high altitude, effectively reducing the safety hazards caused by falling objects from high altitude. An adjustable tie assembly 4 is provided between the building column 1 and the scaffolding steel pipe 3. The adjustable tie assembly 4 comprises a mounting plate 41 mounted on the surface of the building column 1. Two symmetrical bearing seats 42 are welded on one side of the mounting plate 41. An L-shaped rod 43 is rotatably connected to the inner cavity of the bearing seat 42. A threaded pipe 44 is rotatably connected to the end of the L-shaped rod 43. The cross section of the threaded pipe 44 is hexagonal. A threaded rod 45 is threadedly connected to the inner cavity of the threaded pipe 44. One end of the threaded rod 45 extends to the outer side of the threaded pipe 44 and is installed with a clamp sleeve 46 sleeved on the surface of the scaffolding steel pipe 3. The clamp sleeve 4 6 comprises a semicircular sleeve 1 461 welded to the end of the threaded rod 45, the semicircular sleeve 1 461 is sleeved on the surface of the scaffolding steel pipe 3, a semicircular sleeve 2 462 is arranged on the side of the semicircular sleeve 1 461 away from the threaded rod 45, the semicircular sleeve 1 461 and the semicircular sleeve 2 462 are fixedly installed on the surface of the scaffolding steel pipe 3 by four gasket bolts 463, one side of the mounting plate 41 is provided with two U-shaped rods 47 sleeved on the surface of the building column 1, both ends of the U-shaped rod 47 are penetrated to one side of the mounting plate 41 and are threadedly connected with gasket nuts 48 on the surface, and the side of the mounting plate 41 close to the building column 1 is provided with 49 is provided. Through the provision of 49, the mounting plate 41 can be more closely attached to the surface of the building column 1. Compared with the contact between the plane and the building column 1, the surface of the building column 1 will not be worn, thereby improving the stability of the mounting plate 41 after being fixed on the building column 1. The surface of the building column 1 is provided with a protective pad 5, and the protective pad 5 is located on the inner side of the U-shaped rod 47. Through the provision of the protective pad 5, the mounting plate 41 and the U-shaped rod 47 provided on the surface of the building column 1 can be buffered, thereby avoiding direct contact to damage the surface of the building column 1, thereby protecting the building column 1.
[0027] Working principle: When the utility model is used, during the process of erecting the outer construction support body 2 of the ancient building, a plurality of scaffolding steel pipes 3 extending into the ancient building are installed on the construction support body 2 through scaffolding fasteners. The user wraps the protective pad 5 around the surface of the building column 1 according to the height of the scaffolding steel pipe 3, and then passes the U-shaped rod 47 through the hole on the mounting plate 41 and tightens the gasket nut 48. According to the distance between the clamp sleeve 46 and the scaffolding steel pipe 3, the user twists the threaded tube 44 and restricts the threaded rod 45 from rotating, so that the threaded rod 45 is extended. Until the semicircular sleeve 1 461 at the end of the threaded rod 45 is sleeved on the surface of the scaffolding steel pipe 3, and then the semicircular sleeve 2 462 is matched with the gasket bolt 463 to install the clamp sleeve 46 on the surface of the scaffolding steel pipe 3, and then the threaded tube 44 is reversed to make the threaded rod 45 move into the inner cavity of the threaded tube 44. The hexagonal cross-section can facilitate the operation of the threaded tube 44 with a practical wrench, thereby improving the convenience of operation. The threaded rod 45 drives the clamp sleeve 46 to move, so that the scaffolding steel pipe 3 and the construction support body 2 are tied together through the adjustable tie assembly 4.
[0028] In summary, the construction support for the restoration of ancient buildings, by putting a protective pad 5 on the surface of the building column 1 according to the height of the scaffolding steel pipe 3, then installing the mounting plate 41 on the surface of the building column 1, and then operating the threaded tube 44 to rotate, so that the threaded rod 45 is extended until the clamp sleeve 46 is installed on the surface of the scaffolding steel pipe 3, and then the threaded tube 44 is twisted in the opposite direction, so that the threaded rod 45 moves toward the inner cavity of the threaded tube 44 for tensioning and binding, and the ancient building will not be damaged. The scaffolding steel pipe on the construction support is fixed to the column of the ancient building with an adjustable binding structure, without destroying the ancient building, and the installation is simple and fast, and the applicability is strong. The problem that the restoration of ancient buildings is accompanied by climbing operations, generally requires the construction of a construction support to facilitate the construction of construction personnel. During the construction support setting process, it is necessary to bind with the ancient building to ensure the stability of the construction support. During the binding process, the ancient building may need to be destroyed. When the construction support is removed later, it needs to be repaired, which is time-consuming and laborious.
[0029] The technical features disclosed above are not limited to the disclosed combinations with other features. Those skilled in the art may also make other combinations between the technical features according to the purpose of the utility model to achieve the purpose of the utility model.
Claims
1. A construction support for ancient building restoration, characterized in that: include: A construction support body (2) is erected outside an ancient building, wherein the ancient building is provided with a plurality of building columns (1), and the construction support body (2) is provided with a plurality of scaffolding steel pipes (3) extending to the inner side of the building columns (1). An adjustable tie assembly (4) is provided between the building columns (1) and the scaffolding steel pipes (3), and the adjustable tie assembly (4) comprises a mounting plate (41) mounted on the surface of the building column (1), and two symmetrical bearing seats (42) are welded to one side of the mounting plate (41), and the inner cavity of the bearing seat (42) is rotatably connected to an L-shaped rod (43), and the end of the L-shaped rod (43) is rotatably connected to a threaded pipe (44), and the inner cavity of the threaded pipe (44) is threadedly connected to a threaded rod (45), and one end of the threaded rod (45) extends to the outer side of the threaded pipe (44) and is provided with a clamp sleeve (46) sleeved on the surface of the scaffolding steel pipe (3).
2. A construction support for ancient building restoration according to claim 1, characterized in that: The clamp sleeve (46) comprises a semicircular sleeve 1 (461) welded to the end of the threaded rod (45); the semicircular sleeve 1 (461) is sleeved on the surface of the scaffolding steel pipe (3); a semicircular sleeve 2 (462) is provided on the side of the semicircular sleeve 1 (461) away from the threaded rod (45); the semicircular sleeve 1 (461) and the semicircular sleeve 2 (462) are fixedly mounted on the surface of the scaffolding steel pipe (3) by four gasket bolts (463).
3. A construction support for ancient building restoration according to claim 2, characterized in that: Two U-shaped rods (47) sleeved on the surface of the building column (1) are provided on one side of the mounting plate (41), and both ends of the U-shaped rods (47) penetrate through one side of the mounting plate (41) and are threadedly connected with gasket nuts (48) on the surface.
4. A construction support for ancient building restoration according to claim 3, characterized in that: The mounting plate (41) is provided with (49) on one side close to the building column (1).
5. A construction support for ancient building restoration according to claim 4, characterized in that: A protective pad (5) is sleeved on the surface of the building column (1), and the protective pad (5) is located on the inner side of the U-shaped rod (47).
6. A construction support for ancient building restoration according to claim 5, characterized in that: The cross section of the threaded tube (44) is hexagonal.
7. A construction support for ancient building restoration according to claim 6, characterized in that: A climbing frame net (6) is installed on the outside of the construction support body (2), and a cantilever net (7) located below the ceiling of the ancient building is installed above the construction support body (2).