Tunnel secondary lining reinforcing mesh and arch frame installation all-in-one machine

By designing the integrated machine for the mesh and arch frame installation of the tunnel second lining steel bar mesh and arch frame, the problem of low mechanization of the installation of the tunnel second lining steel bar is solved, and the rapid installation of the steel bar is achieved, and the installation accuracy and quality are improved.

CN222797514UActive Publication Date: 2025-04-25CHINA RAILWAY FIRST GROUP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421739099.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2025-04-25
Estimated Expiration
2034-07-22

AI Technical Summary

Technical Problem

In the prior art, the mechanization degree of tunnel second lining steel bar installation is not high, resulting in long construction time and low efficiency, difficult to guarantee the installation accuracy and quality of steel bars, and there are safety hazards.

Method used

A tunnel two-lined steel mesh and arch frame installation integrated machine is designed, including the steel mesh top arch and the side arch. The rapid installation of steel mesh through hydraulic telescopic arms overlap and movable connection is achieved.

Benefits of technology

It improves the mechanization of steel bar installation, saves labor, avoids the pollution problem of steel bar being dragged on the tunnel ground, ensures the accuracy and quality of steel bar installation, and realizes the rapid lamellar installation of steel bars.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222797514U_ABST
    Figure CN222797514U_ABST
Patent Text Reader

Abstract

The utility model discloses a tunnel secondary lining reinforcing mesh and arch frame installation all-in-one machine, which belongs to the technical field of tunnel mechanical construction equipment and comprises a reinforcing mesh top arch and a reinforcing mesh side arch. The number of the reinforcing mesh side arches is two, the two reinforcing mesh side arches are rotationally connected to the two ends of the reinforcing mesh top arch through pins and pin bushes respectively, the reinforcing mesh top arch and the reinforcing mesh side arches are both upper-layer meshes and lower-layer meshes, and the upper-layer meshes and the lower-layer meshes are connected through fastening steel bars. The device has the advantages that the mechanization degree is high, labor is saved, the problems that the reinforcing steel bars are dragged on the tunnel ground and are easily polluted by oil stains, muddy water and the like are solved, the accuracy and the quality of reinforcing steel bar installation are ensured, and the reinforcing steel bars can be rapidly installed in pieces.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of tunnel mechanized construction equipment, and more specifically relates to an integrated machine for installing a tunnel secondary lining steel mesh and an arch frame. Background Art

[0002] A tunnel is an engineering structure buried in the ground, and is a form of human use of underground space. Tunnels can be classified according to different standards, such as purpose, geological conditions, buried depth, location, etc. The main functions of tunnels include transportation, water conservancy, municipal administration, mining, etc. Tunnels can be used for three-dimensional transportation, crossing mountains and ridges, underground passages, crossing rivers and seas, pipeline transportation, underground cables, water conservancy projects, etc. Tunnels can be underground passages or located underground. The latter are usually called underground tunnels. In addition, tunnels can also be divided into different types according to the size of their cross-sectional areas, such as very small section tunnels, small section tunnels, medium section tunnels, large section tunnels and extra-large section tunnels. In tunnel construction, in order to ensure the firmness and reliability of the tunnel, it is often necessary to tie steel bars on the inner wall surface of the tunnel and use concrete for pouring. In the prior art, the steel bars can only be tied on site with the help of a steel mesh trolley, and the steel bars are tied one by one manually on site; the construction time is long and the efficiency is low; the construction quality is poor, the shape and position of the steel mesh cannot be guaranteed, and the thickness of the concrete protective layer cannot be ensured; there are many construction workers on site, and there are great safety hazards; the prior art lacks a steel mesh that can be installed in pieces. Therefore, how to provide a tunnel secondary lining steel mesh and arch frame installation all-in-one machine is a problem that technicians in this field urgently need to solve. Utility Model Content

[0003] In view of this, the utility model provides an all-in-one machine for installing the secondary lining steel mesh and arch frame of a tunnel, which has the advantages of high degree of mechanization, saving labor, avoiding the problem of steel bars being dragged on the tunnel ground and easily contaminated by oil stains, mud and water, etc., ensuring the accuracy and quality of the steel bar installation, and the steel bars can be installed quickly in pieces.

[0004] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0005] A machine for installing a tunnel secondary lining steel mesh and an arch frame comprises: a steel mesh top arch and a steel mesh side arch; the steel mesh side arches are in two pieces, and the two steel mesh side arches are rotatably connected to the two ends of the steel mesh top arch by pins and pin sleeves respectively; the steel mesh top arch and the steel mesh side arches are both upper and lower double-layer meshes, and the upper and lower double-layer meshes are connected by fastening steel bars.

[0006] The integrated arch frame installation machine comprises: a vehicle body, a main arm, a left auxiliary arm and a right auxiliary arm; the main arm, the left auxiliary arm and the right auxiliary arm are all rotatably connected to the vehicle body, the main arm is used to overlap the top arch of the steel mesh, and the left auxiliary arm and the right auxiliary arm are respectively used to overlap two side arches of the steel mesh.

[0007] Furthermore, the main arm is a foldable hydraulic telescopic arm, and the left auxiliary arm and the right auxiliary arm are hydraulic telescopic arms.

[0008] The beneficial effects of the utility model are:

[0009] 1. The implementation of the utility model solves the problem that the installation of the secondary lining steel bars is not mechanized at a high level and the installation is labor-intensive.

[0010] 2. The implementation of the utility model solves the problem that when installing steel bars manually, the steel bars are dragged on the tunnel floor and are easily contaminated by oil stains, muddy water, etc.

[0011] 3. The implementation of the utility model solves the problems of the accuracy and quality of steel bar installation cannot be guaranteed, the frequent occurrence of steel bar deviation, poor steel bar skeleton connection effect, inadequate control of the spacing between the upper and lower steel bar meshes, overall unevenness of the upper mesh and difficulty in controlling the thickness of the concrete protective layer, and quality and safety issues such as overall deviation of the main steel bars or large spacing deviation.

[0012] 4. The implementation of the utility model solves the problem that the tunnel waterproofing board is easily burned during on-site welding of the secondary lining steel bars.

[0013] 5. The implementation of the utility model solves the problem that the number of lining stirrups is difficult to ensure due to the concrete pouring process. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings in the following description are only embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.

[0015] Figure 1 It is a schematic diagram of the bottom structure of the utility model.

[0016] Figure 2 It is a schematic structural diagram of the main arm, the left auxiliary arm and the right auxiliary arm of the utility model.

[0017] Figure 3 It is a schematic diagram of the side structure of the utility model.

[0018] Among them, in the figure:

[0019] 1- steel mesh top arch; 2- steel mesh side arch; 3- vehicle body; 4- main arm; 5- left jib; 6- right jib. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] Please see attached Figure 1-3 The utility model provides a tunnel secondary lining steel mesh, comprising: a steel mesh top arch 1 and a steel mesh side arch 2; the number of the steel mesh side arches 2 is two, and the two steel mesh side arches 2 are rotatably connected to the two ends of the steel mesh top arch 1 through pins and pin sleeves respectively, the steel mesh top arch 1 and the steel mesh side arch 2 are both upper and lower double-layer meshes, and the upper and lower double-layer meshes are connected by fastening steel bars.

[0022] The arch frame installation integrated machine comprises: a vehicle body 3, a main arm 4, a left auxiliary arm 5 and a right auxiliary arm 6; the main arm 4, the left auxiliary arm 5 and the right auxiliary arm 6 are all rotatably connected to the vehicle body 3, the main arm 4 is used to overlap the steel mesh top arch 1, and the left auxiliary arm 5 and the right auxiliary arm 6 are respectively used to overlap two steel mesh side arches 2. A clamping mechanism can be installed on the main arm 4, the left auxiliary arm 5 and the right auxiliary arm 6 to clamp the steel mesh top arch 1 and the steel mesh side arch 2 to prevent the tunnel secondary lining steel mesh from sliding and shifting during the lifting process.

[0023] The main arm 4 is a folding hydraulic telescopic arm, and the left auxiliary arm 5 and the right auxiliary arm 6 are hydraulic telescopic arms, thereby ensuring the lifting height while shortening the vehicle length of the arch frame installation integrated machine.

[0024] The utility model has a simple structure and is easy to use. First, the two ends of the steel mesh top arch 1 are rotated to connect a steel mesh side arch 2 through a pin and a pin sleeve to form a tunnel secondary lining steel mesh, and the two steel mesh side arches 2 are rotated inward to overlap each other, so that the two steel mesh side arches 2 are movably connected; then the steel mesh top arch 1 is lifted by the main arm 4 on the arch frame installation integrated machine, the tunnel secondary lining steel mesh is moved to the area to be constructed by moving the vehicle body 3, and the tunnel secondary lining steel mesh is raised to a suitable position by raising the main arm 4; the movable connection between the two steel mesh side arches 2 is released, and the left auxiliary arm 4 is used to install the steel mesh top arch 1. The arm 5 and the right auxiliary arm 6 are overlapped with the two steel mesh side arches 2 respectively, and stretched outward, so that the two steel mesh side arches 2 are fully unfolded around the steel mesh top arch 1; the positions of the main arm 4, the left auxiliary arm 5 and the right auxiliary arm 6 are adjusted to make the steel mesh top arch 1 and the two steel mesh side arches 2 close to the inner wall of the tunnel, and the tunnel secondary lining steel mesh is fixed manually to complete the installation. Therefore, the utility model has the advantages of high mechanization, labor saving, avoiding the problem that the steel bars are dragged on the tunnel ground and easily contaminated by oil stains, muddy water, etc., ensuring the accuracy and quality of the steel bar installation, and the steel bars can be quickly installed in pieces.

[0025] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.

[0026] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A tunnel secondary lining steel mesh, characterized in that: include: A steel mesh top arch (1) and a steel mesh side arch (2); the number of the steel mesh side arches (2) is two, and the two steel mesh side arches (2) are rotatably connected to the two ends of the steel mesh top arch (1) through pins and pin sleeves respectively; the steel mesh top arch (1) and the steel mesh side arch (2) are both upper and lower double-layer mesh sheets, and the upper and lower double-layer mesh sheets are connected by fastening steel bars.

2. Arch installation integrated machine, characterized in that: The invention is used for installing the tunnel secondary lining steel mesh as claimed in claim 1, comprising: a vehicle body (3), a main arm (4), a left auxiliary arm (5) and a right auxiliary arm (6); the main arm (4), the left auxiliary arm (5) and the right auxiliary arm (6) are all rotatably connected to the vehicle body (3); the main arm (4) is used for overlapping the steel mesh top arch (1); the left auxiliary arm (5) and the right auxiliary arm (6) are respectively used for overlapping two steel mesh side arches (2).

3. The integrated arch installation machine according to claim 2, characterized in that: The main arm (4) is a foldable hydraulic telescopic arm, and the left auxiliary arm (5) and the right auxiliary arm (6) are hydraulic telescopic arms.