Sewage treatment heat recovery equipment capable of monitoring in real time

By introducing a combination of real-time gas monitor and solenoid valves into the sewage treatment and heat recovery equipment, the safety hazards caused by gas accumulation in the equipment are solved, and the safe and reliable operation of the equipment is achieved.

CN222799759UActive Publication Date: 2025-04-25PULIN TECH (TIANJIN) CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421529640.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-01
Publication Date
2025-04-25
Estimated Expiration
2034-07-01

AI Technical Summary

Technical Problem

Existing sewage treatment and heat recovery equipment cannot detect gases generated inside the equipment in real time, resulting in gas accumulation, risk of explosion, and affecting the safety of use.

Method used

A sewage treatment and heat recovery equipment including a real-time gas monitor, an outlet pipe and a solenoid valve is designed. The real-time gas monitor can detect the gas concentration inside the equipment and control the outlet pipe to open through the solenoid valve to discharge excess gas.

Benefits of technology

By monitoring and discharging the gas inside the equipment in real time, the risk of explosion caused by excessive gas concentration is prevented, and the safety of equipment is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222799759U_ABST
    Figure CN222799759U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of sewage treatment heat recovery equipment, and discloses sewage treatment heat recovery equipment capable of being monitored in real time, which comprises a mounting base, a sewage treatment heat recovery equipment body, a fixed cylinder, a maintenance assembly, a real-time gas monitor, a gas outlet pipe and an electromagnetic valve, a real-time gas monitor is arranged at the top of the mounting base, a sewage treatment heat recovery equipment body is fixedly mounted at the top of the mounting base, a fixed cylinder is fixedly mounted at the top of the sewage treatment heat recovery equipment body, and a maintenance assembly is arranged at the top of the fixed cylinder. The real-time gas monitor can detect the concentration of gas in the sewage treatment heat recovery equipment body, the real-time gas monitor can transmit the detected value to the interior of the electromagnetic valve, the electromagnetic valve opens the gas outlet pipe, gas is discharged out of the sewage treatment heat recovery equipment body, and explosion caused by too large gas concentration is prevented; and the sewage treatment heat recovery equipment is safer to use.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of sewage treatment heat recovery equipment, in particular to sewage treatment heat recovery equipment capable of real-time monitoring. Background Art

[0002] Water waste heat recovery technology can be realized through equipment such as sewage source heat pumps, which can greatly save the coal, electricity, etc. consumed by the original method of heat production. Its function is to recover the waste heat in hot water and use it for heating, heating or other purposes, thereby achieving energy conservation and environmental protection.

[0003] Chinese patent CN206056014U proposes an oilfield waste heat recovery device, including a sewage pool, a heat pump and a storage tank, wherein a heat absorbing coil is arranged in the sewage pool, and both ends of the heat absorbing coil are connected to the heat pump through a conduit, a metal heat exchange tube is arranged in the storage tank, and both ends of the metal heat exchange tube are connected to the heat pump through a conduit, a sewage inlet is arranged on the inner wall of one side of the sewage pool, and the sewage inlet is connected to a sewage inlet pipe, a sewage outlet is arranged on the inner wall of the other side of the sewage pool, and the sewage outlet is connected to a sewage outlet pipe, and a sewage outlet is arranged on the inner wall of the sewage pool. In the sewage pool that meets the prefabrication requirements, corrosion-resistant high-pressure heat absorption pipes are arranged to absorb the heat contained in the sewage. The heat absorption pipes are reasonably arranged, which effectively solves the problem of scaling in the heat recovery device that is difficult to clean and improves the heat recovery rate of sewage. The structure is simple, easy to use and low cost. However, the above solution cannot detect the gas generated inside the equipment, which may easily lead to a large amount of gas stored inside the sewage treatment heat recovery equipment. When it is opened, it will cause certain dangers, affect the health of the staff, and reduce the safety of the use of the sewage treatment heat recovery equipment. Utility Model Content

[0004] The purpose of the utility model is to provide a wastewater treatment heat recovery device capable of real-time monitoring in order to solve the above-mentioned problems, thereby solving the problems mentioned in the background technology.

[0005] In order to solve the above problems, the utility model provides a technical solution:

[0006] A sewage treatment heat recovery device capable of real-time monitoring comprises a mounting base, a sewage treatment heat recovery device body, a fixed cylinder, a maintenance component, a real-time gas monitor, an air outlet pipe and a solenoid valve, wherein the sewage treatment heat recovery device body is fixedly mounted on the top of the mounting base, the sewage treatment heat recovery device body is fixedly mounted on the top of the fixed cylinder, a maintenance component is arranged on the top of the fixed cylinder, a real-time gas monitor is fixedly mounted on the bottom of the maintenance component, the real-time gas monitor extends to the interior of the sewage treatment heat recovery device body, an air outlet pipe is fixedly mounted on one side of the sewage treatment heat recovery device body, and a solenoid valve is fixedly mounted on the outer end of the air outlet pipe.

[0007] As a preferred solution of the utility model, a fixing component is arranged on the top of the mounting base, a water outlet pipe is fixedly installed on one side of the sewage treatment heat recovery equipment body, a leak-proof component is arranged below the water outlet pipe, and a storage box is movably placed on the top of the leak-proof component.

[0008] As a preferred solution of the utility model, the maintenance component includes a threaded groove, which is opened inside the fixed cylinder, a movable cover is movably connected above the threaded groove, the movable cover is fixedly connected to the real-time gas monitor, a threaded cylinder is fixedly installed on the bottom of the movable cover, and the threaded cylinder and the threaded groove are threadedly connected.

[0009] As a preferred solution of the utility model, the fixed assembly includes an electric telescopic rod, which is fixedly installed on the other side of the mounting base, a support frame is fixedly installed on the top of the electric telescopic rod, and a pressing plate is symmetrically fixedly installed on the bottom of the support frame, and the two pressing plates are movably connected to the top of the sewage treatment heat recovery equipment body.

[0010] As a preferred solution of the utility model, the anti-leakage component includes a connecting rod, two of the connecting rods are symmetrically installed on one side of the mounting base, springs are fixedly installed on the outer ends of the two connecting rods, and sliding blocks are fixedly installed on the bottom ends of the two springs, and the sliding blocks are slidably connected to the connecting rods.

[0011] As a preferred solution of the utility model, a placement plate is fixedly installed on one side of the two sliding blocks, a contact is fixedly installed on the bottom of the placement plate, and a sensor is fixedly installed below the contact and on one side of the mounting base.

[0012] The beneficial effects of the utility model are: through the cooperation between the real-time gas monitor, the air outlet pipe and the solenoid valve, the real-time gas monitor can detect the gas concentration inside the sewage treatment heat recovery equipment body, and the real-time gas monitor can transmit the detected value to the inside of the solenoid valve. The solenoid valve opens the air outlet pipe to discharge the gas from the sewage treatment heat recovery equipment body to prevent explosion caused by excessive gas concentration, making the sewage treatment heat recovery equipment safer to use. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] For ease of explanation, the present invention is described in detail by the following specific implementations and drawings.

[0014] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0015] Figure 2 It is a schematic diagram of the overall detailed structure of the utility model;

[0016] Figure 3 It is a schematic diagram of the structure of the maintenance component of the utility model;

[0017] Figure 4 This utility model Figure 2 Enlarged view of point A in the middle.

[0018] In the figure: 1. Installation base; 2. Wastewater treatment heat recovery equipment body; 3. Fixed cylinder; 4. Maintenance component; 41. Threaded groove; 42. Movable cover; 43. Threaded cylinder; 5. Real-time gas monitor; 6. Exhaust pipe; 7. Solenoid valve; 8. Fixed component; 81. Electric telescopic rod; 82. Support frame; 83. Pressing plate; 9. Water outlet pipe; 10. Leak-proof component; 101. Connecting rod; 102. Spring; 103. Sliding block; 104. Placement plate; 105. Contact; 106. Sensor; 11. Storage box. DETAILED DESCRIPTION

[0019] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0020] Example

[0021] See also Figure 1 - Figure 4The utility model provides a technical solution: a sewage treatment heat recovery device capable of real-time monitoring, comprising a mounting base 1, a sewage treatment heat recovery device body 2, a fixed cylinder 3, a maintenance component 4, a real-time gas monitor 5, an air outlet pipe 6 and a solenoid valve 7. The sewage treatment heat recovery device body 2 is fixedly mounted on the top of the mounting base 1, the sewage treatment heat recovery device body 2 is fixedly mounted with a fixed cylinder 3, the top of the fixed cylinder 3 is provided with a maintenance component 4, and the bottom of the maintenance component 4 is fixedly mounted with a real-time gas monitor 5. The principle of the real-time gas monitor 5 is mainly to detect the gas concentration in the environment in real time through a sensor, and convert the detection data into a readable signal so that the operator or the system can make judgments and early warnings. The real-time gas monitor 5 extends to the interior of the sewage treatment heat recovery device body 2, and an air outlet pipe 6 is fixedly mounted on one side of the sewage treatment heat recovery device body 2. The outer end of the air outlet pipe 6 is fixedly mounted with a solenoid valve 7. The solenoid valve 7 uses the electromagnetic force generated by the electromagnetic coil to push the valve core to switch and realize the reversal of the airflow.

[0022] Furthermore, a fixing component 8 is provided on the top of the mounting base 1, and a water outlet pipe 9 is fixedly installed on one side of the sewage treatment heat recovery equipment body 2. The material of the water outlet pipe 9 is PE, and a leak-proof component 10 is provided below the water outlet pipe 9. A storage box 11 is movably placed on the top of the leak-proof component 10.

[0023] Furthermore, the maintenance component 4 includes a threaded groove 41, which is opened inside the fixed cylinder 3. A movable cover 42 is movably connected above the threaded groove 41. The movable cover 42 is fixedly connected to the real-time gas monitor 5. A threaded cylinder 43 is fixedly installed on the bottom of the movable cover 42. The threaded groove 41 and the threaded cylinder 43 are convenient for installation and disassembly, and the threaded cylinder 43 and the threaded groove 41 are threadedly connected.

[0024] Furthermore, the fixed component 8 includes an electric telescopic rod 81, which has a motor inside. The motor is powered by a power supply to generate power to drive the telescopic movement of the telescopic rod. The electric telescopic rod 81 is fixedly installed on the other side of the mounting base 1. A support frame 82 is fixedly installed on the top of the electric telescopic rod 81, and a pressing plate 83 is symmetrically fixedly installed on the bottom of the support frame 82. The two pressing plates 83 are movably connected to the top of the sewage treatment heat recovery equipment body 2.

[0025] Furthermore, the anti-leakage component 10 includes a connecting rod 101, and two connecting rods 101 are symmetrically installed on one side of the mounting base 1. The outer ends of the two connecting rods 101 are fixedly installed with springs 102, the springs 102 are elastic and can be reset, and the bottom ends of the two springs 102 are fixedly installed with sliding blocks 103, and the sliding blocks 103 and the connecting rods 101 are slidably connected.

[0026] Furthermore, a placement plate 104 is fixedly installed on one side of the two sliding blocks 103, a contact 105 is fixedly installed on the bottom of the placement plate 104, and a sensor 106 is fixedly installed below the contact 105 and on one side of the mounting base 1. The contact 105 and the sensor 106 are in contact, which can transmit the signal to the inside of the alarm to prevent leakage.

[0027] In summary: the staff places the sewage treatment heat recovery equipment body 2 above the mounting base 1, starts the electric telescopic rod 81, the electric telescopic rod 81 drives the support frame 82 downward, the support frame 82 drives the pressing plate 83 to adjust downward, and uses the two pressing plates 83 to press and fix the sewage treatment heat recovery equipment body 2, the staff transfers the sewage to the inside of the sewage treatment heat recovery equipment body 2, and uses the sewage treatment heat recovery equipment body 2 to recover the sewage treatment heat. During the sewage treatment heat recovery process, the real-time gas monitor 5 is used to detect the gas inside the equipment. The real-time gas monitor 5 The detected value is transmitted to the interior of the solenoid valve 7, the solenoid valve 7 is opened, the gas is discharged through the air outlet pipe 6, and then the water outlet pipe 9 discharges the water into the interior of the storage box 11, the storage box 11 presses the placement plate 104 downward, and the placement plate 104 drives the sliding block 103 to adjust downward, and when the contact 105 contacts the surface of the sensor 106, the sensor 106 transmits the signal to the inside of the alarm to remind the staff to prevent water leakage and replace the real-time gas monitor 5, rotate the movable cover 42, and the threaded barrel 43 under the movable cover 42 rotates out of the inside of the threaded groove 41, and the real-time gas monitor 5 is disassembled.

[0028] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A wastewater treatment heat recovery device capable of real-time monitoring, characterized in that: The invention comprises a mounting base (1), a sewage treatment heat recovery equipment body (2), a fixing cylinder (3), a maintenance component (4), a real-time gas monitor (5), an air outlet pipe (6) and a solenoid valve (7); the sewage treatment heat recovery equipment body (2) is fixedly mounted on the top of the mounting base (1); the sewage treatment heat recovery equipment body (2) is fixedly mounted on the top of the fixing cylinder (3); the maintenance component (4) is arranged on the top of the fixing cylinder (3); the real-time gas monitor (5) is fixedly mounted on the bottom of the maintenance component (4); the real-time gas monitor (5) extends to the interior of the sewage treatment heat recovery equipment body (2); the air outlet pipe (6) is fixedly mounted on one side of the sewage treatment heat recovery equipment body (2); and the outer end of the air outlet pipe (6) is fixedly mounted with a solenoid valve (7).

2. The wastewater treatment heat recovery equipment capable of real-time monitoring according to claim 1, characterized in that: A fixing component (8) is arranged on the top of the installation base (1), a water outlet pipe (9) is fixedly installed on one side of the sewage treatment heat recovery equipment body (2), a leak-proof component (10) is arranged below the water outlet pipe (9), and a storage box (11) is movably placed on the top of the leak-proof component (10).

3. The wastewater treatment heat recovery equipment capable of real-time monitoring according to claim 1, characterized in that: The maintenance component (4) comprises a threaded groove (41), wherein the threaded groove (41) is provided inside the fixed cylinder (3), a movable cover (42) is movably connected above the threaded groove (41), the movable cover (42) and the real-time gas monitor (5) are fixedly connected, a threaded cylinder (43) is fixedly installed at the bottom of the movable cover (42), and the threaded cylinder (43) and the threaded groove (41) are threadedly connected.

4. The wastewater treatment heat recovery equipment capable of real-time monitoring according to claim 2, characterized in that: The fixing assembly (8) comprises an electric telescopic rod (81), the electric telescopic rod (81) being fixedly mounted on the other side of the mounting base (1), a support frame (82) being fixedly mounted on the top of the electric telescopic rod (81), a pressing plate (83) being symmetrically fixedly mounted on the bottom of the support frame (82), and two pressing plates (83) being movably connected to the top of the sewage treatment heat recovery equipment body (2).

5. The wastewater treatment heat recovery equipment capable of real-time monitoring according to claim 2, characterized in that: The anti-leakage assembly (10) comprises a connecting rod (101), wherein two connecting rods (101) are symmetrically mounted on one side of the mounting base (1), springs (102) are fixedly mounted on the outer ends of the two connecting rods (101), and sliding blocks (103) are fixedly mounted on the bottom ends of the two springs (102), and the sliding blocks (103) are slidably connected to the connecting rods (101).

6. The wastewater treatment heat recovery equipment capable of real-time monitoring according to claim 5, characterized in that: A placement plate (104) is fixedly mounted on one side of the two sliding blocks (103), a contact (105) is fixedly mounted on the bottom of the placement plate (104), and an inductor (106) is fixedly mounted below the contact (105) and on one side of the mounting base (1).

Citation Information

Patent Citations

  • Oil field sewage waste heat recovery apparatus

    CN206056014U